This is an Addendum to a federal design contract for replacing the fire alarm system at Building 529, Naval Air Station Oceana, Virginia Beach, Virginia, issued on 11 August 2026.
The addendum modifies submittal requirements across multiple design phases. For Design Development (35%), Pre-Final Design, Interim Final Design, and Final Design phases, contractors must submit specified deliverables including basis of design calculations, half-size drawings, outline and final specifications, duct smoke detector reports, design/construction schedules, QC reviews, project management summaries, and electronic PDF files via DoD SAFE file transfer. The Final Design phase requires two hardcopies each of half-size drawings and specifications, plus all native CAD files in AutoCAD 2018 format and native SPECSINTACT specification files submitted on DVD and via DoD SAFE transfer. Project Close-Out deliverables include as-built drawings, project specifications, duct smoke detector reports, record of materials, warranty documentation, equipment inventory forms, and operation and maintenance information.
The addendum significantly expands engineering requirements by changing D30 HVAC from "Not Applicable" to applicable, requiring a comprehensive Duct Smoke Detectors Investigation & Report sealed by a registered professional engineer (mechanical or fire protection). This report must document all air handling units serving Building 529, including comprehensive unit listings, location plans, manufacturer specifications, capacity/airflow data, photographs, field notes, control systems, existing detector locations, and code analysis regarding duct-mounted smoke detector requirements. Additionally, the D4010 Fire Alarm and Detection Systems section is revised to require a combined mass notification/fire alarm system with manual pull stations, sprinkler monitoring, strobe/speaker notifications, carbon monoxide detection, remote annunciators, Class B circuits, connection to a Monaco BT-X transceiver provided under separate contract for regional dispatch center reporting, Federal Signal Mass Notification Transceiver integration, and specific transmitter zones for sprinkler water flow, smoke detectors, manual stations, supervisory conditions, and carbon monoxide alarms.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BUILDING 529 – REPLACE FIRE ALARM SYSTEM
NAS Oceana, Virginia Beach VA
Addendum 0001
11 AUGUST 2026
1) In Part 2, Replace the Submittal Charts with:
DESIGN DEVELOPMENT (35%) - Hardcopies Deliverable ROICC/CM ROICC/DM USER Basis of Design / Calculations / Cut Sheets -- 1 -- Half-size Drawings -- 1 -- Outline Specifications -- 1 -- Duct Smoke Detector Report -- 1 -- Design/Construction Schedule -- 1 -- QC Review – Drawings and Specifications -- 1 -- Project Management Summary -- 1 --
Electronic PDF Files of all documents submitted via DoD SAFE file transfer -- 1 --
PRE-FINAL DESIGN - Hardcopies
Basis of Design / Calculations / Cut Sheets -- 1 -- Half-size Drawings -- 1 --
Specifications (in Specsintact “Show Revisions” format showing all deletions from and additions to the UFGS master specifications)
-- 1 --
Design/Construction Schedule -- 1 -- QC Review – Drawings and Specifications -- 1 -- Duct Smoke Detector Report -- 1 -- Project Management Summary -- 1 --
Electronic PDF Files of all documents submitted via DoD SAFE file transfer -- 1 --
INTERIM FINAL DESIGN - (Electronic Submission ONLY! On DoD SAFE file transfer)
Basis of Design / Calculations / Cut Sheets -- 1 -- Half-size Drawings -- 1 --
Specifications (In final Specsintact format with all deletions from and additions to the UFGS master specifications executed)
-- 1 --
Duct Smoke Detector Report -- 1 -- Design/Construction Schedule -- 1 -- Project Management Summary -- 1 -- QC Review – Drawings and Specifications -- 1 --
FINAL DESIGN
Basis of Design / Calculations / Cut Sheets -- 1 -- Half-size Drawings 2 1 -- Specifications 2 1 -- Duct Smoke Detector Report -- 1 -- Project Management Summary -- 1 -- Design/Construction Schedule -- 1 -- QC Review – Drawings and Specifications -- 1 --
Electronic PDF Files of all documents submitted, all native CAD files for the final drawings in AutoCAD 2018 format, and native SPECSINTACT Specification files. (Electronic Submission must be on a DVD and also via DoD SAFE file transfer)
-- 1 --
2) In Part 3, 6.0 ENGINEERING SYSTEMS REQUIREMENTS (ESR) where is says, D30 HVAC – Not Applicable
Replace with:
D30 HVAC
3) In Part 3, where it says, D30 HVAC – NOT APPLICABLE, D30 HVAC
Duct Smoke Detectors Investigation & Report
DOR must submit a report of all air handling units serving Building 529. The primary objective of the report is to determine the requirement for duct smoke detectors in Building 529 according to relevant codes and standards. This report is separate from and will not affect the other fire alarm work in this contract. Final
PROJECT CLOSE-OUT
(Electronic Submission ONLY! On a DVD and also via DoD SAFE file transfer)
Deliverable ROICC/CM ROICC/DM USER As-Built Drawings -- 1 -- Project Specifications -- 1 -- Duct Smoke Detector Report -- 1 -- Record of Materials -- 1 -- Warranty Documentation -- 1 -- Record Copies of “Equipment Inventory Forms” -- 1 -- Operation and Maintenance Information -- 1 --report must be sealed by a registered professional engineer, either mechanical or fire protection.
Report must include:
a. Comprehensive list of all AHUs/RTUs/DSS, etc. serving Building 529, regardless of size or capacity.
b. Plan (floor/roof/site) showing location of units and the corresponding areas served.
c. List of units with manufacturer, model and serial numbers.
d. Capacity and airflow of each unit.
e. Photographs of units and nameplates.
f. Field notes and any other photographs.
g. Control of each unit.
h. Location of all existing duct smoke detectors.
i. Code analysis with respect to duct mounted smoke detectors.
4) In Part 3, D40 FIRE PROTECTION SYSTEMS:
Delete SYSTEM DESCRIPTION in its entirety.
SYSTEM DESCRIPTION
Provide a new Fire Alarm Mass Notification System throughout the facility. Modify the fire suppression system as necessary to accommodate the new fire alarm system monitoring. Remove the existing fire alarm system within the entire facility. Provide regional dispatch center reporting by connecting to a new (provided in another contract) Monaco BT-X transceiver.
5) In Part 3, D40 FIRE PROTECTION SYSTEMS:
Delete D4010 FIRE ALARM AND DETECTION SYSTEMS in its entirety.
D4010 FIRE ALARM AND DETECTION SYSTEMS
Provide a combined mass notification/fire alarm system.
Provide manual pull stations, sprinkler system monitoring, strobe and speakers for combined mass notification/fire alarm systems. Provide loudspeaker type speaker notification within basketball court area.
Provide carbon monoxide detection.
Provide a remote annunciator with alarm acknowledge, alarm silence, and reset functions. The remote annunciator must be located as directed by the Contracting Officer in conjunction with the cognizant NAVFAC Fire Protection Engineer.
Provide Class B Notification Appliance Circuits, Class B Signaling Line Circuits. Any Class B Initiation Device Circuits must be less than 10 feet in length.
A Monaco BT-X transceiver, Monaco radio transmitter and antenna system are being provided in a separate contract. Connect new Fire Alarm System to Monaco System. Provide regional dispatch center reporting. Send fire alarm signals to the fire alarm receiving station via the Monaco radio transmitter and antenna system. Provide all necessary wiring, components, programming, testing, etc. for a complete and usable system.
Provide Federal Signal Mass Notification Transceiver for interface with existing base wide mass notification transmission system.
All fire alarms, supervisory alarms and trouble conditions indicated at the fire alarm control panel must be transmitted to the fire alarm receiving station. Transmitter zones must be as follows:
a. Sprinkler Water Flow-Alarm
b. Smoke Detector- Alarm
c. Manual Pull Station-Alarm
d. Supervisory (i.e., valve tamper switch)
e. Carbon Monoxide Detector- Alarm