OP-2 Sunshade_Design Drawing.pdf

PDF 4 MB Posted

Attached to
OP-2 Observation Tower Repairs
Solicitation number
N4008525R9024
Issued by

About this file

These are the engineering design and fabrication drawings for a CLIN 1441 Shade Structure at Camp Lejeune, North Carolina, prepared by Sunguard and marked as a final version on August 5, 2011. The project (DO-0006 - OP2 Tower) includes detailed technical specifications and engineering drawings for a shade structure, with comprehensive diagrams showing front elevation, side elevation, plan layout, column assembly details, hip beam details, and fabric cover configurations. The drawings provide precise measurements and structural details, with the shade structure measuring approximately 13'-5" and featuring multiple architectural and engineering components including columns, beams, and fabric covering specifications.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Ernesto De Oliveira

ACS

Ernesto De Oliveira Typewritten Text Prepared for:

Ernesto Final

Ernesto Revised

Final

File details come from the government source that posted it. Updated .