About this file

These architectural and engineering drawings detail the replacement of hangar doors with roll-up doors for Building 1108 at Joint Expeditionary Base Little Creek - Fort Story in Virginia Beach, Virginia. The project, prepared by Naval Facilities Engineering Command (NAVFAC) Mid-Atlantic, involves comprehensive structural modifications including demolishing existing sliding steel doors, installing new roll-up doors, replacing steel framing, and making associated structural and electrical upgrades.

The technical drawings comprehensively document the project scope across multiple sheets, including structural details, demolition and new work plans, framing elevations, wall sections, and electrical specifications. Key elements include removing existing high bay sliding steel doors, installing new roll-up doors with electric motors, replacing and reinforcing steel columns and panels, filling existing trenches with 3ksi concrete, and integrating new electrical components like door motors, controllers, and exit signage. The drawings provide precise technical specifications for contractors, including dimensional details, material requirements, and installation guidelines for the hangar door replacement project.

View the file

Other files

File Type Posted
N4008525R2602_0001.pdf PDF
25R2602 General Requirements.pdf PDF
Attachment B - Drawings.pdf PDF
Attachment A - Specifications.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

S-001

GENERAL NOTES

SPECIAL INSPECTIONS

DESIGN CODES AND SPECIFICATIONS

ROLL-UP DOOR DESIGNDESIGN LOADS CAST-IN-PLACE CONCRETE NOTES

ANTI-TERRORIST FORCE PROTECTION (ATFP)

STRUCTURAL STEEL

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

B U

IL

D

IN

G

R

E P

LA

C

E B

A Y

D O

O R

S

50'-0"

30'-0"

MKJ NEW NEW

EXISTING W33X118

EXISTING W30X99

N

EXISTING C12X20.7 EXISTING W18X97

W14X60 W14X60

HSS 20X8X5/16

EXISTING `

11'-6" 9'-8" 32'-8" 9'-8" 11'-6"

52'-0"

EXISTING C12X20.7

'-6

3/

5'- 0"

5'- 0"

5'- 0"

5'- 0"

5'- 0"

'-0

5'- 0"

'-3

C8X11.5 C8X11.5

EXISTING

DOOR JAM

'-0

'-0

5'- 0"

5'- 0"

5'- 0"

5'-

0"OFFSET AS NEEDED

9'- 0"

EXISTING

EXTERIOR

WALL PANEL

3'- 0"

'-1

1/ 2"

EXISTING

C12X20.7 (TYP)

NEW DOOR. REFER

TO D4, SHEET A-101

C8X11.5 (TYP)

EXISTING C12X20.7

EXISTING

C8X11.5 (TYP)C8X11.5 (TYP)

10'-0" 10'-0" 10'-0"

NEW ROLL-UP DOOR

EXISTING TRENCH

FILL TRENCH WITH 3KSI CONCRET

A1 S-501

FILL TRENCH WITH 3KSI CONCRET

1'-4"

A2 A-301

A1 A-301

EXISTING

C12X20.7 (TYP)

GRAPHIC SCALE(S)

N

EW

F R

AM

IN

G E

LE

VA

TI

O

N

RFS RFS IR

AS NOTED

12914857

S-201

RON SILVA, PE

0' 1/4"=1'-0"

2' 4' 8'

SCALE:A1 NEW FRAMING ELEVATION

############ A-101

GENERAL SHEET NOTES

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A

IL

D

IN

G

R

E P

LA

C

E B

A Y

D O

O

50'-0"

30'-0"

MKJ NEW NEW N

11'-6" 9'-8" 32'-8" 9'-8" 11'-6"

52'-0"

'-6

3/

'-6

'-3

'-0

'-0

9'-

0"

3'- 0"

'-1

1/ 2"

GRAPHIC SCALE

S-202

RON SILVA P.E.

SCALE:A1 BAY 3 ELEVATION- ADDITIONAL WORK

############ A-101

SCALE:B5 SECTION - EXISTING CONDITION

N.T.S. S-201

17'-4" 17'-4" 17'-4"

GENERAL SHEET NOTES

1. CONTRACTOR TO VERIFY ALL FIELD CONDITIONS RELATING TO THE

WORK IN THIS CONTRACT.

2. WORK SHOWN ON THIS SHEET IS APPLICABLE TO BAY 3 ONLY.

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A

IL

D

IN

G

R

E P

LA

C

E B

A Y

D O

O

6"

UNDER NEW ROLL-UP

DOOR KEEP TRENCH

FILL TRENCH WITH 3KSI CONCRETE TO EXTENTS OF REMOVED HANGER DOOR.

OPPOSITE ORIENTATION FOR OTHER SIDE.

2 3/8"2 3/8"

2"

3"

2"

20"

8" M

IN

S-501

RON SILVA, PE

SCALE:D1 DETAIL- EXISTING CONDITION

N.T.S S-201 SCALE:D3 DETAIL-EXISTING CONDITION

N.T.S S-201 SCALE:D5 DETAIL-EXISTING CONDITION

N.T.S S-201

SCALE:A5 DETAIL-EXISTING CONDITION

N.T.S S-201

SCALE:A1 BASEPLATE DETAIL

N.T.S S-201

SCALE:A3 DETAIL- EXISTING CONDITION

N.T.S. S-201

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A

IL

D

IN

G

R

E P

LA

C

E B

A Y

D O

O

A-301

GENERAL SHEET NOTES

GRAPHIC SCALE

NEW WORK KEYNOTES

WALL SECTION A1 WALL SECTION A2 DETAIL @ DOOR JAMB A4

DETAIL AT EXISTING DOOR JAMB C4

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A

IL

D

IN

G

R

E P

LA

C

E B

A Y

D O

O

A-501

GENERAL SHEET NOTES

GRAPHIC SCALE

SECTION AT DOOR HEAD A4SECTION AT BOTTOM OF PANEL INFILL A2

SECTION TOP OF PANEL INFILL C2

NEW WORK KEYNOTES

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A

IL

D

IN

G

R

E P

LA

C

E B

A Y

D O

O

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

RI

N G

S

YS

TE

M

S C

O M

M

AN

D

M

ID

-A

TL

AN

TI

C

BU

IL

DI

NG

RE

PL

AC

E

BA

Y

DO

O

RS

E-001

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

ABBREVIATIONS GENERAL NOTESELECTRICAL LEGEND

DOOR ELEVATION DETAIL

GRAPHIC SCALE

KEYPLAN

DEMOLITION KEYNOTES

NEW WORK KEYNOTES

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

RI

N G

S

YS

TE

M

S C

O M

M

AN

D

M

ID

-A

TL

AN

TI

C

BU

IL

DI

NG

RE

PL

AC

E

BA

Y

DO

O

RS

E-101

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

PARTIAL FLOOR PLAN - NEW WORK

PARTIAL FLOOR PLAN - DEMOLITION

Sheets and Views
G-001 COVER SHEET
S-001 STRUCTURAL NOTES
S-201 NEW FRAMING ELEVATION
S-202 ADDITIONAL WORK AT BAY 3 -ELEVATION & DETAILS
S-501 DETAILS
A-101 NEW WORK PLAN AND ENLARGED PLAN
A-201 ELEVATIONS
A-301 WALL SECTIONS
A-501 DETAILS
E-001 LEGEND NOTES AND DETAILS
E-101 FLOOR PLAN DEMOLITION AND NEW WORK

2025-04-24T11:23:07-0400

2025-04-24T11:23:29-0400

2025-04-24T11:23:29-0400

2025-04-24T11:23:30-0400

2025-04-24T11:23:30-0400

2025-04-24T11:23:31-0400

2025-04-24T11:23:31-0400

2025-04-24T11:23:32-0400

2025-04-24T11:23:32-0400

2025-04-24T11:23:33-0400

2025-04-24T11:23:33-0400

2025-04-24T11:26:44-0400

2025-04-24T11:27:05-0400

2025-04-24T11:27:05-0400

2025-04-24T11:27:06-0400

2025-04-24T11:27:06-0400

2025-04-24T11:27:07-0400

2025-04-24T11:27:07-0400

2025-04-24T11:27:08-0400

2025-04-24T11:27:08-0400

2025-04-24T11:27:09-0400

2025-04-24T11:27:09-0400

File details come from the government source that posted it. Updated .