This is Amendment 0004 to a federal solicitation for construction services issued by NAVFAC Mid-Atlantic for the Camp Lejeune, North Carolina facility.
The solicitation N40085-26-R-9054, titled "BEQ M400 Area Paint-Flooring Repairs," has been extended with the deadline for receipt of proposals moved to 13 August 2026 at 2:00 p.m. The amendment clarifies three key aspects of the project scope through a Questions and Answers format. First, it confirms that Attachment "BEQ M400 Area Carpet and Paint Specs" serves as the controlling document for all finish selections, including paint colors and sheens, LVT color and pattern, and epoxy resinous flooring system specifications. Second, it specifies that any existing carpet in sleeping rooms will be replaced with LVT flooring, while carpet in common areas will be replaced with epoxy flooring, establishing the full scope of flooring replacement across the facility. Third, it addresses testing requirements for concrete substrates, confirming that moisture, alkalinity, and bond testing standards applicable to each flooring type remain in effect as specified in the construction sections. All other terms and conditions of the original solicitation remain unchanged. Offerors must acknowledge receipt of this amendment with their proposal submissions to avoid rejection.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICIATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 11)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPIRATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
1 2
AMENDMENT NO. 0004 8/4/26 26-0433
N40085
NAVFAC Mid-Atlantic Resident Officer in Charge of Construction 1107A Birch Street Camp Lejeune, NC 28547-2521
See Item 6
✘ N40085-26-R-9054
7/8/26
26-0433, BEQ M400 Area Paint-Flooring Repairs Amendment 0004, Requests for Information
The date and time for receipt of proposals has been extended to 13 August 2026 at 2pm.
This amendment should be acknowledged when your proposal is submitted. Failure to acknowledge the amendment may constitute grounds for rejection of a proposal.
See Continuation Page(s)
N40085-26-R-9054 Amendment 0004
CONTINUATION SHEET
1. QUESTION: Please identify the controlling document for finish selections to be used for bidding and installation, including paint colors/sheens, LVT color/pattern, epoxy resinous flooring system/color, and any carpet selections if applicable. The Scope of Work references attached product specifications and finish specifications, and Section 09 65 00 requires color, pattern, and texture as indicated on the drawings or in the Project Scope of Work, while Section 09 68 00 states that color, texture, and pattern are to be in accordance with the drawings. Please confirm which attachment or drawing sheet is the governing finish schedule where multiple attachments may exist.
ANSWER: Attachment “BEQ M400 Area Carpet and Paint Specs” has been provided.
2. QUESTION: Please confirm whether moisture, alkalinity, and bond testing of existing concrete substrates is required as part of this project for all flooring replacement areas, and if so, which standard governs each flooring type and whether testing reports are required prior to installation. Section 09 65 00 references ASTM F1869 and ASTM F2170 and lists 'Moisture, Alkalinity and Bond Tests' as a required submittal item, while Section 09 68 00 requires moisture and alkalinity tests in accordance with CRI 104/105 for carpeting. The Scope of Work describes LVT and epoxy resinous flooring replacement but does not identify where carpeting, if any, remains in scope.
ANSWER: Any carpet in sleeping rooms will be replaced with LVT and any carpet in common areas will be replaced with Epoxy.
3. All other terms and conditions remain unchanged.
File details come from the government source that posted it. Updated .