OP-2 Sunshade_Design Drawing.pdf
PDF 4 MB Posted
- Attached to
- OP-2 Observation Tower Repairs
- Solicitation number
- N4008525R9024
About this file
These are the engineering design and fabrication drawings for a CLIN 1441 Shade Structure at Camp Lejeune, North Carolina, prepared by Sunguard and marked as a final version on August 5, 2011. The project (DO-0006 - OP2 Tower) includes detailed technical specifications and engineering drawings for a shade structure, with comprehensive diagrams showing front elevation, side elevation, plan layout, column assembly details, hip beam details, and fabric cover configurations. The drawings provide precise measurements and structural details, with the shade structure measuring approximately 13'-5" and featuring multiple architectural and engineering components including columns, beams, and fabric covering specifications.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Ernesto De Oliveira
ACS
Ernesto De Oliveira Typewritten Text Prepared for:
Ernesto Final
Ernesto Revised
Final
File details come from the government source that posted it. Updated .