This is Amendment 0002 to solicitation N40085-26-R-9033, issued by NAVFAC Mid-Atlantic on May 13, 2026, with an effective date of May 13, 2026. The amendment responds to six Requests for Information (RFI) regarding roof repairs to Buildings HP145 and HP175 (BEQ facilities) at Camp Lejeune, North Carolina. The solicitation requires acknowledgment of this amendment upon proposal submission, with failure to acknowledge potentially resulting in proposal rejection.
The amendment clarifies key project requirements based on contractor inquiries: (1) existing lightning protection will not be reinstalled; (2) contractors should assume 231 linear feet of truss repairs per building for bidding purposes; (3) the roof color specification is corrected to "Suede" (resolving confusion between "Sandstone/Slate Gray"); (4) asbestos testing reports will be provided by the government to assist contractors in bidding; (5) no separate ELIN for estimated truss repair quantities is required on the pricing sheet; and (6) no separate ELIN for plywood repair square footage is required on the pricing sheet. All other terms and conditions of the original solicitation remain unchanged.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICIATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 11)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPIRATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
1 3
AMENDMENT NO. 0002 05/13/26 26-0422
N40085
NAVFAC Mid-Atlantic Resident Officer in Charge of Construction 1107A Birch Street Camp Lejeune, NC 28547-2521
See Item 6
✘ N40085-26-R-9033
04/29/26
26-0422 - Roof Repairs BEQ HP145 & HP175
Amendment 0002, Response to RFI's.
This amendment should be acknowledged when your proposal is submitted. Failure to acknowledge the amendment may constitute grounds for rejection of a proposal.
N40085-26-R-9033 Amendment 0002
CONTINUATION SHEET
QUESTION 1: Note 2 under General Requirements on Drawings DTL1 and DTL2 states “Remove existing Lightening Protection If Applicable”. There are no notes to reinstall the existing lightening protection. Is the intent to leave the Lightening protection off the building?
Is the intent to reinstall the existing lightening protection? Is the intent to install new lightening protection? If new lightening protection is required, please provide design requirements.
ANSWER 1: Lightening protection is not to be re-installed.
QUESTION 2: Note 5 under General Requirements on Drawings DTL1 and DTL2 states “Sister any Damaged/Rotten Truss Framing Members, min 8’ long”. We have no way of knowing how many truss repairs will be required. Can this item be added to the Price Sheet and quantified similar to the previous projects that recently bid?
ANSWER 2: For bidding purposes, assume 231 L.F. per building.
QUESTION 3: Note 9 under General Requirements on Drawings DTL1 and DTL2 states to “Install new aluminum standing seam metal roof with a vented ridge cap, color to be Sandstone/Slate Gray. Sandstone and Slate Gray are 2 separate distinct different colors. Our experience with the Hadnot Point area of Camp Lejeune, the Roof Panel color has been Garlands Suede or Sierra Tan. The color will not have an impact on our bid pricing, but would help clarify the color schemes are not being altered. Please confirm the roof color.
ANSWER 3: Apologies on the typo errors, it will be Suede
QUESTION 4: On drawing T-2 in block HAZARDOUS MATERIALS note 2 states “The Contractor must survey the existing conditions affected by this project. If Asbestos Materials are found the Contractor must abate all such materials.” Note 23 in block GENERAL NOTES number 23 states “Contractor shall review asbestos inspection survey before commencing work.
The solicitation has provided a “Contractor Environmental Guide” which does not address Asbestos regarding quantities or locations. Are there recent Asbestos Testing Reports that can be provided to help verify if asbestos is present in the scope of work and if so, help verify any quantities for bidding purposes?
ANSWER 4: I will get the reports and send them over for your review.
QUESTION 5: The previous projects that recently bid had a Pricing sheet or a revised pricing sheet that added an ELIN for an Estimated Quantity of Trusses to repair requesting pricing per repair and the total for that ELIN. Will this project need that ELIN on a revised pricing sheet?
ANSWER 5: No
N40085-26-R-9033 Amendment 0002
QUESTION 6: The Previous projects that recently bid had a Pricing Sheet or revised pricing sheet that added an ELIN for an Estimated Quantity of square foot of plywood to repair requesting the Square Foot Unit price and extended quantity. Will this project need that ELIN on a revised pricing sheet.
ANSWER 6: No