Attachment B - Drawings.pdf
PDF 5 MB Posted
- Solicitation number
- N4008525R2602
About this file
These are architectural and engineering drawings for replacing hangar doors at Building 1108 on Joint Expeditionary Base Little Creek - Fort Story in Virginia Beach, Virginia. The project involves removing existing hangar doors and installing new roll-up doors across multiple bays of the vehicle maintenance shop. The drawings detail structural modifications, including replacing existing steel framing, installing new metal panels, modifying electrical connections, and filling existing trenches with 3,000 PSI concrete. The architectural plans specify using vertical flat insulated metal panels, new steel door frames, and modifications to existing wall structures and column supports. Electrical drawings indicate requirements for door motors, controllers, and exit signage, with comprehensive demolition and new work floor plans showing the precise locations and extent of the renovation work.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N4008525R2602_0001.pdf | ||
| Attachment M - Drawings (Rev.1).pdf | ||
| 25R2602 General Requirements.pdf | ||
| Attachment A - Specifications.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
G-001
VICINITY MAP
SYMBOLS LEGEND GENERAL NOTES
BUILDING 1108
ABBREVIATIONS
DETAIL OR SECTION TITLE B2
LIST OF SHEETS
SHEET NO. SHEET TITLE
VIRGINIA BEACH, VIRGINIA
FEAD LITTLE CREEK
NAVFAC MID-ATLANTIC, LITTLE CREEK SITE
JOINT EXPEDITIONARY BASE LITTLE CREEK - FORT STORY
PROJECT SCOPE
NAVFAC DWG NO.
HAZARDOUS MATERIAL NOTES
REPLACE HANGAR DOORS W/ ROLL-UP DOOR
GENERAL
STRUCTURAL
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
B U
IL
D
IN
G
R
E P
LA
C
E B
A Y
D O
O R
S
ELECTRICAL
ARCHITECTURAL
S-001
GENERAL NOTES
SPECIAL INSPECTIONS
DESIGN CODES AND SPECIFICATIONS
ROLL-UP DOOR DESIGNDESIGN LOADS CAST-IN-PLACE CONCRETE NOTES
ANTI-TERRORIST FORCE PROTECTION (ATFP)
STRUCTURAL STEEL
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A
IL
D
IN
G
R
E P
LA
C
E B
A Y
D O
O
50'-0"
30'-0"
MKJ NEW NEW
EXISTING W33X118
EXISTING W30X99
N
EXISTING C12X20.7 EXISTING W18X97
W14X60 W14X60
HSS 20X8X5/16
EXISTING `
11'-6" 9'-8" 32'-8" 9'-8" 11'-6"
52'-0"
EXISTING C12X20.7
'-6
3/
5'- 0"
5'- 0"
5'- 0"
5'- 0"
5'- 0"
'-0
5'- 0"
'-3
C8X11.5 C8X11.5
EXISTING
DOOR JAM
'-0
'-0
5'- 0"
5'- 0"
5'- 0"
5'-
0"OFFSET AS NEEDED
9'- 0"
EXISTING
EXTERIOR
WALL PANEL
3'- 0"
'-1
1/ 2"
EXISTING
C12X20.7 (TYP)
NEW DOOR. REFER
TO D4, SHEET A-101
C8X11.5 (TYP)
EXISTING C12X20.7
EXISTING
C8X11.5 (TYP)C8X11.5 (TYP)
10'-0" 10'-0" 10'-0"
NEW ROLL-UP DOOR
EXISTING TRENCH
FILL TRENCH WITH 3KSI CONCRET
A1 S-501
FILL TRENCH WITH 3KSI CONCRET
1'-4"
A2 A-301
A1 A-301
EXISTING
C12X20.7 (TYP)
GRAPHIC SCALE(S)
N
EW
F R
AM
IN
G E
LE
VA
TI
O
N
RFS RFS IR
AS NOTED
12914857
S-201
RON SILVA, PE
0' 1/4"=1'-0"
2' 4' 8'
SCALE:A1 NEW FRAMING ELEVATION
############ A-101
GENERAL SHEET NOTES
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A
IL
D
IN
G
R
E P
LA
C
E B
A Y
D O
O
50'-0"
30'-0"
MKJ NEW NEW N
11'-6" 9'-8" 32'-8" 9'-8" 11'-6"
52'-0"
'-6
3/
'-6
'-3
'-0
'-0
9'-
0"
3'- 0"
'-1
1/ 2"
GRAPHIC SCALE
S-202
RON SILVA P.E.
SCALE:A1 BAY 3 ELEVATION- ADDITIONAL WORK
############ A-101
SCALE:B5 SECTION - EXISTING CONDITION
N.T.S. S-201
17'-4" 17'-4" 17'-4"
GENERAL SHEET NOTES
1. CONTRACTOR TO VERIFY ALL FIELD CONDITIONS RELATING TO THE
WORK IN THIS CONTRACT.
2. WORK SHOWN ON THIS SHEET IS APPLICABLE TO BAY 3 ONLY.
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A
IL
D
IN
G
R
E P
LA
C
E B
A Y
D O
O
6"
UNDER NEW ROLL-UP
DOOR KEEP TRENCH
FILL TRENCH WITH 3KSI CONCRETE TO EXTENTS OF REMOVED HANGER DOOR.
OPPOSITE ORIENTATION FOR OTHER SIDE.
2 3/8"2 3/8"
2"
3"
2"
20"
8" M
IN
S-501
RON SILVA, PE
SCALE:D1 DETAIL- EXISTING CONDITION
N.T.S S-201 SCALE:D3 DETAIL-EXISTING CONDITION
N.T.S S-201 SCALE:D5 DETAIL-EXISTING CONDITION
N.T.S S-201
SCALE:A5 DETAIL-EXISTING CONDITION
N.T.S S-201
SCALE:A1 BASEPLATE DETAIL
N.T.S S-201
SCALE:A3 DETAIL- EXISTING CONDITION
N.T.S. S-201
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A
IL
D
IN
G
R
E P
LA
C
E B
A Y
D O
O
A-301
GENERAL SHEET NOTES
GRAPHIC SCALE
NEW WORK KEYNOTES
WALL SECTION A1 WALL SECTION A2 DETAIL @ DOOR JAMB A4
DETAIL AT EXISTING DOOR JAMB C4
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A
IL
D
IN
G
R
E P
LA
C
E B
A Y
D O
O
A-501
GENERAL SHEET NOTES
GRAPHIC SCALE
SECTION AT DOOR HEAD A4SECTION AT BOTTOM OF PANEL INFILL A2
SECTION TOP OF PANEL INFILL C2
NEW WORK KEYNOTES
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A
IL
D
IN
G
R
E P
LA
C
E B
A Y
D O
O
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
RI
N G
S
YS
TE
M
S C
O M
M
AN
D
M
ID
-A
TL
AN
TI
C
BU
IL
DI
NG
RE
PL
AC
E
BA
Y
DO
O
RS
E-001
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
S
YS
TE
M
S C
O M
M
AN
D
DES DRW
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
DRAWFORM REVISION: 14 SEP 2023
CHK
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
ABBREVIATIONS GENERAL NOTESELECTRICAL LEGEND
DOOR ELEVATION DETAIL
GRAPHIC SCALE
KEYPLAN
DEMOLITION KEYNOTES
NEW WORK KEYNOTES
N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
RI
N G
S
YS
TE
M
S C
O M
M
AN
D
M
ID
-A
TL
AN
TI
C
BU
IL
DI
NG
RE
PL
AC
E
BA
Y
DO
O
RS
E-101
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
S
YS
TE
M
S C
O M
M
AN
D
DES DRW
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
DRAWFORM REVISION: 14 SEP 2023
CHK
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
OF
EPROJECT NO.:
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
PARTIAL FLOOR PLAN - NEW WORK
PARTIAL FLOOR PLAN - DEMOLITION
| Sheets and Views |
| G-001 COVER SHEET |
| S-001 STRUCTURAL NOTES |
| S-201 NEW FRAMING ELEVATION |
| S-202 ADDITIONAL WORK AT BAY 3 -ELEVATION & DETAILS |
| S-501 DETAILS |
| A-101 NEW WORK PLAN AND ENLARGED PLAN |
| A-201 ELEVATIONS |
| A-301 WALL SECTIONS |
| A-501 DETAILS |
| E-001 LEGEND NOTES AND DETAILS |
| E-101 FLOOR PLAN DEMOLITION AND NEW WORK |
2025-04-02T09:41:23-0400
2025-04-02T09:42:07-0400
2025-04-02T09:42:07-0400
2025-04-02T09:42:08-0400
2025-04-02T09:42:08-0400
2025-04-02T09:42:08-0400
2025-04-02T09:42:09-0400
2025-04-02T09:42:09-0400
2025-04-02T09:42:10-0400
2025-04-02T09:42:10-0400
2025-04-02T09:42:11-0400
2025-04-02T09:42:58-0400
2025-04-02T09:43:12-0400
2025-04-02T09:43:13-0400
2025-04-02T09:43:13-0400
2025-04-02T09:43:14-0400
2025-04-02T09:43:14-0400
2025-04-02T09:43:15-0400
2025-04-02T09:43:15-0400
2025-04-02T09:43:16-0400
2025-04-02T09:43:16-0400
2025-04-02T09:43:17-0400
File details come from the government source that posted it. Updated .