Revised AOI N4008526R0276 - OTA 2 MCI East Barracks 10 13 26.pdf

PDF 217 KB Posted

Attached to
MCI East Barracks Industrialized Construction Projects for Barracks via Other Transaction Authority (10 USC 2808a)
Solicitation number
N4008526R0276
Issued by

About this file

This document is an Area of Interest (AOI) solicitation issued by the Department of the Navy for industrialized construction (IC) projects to modernize military barracks using advanced manufacturing methodologies.

The Navy seeks vendors to design, manufacture, and construct approximately 1,723,259 square feet across 12 barracks buildings at four Marine Corps installations: MCB Camp Lejeune (8 projects ranging from 71,424 to 241,230 SF), MCAS Cherry Point (2 projects of 176,120 SF each), MCRD Parris Island (2 projects totaling 423,885 SF), and MCB Quantico/National Capital Region (3 projects ranging from 61,849 to 95,808 SF). The procurement utilizes Other Transaction Authority under 10 USC 2808a, allowing flexible contracting outside traditional FAR processes. White paper submissions are due by 1400 EDT on 29 October 2026 and should not exceed 10 pages using 12-point font, excluding title page and executive summary. Evaluation criteria focus on three areas: (1) Relevant Experience—vendors must demonstrate at least three completed IC commercial projects within 10 years, each valued at minimum $50,000,000; (2) Technical Approach—vendors must demonstrate ability to reduce costs by 20% or more and design/build timelines by 30% or more compared to traditional construction, with 9-12 month design-approval timeframe; and (3) Vendor Capability—organizations must prove capacity to manage large-scale IC projects across the Southwestern United States, obtain appropriate bonding, and maintain quality control frameworks. Selected vendors may be invited to Phase 2 for Request for Project Proposal (RPP) submission, which remains valid for one year with possible two-year extension. The Government notes that successful OT agreements may lead to follow-on production contracts without competitive procedures, potentially for use government-wide. Vendors must comply with Buy American Act, Davis Bacon Act, Miller Act, and Cybersecurity Maturity Model Certification requirements. Questions must be submitted by 1400 EDT on 19 October 2026, and vendors interested in the Interested Parties List should also submit information by that date.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Area of Interest (AOI) Number: N4008526R0276

Title: MCI East Barracks Industrialized Construction Projects for Barracks via Other Transaction

Authority (10 USC 2808a)

Submissions Due: 1400 EDT on 29 October 2026

Submit to Government Points of Contact:

Brittany Cristelli, 757-341-1978, brittany.n.cristelli.civ@us.navy.mil

Philip Cole, 757-341-1970, philip.j.cole.civ@us.navy.mil

Statement of Need:

The Department of the Navy (DON) is modernizing its aging infrastructure, which continues to degrade due to poor environmental conditions, structural deficiencies, and outdated building systems. The goal is to improve warfighter quality of life, ensuring the warfighter’s living and learning environments match the standard of excellence expected on the battlefield. Current military construction processes alone cannot meet the speed or scalability required to achieve the DON’s goal to modernize more than $6B of its barracks portfolio while aligning with operational tempo and strategic readiness goals.

To address these challenges, the DON seeks to procure new barracks constructed using advanced manufacturing and Industrialized Construction (IC) methods that are capable of delivering high-quality, energy-efficient, and resilient facilities. The use of IC must accelerate delivery timelines and reduce both construction and lifecycle costs while delivering increased quality, durability, resilience, and lifecycle performance using a scalable and repeatable modular design and construction methodology.

This AOI is in reference to “OTA 2: MCI East Barracks (Total ~1,723,259 SF, 12 Buildings)” mentioned in the NAVFAC Special Notice posted to SAM.gov on 1 July 26, which can be found here: https://sam.gov/workspace/contract/opp/01f4c64f2229452f8b0d4760b977f43f/view

Desired Solution Objectives:

The DON is seeking commercial vendors with solutions that directly address the challenges listed above while achieving the following objectives:

• Utilize barracks room IC design standards provided by DoN to define advanced manufacturing and IC methodologies (such as volumetric modular, hybrid, and/or Kit of

Parts) to deliver high-performing, durable barracks.

• Provide barracks that meet or exceed traditional DoD Unified Facility Criteria (UFC) and

Whole Building Design Guide (WBDG) standards. Alternative commercial building methods may be considered where proven equivalency or superiority is demonstrated in durability, longevity, life/safety requirements, and force protection.

• Integrate design, manufacturing, assembly, and onsite construction activities into a streamlined and coordinated project delivery approach.

• Maintain disciplined schedule and cost control across all project phases to support accelerated delivery objectives by:

• Significantly reducing design and build timelines compared to traditional commercial construction.

mailto:brittany.n.cristelli.civ@us.navy.mil mailto:philip.j.cole.civ@us.navy.mil https://sam.gov/workspace/contract/opp/01f4c64f2229452f8b0d4760b977f43f/view

• Providing greater cost predictability and budget certainty through early vendor engagement, integrated solution development, and standardized and repeatable construction methodologies.

• Reducing design and construction costs compared to traditional commercial construction methods.

• Utilize Modular Open Systems Approach architecture with open, standardized interfaces to accelerate maintenance and reduce lifecycle costs.

Vendor White Paper Submission Requirements:

Submission Formatting Guidelines

• Page Limits: White Papers should not exceed ten (10) written pages using 12-point font.

• Title Page (cover page): Must include Vendor Name, Date, Point of Contact (Name, E-

Mail Address, Phone), Vendor Address, and the AOI Number for which the White

Paper is submitted.

• Executive Summary: Provide a one-page executive summary detailing the proposed technology and approach.

• Title page (cover page) and Executive Summary are excluded from page limit.

Evaluation Criteria:

1. Relevant Experience: Vendors must provide verified examples of past relevant experience utilizing advanced manufacturing and IC methodologies (specifically volumetric modular, hybrid, or Kit of Parts).

• Verified examples must include descriptions of designing and building a minimum of three (3) completed IC commercial projects within the 10 years preceding this AOI posting date, each project totaling at least $50,000,000.

Examples can include a project with multiple buildings at a location. Relevant experience may be demonstrated by the proposed team, and it should reflect the specific role (GC, A/E, IC manufacturer, IC-set/stitch, onsite non-IC construction) each key participant performed. Preference will be given for examples demonstrating an ability to concurrently manage multiple large-scale construction projects with an aggregate value exceeding $150,000,000 and/or building types - barracks, hotels, dorms.

2. Technical Approach: Vendors must detail their integrated advanced manufacturing and IC process and approach—from concept development through design, manufacturing, assembly, and construction. Submissions must propose a comprehensive IC approach encompassing adaptable designs, advanced manufacturing techniques, and scalable building methodologies. Vendors must demonstrate effective cost and schedule control across all project phases (design, manufacturing, transportation, assembly, construction, integration and commissioning, performance, and sustainment) by providing detailed estimates for scalability and deliverability. Specifically, the proposed approach must ensure:

• Improved Cost Predictability: Demonstrate the ability to achieve greater budget certainty through early vendor engagement, integrated solution development, standardized manufacturing processes, and repeatable IC methodologies.

Submissions shall include supporting data from comparable projects, including estimated versus actual cost performance.

• Reduced Project Costs: Demonstrate the ability to reduce overall design and construction costs by 20% or more compared to traditional commercial construction delivery methods while maintaining quality, durability, resiliency, and lifecycle performance.

• Accelerated Project Delivery: Demonstrate the ability to reduce overall design and build timelines by 30% or more, with the proposed structures capable of being designed, reviewed, and approved within a 9-12 month timeframe.

Submission shall describe the proposed approach for accelerating project delivery relative to traditional commercial construction delivery methods and include supporting schedule data from comparable projects where available.

3. Vendor Capability: Vendors must demonstrate the organizational and operational capability to execute large scale IC within the Southwestern United States and to manage and execute multiple concurrent projects. Specifically, vendors should demonstrate an ability to:

• Manage the comprehensive design, manufacturing, logistics, construction, and commissioning of IC buildings.

• Work directly with stakeholders to define and refine detailed project requirements that align with overarching mission objectives.

• Submit detailed technical and cost proposals and successfully negotiate formal agreements for the design, manufacturing, and construction phases.

• Manage a quality control framework where the vendor maintains strict responsibility for all Quality Control functions, while facilitating seamless collaboration with DON personnel, who retain responsibility for Quality

Assurance.

• Obtain bonding for projects of comparable size and complexity, including a brief description of current surety support and approximate per project and aggregate bonding capacity. The “brief description” does not have to be official documentation from a surety company. Vendors can state their current project and aggregate bonding capacity. Vendors who are selected to proceed to the

Request for Project Proposal (RPP) phase will receive specific bonding requirement submission details.

Award Objective:

If selected for award of an agreement, vendor(s) will be responsible for design, manufacturing, logistic, construction, and commissioning of assigned barracks from listing below:

• MCB Camp Lejeune o BEQ - French Creek, 400 rooms (241,230 SF) o P1640RR – BEQ HP485 Replacement, 120 rooms (71,424 SF) o P1641RR – BEQ HP465 Replacement, 144 rooms (85,709 SF) o P1109 – BEQ Camp Geiger, 200 rooms (119,049 SF) o P2703RR – BEQ New River, AS4030 & AS4035 Repair by Replacement, 180 rooms (111,019 SF) o P1642RR – BEQ HP475 Replacement, 120 rooms (71,424 SF) o P2704 – BEQ New River, 200 rooms (124,430 SF) o P2803RR – BEQ New River AS4200 Repair by Replacement, 180 rooms

(107,144)

• MCAS Cherry Point o P296RR – BEQ, 296 rooms (176,120 SF) o P297RR – BEQ, 296 rooms (176,120 SF)

• MCRD Parris Island o P425 – Construct 1st Battalion Barracks (4 barracks), 2,352 OSB Bed

Count (338,380 SF) o P411 – 3rd Battalion Recruit Barracks, 588 OSB Bed Count (85,505 SF)

• MCB Quantico – National Capital Region (NCR) o QU2729, BEQ TBS-New, 110 rooms (61,849 SF) o QU2702, B5001 OCS: Open Squad Bays with capacity of 600 (barracks 87,554

SF, overall square footage of building 95,808 SF) o QU2703, B5002 OCS: Open Squad Bays with capacity of 600 (barracks 87,554

SF, overall square footage of building 95,808 SF)

NAVFAC’s OTA Process for Construction Projects under 10 U.S.C. § 2808a:

Phase 1 - AOI

• AOI Posting & Notification: The Government publicly issues an AOI outlining the core mission need, facility requirements, and project objectives.

• White Paper Submission: Interested vendors submit a concise, ten (10) page White

Paper detailing their qualifications and unique technical concept, proposed delivery approach, and relevant vendor history/viability.

• Initial Evaluation & Short-listing: The Government evaluates the White Papers based on Relevant Experience, Technical Approach, and Vendor Capability and short-lists vendors to proceed to the Request for Project Proposal (RPP) phase.

• White Paper Validity Period (Portal): AOI White Paper submissions remain valid and eligible for consideration for 1 year from the AOI submission due date with an option to extend to 2 years solely within the Government’s discretion. During this 1-year validity period, if an additional Government requirement within the scope of this AOI and resources become available, a portaled vendor may be invited to Phase 2 to receive an

RPP. If 1 year passes without a Government notification to formally move into Phase 2 or notification of extension, the vendor will no longer be eligible for an award under this

AOI.

Phase 2 - RPP

• RPP Submission: Vendors short-listed from Phase I - AOI will be sent an RPP with additional details of the Government’s requirements and are invited to submit a comprehensive full proposal that includes an expanded technical approach, detailed price and schedule estimates (rough order of magnitude), as well as data rights/IP assertions.

• RPP Evaluation & Pitch Sessions: The Government evaluates the full proposals for best-value. During this step, vendors may be invited to conduct an interactive “pitch” session.

• Negotiation of Agreement: The Government negotiates an agreement with the selected vendor(s) that have been determined to have proposed the most beneficial option to the

Government. During this process, vendors may propose their own terms and conditions, including service or license agreements, for consideration during negotiations. The

Government will assess and may adopt these proposed terms and conditions if they are determined beneficial to the Government and compliant with applicable law, regulations and policy.

Follow-on Production:

Vendors are advised that any Other Transaction (OT) agreement awarded in response to this AOI may result in the award of a follow-on production OT agreement or contract without the use of further competitive procedures. The follow-on production OT agreement or contract may be issued and available for use by other Department of Defense (DoD) organizations and, as a result, the magnitude of the follow-on production OT agreement or contract could be significantly larger than that of the original transaction. As such, any OT will include the following statement relative to the potential for follow-on production:

"In accordance with 10 U.S.C. § 2808a, and upon a determination that the participants in this transaction successfully completed a complete and usable facility or a complete and usable improvement to a facility, this competitively awarded OT agreement may result in the award of a follow-on production OTA or contract without further competition.”

Requests for Information (RFI):

Questions from vendors must be submitted via email to the Government points of contact by

1400 EDT on 19 October 2026. Responses to the questions that are submitted prior to this date/time will be posted on SAM.gov via amendment. Identifying information from the requester will be removed when responses are posted. Questions are encouraged to be submitted earlier than the cut-off date/time.

Interested Parties List:

The purpose of this list is to be a resource for interested vendors to communicate with each other.

Inclusion on the Interested Parties List does not constitute a Government endorsement or guarantee of any kind to include but not limited to vendor qualifications, capabilities, eligibility, teaming arrangements, subcontracting commitments, determination of responsibility, or indication of future awards.

Vendors desiring to be included in an Interested Parties List for this AOI should submit the following information to the Government points of contact by 1400 EDT on 19 October 2026:

a. Company legal business name

b. Company address

c. Primary contact details (name, title, phone number, email address)

d. Capabilities offered (short one sentence description; elaborate descriptions or attaching capability presentations are not desired nor will be included in the list)

Special Considerations:

DoD requires vendors without a CAGE code to register in SAM https://SAM.gov if selected for an agreement award. The Government recommends that prospective vendors begin this process as early as possible.

Projects executed under 10 U.S.C § 2808a must be otherwise authorized by law and are subject to applicable laws, regulations, and policies. Successful awardee(s) will be responsible for adhering to the following, but not limited to: Buy American Act, Davis Bacon Act, Miller Act, and

Cybersecurity Maturity Model Certification. Additional information will be shared with the vendors selected to proceed to the Phase 2-RPP.

This OTA is subject to the Buy American Act and as such, will follow the statutory regulation requirements that can be found at RFO Part 25.2, Buy American – Construction Materials. The

Government intends to utilize the maximum statutory flexibility allowed under the law to grant waivers and exemptions. Vendors shortlisted to participate in Phase 2-RPP may submit requests for Pre-award Determinations pursuant to the Buy American Act statutory regulation requirements that can be found at RFO Part 25.203 after the Phase 2-RPP has been released to the down-selected offerors and prior to submission of proposals. Post-award determinations may be made pursuant to RFO Part 25.205, but if the Agreements Officer concludes that the vendor should have made the request before agreement award, the Agreements Officer may deny the request. The Government will not evaluate requests for determinations until after the release of the Phase 2-RPP.

A company incorporated outside the United States may be eligible to submit a White Paper and participate directly in this OTA to the extent it is not prohibited under Revolutionary FAR

Overhaul (RFO) Part 40.202, Prohibitions and Clause 52.240-91, Security Prohibitions and

Exclusions. These prohibitions are statutorily based and therefore apply to Other Transaction

Agreements.