This is Amendment 0004 to solicitation N40085-25-R-2565, issued by NAVFACSYSCOM Mid-Atlantic PWD Oceana on January 8, 2025. The amendment provides PPI Responses and Amendment 2 to the Scope of Work for a project to provide closed circuit evaporative cooler systems at Buildings 230, 232, and 137 at NAS Oceana.
The amendment maintains the proposal due date of January 16, 2025 at 2:00 PM EDT. The hour and date specified for receipt of offers is not extended. The amendment is administered by NAVFAC under Contract ID Code J, with Requisition/Purchase number ACQR6026622.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 25R2565 Amendment 0003.pdf | ||
| 25R2565 Amendment 0002.pdf | ||
| 25R2565 AMENDMENT 0001.pdf | ||
| Attachment B Wage Determination.txt | TXT text file | |
| 1786894 PROPOSED LAY DOWN AREA.pdf | ||
| Attachment H PROVISION 52.204-24.pdf | ||
| BLANK SPONSOR VERIFICATION SPREADSHEET.xls | XLS spreadsheet | |
| 1786894 Final DB_RFP (Revision 1)(111124).pdf | ||
| N4008525R2565 GENERAL REQUIREMENTS .pdf | ||
| Attachment C BASE ACCESS INSTRUCTION.pdf | ||
| Attachment F PPI Spreadsheet.xlsx | XLSX spreadsheet | |
| Attachment D SECNAV 5512.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
J
PAGE OF PAGES
1 2
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. P ROJECT NO.(If applicable)
6. ISSUED BY CODE N4008 7. ADMINISTERED BY (If other than item 6) CODE
See Item 6
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X 9A. AMENDMENT OF SOLICITATION NO.
X 9B. DATED (SEE ITEM 11)
10A. MOD. OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICAT IONS OF CONT RACTS/ORDERS.
IT MODIFIES T HE CONT RACT /ORDER NO. AS DESCRIBED IN ITEM 14.
A. T HIS CHANGE ORDER IS ISSUED PURSUANT T O: (Specify authority) THE CHANGES SET FORT H IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONT RACT /ORDER IS MODIFIED TO REFLECT THE ADMINIST RAT IVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO T HE AUT HORIT Y OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORT ANT : Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT /MODIFICAT ION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
TEL: EMAIL:
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
BY
(Signature of Contracting Officer)
16C. DATE SIGNED
EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
30-105-04 ST ANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
0004 08-Jan-2025 ACQR6026622
N40085-25-R-2565
10-Dec-2024
SOLICITATION N40085-25-R-2565, PROVIDE CLOSED CIRCUIT EVAPORATIVE COOLER, BLDG 230, 232, AND 137 NAS OCEANA
The purpose of this amendment is to provide PPI Responses and Amendment 2 to the Scope of Work.
***Receipt of Proposal due date is 16 January 2025 at 2:00PM EDT.***
SEE CONTINUATION PAGE.
08-Jan-2025
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
(End of Summary of Changes)
N40085-25-R-2565
SOLICITATION N40085-25-R-2565, PROVIDE CLOSED CIRCUIT EVAPORATIVE COOLER, BLDG 230, 232, AND 137 NAS OCEANA
The purpose of this amendment is to provide PPI Responses and Amendment 2 to the Scope of Work.
BUILDINGS 230, 232 AND 137 - PROVIDE CLOSED CIRCUIT EVAPORATIVE COOLER
Naval Air Station Oceana, Virginia Beach, Virginia eProjects 1786894
Amendment 2, 01/08/2025
1. RFP Part 3, D5010 ELECTRICAL SERVICE AND DISTRIBUTION: Delete the second paragraph “In the
Electrical Room, verify that existing Panel ‘B’ …. unit Safety Disconnect Switch.” in its entirety and replace with the following:
“In the Electrical Room, verify that existing Panel ‘B’, located surface mount on the southeast wall near the double doors, can accept circuit breaker(s) required to power the closed circuit evaporative cooler system. Verify that this mechanical unit will require only a single power connection and install it in Panel 'B'. If the power requirement of the closed circuit evaporative cooler exceeds the breaker frame size capability of this existing panel, then power to the closed circuit evaporative cooler control panel may be provided by two circuits. Coordinate the existing panel limitation with the Mechanical DoR in the design and selection of the closed circuit evaporative cooler and control panel. Panel ‘B’ is 225 Amp, Main Lug Only, 208Y/120 Volt, 3-phase, 4-wire, Eaton Manufacturer, Serial #SRM0674350-001. Panel ‘B’ is fed from existing MDP, third section of floor mount interior substation and on generator backup. Coordinate Panel ‘B’ power outages with Air Operations Airfield Manager, Mr. James ‘Gramps’ McDowell, Office 757-433-2318, due to source of power for tower beacon light in Panel ‘B’, positions 7,9, in addition to other entities requiring power outage coordination and notification. Route the closed circuit evaporative cooler circuit(s) directly outside of the Electrical Room and underground to the unit Safety Disconnect Switch(es).”
2. Attachment:
- Attachment (A) - Response to MIG GOV PPI dated 01/07/25
Page Section Para. Dwg #
1 MIG GOV 01/07/25
RFP, Part 3, D5010 indicates to supply the new equipment from panelboard B.
Panelboard B cannot accommodate a
125A circuit breaker and also does not appear to have an adequate SCCR rating based on available fault current.
The MDP in the same electrical room appears to have space for a 125A breaker. Would the government allow contractors to use the MDP to supply the new equipment. If not, could you please provide an alternate existing panelboard that can supply the new equipment.
This project is executed as a Design Build
(DB) Request for Proposal (RFP) where the
Prime Contractor's Designer of Record
(DoR) provides the design for approval.
The electrical design will support the finalized mechanical design requirements.
The 125A circuit breaker size is an estimation and should not have been specifically noted in the RFP. If the actual mechanical equipment load is 125A or greater or the actual SCCR rating is calculated to be insufficient, then possibly an alternate power source will need to be provided for approval, whether that is the
MDP or another existing power source.
Part 3, D3030 COOLING GENERATING
SYSTEMS, paragraph "CLOSED CIRCUIT
EVAPORATIVE COOLER CONTROL
PANEL” specifies the minimum requirements for the control panel. It is preferred to provide the closed circuit evaporative cooler and control panel system utilizing a single point power connection, but the mechanical design may provide the control panel with two electrical feeders if necessary to support the breaker size limitation of the existing electrical
Project Title:Provide Closed Circuit Evaporative Cooler, Buildings 230, 232 and 137 Naval Air Station Oceana, Virginia Beach, Virginia
Solicitation / RFP#: N4008525R2565 - PPI Cut Off Date: 12/23/24
Amend No.GOVERNMENT RESPONSE PPI No.
Offeror Date
Submitted
REFERENCE
QUESTION
File details come from the government source that posted it. Updated .