26M076CN BEQ HP145- BEQ HP175 Roof Repairs PD.pdf
PDF 61 KB Posted
- Attached to
- Roof Repairs BEQ HP145 & HP175
- Solicitation number
- N4008526R9033
About this file
This document is a Project Description and Scope of Work for a roofing replacement project at Bachelor Enlisted Quarters (BEQ) buildings HP145 and HP175 located at Camp Lejeune, North Carolina. The contractor is required to replace existing shingle roof systems with standing seam metal roofing systems on both buildings. The project scope encompasses all noted Bachelor Enlisted Quarters facilities at the specified locations.
The work must be conducted while the facility remains operational, with the contractor required to minimize interference with normal operations. The contractor is responsible for moving furniture and other objects in the project area as needed. Supervision requirements allow for a single qualified individual to serve simultaneously as Superintendent, Quality Control Manager, and Safety & Health Officer, provided that person meets all qualifications as defined in the project specification.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT DESCRIPTION
This scope of work is to be accomplished in BEQ buildings HP145 and HP175 located on Camp Lejeune, North Carolina. Contractor shall Provide the following: Replace existing shingle roof systems with standing seam metal roofing systems on all noted Bachelor Enlisted Quarters noted.
SPECIAL SCHEDULING
The facility/activity will remain in operation during the entire construction period. The Contractor shall conduct his operations so as to cause the least possible interference with normal operations of the facility/activity. The furniture and other objects in the project area are to be moved by the contractor if required.
SUPERVISION
One person may fill the roles of Superintendent, Quality Control Manager, and Safety & Health Officer, if duly qualified for all three positions as defined in the project specification.
File details come from the government source that posted it. Updated .