Amendment No. 0001 to Solicitation N40085-26-R-9023
This is an Amendment of Solicitation issued by NAVFAC Mid-Atlantic for Project 25-0014, Building FC65 Exhaust System Repairs. The amendment, effective April 13, 2026, extends the proposal due date to April 23, 2026 at 3:00 PM and schedules a mandatory site visit for Wednesday, April 15, 2026 at 9:00 AM in front of Building FC65 at Camp Lejeune, North Carolina.
The amendment addresses a clarification question regarding conflicting specifications in the original solicitation documents regarding exhaust fan mounting locations (side wall-mounted versus roof-mounted) and ductwork routing. The contracting officer's answer confirms that the drawings accurately depict the required work: replacing inline exhaust fans with wall-mounted exhaust fans and providing new lockable disconnects in NEMA 4 enclosures at each fan. The amendment deletes the original scope of work and replaces it with a revised scope. Offerors must acknowledge receipt of this amendment with their proposal submissions or risk rejection. All other terms and conditions of the original solicitation remain unchanged.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 25-0014 REVISED SOW 13APR2026.pdf | ||
| Mech MACC RFP.pdf | ||
| N4008525B0014 Dwgs.pdf | ||
| 25-0014 SOW.pdf | ||
| N4008525B0014 Specs.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICIATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 11)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPIRATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
1 2
AMENDMENT NO. 0001 04/13/26 25-0014
N40085
NAVFAC Mid-Atlantic Resident Officer in Charge of Construction 1107A Birch Street Camp Lejeune, NC 28547-2521
See Item 6
✘ N40085-26-R-9023
03/18/26
25-0014, Building FC65 Exhaust System Repairs Amendment 0001, Schedule Site Visit, Extend Proposal Due Date
The time and date for receipt of proposals is hereby changed to 23 April 2026 at 3:00 PM.
This amendment should be acknowledged when your proposal is submitted. Failure to acknowledge the amendment may constitute grounds for rejection of a proposal.
See Continuation Page(s)
N40085-26-R-9023 Amendment 0001
CONTINUATION SHEET
1. A site visit is scheduled for Wednesday, 15 April 2026 at 0900. We will meet in front of building FC65.
2. QUESTION: Page M601 Shows Side Wall Mounted Exhaust Fans and in the written Requirements and Specifications #2 F-7 & #3 F-11 it says Roof Mounted Exhaust Fans and to mount the new Disconnects on the roof near the New Exhaust Fans. On #4 It states Demo F-6 and install a new piece of stainless steel ductwork, on Page M101 it shows to Demo entire fan and ductwork and reroute from existing dishwasher to the right to the outside wall with a wall mounted Exhaust Fan. All that I see that is correct is #1 F-12 remove and cap please advise.
ANSWER: Drawings accurately depict work required to complete this project which includes replacing inline exhaust fans with wall mounted exhaust fans and providing new lockable disconnects in NEMA 4 enclosures at each fan.
3. Delete original scope of work included with the project and replace with the attached revised scope of work.
4. All other terms and conditions remain unchanged.