Amend 02 - 01 57 19 Temporary Environmental Controls.pdf
PDF 96 KB Posted
- Attached to
- Building AS890 VLFD Repairs
- Solicitation number
- N4008525R9018
About this file
This document is Section 01 57 19 for Temporary Environmental Controls, a technical specification section providing comprehensive guidelines for environmental management during a construction project at Marine Corps Base Camp Lejeune. The section details extensive requirements for environmental protection, waste management, and regulatory compliance, with specific focus on controlling and disposing of various types of waste, including solid waste, hazardous materials, construction debris, and potentially contaminated materials.
Key requirements include preparing an Environmental Protection Plan, managing hazardous materials tracking, implementing dust control measures, protecting natural resources, controlling erosion, and ensuring proper disposal of different waste categories. The document mandates specific procedures for handling materials like asbestos, lead-based paint, metal, concrete, and electrical equipment, with detailed instructions for recycling, off-base disposal, and reporting. Contractors must follow strict guidelines for waste segregation, obtain necessary permits, provide documentation, and coordinate with base environmental management offices, with an emphasis on minimizing environmental impact and adhering to federal, state, and local environmental regulations.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION 01 57 19
TEMPORARY ENVIRONMENTAL CONTROLS
068/25
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM E2356 (2018) Standard Practice for Comprehensive Building Asbestos Surveys
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2024) Safety -- Safety and Occupational Health (SOH) Requirements
U.S. ENVIRONMENTAL PROTECTION AGENCY (EPA)
EPA SW-846 (Third Edition; Update VII) Test Methods for Evaluating Solid Waste:
Physical/Chemical Methods
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
29 CFR 1910.1053 Respirable Crystalline Silica
29 CFR 1910.1200 Hazard Communication
29 CFR 1926.1153 Respirable Crystalline Silica
40 CFR 50 National Primary and Secondary Ambient Air Quality Standards
40 CFR 60 Standards of Performance for New Stationary Sources
40 CFR 61.145 Standard for Demolition and Renovation
40 CFR 63 National Emission Standards for Hazardous Air Pollutants for Source Categories
40 CFR 64 Compliance Assurance Monitoring
40 CFR 68 Chemical Accident Prevention Provisions
40 CFR 82 Protection of Stratospheric Ozone
40 CFR 112 Oil Pollution Prevention
40 CFR 122.26 Storm Water Discharges (Applicable to State NPDES Programs, see section 123.25)
40 CFR 152 Pesticide Registration and Classification Procedures
40 CFR 152 - 186 Pesticide Programs
40 CFR 241 Guidelines for Disposal of Solid Waste
40 CFR 243 Guidelines for the Storage and Collection of Residential, Commercial, and Institutional Solid Waste
40 CFR 258 Subtitle D Landfill Requirements
40 CFR 260 Hazardous Waste Management System: General
40 CFR 261 Identification and Listing of Hazardous Waste
40 CFR 261.7 Residues of Hazardous Waste in Empty Containers
40 CFR 262 Standards Applicable to Generators of Hazardous Waste
40 CFR 262.11 Hazardous Waste Determination and Recordkeeping
40 CFR 262.34 Standards Applicable to Generators of Hazardous Waste-Accumulation Time
40 CFR 263 Standards Applicable to Transporters of Hazardous Waste
40 CFR 264 Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities
40 CFR 265 Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities
40 CFR 266 Standards for the Management of Specific Hazardous Wastes and Specific Types of Hazardous Waste Management Facilities
40 CFR 268 Land Disposal Restrictions
40 CFR 273 Standards for Universal Waste Management
40 CFR 273.2 Standards for Universal Waste Management - Batteries
40 CFR 273.3 Standards for Universal Waste Management - Pesticides
40 CFR 273.4 Standards for Universal Waste Management - Mercury Containing Equipment
40 CFR 273.5 Standards for Universal Waste Management - Lamps
40 CFR 273.6 Applicability - Aerosol Cans
40 CFR 279 Standards for the Management of Used Oil
40 CFR 300 National Oil and Hazardous Substances Pollution Contingency Plan
40 CFR 300.125 National Oil and Hazardous Substances Pollution Contingency Plan - Notification and Communications
40 CFR 302 Designation, Reportable Quantities, and Notification
40 CFR 355 Emergency Planning and Notification
40 CFR 372 Toxic Chemical Release Reporting
40 CFR 403 General Pretreatment Regulations for Existing and New Sources of Pollution
40 CFR 745 Lead-Based Paint Poisoning Prevention in Certain Residential Structures
40 CFR 761 Polychlorinated Biphenyls (PCBs) Manufacturing, Processing, Distribution in Commerce, and Use Prohibitions
49 CFR 171 General Information, Regulations, and Definitions
49 CFR 172 Hazardous Materials Table, Special Provisions, Hazardous Materials Communications, Emergency Response Information, and Training Requirements
49 CFR 172.101 Hazardous Material Regulation-Purpose and Use of Hazardous Material Table
49 CFR 173 Shippers - General Requirements for Shipments and Packagings
49 CFR 178 Specifications for Packagings
84 FR 24503 Final Modification to National Pollutant Discharge Elimination System (NPDES) General Permit for Stormwater Discharges from Construction Activities\
1.2 Contractor Liabilities for Environmental Protection
Contractors shall complete and provide Environmental Training Documentation for training required by Federal, State, and local regulations.
1.3 DEFINITIONS
1.3.1 Sediment
Soil and other debris that have eroded and have been transported by runoff water or wind.
1.3.2 Solid Waste
Rubbish, debris, garbage, and other discarded solid materials, except recyclables and hazardous waste as defined in paragraph entitled "Hazardous Waste," resulting from industrial, commercial, and agricultural operations and from community activities.
1.3.3 Sanitary Wastes
Wastes characterized as domestic sanitary sewage.
1.3.4 Rubbish
Combustible and noncombustible wastes such as non-recyclable paper and cardboard, crockery, and bones.
Recyclables includes: clean paper, cardboard, glass, plastics (No. 1 & 2), metal, and cans.
Non-recyclable paper and cardboard are defined as material that has become wet or contaminated with food or other residue that render it un-acceptable for recycling.
Treated wood/lumber is defined as wood that has been stained or treated to prevent rot, or composite wood products such as OSB, pressboard furniture, etc.
Untreated wood is defined as lumber, trees, stumps, limbs, tops, and shrubs.
1.3.5 Debris
Combustible and noncombustible wastes such as ashes and waste materials resulting from construction or maintenance and repair work, (excluding organic matter) leaves, pine straw, grass and shrub clippings.
1.3.6 Chemical Wastes
This includes salts, acids, alkalies, herbicides, pesticides, and organic chemicals.
1.3.7 Garbage
Refuse and scraps resulting from preparation, cooking, dispensing, and consumption of food.
1.3.8 Hazardous Waste
Hazardous substances as defined in 40 CFR 261 or as defined by applicable State and local regulations.
1.3.9 Hazardous Materials
Hazardous materials as defined in 49 CFR 171 and listed in 49 CFR 172.
1.3.10 Landscape Features
Trees, plants, shrubs, and ground cover.
1.3.11 Lead Acid Battery Electrolyte
The electrolyte substance (liquid medium) within a battery cell.
1.3.12 Oily Waste
Petroleum products and bituminous materials.
1.3.13 Class I Ozone Depleting Substance (ODS)
Class I and Class II ODS are defined in Sections 602 (a and b) of The Clean Air Act.
1.4 SUBMITTALS
Submit the following in accordance with Section 01 33 00, "Submittal Procedures."
SD-01 Preconstruction Submittals
[Environmental protection plan]
[Preconstruction survey report]
[MSDS for Class I ODS waivered product]
[Permit for storm water discharge]
[Notice of Intent]
[Notice of Termination]
[Pollution Prevention Plan]
SD-01 Preconstruction Submittals
Environmental Protection Plan
[SD-06 Test Reports
Abrasive blasting waste materials - if applicable
Submit a copy of an approved laboratory analysis of materials collected as a result from abrasive blasting operations before disposing of waste materials.]
SD-11 Closeout Submittals
Solid waste disposal permit
Disposal permit for hazardous waste
Environmental training documentation
Permit to transport hazardous waste
Hazardous waste certification
[Erosion and sediment control inspection reports]
Environmental Plan Review
Annual Report of Products Containing Recovered Materials
1.4.1 Solid Waste Disposal Permit
Submit one copy of a [State] [and] [local] permit or license for the solid waste disposal facility. If the contract permists the use of the Base Landfill, request a letter from the Contracting Offcier authorizing permission to dump on base; submit the letter to the Base Landfill Office.
In lieu of the letter a copy of the contract must be delivered to the Landfill Office for review.Submit one copy of a State permit or license for the solid waste disposal facility. If the contract permits the use of the Base Landfill, request a letter from the Contracting Offcier FSC/Landfill Director authorizing permission to dump on base; submit the letter to the Base Landfill Office.
In lieu of the letter a copy of the contract must be delivered to the Landfill Office for review.
1.4.2 Disposal Permit for Hazardous Waste
Submit a copy of the applicable EPA [and State] permits, manifests, or licenses for transportation, treatment, storage, and disposal of hazardous waste by permitted facilities.
1.4.3 Permit to Transport Hazardous Waste
Submit one copy of the EPA or State permit license, or regulation for the transporter who will ship the hazardous waste to the permitted Treatment, Storage, and Disposal (TSD) facility.
1.4.4 Hazardous Waste Certification
Submit written certification that hazardous waste turned in for disposal was generated on Government property and is identified, packaged, and labeled in accordance with 40 CFR 261, 40 CFR 262, and 40 CFR 263.
1.4.5 Erosion and Sediment Control Inspection Reports
Submit to the Contracting Officer once every 7 calendar days and within 24 hours of a storm event that produces 0.5 inch of rain.
1.5 ENVIRONMENTAL PROTECTION REGULATORY REQUIREMENTS
Provide and maintain, during the life of the contract, environmental protection as defined in this Section. Plan for and provide environmental protective measures to control pollution that develops during normal construction practice. Plan for and provide environmental protective measures required to correct conditions that develop during the construction of permanent or temporary environmental features associated with the project. Comply with Federal, State, and local regulations pertaining to the environment, including but not limited to water, air, solid waste, and noise pollution.
1.6 [ENVIRONMENTAL PROTECTION PLAN
1.6.1 [Contents of Environmental Protection PlanEnvironmental Protection Plan
a. Include any hazardous materials (HM) planned for use on the station shall be included in the station HM Tracking Program maintained by the Safety Department. To assist this effort, submit a list (including quantities) of HM to be brought to the station and copies of the corresponding material safety data sheets (MSDS). Submit this list to the Contracting Officer. At project completion, remove any hazardous material brought onto the station. Account for the quantity of HM brought to the station, the quantity used or expended during the job, and the leftover quantity which (1) may have additional useful life as a HM and shall be removed by the Contractor, or (2) may be a hazardous waste, which shall then be removed as specified herein.
b. The Environmental Protection Plan shall list and quantify any Hazardous Waste (HW) to be generated during the project.
c. In accordance with station regulations, store HW near the point of generation up to a total quantity of one quart of hazardous waste or 55 gallons of hazardous waste. Move any volume exceeding these quantities to a HW permitted area within 3 days. Prior to generation of HW, contact Contracting Officer for labeling requirements for storage of hazardous wastes.
d. In accordance with station regulations, substitute materials as necessary to reduce the generation of HW and include a statement to that effect in the Environmental Plan.
e. Contact Contracting Officer for conditions in the area of the project which may be subject to special environmental procedures.
Include this information in the Preconstruction Survey. Describe in the Environmental Protection Plan any permits required prior to working the area, and contingency plans in case an unexpected environmental condition is discovered.
f. Obtain permits for handling HW, and deliver completed documents to
Contracting Officer for review. File the documents with the appropriate agency, and complete disposal with the approval of Contracting Officer. Deliver correspondence with the State concerning the environmental permits and completed permits to Contracting Officer.]
1.6.2 [Environmental Protection Plan Format
The Environmental Protection Plan shall follow the following format:
ENVIRONMENTAL PROTECTION PLAN
Contractor Organization Address and Phone Numbers
1. Hazardous materials to be brought onto the station
2. MSDS package
3. Employee training documentation
4. HW storage plan
5. HW to be generated
6. Preconstruction survey results
7. Permitting requirements identified]
1.6.3 [Environmental Plan Review
Fourteen days after the environmental protection meeting, submit the proposed environmental plan for further discussion, review, and approval.]
1.6.4 [Preconstruction Survey
Perform a preconstruction survey of the project site with the Contracting Officer, and [take photographs showing] [document] existing environmental conditions in and adjacent to the site.]]
1.7 [STORMWATER POLLUTION PREVENTION PLAN
40 CFR 122.26, EPA 832-R-92-005. Provide "Stormwater Pollution Prevention Plan."
a. Identify potential sources of pollution which may reasonably be expected to affect the quality of storm water discharge from the site.
b. Describe and ensure implementation of practices which will be used to reduce the pollutants in storm water discharge associated with industrial activity at the construction site.
c. Ensure compliance with terms of EPA general permit for storm water discharge.
d. Select applicable management practices from EPA 832-R-92-005 and
[e. Provide completed copy of Notice of Intent and Notice of
Termination except for effective date.]]
1.7.1 [Notice of Intent
The Contractor shall prepare a completed Notice of Intent (NOI) form in accordance with the requirements of the State's general permit for storm water discharges from construction sites. Submit NOI, and the appropriate permit fee to the Contracting Office a minimum of 14 days prior to start of construction.
The Contractor shall keep a copy of the approved permit on site at the Contractor's trailer at all times.
1.7.2 Class I and II ODS Prohibition
Class I ODS as defined and identified herein shall not be used in the performance of this contract, nor be provided as part of the equipment [, except a waiver has been obtained for [_____]. Contractor must provide MSDS for Class I ODS waivered product.] This prohibition shall be considered to prevail over any other provision, specification, drawing, or referenced documents.
1.7 ADMINISTRATIVE REQUIREMENTS
1.7.1 [Licenses and Permits
Obtain licenses and permits pursuant to "FAR 52.236-7, Permits and Responsibilities" except for those permits which will be obtained by the Contracting Officer as follows:.
a. [_____]
b. [_____]
For permits obtained by the Contracting Officer, whether or not required by the permit, perform inspections of the work in progress, and submit certifications to the applicable regulatory agency, via the Contracting Officer, that the work conforms to the contract and permit requirements.
The inspections and certifications shall be provided through the services of a Professional Engineer, registered in the State where the work is being performed. As a part of the quality control plan, which is required to be submitted for approval by the quality control section, provide a subitem containing the name, P.E. registration number, address, and telephone number of the professional engineer(s) who will be performing the inspections and certifications for each permit listed above.]
1.8 GENERAL ENVIRONMENTAL MANAGEMENT SYSTEM AND ENVIRONMENTAL AWARENESS
The Contractor shall familiarize himself with requirements of the attached "Marine Corps Base (MCB), Camp Lejeune, Contractor Environmental Guide."
1.9 CAMP LEJEUNE SANITARY LANDFILL INFORMATION SHEET
See attached "Camp Lejeune Sanitary Landfill Information Sheet" for hours of operation and other important information pertaining Landfill.
a. Contractors may ONLY use the Camp Lejeune Sanitary Landfill for the disposal of asbestos containing materials, building products with tightly adhered lead containing paint, non-contaminated clean dirt, asphalt and clean gravel. The hours of operation are 0730-1530.
Concrete with Asbestos Containing Materials and tightly adhered lead containing paint must be delivered in accordance to Marine Corps Camp Lejeune Base Order 11350.1A
b. Delivery of asbestos shall be by appointment only. Appointments made by phone at 910-451-8666 or 910-451-2946. ALL other contractor generated material shall be weighed at their final destination and once the contract is complete, all tickets shall be submitted to the Base Landfill for reporting. Contractors authorized to use the base scales will require a Landfill Use Letter from the FSC/Landfill Director.
c. The Contracting Officer will register the contract via E-mail, with the base landfill. All haul vehicles will maintain a secure vehicle placard as a condition to utilize the scale. E-mail the contract information to the Landfill Clerk, including the name on the Prime Contractor, contract number, job name/description, completion date and whether or not any of the above materials will be delivered to the Landfill.
d. As of May 01 2014 the above supersedes any other statements/specifications pertaining to the delivery of materials to the Base Landfill.
PART 2 PRODUCTS
2.1 ANNUAL REPORT OF PRODUCTS CONTAINING RECOVERED MATERIALS
The Contractor shall submit data annually (by December 1) products used during the previous fiscal year (October 1 - September 30) as required by 6002 of the Solid Waste Disposal Act as amended by Resource Conservation and Recovery Act (RCRA). Report forms is attached to end of this section as "Appendix A."
PART 3 EXECUTION
3.1 PROTECTION OF NATURAL RESOURCES
Preserve the natural resources within the project boundaries and outside the limits of permanent work. Restore to an equivalent or improved condition upon completion of work. Confine construction activities to within the limits of the work indicated or specified. [Conform to the [national] [state] permitting requirements of the Clean Water Act.]
3.1.1 Land Resources
Except in areas to be cleared, do not remove, cut, deface, injure, or destroy trees or shrubs without Contracting Officer's permission. Do not fasten or attach ropes, cables, or guys to existing nearby trees for anchorages unless authorized by Contracting Officer. Where such use of attach ropes, cables, or guys is authorized, the Contractor shall be responsible for any resultant damage.
3.1.1.1 Protection of Trees
Protect existing trees which are to remain and which may be injured, bruised, defaced, or otherwise damaged by construction operations. Remove displaced rocks from uncleared areas. By approved excavation, remove trees with 30 percent or more of their root systems destroyed. Removal of trees and the procedure for removal requires approval of the Contracting Officer.
3.1.1.2 Landscape Replacement
Remove trees and other landscape features scarred or damaged by equipment operations, and replace with equivalent, undamaged trees and landscape features. Obtain Contracting Officer's approval before removal or replacement.
3.1.1.3 Temporary Construction
Remove traces of temporary construction facilities such as haul roads, work area, structures, foundations of temporary structures, stockpiles of excess or waste materials, and other signs of construction. Grade temporary roads, parking areas, and similar temporarily used areas to conform with surrounding contours.
3.1.2 [Water Resources
3.1.2.1 [Stream Crossings
The Contracting Officer's approval is required before any equipment will be permitted to ford live streams.
In areas where frequent crossings are required, install temporary culverts or bridges. Remove temporary culverts or bridges upon completion of work, and repair the area [to its original condition] [or] [as indicated] [or] [as specified].]
3.1.2.2 [Oily Wastes
Prevent oily or other hazardous substances from entering the ground, drainage areas, or local bodies of water. Surround all temporary fuel oil or petroleum storage tanks with a temporary earth berm of sufficient size and strength to contain the contents of the tanks in the event of leakage or spillage.]]
3.1.3 [Fish and Wildlife Resources
Do not disturb fish and wildlife. Do not alter water flows or otherwise significantly disturb the native habitat adjacent to the project and critical to the survival of fish and wildlife, except as indicated or specified.]
3.2 HISTORICAL AND ARCHAEOLOGICAL RESOURCES
Carefully protect in-place and report immediately to the Contracting Officer historical and archaeological items or human skeletal remains discovered in the course of work. Stop work in the immediate area of the discovery until directed by the Contracting Officer to resume work. The Government retains ownership and control over historical and archaeological resources.
3.3 NOISE
Make the maximum use of low-noise emission products, as certified by the EPA. Blasting or use of explosives will not be permitted without written permission from the Contracting Officer, and then only during designated times. [Confine pile-driving operations to the period between 8 a.m. and 4 p.m., Monday through Friday, exclusive of holidays, unless otherwise directed.]
3.4 RESTRICTIONS ON EQUIPMENT
3.4.1 Electromagnetic Interference Suppression
a. Electric motors must comply with MIL-STD-461 relative to radiated and conducted electromagnetic interference. A test for electromagnetic interference will not be required for motors that are identical physically and electrically to those that have previously met the requirements of MIL-STD-461. An electromagnetic interference suppression test will not be required for electric motors without commutation or sliprings having no more than one starting contact and operated at 3,600 revolutions per minute or less.
b. Equipment used by the Contractor shall comply with MIL-S-16165for internal combustion engines and MIL-STD-461 for other devices capable of producing radiated or conducted interference.
c. Conduct tests for electromagnetic interference on electric motors and Contractor's construction equipment in accordance with MIL-STD-461 and MIL-STD-462. Test location shall be reasonably free from radiated and conducted interference. Furnish testing equipment, instruments, and personnel for making the tests; a test location; and other necessary facilities.
3.4.2 Radio Transmitter Restrictions
Conform to the restrictions and procedures for the use of radio transmitting equipment, as directed. Do not use transmitters without prior approval.
3.5 EROSION AND SEDIMENT CONTROL MEASURES
3.5.1 [Local Erosion and Sediment Control Plan
Follow the approved storm water management, erosion and sediment control plan.]
3.5.2 Burnoff
Burnoff of the ground cover is not permitted.
3.5.3 [Borrow Pit Areas
Manage and control borrow pit areas to prevent sediment from entering nearby streams or lakes. Restore areas, including those outside the borrow pit, disturbed by borrow and haul operations. Restoration includes grading, replacement of topsoil, and establishment of a permanent vegetative cover. Uniformly grade side slopes of borrow pit to not more than a slope of 1 part vertical to 2 parts horizontal. Uniformly grade the bottom of the borrow pits to provide a flat bottom and drain by outfall ditches or other suitable means. Stockpile topsoil removed during the borrow pit operation, and use as part of restoring the borrow pit area.]
3.5.4 [Protection of Erodible Soils
Immediately finish the earthwork brought to a final grade, as indicated or specified. Immediately protect side and back slopes upon completion of rough grading. Plan and conduct earthwork to minimize duration of exposure of unprotected soils.]
3.5.5 Temporary Protection of Erodible Soils
Use the following methods to prevent erosion and control sedimentation:
3.5.5.1 Mechanical Retardation and Control of Runoff
Mechanically retard and control the rate of runoff from the construction site. This includes construction of diversion ditches, benches, berms, and use of silt fences and strawbales to retard and divert runoff to protected drainage courses.
3.5.5.2 [Sediment Basins
Trap sediment in [temporary] [permanent] sediment basins. [Select a basin size to accommodate the runoff of a local [_____]-year storm.] Pump dry and remove accumulated sediment, after each storm. Use a paved weir or vertical overflow pipe for overflow. Remove collected sediment from the site. Institute effluent quality monitoring programs.]
3.5.5.3 [Borrow
Permit only in areas where suitable environmental controls are possible.]
3.5.5.4 Vegetation and Mulch
Provide temporary protection on sides and back slopes as soon as rough grading is completed or sufficient soil is exposed to require erosion protection. Protect slopes by accelerated growth of permanent vegetation, temporary vegetation, mulching, or netting. Stabilize slopes by hydroseeding, anchoring mulch in place, covering with anchored netting, sodding, or such combination of these and other methods necessary for effective erosion control.
a. Provide new seeding where ground is disturbed. Include topsoil or nutriment during the seeding operation necessary to [establish] [re-establish] a suitable stand of grass. [Provide seeding as specified in Section _____, "_____."]
3.5 CONTROL AND DISPOSAL OF SOLID WASTES
Pick up and separate solid wastes, and place in covered containers which are regularly emptied. Do not prepare or cook food on the project site.
Prevent contamination of the site or other areas when handling and disposing of wastes. At project completion, leave the areas clean.
3.5.1 Disposal of Metal Paint Cans
All metal paint cans shall be taken to Building 962 for recycling. The cans shall be empty and completely dry. The cans shall be triple rinsed and stenciled "Triple Rinsed" prior to turn in. The Contractor shall give the Government 72 hours advance notice prior to turn-in. Contractor is responsible for rinsing, stenciling, crushing, and deposting in Government owned receptable, located at Building 962.
3.5.2 Disposal of Rubbish and Debris, Metal and Dirt
Rubbish and debris shall be taken off-base for disposal, unless specifically directed otherwise below:
Metals shall be taken to the DRMO disposal area at Lot 203, as specified Metals shall be taken to the Qualified Recycling Program (QRP) located at the Building 982, Base Landfill, as specified..
CONSTRUCTION DEBRIS DISPOSAL - BASE
SANITARY LANDFILL EXAMPLE/GENERAL
CATEGORY INFORMATION FOR DEPOSIT IN THE LANDFILL
Recyclable Cardboard Breakdown corrugated cardboard boxes and deliver to the Base Recycling Center located at Building 982. If base personnel rejects the cardboard, take cardboard for off-base disposal.
Recyclable Wood Pallets Deliver usable pallets to the Base Recycling Center located at Building 982. If base personnel rejects the pellets, take pallets for off-base disposal.
Organic Matter Organic matter will not be accepted at the landfill.
Asphalt Pavement Remove pavement from Government property and deliver to an asphalt recycling establishment.
Provide a record of the total tons of asphalt recycled and the corporate name and location of the recycling establishment receiving the removed asphalt.
***** Weigh each and every vehicle delivering debris upon entrance and exit. Cover debris.
Asbestos Refer to Section [02 82 16] [02 82 17] or [02 82 18.00].
Lead Based Paint Materials Refer to Section 02 82 33.13.
Metals Metals will be accepted at the Recycling Center located at the Base Landfill, Bldg 982.
not be accepted at the landfill.
Remove metals from each and every category before delivery to landfill.
(Example: Remove hardware from doors and windows.)
Dispose of metal construction debris at Defense Reutilization Maintenance Office
(DRMO).
Aluminum, brass, copper, lead, other metal, electrical wiring, and cable (cut in 3 foot or less sections) shall be delivered to the Recycling Center at Building 982, Base Landfill.
Treated & Untreated Treated & untreated wood/lumber will not be Wood/Lumber accepted at the landfill.
Concrete Concrete will not be accepted at the landfill.
CONSTRUCTION DEBRIS DISPOSAL - BASE
SANITARY LANDFILL EXAMPLE/GENERAL
CATEGORY INFORMATION FOR DEPOSIT IN THE LANDFILL
Construction Material Construction material should be managed and placed in a designated area. Area shall be kept clean of debris and all material removed at the end of the project.
Solid Waste Separate each category of solid waste to enhance recycling.
Hazardous Material This project involves demolition, renovation/repair and/or construction activities; therefore, hazardous material (such as paints, solvents, thinners, adhesives, etc) may be used during the execution of this project. The contractor will be required to appropriately manage the hazardous material and provide secondary containment.
Solid Waste Report All solid waste generated and recycled will be weighed. Contractor will report the amount of solid wasted disposed and recycled at the end of the project to EMD's Solid Waste Manager or the Pollution Prevention Manager via the OICC.
Tonnage information for all materials delivered to the Base Landfill is available at the Landfill Office. Submit a written request to the Landfill Manager, specifying the desired information.
Recycling of Recyclable material (ex. Scrap Construction Debris metal/aluminum/brass/copper/lead, and other metal) may be recycled through Defense Utilization Maintenance Office) DRMO using a 1348-1a with the following information (Proceeds for the sale of recyclable material are to go to the Qualified Recycling financial account - 17F3875 27RM 00767001 0 000027 3c 000000 06700198004). For additional information contact the Base Recycling Coordinator 910-451-4214.the Qualified Recycling Program. For additional information contact the Base Recyling Coordinator at 910-451-4214
Electrical Equipment Before demolition or removal of electrical equipment from the Base - Contractor shall contact Base High Voltage Shop Supervisor at (910) 451-2790, to allow for first right of refusal of electrical equipment such as:
ATS, transformers, and generators. Electrical equipment will not be accepted at landfill.
3.5.3 Disposal Off-Base
a. Provide 24-hour advance written notice to the Contracting Office of Contractor's intention to dispose of off base.
b. Disposal at sites or landfills not holding a valid State of North Carolina permit is specifically prohibited. The prohibition also applies to sites where a permit may have been applied for but not yet obtained.
c. Off-base disposal of construction debris outside the parameters of this paragraph at site without State permits and/or not in accordance with regulatory requirements shall require the Contractor at his own expense to remove, transport and relocate the debris to a State approved site. The Contractor shall also be required to pay any fines, penalties, or fees related to the illegal disposal of construction debris
3.6 CONTROL AND DISPOSAL OF HAZARDOUS WASTE
3.6.1 Hazardous Waste Generation
Handle generated hazardous waste in accordance with 40 CFR 262.
3.6.2 [Hazardous Waste Disposal
Dispose of hazardous waste in accordance with Federal, State, and local regulations, especially 40 CFR 263, 40 CFR 264, and 40 CFR 265. Removal of hazardous waste from Government property shall not occur without prior notification and coordination with the Contracting officer. Transport hazardous waste by a permitted, licensed, or registered hazardous waste transported to a TSD facility. Hazardous waste shall be properly identified, packaged, and labeled in accordance with 49 CFR 172. Provide completed manifest for hazardous waste disposed of off-site to the Contracting Officer within 7 days of disposal. Hazardous waste shall not be brought onto the station.]
3.6.3 Hazardous Waste Storage
Store hazardous waste in containers in accordance with 49 CFR 178.
Identify hazardous waste in accordance with 40 CFR 261 and 40 CFR 262.
Identify hazardous waste generated within the confines of the station by the station's EPA generator identification number.
3.6.4 Spills of Oil and Hazardous Materials
Take precautions to prevent spills of oil and hazardous material. In the event of a spill, immediately notify the Contracting Officer. Spill response shall be in accordance with 40 CFR 300 and applicable State regulations.
3.6.5 Lead-Acid Batteries
Dispose of lead-acid batteries that are not damaged or leaking at a State-approved battery recycle or at a permitted or interim status hazardous waste TSD facility. For lead-acid batteries that are leaking or have cracked casings, dispose of the electrolyte solution using one of the following alternatives:
a. An industrial waste water treatment plant, if available and approved by the Contracting Officer for disposing of lead-acid battery electrolyte.
b. Dispose of the lead-acid battery electrolyte at a permitted or interim status hazardous waste TSD facility.
The management and disposal of waste lead-acid batteries and electrolyte shall comply with requirements for management and disposal of hazardous wastes.
3.6.6 Mercury Control
Prior to starting work, remove thermostats, switches, and other components that contain mercury. Upon removal, place items containing mercury in doubled polyethylene bags, label, and turn over to the Contracting Officer for disposal.
3.6.7 Petroleum Products
Protect against spills and evaporation during fueling and lubrication of equipment and motor vehicles. Dispose of lubricants to be discarded and excess oil.
3.6.8 Ozone Depleting Substances (ODS)
Remove ODS as specified in Section 02 41 00, "Demolition."
3.7 DUST CONTROL
Keep dust down at all times, including nonworking periods. Sprinkle or treat, with dust suppressants, the soil at the site, haul roads, and other areas disturbed by operations. Dry power brooming will not be permitted.
Instead, use vacuuming, wet mopping, wet sweeping, or wet power brooming.
Air blowing will be permitted only for cleaning nonparticulate debris such as steel reinforcing bars. Only wet cutting will be permitted for cutting concrete blocks, concrete, and bituminous concrete. Do not shake bags of cement, concrete mortar, or plaster unnecessarily.
3.7.1 Abrasive Blasting
3.7.1.1 Blasting Operations
The use of silica sand is prohibited in abrasive blasting.
Provide tarpaulin drop cloths and windscreens to enclose abrasive blasting operations to confine and collect dust, abrasive agent, paint chips, and other debris [in accordance with the requirements specified]. [Perform work involving removal of hazardous material in accordance with 29 CFR 1910.
3.7.1.2 Disposal Requirements
Collect dust, abrasive, paint, and other debris resulting from abrasive blasting operations and store in 55 gallon drums with watertight lids.
Take a representative sample of this material, and test for EP toxicity with respect to lead, chromium, [and] cadmium [, and _____] content. The sampling and testing shall be performed in accordance with 40 CFR 261. [ Handle debris resulting from the abrasive blasting operations as a hazardous material, and dispose of in accordance with 40 CFR 262, 40 CFR 263, 40 CFR 264, and 40 CFR 265. Transport hazardous material by a transporter licensed and permitted for transportation of hazardous materials. Dispose of hazardous material in an EPA-approved and permitted facility specifically designated for hazardous waste disposal.]
3.8 [QUARANTINE FOR IMPORTED FIRE ANT (4/82)
Onslow, Jones, and Cartaret Counties and portions of Duplin and Craven Counties have been declared a generally infested area by the United States Department of Agriculture (USDA) for the imported fire ant. Compliance with the quarantine regulations established by this authority as set forth in USDA Publication 301.81 of 31 December 1992, is required for operations hereunder. Pertinent requirements of the quarantine for materials originating on the Camp Lejeune reservation, the Marine Corps Air Station (Helicopter), New River and the Marine Corps Air Station, Cherry Point, which are to be transported outside Onslow County or adjacent suppression areas, include the following:
a. Certification is required for the following articles and they shall not be moved from the reservation to any point outside Onslow County and adjacent designated areas unless accompanied by a valid inspection certificate issued by an Officer of the Plant Protection and Quarantine Program (PPQ) of the U.S. Department of Agriculture.
(1) Bulk soil
(2) Used mechanized soil-moving equipment. (Used mechanized soil-moving equipment is exempt if cleaned of loose noncompacted soil).
(3) Other products, articles, or means of conveyances, if it is determined by an inspector that they present a hazard of transporting spread of the imported fire ant and the person in possession thereof has been so notified.
b. Authorization for movement of equipment outside the imported fire and regulated area shall be obtained from USDA, Animal and Plant Health Inspection Service (APHIS), Plant Protection and Quarantine (PPQ), Box 28, Goldsboro, North Carolina, 27533-0028, Attn:
Mr. William Scroggins or Mr. Frank Best, telephone (919) 735-1941. If Mr. Scroggins or Mr. Best are not available, contact Mr. Jim Kelley at (910) 815-4667, the supervisor's office in Wilmington. Requests for inspection shall be made sufficiently in advance of the date of movement to permit arrangements for the services of authorized inspectors. The equipment shall be prepared and assembled so that it may be readily inspected. Soil on or attached to equipment, supplies, and materials shall be removed by washing with water or such other means as necessary to accomplish complete removal. Resulting spoil shall be wasted as necessary and as directed.]
ANNUAL REPORT OF PRODUCTS CONTAINING RECOVERED MATERIALS
Contractor shall submit data annually (By 1 December) for the following products used during the previous fiscal year (1 October - 30 September) as required by 6002 of the Solid Waste Disposal Act as ammended by Resource Conservation and Recovery Act (RCRA):
Contract Number: __________________ Fiscal Year: _____________
| MATERIAL | UNIT | QUANTITY (CRM) | TOTAL QUANTITY |
|A. Insulation | | | | | 1. Loose fill | Ft3 | | | | 2. Blanket or batt | Ft2 | | | | 3. Board | Ft2 | | | | 4. Spray-in-place | m3 | | | | 5. Other | | | | |B. Cement and Concrete | yd3 | | | |C. Paper and Paper Products | | | | | 1. Copy Paper | Box | | | | 2. Printing/Writing Paper| Box | | | | 3. Corrugated and | | | | | fiberboard boxes | Box | | | | 4. Folding boxboard and | | | | | cartons | Box | | | | 5. Stationary, office | | | | | papers, envelopes, and| | | | | computer paper | $Amt | | | | 6. Toilet tissue, paper | | | | | towels, fasial tissue,| | | | | paper napkins, doilies| | | | | and industrial wipes | $Amt | | | | 7. Brown papers and | | | | | coarse papers | Box | | | | 8. Other | | | |
APPENDIX A
| MATERIAL | DEFINITION |
|1. Quantity (CRM) | Quantity used containing recovered materials.| |2. Total Quantity | Quantity used containing recovered materials | | | plus quantity used not containing recovered | | | materials. | |3. Unit | Ft3 (cubic feet), Ft2 (square feet), | | | m3 (cubic meters), yd3 (cubic yards), box | | | (number of boxes used), $ Amt (dollar value | | | of material used) | |4. Loose-Fill Insulation | Includes, but is not limited to..."cellulose | | | fiber, mineral fibers (fiberglass and rock | | | wool), vermiculite, and perlite. | |5. Blanket or Batt | Includes, but is not limited to... "mineral | | Insulation | fibers (fiberglass and rock wool)." | |6. Board Insulation | This category refers to sheathing, roof | | | decking, and wood panel insulation. It | | | includes, but is not limited to... "cellulose| | | fiber fiberboard, perlite composite board, | | | polyurethane, polyisocyanurate, polystyrene, | | | phenolics, and composites." | |7. Spray-in-place | Includes, but is not limited to... "foam-in- | | Insulation | place polyurethane and polyisocyanurate, | | | and spray-on cellulose." | |8. Cement or Concrete | | | Containing Recovered | | | Materials, Cement, or | | | Concrete Containing | | | Fly Ash | | |9. Copy Paper | This item refers to... "any grade of paper | | | suitable for copying by the xerographic | | | method." | |10. Printing & Writing | This item refers to... "paper designed for | | Paper | printing, other than newsprint, such as | | | offset or book paper," and... "paper | | | suitable for pen and ink, pencil, typewriter | | | or printing." |
| MATERIAL | DEFINITION |
|11. Corrugated & Fiberboard | Corrugated boxes refer to... "boxes made of | | Boxes | corrugated paperboard, which, in turn, is | | | made from a fluted corrugating medium pasted | | | to two flat sheets of paperboard | | | (linerboard)." Fiber or fiberboard boxes | | | refer to... "boxes made from containerboard, | | | either solid fiber or corrugated paperboard | | | (general term); or boxes made from solid | | | paperboard of the same material throughout." | |12. Folding Boxes and | This item refers to... "a paperboard | | Cartons | suitable for the manufacture of folding | | | cartons." | |13. Stationery, Office | This item is considered self-explanatory, | | Papers, Envelopes, and | however, if questions arise refer to | | Manifold Business Forms | 40 CFR 250.4 for definitions of any of these | | | items. | |14. Toilet Tissue, Paper | This item is considered self-explanatory, | | Towels, Facial Tissue, | however, if questions arise refer to | | Paper Napkins, Doilies, | 40 CFR 250.4 for definitions of any of these | | and Industrial Wipes | items. | |15. Brown Papers, and Coarse| Brown papers refer to... "papers usually | | Papers | made from unbleached kraft pulp and used | | | for bags, sacks, wrapping paper, and so | | | forth." Coarse papers refer to... "papers | | | used for industrial purposes, as | | | distinguished from those used for cultural | | | or sanitary purposes." | |16. Other | Any other type of paper not included in any | | | of the above categories. |
-- End of Section --
File details come from the government source that posted it. Updated .