Amen 06.pdf
PDF 245 KB Posted
- Attached to
- BEQ M400 Area Paint-Flooring Repairs
- Solicitation number
- N4008526R9054
About this file
This is Amendment No. 0006 to a federal solicitation for paint and flooring repairs at five Barracks for Enlisted Quarters (BEQ) buildings located at Camp Lejeune, North Carolina. The amendment was issued on August 14, 2026, with an effective date matching the original solicitation date of July 8, 2026. The solicitation number is N40085-26-R-9054, and the project number is 26-0433. The contracting office is NAVPAC Mid-Atlantic, Resident Officer in Charge of Construction, located at Camp Lejeune, NC 28547-2521.
The amendment consists of questions and answers addressing contractor concerns regarding project scope and execution. Key clarifications include: contractors may work on multiple BEQs simultaneously with a minimum of 10 rooms available for repairs at each building, with completion of 10 rooms required within 30 days; all products must be installed per government finish specifications and manufacturer installation requirements; all previously painted surfaces, including dorm room ceilings, must be painted; and contractors are responsible for moving furniture and items impeding work areas. The five buildings included in the project are M430 (Company St. A, Mainside), M435, M446, M447, and M448 (all on Company St. B, Mainside). The time and date for receipt of proposals remains unchanged, and contractors must acknowledge receipt of this amendment with their proposal submission or risk rejection. All other terms and conditions of the original solicitation remain in effect.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICIATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 11)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPIRATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
N40085-26-R-9054 Amendment 0006
CONTINUATION SHEET
1. QUESTION: Please clarify the required phasing, access windows, and turnover durations for work in occupied BEQ areas. The Scope of Work states that approximately one-quarter of the work areas will be available for paint at any given time and that the contractor must coordinate scheduling with the building point of contact. The Scope also requires the contractor to remove/reset furniture and, where needed, provide on-site storage. Section 09 65 00 further requires flooring application to be scheduled after completion of other work that could damage finished surfaces. Please confirm the anticipated sequencing by building/area, allowable working hours, room turnover expectations, and whether similar quartering/phasing limits apply to flooring work as well as painting; as well as the intent to allow the contractor to perform work in all 5 buildings concurrently.
ANSWER: Contractor can work on multiple BEQs included in this project simultaneously.
There will be a minimum of 10 rooms available for repairs at each BEQ. Complete 10 rooms in 30 days. Contractor will be responsible for moving furniture or other items impeding work areas.
2. QUESTION: Please clarify the extent of substrate preparation to be included in the base bid after removal of existing flooring and adhesives. The Scope of Work requires all flooring surfaces to be free of all previous adhesives prior to installation and requires sealing LVT surfaces prior to new flooring installation. Section 09 65 00 requires substrate conditions to be examined and reported, with no corrective action taken without written Government permission, and requires surface-preparation materials as recommended by the manufacturer. Section 09 68 00 similarly requires repair of holes, cracks, depressions, and rough areas. Please confirm what level of patching, crack repair, leveling, and adhesive-residue removal is intended to be included in the bid versus treated as a changed condition if unsuitable substrate conditions are encountered.
ANSWER: All products are to be installed per government finish spec. and manufacturer’s installation requirements.
3. QUESTION: Are the existing dorm room ceilings to be painted? Are these drywall or exposed structure?
ANSWER: Paint all previously painted surfaces.
N40085-26-R-9054 Amendment 0006
4. QUESTION: There are numerous mentions in nearly every sub-paragraph of the Scope of Work General Requirements of "shall be noted below in the project area description."
Where is this "project area description"? Without this information, it is impossible for all (7) of the MACC GC's to bid at the same level.
ANSWER:
Project Area Description
a. Building M430 is a BEQ located on Company St. A at Mainside Camp Lejeune.
b. Building M435 is a BEQ located on Company St. B at Mainside Camp Lejeune
c. Building M446 is a BEQ located on Company St. B at Mainside Camp Lejeune
d. Building M447 is a BEQ located on Company St. B at. Mainside Camp Lejeune.
e. Building M448 is a BEQ located on Company St. B at Mainside Camp Lejeune.
5. All other terms and conditions remain unchanged.
| Untitled |
| Untitled |
| IDCode: |
| Page: 1 |
| Pages: 3 |
| AmendNo: AMENDMENT NO. 0006 |
| EffDate: 08/14/26 |
| ReqNo: |
| ProjNo: 26-0433 |
| IssCode: N40085 |
| IssuedBy: NAVFAC Mid-Atlantic |
Resident Officer in Charge of Construction 1107A Birch Street Camp Lejeune, NC 28547-2521
| AdmCode: |
| AdminBy: See Item 6 |
| ContName: |
| ContStrt: |
| ContCnty: |
| ContSt: |
| ContZIP: |
| Code: |
| FacCode: |
| SolAmdNo: N40085-26-R-9054 |
| AmendDate: 7/8/26 |
| ModNo: |
| ModDate: |
| NoCopies: 1 |
| Amended: Yes |
| ApprData: |
| ChgeOrder: |
| Modify: Off |
| SuppAuth: |
| OthrSpec: |
| Require: Off |
| Copies: |
| Descript: 26-0433, BEQ M400 Area Paint & Flooring Repairs |
Amendment 0006, Requests for Information
The time and date for receipt of proposals remains unchanged.
This amendment should be acknowledged when your proposal is submitted. Failure to acknowledge the amendment may constitute grounds for rejection of a proposal.
See Continuation Page(s)
| SignName: |
| SignTitl: |
| ContDate: |
| CoName: |
| CoTitle: |
| CODate: |
| SolChgYs: Yes |
| SolChgNo: Off |
| OffrExt: Off |
| OffrNoEx: No |
| ChgeOrd: Off |
| SuppAgre: Off |
| ModOthr: Off |
| NoReq: Off |
File details come from the government source that posted it. Updated .