Amend 0003.pdf
PDF 14 MB Posted
- Attached to
- ECP OPT Traffic Calming Federal contract opportunity
- Solicitation number
- N4008525R9003
About this file
This document is an Amendment of Solicitation/Modification of Contract (Standard Form 30) for a Navy Civil/Paving Multiple Award Construction Contract (MACC) at Camp Lejeune. Amendment 0003 for solicitation N4085-25-R-9003 modifies the original solicitation for ECP OPT Traffic Calming project, specifically changing the time and date for receipt of proposals to 1300, 01 July 2025. The amendment includes two key clarifications from potential contractors: 1) a request about gate shutdown schedules, which was denied with stipulations that contractors must keep two of three gates at Piney Green, Wilson, and Holcomb open, and cannot work simultaneously on Douglass and Curtis gates, and 2) a verification request about previous work orders, which was confirmed as completed per the referenced drawing (25-0061 DWG REV 20250623).
The attached documents include detailed aerial maps and technical drawings showing specific traffic calming intervention locations, with multiple pages of cross-section details, specification sheets, and geospatial annotations. The project appears to involve road infrastructure modifications, likely including rumble strips, traffic control measures, and potential lane restructuring across multiple gates and access points at the Camp Lejeune military installation. The technical drawings utilize a standardized symbology and include satellite imagery overlays to precisely locate proposed engineering changes.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amend 0004.pdf | ||
| Amend 0002.pdf | ||
| Amend 0001.pdf | ||
| 25-0061 SOW.pdf | ||
| N4008525B0061 Specs.pdf | ||
| RFP 250061.pdf | ||
| N4008525B0061 Dwgs.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N40085-25-R-9003 Amendment 0003
CONTINUATION SHEET
1. QUESTION: Is it possible to get all gates on the 3 day shut down schedule?
Per stripping sub this would give the Government better quality appearance of the rumble strips.
The duration of the project is going to be hard to achieve with the gates that do not shut down.
ANSWER: No, Contractor is to follow the original guidance. Contractor may work multiple gates with the following stipulations: for Piney Green, Wilson and Holcomb, Contractor must keep two of the three gates open. Contractor cannot work on Douglass and Curtis at the same time.
2. QUESTION: Please verify all work that is shown being done on previous work orders and WO 2701388 have been completed per plan.
ANSWER: Yes, please see 25-0061 DWG REV 20250623.
3. All other terms and conditions remain unchanged.