PROVIDE CLOSED CIRCUIT EVAPORATIVE COOLER, BLDGS 230, 232 AND 137, NAS OCEANA
Solicitation number
N4008525R2565
Issued by

About this file

This amendment to solicitation N4008525R2565 revises the scope of work for providing a closed circuit evaporative cooler system at Naval Air Station (NAS) Oceana. The project specifically involves Building 230 and requires dedicated lead and stand-by branch loop pumps to integrate the cooler into the existing water source heat pump (WSHP) condenser water system that serves Buildings 230, 232, and 137.

The solicitation is restricted to Multiple Award Construction Contract (MACC) holders under Group ID: ML-C00075. The work will be performed at NAS Oceana, Virginia, under the Naval Facilities Engineering Command (NAVFAC).

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

J

PAGE OF PAGES

1 2

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. P ROJECT NO.(If applicable)

6. ISSUED BY CODE N4008 7. ADMINISTERED BY (If other than item 6) CODE

See Item 6

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X 9A. AMENDMENT OF SOLICITATION NO.

X 9B. DATED (SEE ITEM 11)

10A. MOD. OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICAT IONS OF CONT RACTS/ORDERS.

IT MODIFIES T HE CONT RACT /ORDER NO. AS DESCRIBED IN ITEM 14.

A. T HIS CHANGE ORDER IS ISSUED PURSUANT T O: (Specify authority) THE CHANGES SET FORT H IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONT RACT /ORDER IS MODIFIED TO REFLECT THE ADMINIST RAT IVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO T HE AUT HORIT Y OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORT ANT : Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT /MODIFICAT ION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

TEL: EMAIL:

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

BY

(Signature of Contracting Officer)

16C. DATE SIGNED

EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

30-105-04 ST ANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

0002 07-Jan-2025 ACQR6026622

N40085-25-R-2565

10-Dec-2024

SOLICITATION N40085-25-R-2565, PROVIDE CLOSED CIRCUIT EVAPORATIVE COOLER, BLDG 230, 232, AND 137 NAS OCEANA

The purpose of this amendment is to provide the PPI Responses, Amendment 1 to Scope of Work, and Attachments (A), (B), and (D).

***Receipt of Proposal due date is 10 January 2025 at 2:00PM EDT.***

SEE CONTINUATION PAGE.

07-Jan-2025

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

(End of Summary of Changes)

N40085-25-R-2565

SOLICITATION N40085-25-R-2565, PROVIDE CLOSED CIRCUIT EVAPORATIVE COOLER, BLDG 230, 232, AND 137 NAS OCEANA

The purpose of this amendment is to provide the PPI Responses, Amendment 1 to Scope of Work, Attachment (A)

- eProjects 1374448 BUILDING 230 232 AND 137 - REPAIRS TO GEOTHERMAL CONDENSER WATER SYSTEM, Attachment (B) - eProjects 1374448 Certified Final Tab Report for Proportional Balancing, and Attachment (D) - NASO Building 232 – ESPC.

BUILDINGS 230, 232 AND 137 - PROVIDE CLOSED CIRCUIT EVAPORATIVE COOLER

Naval Air Station Oceana, Virginia Beach, Virginia eProjects 1786894

Amendment 1, 01/07/2025

1. RFP Part 3 Statement of Work, Paragraph 1.0 Project Description:

Delete paragraph “Integrate the closed circuit evaporative cooler …. stable condenser water temperature.” in its entirety and replace with the following:

“Integrate the control of the closed circuit evaporative cooler and associated loop pumps (provided by this project) into the existing Building 230 Trane Tracer DDC system to provide stable operation of the primary/secondary condenser water loop system including but not limited to the geothermal well field, this closed circuit evaporative cooler, and pumping.

The Building 137 Johnson Controls Metasys system is existing to remain and will continue to provide the control of the Building 137 condenser water system, including but not limited to the closed circuit evaporation cooler, secondary loop pumps and boiler. The existing Building 137 closed circuit evaporative cooler and boiler will continue to provide indirect support of the Building 230/232/137 condenser water primary loop as per the operation of Building 137”

2. RFP Part 3 Statement of Work, Paragraph D3060 Controls and Instrumentation:

Delete section “HVAC Controls: The existing DDC system …. reflect all modifications and additions.” in its entirety and replace with the following:

“HVAC Controls:

The existing DDC system in Building 230 (Trane Tracer) and Buildings 232/137 (Johnson Controls Metasys) are existing to remain.

Modify the Building 230 Trane Tracer control system to integrate the Circuit Evaporative Cooler and associated pumps (provided by this project) and the existing geothermal well field and Building 230/232/137 condenser water primary/secondary pumping system to provide stable operation of the primary/secondary condenser water loop system including but not limited to the geothermal well field, this closed circuit evaporative cooler, and pumping. Provide monitoring of the inlet and outlet water temperatures for the closed circuit evaporative cooler and the geothermal well field system and the condenser water primary loop supply and return water temperatures.

The existing geothermal well field shall remain as the primary heat sink (first stage) for the “heat of rejection” and “heat of absorption” demands for Buildings 230, 232, and 137 water source heat pump systems. The closed circuit evaporative cooler provided by this project shall act as a second stage to supplement the geothermal well field to satisfy the entire water source heat pump system “heat of rejection” demand.

The existing closed circuit evaporative cooler and gas-fired boiler at Building 137 shall remain to supplement the Building 230/232/137 condenser water primary loop temperature control as allowed by the existing controls in Building 137.

BUILDINGS 230, 232 AND 137 - PROVIDE CLOSED CIRCUIT EVAPORATIVE COOLER

Naval Air Station Oceana, Virginia Beach, Virginia eProjects 1786894

Amendment 1, 01/07/2025

Provide Direct Digital Control (DDC) in accordance with y with UFGS 23 09 00 Instrumentation and Control for HVAC, UFGS 23 09 23.02 BACnet Direct Digital Control Systems for HVAC and Other Building Control Systems and UFGS 23 09 13 Instrumentation and Control Devices for HVAC.

Update the Building 230 Trane Tracer system DDC graphics packages to reflect all modifications and additions.”

3. Attachments:

- Attachment (A) - eProjects 1374448 BUILDING 230 232 AND 137 - REPAIRS TO GEOTHERMAL

CONDENSER WATER SYSTEM"

- Attachment (B) - eProjects 1374448 Certified Final Tab Report for Proportional Balancing

- Attachment (C) - Pre-Proposal Site Visit Attendance Sign-In Sheet

- Attachment (D) - NASO Building 232 – ESPC

- Attachment (E) - Responses to Baron-Rand PPIs dated 12/19/24

- Attachment (F) - Responses to Argus CJW JV 3, LLC dated 12/23/24

Page Section Paragraph

Argus CJW JV 3, LLC 12/23/24 Please share the Sign In Sheet. Refer to "Attachment (C) Pre-Proposal Site Visit Attendance Sheet"

Please share the As-built drawings if applicable. Refer to "Attachment (A) eProjects 1374448 BUILDING 230 232 AND 137 - REPAIRS TO

GEOTHERMAL CONDENSER WATER SYSTEM" 1

Can a single person be a SSHO/Super/QC if eligible? The supervisor may also serve as SSHO and QC if all of the qualifications of the RFP are met.

RFP Part 2 paragraph 01 30 00.05 20 ADMINISTRATIVE REQUIREMENTS, 1.1 Supervision includes the following: "The Superintendent may serve as the Site Safety, Health Officer." and

RFP Part 2 paragraph 01 45 00.05 20 DESIGN AND CONSTRUCTION QUALITY CONTROL, 1.2

Quality Control Manager Qualifications includes the following: "The Superintendent may serve as the Quality Control Manager on this project."

Is US citizen mandatory in job site? RFP Part 2 paragraph 01 14 00.05 20 WORK RESTRICTIONS, 1.3 Work Hours, Access and

Passes, b. Passes and Badges includes the following: "Contractor employees and representatives performing work under this contract are required to be either United States citizens or documented legal residents (status verified by prime contractor)."

Are Buildings 137, 230, 232 the only buildings / loads on this condenser water loop?

Refer to "Attachment (A) eProjects 1374448 BUILDING 230 232 AND 137 - REPAIRS TO

GEOTHERMAL CONDENSER WATER SYSTEM" and reference drawings provided in Part 6 of the

RFP which show that Building 230, 232 and 137 are the only buildings served by this geothermal well field and condenser water primary loop pumping system extending from Building 230.

What is the Square Footage of Buildings 137, 230, 232? GeoReadiness Explorer (GRX) indicates building areas as: Building 230 - approximately 27453

SF, Building 232 approximately 8186 SF, and Building 137 - approximately 71899 SF

What is the estimated tonnage of Buildings 137, 230, 232? Refer to "Attachment (A) eProjects 1374448 BUILDING 230 232 AND 137 - REPAIRS TO

RFP for a listing of equipment in each building and the associated condenser water flows.

What is the heating btu/h of Buildings 137, 230, 232? Refer to "Attachment (A) eProjects 1374448 BUILDING 230 232 AND 137 - REPAIRS TO

RFP for a listing of equipment in each building and the associated condenser water flows..

How much summer/winter btu/h is currently being handled by the

Geothermal loops?

Trending data for the geothermal well field and the thermal loading of each building are not available.

Building 137 condenser water piping serving Building 137 WSHPs have been replace and a project has been awarded to replace the WSHPs and WSHP controls in Building 137. During this work, there has been and may be periods where Building 137 and the Building 137 Closed Circuit

Evaporative Cooler have been isolated from the condenser water primary loop and Building 137 operated in a stand alone mode with the geothermal well field serving the heat loads for Buildings

230 and 232. There have been other periods when the Building 137 Closed Circuit Evaporative cooler has been available to supplement the geothermal well field.

How much summer btu/h is currently being handled by the existing

Cooling Tower at Building 137?

Trending data for the geothermal well field and the thermal loading of each building are not available.

Refer to RFP Part 6 reference data and "Attachment (A) eProjects 1374448 BUILDING 230 232

AND 137 - REPAIRS TO GEOTHERMAL CONDENSER WATER SYSTEM" which includes equipment data.

How much winter btu/h is being handled by the existing Boiler at

Building 137?

Trending data for the geothermal well field and the thermal loading of each building are not available.

Pre-Proposal Inquiry Submission Form

Title: Provide Closed Circuit Evaporative Cooler at Buildings 230, 232 and 137 Naval Air Station Oceana, Virginia Beach, Virginia

Solicitation No.: N4008525R2565

Argus CJW JV 3, LLC

GOVERNMENT RESPONSE

Amend

No.

Date

Submitted Question

Reference Submitted By LEAVE

BLANK

What type of cooling tower water treatment system is desired? Refer to RFP Part 3 paragraph D3040 DISTRIBUTION SYSTEMS, paragraph Chemical Treatment

(Closed Loop Evaporative Cooler Evaporation) and RFP Part 4 D3040 DISTRIBUTION SYSTEMS paragraph 8. Chemical Treatment. Provide a water treatment system shall be capable of automatically feeding chemicals and bleeding the system to prevent corrosion, scale, and biological formations. Automatic chemical feed systems shall automatically feed chemicals into the condenser water based on varying system conditions. Refer to UFGS 23 81 47 and UFGS 23 64 25 for additional information.

Page 37 and 232 of the RFP mention that a temporary 10-ton

HVAC unit needs to be provided to Building 232, for the server room. What is the preferred method of connecting and/or providing the temp unit? Where in the building is this room located?

Refer to "Attachment (D) - NASO Building 232 - ESPC" for clarification of telecommunications server room location in Building 232. The temporary HVAC system design and specification must be addressed in the design documents. Previous construction projects have provided a temporary server room exterior door with penetrations for supply and return ductwork from a temporary HVAC system to serve the server room space.

For Temp Unit, RFP (p 233) mentions that we may need a temporary generator. Estimated kW of this generator? Size / site / noise restrictions? What type of fuel?

The size of the generator must be addressed as a part of and supporting the temporary HVAC system. Emergency Generator requirements are located under Part 4, D5090 OTHER

ELECTRICAL SERVICES, item #4, Emergency Generator, in addition to the emission-generating equipment requirements of The Navy Region Mid-Atlantic Environemental Checklist, as approved by the Contracting Officer. Site will be at the rear of Build 232 as approved by the Contracting Officer based on the space needed for the temporary system. This must all be presented in the design development documents for approval.

Please provide more information on the RFP requirement: “Provide primary condenser water loop modifications to provide manual isolation of the geothermal well field system from the primary condensers water loop…” Does this mean add a valve at the well field? And/or a branch / bypass? (p.34)

Page 33/34 of the RFP is Part 3 paragrah 1.0 PROJECT DESCRIPTION, which is a general description of the project. Refer to RFP Part 3 D3040 DISTRIBUTION SYSTEMS and concept diagram provided in Part 6 ATTACHMENTS for additional information

RFP P. 34 mentions that new pump and Evap Cooler ties into

Building 230 Trane Tracer control system. But also requires modification of Bld 137 Johnson Metasys system. Which system will be the “primary” control system that drives the ‘brains’ of the geothermal system and its supplement coolers, pumps, and boiler?

(and then please verify that the ‘other’ controls systems is just for basic feedback and alarms?)

Building 137 Johnson Controls DDC system is existing to remain. Refer to Amendment revising this paragraph.

What is the size of the Water Line that needs to be relocated? RFP Part 6 reference documents includes drawing C-101 (from the Building 230 Generator project) indicates "4" W (PER RECORDS)"

What is the project schedule? __weeks to DD. ___ weeks to Pre-

Final. ____weeks to Interim Final. ____ weeks to Final

This is a design build (DB) project and Prime Contractor is responsible for the complete project management, including developing and managing the scheduling of events during both the design and construction phases to complete this project on/or before the contract completion date. The designer of record (DoR) is a sub-contractor to be managed by the Prime Contractor. Refer to RFP

Part 2 which includes the required design submissions and the Government review periods.

Can the foundation work for new concreate pad be shown/specified on the mechanical drawings? Or is a structural engineer is required?

Per FC 1-300-09N (paragraph 2-5) and the RFP Part 2 (page 18) "Each drawing must only be signed, sealed, and dated by the Registered Architect or the Professional Engineer who is registered to practice in the particular field involved for work depicted on that drawing, serves as the Designer of Record (DOR) for that work. " If the mechanical DoR provides the structural design and supporting calculations for the closed circuit evaporative cooler equipment pad and supporting steel then the details can be shown on the mechanical drawings that the DoR seals and signs; otherwise a structural engineer and separate structural drawings must be provided.

Can the architectural painting and sealant scope be presented on the mechanical drawings or are architectural drawings and specs required?

Per FC 1-300-09N (paragraph 2-5) and the RFP Part 2 (page 18) "Each drawing must only be signed, sealed, and dated by the Registered Architect or the Professional Engineer who is registered to practice in the particular field involved for work depicted on that drawing, serves as the Designer of

Record (DOR) for that work." Per RFP Part 2, paragraph 01 33 10.05 DESIGN SUBMITTAL

PROCEDURES paragraph 1.3.e "ON DRAWING SPECIFICTIONS WILL NOT BE ACCEPTED"

Will an engineer have to prepare calculations to confirm the selection for the cooler or be specified has what is proposed in the

RFP on page 41?

The minimum performance requirements for the Closed Circuit Evaporative Cooler are provided in the RFP. Heat load analysis of the buildings for the minimum capacity of the Closed Circuit

Evaporative Cooler is not required.

Will government provide CADD files for the area of work? CADD files will not be provided.

Argus CJW JV 3, LLC 12/23/24 2 Part 3 5

Part 1 Section 1 Project Description indicates that a new Closed

Circuit Cooler should be integrated into the Existing Building 230

Trane Tracer System and to modify the existing Trane System at

B230 as well as the Existing Johnson Control System at B-137 to integrate these systems to provide control and sequencing of both systems for stable condenser water temperature. It is our understanding that at best this would require a Gateway (aka

Bridge) from Trane to accomplish. The support and on-going operation of such devices is inherently difficult. This also is generally not allowed by the UFC. We would first suggest that the

Metasys System which currently controls the condenser water system other than the pumps for the WSHP loop at B-230 control the new Cooler System. In lieu of that we suggest that the call for heat injection from the boiler at B-137 be accomplished by hard wired Outputs from the Trane System to the Metasys System at B-

137, with Metasys Providing a Boiler System Status output to the

Trane system.

Building 137 Johnson Controls Metasys DDC system is existing to remain. Refer to Amendment revising the RFP.

D

C

B

A

I

1 2 3 4 5

BUILDINGS 230, 232 AND 137

REPAIRS TO GEOTHERMAL CONDENSER WATER SYSTEM

NAS OCEANA

VIRGINIA BEACH, VIRGINIA

VIC IN ITV MAP {NOT TO SCALE)

NAS OCEANA

r

NORTH

� ....... :ir:� ./

'x

\ r

LOCA Tl ON MAP (NOT TO SCALE)

BUILDING 137

4 5

NO H

Richard C. Hanis

N0.007435

07-05-2017

Dills architects

SEAL

1432 North Great Neck Rd. #204 Virginia Beach, VA 23454

A/E INFO

< APPRO'v'ED

FOR cot.lWIDER NA\IFAC

ACIM1Y

C. MACHMER

SATISFACTORY TO DATE 04 25 17

DES RCH DRW GEB CHK

PM/D• CBM DWG

BRANCH MANAGER CBM

CHIEF ENG/ARCH RJC

FIRE PROTECTION

CONSTR CONTR. NO.

NAVFAC DRAWING NO.

12748691

SHEET 1 OF 43

G-001

DRAWFORM REVISION: 31 JANI.MY 2017

GENERAL NOTES: CAST-IN-PLACE CONCRETE NOTES:

TYPICAL CLOSED CIRCUIT COOLER

EQUIPMENT PAD DETAIL

STRUCTURAL STEEL NOTES:

TYPICAL DETAIL AT CONCENTRATED LOADS ON EXISTING JOISTS

DETAIL

ELEVATION

S-101

N

V

L F

IL

IT

IE

S

E

G

IN

R

O M

ID

-A

TL

TI

1432 North Great Neck Rd, #204

Da Di l s arl ch ti stec

B U

IL

, 2

P

IR

T

TH

L/

W

TE

YS

TE

Structural Engineers 5032 Rouse Dr., Ste 200 Virginia Beach, VA 23462

757.671.8626 - lynchmykins.com

12748696

12748697

12748698

12748699

12748700

12748701

12748702

12748703

12748704

12748705

12748706

12748707

12748708

12748709

12748710

12748711

12748712

12748713

12748714

12748715

12748716

12748717

12748718

12748719

12748720

12748721

12748722

12748723

12748724

12748725

12748726

12748727

12748728

12748729

12748730

12748731

12748732

12748733

CONTRACT NO TRANSMITTAL NO DATE

CONTRACTOR'S SUBMITTAL TRANSMITTAL N40085-17-D-0358 54 A 7/27/2022

LANTDIV NORFOLK 4-4355/3 (Rev,11-80) N40085-18-F-5843

FROM CONTRACTOR PROJECT TITLE AND LOCATION

Civil Works Contracting, 184 Business Park Drive, Virginia Beach, VA 23462

TO: ATTN:

CONTRACTORS USE ONLY REVIEWER USE ONLY

List only one specification division per form ACTION CODES A-Approved

List only one of the following categories on each transmittal form D-Disapproved and indicate which is being submitted AN-Approved as noted

RA-Receipt acknowledged

Contractor Approved x Government Approval DEVIATION/SUBSTITUTION C-Comments

For Government Approval R-Resubmit

ITEM PROJ.SPEC.SECT. ITEM IDENTIFICATION NO.OF ACTION REVIEWERS

NO & PARA.and/or (TYPE,size,model no. Mfg.name.dwg.or COPIES CODES INITIALS

PROJ. DWG.NO. * brochure number) CODE AND DATE

23 05 93 1.4

CONTRACTOR'S COMMENTS:

COPY OF TRANSMITTAL AND SUBMITTALS TO FEAD 7/27/2022 CONTRACTOR REPRESENTATIVE (SIGNATURE)

DATE RECEIVED BY REVIEWER FROM (REVIEWER) TO

Submittals are returned with action indicated. Approval of an item does not include approval of any deviation from the contract requirements unless the contractor calls attention to and supports the deviation.

Submittals are forwarded to LANTDIV with A-E recommendations indicated in REVIEWER USE ONLY Section and in comments below on ONE COPY of the transmittal form.

REVIEWER'S COMMENTS

COPIES TO DATE SIGNATURE

Repairs to Geothermal Condenser Water System, NAS Oceana, Virginia Beach, VA

NAVFAC Mid Atlantic, PWD Oceana, 953 Hornet Dr., Ste. 213, Virginia Beach, VA 23460 Civil Works Contracting Project No. 257

Certified Final Tab Report for Proportional Balancing

SD-06

pcs

Text Box

AN

PCS; 08/09/22

07/29/22

08/09/22

X

08/09/22

NAVFAV MIDLANT

Image

N40085-17-D-0358 N40085-18-F-5843

SUBMITTAL NO. 54 A Civil Works Contracting Project No. 257

23 05 93 SD-06

Date: 7/27/2022 Phil DelSignore

Date:

Certified by Q. C. Manager

Certified by Submittal Reviewer

“I hereby certify that the (equipment) (material) (article) shown and marked in this submittal is that proposed to be incorporated with Contract Number N40085-17-D-0358/N40085-18-F-5843, is in compliance with the contract drawings and specification, can be installed in the allocated spaces, and is submitted for Government approval.”

Repairs to Geothermal Condenser Water System, NAS Oceana, Virginia Beach, VA

7/27/22

14316 Sommerville Court www.cwtesco.com

Midlothian, VA 23113 (804) 379-9345

This report was prepared for:

1) Architect: Dills architects

1432 North Great Neck Rd. #204

2) Mechanical Vansant & Gusler Inc.

Engineer: 6330 Newtown Rd # 400

Norfolk, VA 23502

3) Mechanical Civil Works Contracting, LLC

Contractor: 3329-C Wrightsville Avenue Wilmington, NC 28403

14316 Sommerville Court www.cwtesco.com

Midlothian, VA 23113 (804) 379-9345

REPORT SUMMARY

Repairs to Geothermal/Condenser Water System Buildings 232, 230, and 137

This project contained several hydronic systems. One primary geothermal loop that is assisted by a cooling tower. The primary loop supplied three secondary loops. Each secondary loop is a separate building that consists of multiple water source heat pumps.

Building 232 consists of two secondary loop pumps, P-7, P-8, and six water source heat pumps. All equipment has been balanced to meet AABC standards and design tolerances. The heat pumps had no ports installed on balancing valves found. Measurements were taken across the heat exchanger for each heat pump to prove water flow. See notations throughout the report.

Building 230 consists of two primary pumps P-1, P-2, two secondary pumps P-3, P-4, two heating water pumps P-5, P-6, and 42 water source heat pumps. All equipment has been balanced to meet AABC standards and design tolerances. Several of the heat pumps did not have ports installed, measurements were taken across the heat exchanger for these heat pumps to prove water flow. Some of the heat pumps had no way to prove flow (ports not provided or replaced with plugs). See notations throughout the report.

Building 137 consists of two secondary pumps P-9, P-10, two heating water pumps P-11, P-12, and 35 water source heat pumps found in the building. Some of the heat pumps were not able to be accessed due to security reasons. All equipment has been balanced to meet AABC standards and design tolerances. Several of the heat pumps that have ports were too corroded for us to be able to hook our hoses to. When we tried to do so resulted in a leak. Some of the heat pumps had no way to prove flow (ports not provided or replaced with plugs). See notations throughout the report.

USE Type MODEL SERIAL Cal. Date Mo Cal. Due TECHNICIAN

Amps / Volts Clamp Meter Fluke T5-600 95691580 11/05/21 12 11/05/22 Butch Norris

RPM Tachometer Monarch PLT200 1824982 11/05/21 12 11/05/22 Butch Norris

Water Hydrodata Meter Shortridge HDM-250 W15120 11/05/21 12 11/05/22 Butch Norris

INSTRUMENT CALIBRATION REPORT

Table Of Contents

PROJECT:

LOCATION:

Repairs to Geothermal/Condenser Water System Virginia Beach, VA

2018-157PROJECT #:

DATE:

CONTACT:

7/26/2022

Table Of Contents 1 Heat Pump

1.1 WWHP-1

2 Hydronic Pump

2.1 P-01

2.2 P-02

2.3 P-03

2.4 P-04

2.5 P-05

2.6 P-06

2.7 P-07

2.8 P-08

2.9 P-09

2.10 P-10

2.11 P-11

2.12 P-12

3 Cooling Tower

3.1 CCC-01

C & W Tesco

Heat Pump

Tested By: Butch Norris Date: 7/26/2022

SYSTEM/UNIT: WWHP-1

Unit Data Unit Manufacturer TRANE Unit Model Number EXWE060 Phase/Hertz 3 Design Voltage 208 Actual Voltage 210

Test Data Design Airflow NA CFM

PUMP P-01 & P-02

Hydronic Pump

Date: 6/30/2022

SYSTEM/UNIT: P-01

AREA: Primary Geothermal Loop

Log: P-01 6/30/2022 Butch Norris Flow determined by balancing valve.

Pump Manufacturer Taco Pump Model Number FI4013E4MAJ1L0AB1947D Pump Serial Number 540160/1/1 Rated Waterflow 674.00 GPM

Starter Data Starter Manufacturer Square D Starter Model 8536SFO1H30S

Rated Amps Range 45-135 set @ 100 Amps

Final Test Data Design Waterflow 674 GPM Actual Waterflow 646.78 GPM Motor Volts T1-T2 205 Volts Motor Volts T2-T3 205 Volts Motor Volts T1-T3 205 Volts Motor Amps T1 98.30 Amps Motor Amps T2 95.60 Amps Motor Amps T3 96.70 Amps Motor RPM 1777 RPM

Motor Data Motor Manufacturer Baldor Motor Frame 324T Motor HP 40 HP Motor RPM 1770 RPM Motor Rated Volts 208 Volts Motor Phase 3 Motor Hertz 60 Hz Motor F.L. Amps 99.00 Amps Motor Service Factor 1.15

System/Unit Manufact urer

Model Numbe

Valve Size d.GPM p.GPM a.GPM Design

D.P.

Prelimi nary

Final

(PSI)

%D Des/Pr e

Des/Fi nal

CV

Design

D.P. (in)

Valve-01 Nexus NXFB6

6 674.00 605.18 646.78 28.81 19.20 21.93 90 96

Totals: - - - 674.00 605.18 646.78 - - - 90 96 - - -

P-01 Balance Valve Summary

SYSTEM/UNIT: P-02

AREA: Primary Geothermal Loop

Log: P-02 6/30/2022 Butch Norris Flow determined by balancing valve.

Pump Model Number F14013E4MAJ1L0AB1947D Pump Serial Number 540160/1/1 Rated Waterflow 674.00 GPM

Starter Model 8536SFO1H30S

Rated Amps Range 45-135 set @ 100

Design Waterflow 674 GPM Actual Waterflow 644.56 GPM Motor Volts T1-T2 205 Volts Motor Volts T2-T3 205 Volts Motor Volts T1-T3 205 Volts Motor Amps T1 99.00 Amps Motor Amps T2 98.70 Amps Motor Amps T3 97.60 Amps Motor RPM 1775 RPM

Motor Frame 324T Motor HP 40 HP Motor RPM 1770 RPM Motor Rated Volts 208 Volts Motor Phase 3 Motor Hertz 60 Hz Motor F.L. Amps 99.00 Amps

Valve-01 Nexus NXFB6

6 674.00 542.00 644.56 28.81 15.40 21.78 80 96

Totals: - - - 674.00 542.00 644.56 - - - 80 96 - - -

P-02 Balance Valve Summary

PUMP P-03 & P-04

SYSTEM/UNIT: P-03

AREA: BLDG 230 Secondary Water

Pump Model Number F12510E4GAH1L0CB1942D Pump Serial Number 540160/8/1 Rated Waterflow 240.00 GPM

Starter Model 8536SBO2H30S

Rated Amps Range 15-45 Amp set @ 26

Design Waterflow 240 GPM Actual Waterflow 236.00 GPM Motor Volts T1-T2 207 Volts Motor Volts T2-T3 207 Volts Motor Volts T1-T3 207 Volts Motor Amps T1 17.80 Amps Motor Amps T2 16.50 Amps Motor Amps T3 18.30 Amps Motor RPM 1790 RPM

Motor Frame 215T Motor HP 10 HP Motor RPM 1770 RPM Motor Rated Volts 208 Volts Motor Phase 3 Motor Hertz 60 Hz Motor F.L. Amps 26.00 Amps

Valve-01 Nexus NXFB4

4 240.00 236.00 236.00 15.22 14.80 14.80 98 98

Totals: - - - 240.00 236.00 236.00 - - - 98 98 - - -

P-03 Balance Valve Summary

SYSTEM/UNIT: P-04

AREA: BLDG 230 Secondary Water

Log: P-04 6/30/2022 Butch Norris Flow determined by balancing valve.

P-04 12/17/2021 Butch Norris Devices total 225 GPM

Pump Model Number F12510E4GAH1L0CB1942D Pump Serial Number 540160/8/1 Rated Waterflow 240.00 GPM

Rated Amps Range 15-45 Amp set @ 26

Design Waterflow 240 GPM Actual Waterflow 235.00 GPM Motor Volts T1-T2 207 Volts Motor Volts T2-T3 207 Volts Motor Volts T1-T3 206 Volts Motor Amps T1 18.50 Amps Motor Amps T2 19.10 Amps Motor Amps T3 17.60 Amps Motor RPM 1789 RPM

Motor Frame 215T Motor HP 10 HP Motor RPM 1770 RPM Motor Rated Volts 208 Volts Motor Phase 3 Motor Hertz 60 Hz Motor F.L. Amps 26.00 Amps

(E) HP-01-217* Hays 2511 ½" 1.50

(E) HP-01-

217A*

Hays 2511 ½" 1.50 2.70 0.00 0.00

(E) HP-02-110* Hays 2511 ½" 2.80 9.30 9.80 9.80

(E) HP-02-

122A* Hays 2511 ½" 2.80 9.30 0.00 0.00

(E) HP-02-204* Hays 2511 ½" 2.80 9.30 9.70 9.70

(E) HP-02-

217B* Hays 2511 ½" 2.80 9.30 0.00 0.00

(E) HP-02-228* Hays 2511 ½" 2.80 9.30 2.80 2.80

(E) HP-03-120* Hays 2511 ½" 4.00 8.50 9.10 9.10

(E) HP-04-103* Hays 2511 ½" 4.00 8.50 9.00 9.00

(E) HP-04-119* 4.00

(E) HP-04-120* Hays 2511 ½" 4.00 8.50 8.60 8.60

(E) HP-04-

123A*

Hays 2511 ½" 4.00 8.50 0.00 0.00

(E) HP-04-128* Hays 2511 ½" 4.00 8.50 8.30 8.30

(E) HP-04-132* Hays 2511 ½" 4.00 8.50 9.10 9.10

(E) HP-04-133* Hays 2511 ½" 4.00 8.50 7.90 7.90

(E) HP-04-135* Hays 2511 ½" 4.00 8.50 8.10 8.10

(E) HP-04-

202A*

Hays 2511 ½" 4.00 8.50 8.90 8.90

P-04 Balance Valve Summary

(E) HP-04-216* Hays 2511 ½" 4.00

(E) HP-04-217D

left side * 4.00

(E) HP-04-217D

right side*

Hays 2511 ½" 4.00 8.50 9.10 9.10

(E) HP-04-220* Hays 2511 ½" 4.00 8.50 8.10 8.10

(E) HP-04-221* 4.00

(E) HP-04-222* Hays 2511 ½" 4.00 8.50 7.80 7.80

(E) HP-04-226* Hays 2511 ½" 4.00 8.50 8.70 8.70

(E) HP-04-229* Hays 2511 ½" 4.00 8.50 9.60 9.00

(E) HP-05-1st Floor Hall in front of 123

4.00 8.50 8.20 8.20

(E) HP-05-1st front of 124*

(E) HP-05-2nd Floor Hall across from 200*

4.00 8.50 0.00 0.00

(E) HP-05-2nd between 200 and 229*

(E) HP-06-2nd across from 207

5.00 across from 217C* between 205 and 207*

(E) HP-07-1st Floor Hall*

Hays 2520 1 7.00 14.80 14.30 14.30

(E) HP-07-2nd

7.00 14.80 14.50 14.20

(E) HP-09-140

in front of 106*

8.00 9.60 9.60

(E) HP-09-140

right corridor *

8.00 8.70 8.70

(E) HP-09-140-

Lobby*

8.00 8.90 8.90

(E) HP-09-1st

8.00 9.30 8.60 8.60

(E) HP-09-1st front of 112

8.00

(E) HP-09-2nd

8.00 9.30 8.90 8.90

(E) HP-10-105 Nexus XB 4A 1 ½" 15.00 29.99 15.02 22.93 49.30 23.00 200 100

(E) HP-11-105* 28.00

Pump-4 Nexus NXFB4

4 240.00 235.00 235.00 15.22 14.60 14.60 98 98

Secondary System Return

Nexus NXFB4

4 240.00 446.00 239.00 15.22 52.60 15.10 186 100

WWHP-1 Nexus XB 4A 1 ½ 23.00 23.08 53.93 54.30 100 Totals: - - - 728.00 710.99 512.10 - - - 98 70 - - -

Log: P-04/(E) HP-01-217 6/28/2022 Butch Norris No ports on the automatic flow control valve. Unable to obtain Measurement

P-04/(E) HP-01-217A 6/28/2022 Butch Norris No ports on the automatic flow control valve.

Measured differential across the exchanger.

P-04/(E) HP-02-110 6/28/2022 Butch Norris No ports on the automatic flow control valve.

P-04/(E) HP-02-122A 6/28/2022 Butch Norris No ports on the automatic flow control valve.

P-04/(E) HP-02-204 6/28/2022 Butch Norris No ports on the automatic flow control valve.

P-04/(E) HP-02-228 6/28/2022 Butch Norris No ports on the automatic flow control valve.

P-04/(E) HP-03-120 6/28/2022 Butch Norris No ports on the automatic flow control valve.

P-04/(E) HP-04-103 6/28/2022 Butch Norris No ports on the automatic flow control valve.

P-04/(E) HP-04-120 6/28/2022 Butch Norris No ports on the automatic flow control valve.

P-04/(E) HP-04-123A 6/28/2022 Butch Norris No ports on the automatic flow control valve.

P-04/(E) HP-04-128 6/28/2022 Butch Norris No ports on the automatic flow control valve.

P-04/(E) HP-04-132 6/28/2022 Butch Norris No ports on the automatic flow control valve.

P-04/(E) HP-04-133 6/28/2022 Butch Norris No ports on the automatic flow control valve.

P-04/(E) HP-04-135 6/28/2022 Butch Norris No ports on the automatic flow control valve.

P-04/(E) HP-04-202A 6/28/2022 Butch Norris No ports on the automatic flow control valve.

P-04/(E) HP-04-216 6/28/2022 Butch Norris No ports on the automatic flow control valve. Unable to obtain Measurement

P-04/(E) HP-04-217D right side 6/28/2022 Butch Norris No ports on the automatic flow control valve.

P-04/(E) HP-04-220 6/28/2022 Butch Norris No ports on the automatic flow control valve.

P-04/(E) HP-04-221 6/28/2022 Butch Norris No heat pump in room

P-04/(E) HP-04-222 6/28/2022 Butch Norris No ports on the automatic flow control valve.

P-04/(E) HP-04-226 6/28/2022 Butch Norris No ports on the automatic flow control valve.

P-04/(E) HP-04-229 6/28/2022 Butch Norris No ports on the automatic flow control valve.

P-04/(E) HP-05-1st Floor Hall in front of 124

6/28/2022 Butch Norris Heat pump not found.

P-04/(E) HP-05-2nd Floor Hall across from 200

6/28/2022 Butch Norris No balancing valve found. Measured differential across the exchanger.

P-04/(E) HP-05-2nd Floor Hall between 200 and 229

6/28/2022 Butch Norris No balancing valve found. Port for supply side missing unable to obtain measurement

P-04/(E) HP-06-2nd Floor Hall across from 217C

6/28/2022 Butch Norris Heat pump not found.

P-04/(E) HP-07-1st Floor Hall 6/28/2022 Butch Norris No ports on the automatic flow control valve.

P-04/(E) HP-07-2nd Floor Hall 6/28/2022 Butch Norris No balancing valve found. Measured differential

P-04/(E) HP-09-140 in front of 106 6/28/2022 Butch Norris No balancing valve found. Measured differential

P-04/(E) HP-09-140 right corridor 6/28/2022 Butch Norris No balancing valve found. Measured differential

P-04/(E) HP-09-140-Lobby 6/28/2022 Butch Norris No balancing valve found. Measured differential

P-04/(E) HP-09-1st Floor Hall 6/28/2022 Butch Norris No balancing valve found. Measured differential

P-04/(E) HP-09-2nd Floor Hall 6/28/2022 Butch Norris No balancing valve found. Measured differential

P-04/(E) HP-01-217A 6/28/2022 Butch Norris No flow

P-04/(E) HP-02-122A 6/28/2022 Butch Norris No flow

P-04/(E) HP-02-217B 6/28/2022 Butch Norris No flow

P-04/(E) HP-02-228 6/28/2022 Butch Norris Low flow

P-04/(E) HP-04-119 6/28/2022 Butch Norris Valves off

P-04/(E) HP-04-123A 6/28/2022 Butch Norris No flow

P-04/(E) HP-04-217D left side 6/28/2022 Butch Norris unit unplugged

P-04/(E) HP-04-217D left side 6/28/2022 Butch Norris No flow

P-04/(E) HP-05-2nd Floor Hall across from 200

6/28/2022 Butch Norris No flow

P-04/(E) HP-06-2nd Floor Hall between 205 and 207

6/28/2022 Butch Norris One port missing on the return side. Unable to obtain measurement.

P-04/(E) HP-11-105 6/28/2022 Butch Norris Unit valved off

There were no balancing valves found on any of the heat pumps inside the building. The only thing we could do to prove flow is measure a drop across the exchanger. Please see notes throughout the report.

There were no balancing valves found on any of the heat pumps inside the building. The only thing we could do to prove flow is measure a drop across the exchanger. Please see notes throughout the report.

23.08

15.02

Unit valved off technician

Line

PUMP P-05 & P-06

SYSTEM/UNIT: P-05

AREA: BLDG 230 Heating Water

Log: P-05 6/30/2022 Butch Norris Flow determined by balancing valve.

Pump Model Number JS1507AE2HCC807M Pump Serial Number 540161/1/1 Rated Waterflow 23.00 GPM

Starter Model 8536SDO1H30S Rated Amps Range 6-18 set @ 6 Amps

Design Waterflow 23 GPM Actual Waterflow 22.00 GPM Motor Volts T1-T2 207 Volts Motor Volts T2-T3 207 Volts Motor Volts T1-T3 206 Volts Motor Amps T1 3.90 Amps Motor Amps T2 3.90 Amps Motor Amps T3 3.70 Amps

Motor RPM Field Measurement not Possible RPM

Motor Frame 145TCZ Motor HP 2 HP Motor RPM 1725 RPM Motor Rated Volts 208 Volts Motor Phase 3 Motor Hertz 60 Hz Motor F.L. Amps 5.70 Amps

Valve-01 Nexus XB 4A 1.5 23.00 16.75 22.00 53.93 28.20 49.33 73 96 Totals: - - - 23.00 16.75 22.00 - - - 73 96 - - -

P-05 Balance Valve Summary

SYSTEM/UNIT: P-06

AREA: BLDG 230 Heating Water

Log: P-06 6/30/2022 Butch Norris Flow determined by balancing valve.

Pump Model Number JS1507AE2HCC807M Pump Serial Number 540161/1/1 Rated Waterflow 23.00 GPM

Rated Amps Range 6-18 set @ 6 Amps

Design Waterflow 23 GPM Motor Volts T1-T2 207 Volts Motor Volts T2-T3 207 Volts Motor Volts T1-T3 206 Volts Motor Amps T1 3.10 Amps Motor Amps T2 3.00 Amps Motor Amps T3 2.80 Amps

Motor RPM Field Measurement not Possible RPM

Motor Frame 145TCZ Motor HP 2 HP Motor RPM 1725 RPM Motor Rated Volts 208 Volts Motor Phase 3 Motor Hertz 60 Hz Motor F.L. Amps 5.70 Amps

Valve-01 Nexus XB 4A 1.5 23.00 16.60 22.09 53.93 28.10 49.73 72 96 Totals: - - - 23.00 16.60 22.09 - - - 72 96 - - -

P-06 Balance Valve Summary

PUMP P-07 & P-08

SYSTEM/UNIT: P-07

AREA: BLDG 232 Secondary Water

Log: P-07 6/30/2022 Butch Norris Flow determined by balancing valve.

Pump Model Number FI1509E4DAJ1L0B1939D Pump Serial Number T40160/19/1 Rated Waterflow 80.00 GPM

Rated Amps Range 6-18 set @ 8 Amps

Design Waterflow 80 GPM Actual Waterflow 76.14 GPM Motor Volts T1-T2 206 Volts Motor Volts T2-T3 206 Volts Motor Volts T1-T3 204 Volts Motor Amps T1 6.60 Amps Motor Amps T2 6.20 Amps Motor Amps T3 6.10 Amps Motor RPM 1774 RPM

Motor Frame 182T Motor HP 3 HP Motor RPM 1765 RPM Motor Rated Volts 208 Volts Motor Phase 3 Motor Hertz 60 Hz Motor F.L. Amps 8.50 Amps

Valve-01 Nexus NXFB2

2.5 80.00 76.14 78.10 12.70 11.50 12.10 95 98

Totals: - - - 80.00 76.14 78.10 - - - 95 98 - - -

P-07 Balance Valve Summary

SYSTEM/UNIT: P-08

AREA: BLDG 232 Secondary Water

Log: P-08 12/17/2021 Butch Norris Devices total 75 GPM

Pump Model Number FI1509E4DAJ1L0B1939D Pump Serial Number T40160/19/1 Rated Waterflow 89.00 GPM

Rated Amps Range 6-18 set @ 8 Amps

Design Waterflow 80 GPM Actual Waterflow 77.80 GPM Motor Volts T1-T2 206 Volts Motor Volts T2-T3 206 Volts Motor Volts T1-T3 204 Volts Motor Amps T1 6.70 Amps Motor Amps T2 6.30 Amps Motor Amps T3 6.20 Amps Motor RPM 1778 RPM

Motor Frame 182T Motor HP 3 HP Motor RPM 1765 RPM Motor Rated Volts 208 Volts Motor Phase 3 Motor Hertz 60 Hz Motor F.L. Amps 8.50 Amps

(E) HP-01-119* Hays 2520 1 20.00 6.90

(E) HP-02-119* Hays 2520 1 15.00 8.10

(E) HP-03-103* Hays 2520 1 15.00 9.40

(E) HP-04-119* Hays 2520 1 5.00 6.90

(E) HP-04-119* Hays 2520 1 5.00 7.80

(E) HP-04-119* Hays 2520 1 15.00 9.10

Pump-8 Nexus NXFB2

2.5 80.00 77.80 77.80 12.70 11.70 11.70 97 97

Nexus NXFB2

2.5 80.00 77.45 77.45 12.70 11.90 11.90 97 97

Totals: - - - 235.00 155.25 155.25 - - - 66 66 - - -

P-08 Balance Valve Summary

Log: P-08/(E) HP-01-119 6/30/2022 Butch Norris No balancing valve found. Measured differential

P-08/(E) HP-02-119 6/30/2022 Butch Norris No balancing valve found. Measured differential

P-08/(E) HP-03-103 6/30/2022 Butch Norris No balancing valve found. Measured differential

P-08/(E) HP-04-119 6/30/2022 Butch Norris No balancing valve found. Measured differential

There were no balancing valves found on any of the heat pumps inside the building or the mechanical room. The only thing we could do to prove flow is measure a drop across the exchanger. Please see notes throughout the report.

78.1 77.8

77.45

PUMP P-09 & P-10

SYSTEM/UNIT: P-09

AREA: BLDG 137 Secondary Water

Log: P-09 6/30/2022 Butch Norris Flow determined by balancing valve.

Pump Model Number FI3011E4JAJ1L0DB1944D Pump Serial Number T40160/21/1 Rated Waterflow 354.00 GPM

Rated Amps Range 15-45 set @ 24 Amps

Design Waterflow 354 GPM Actual Waterflow 340.00 GPM Motor Volts T1-T2 481 Volts Motor Volts T2-T3 478 Volts Motor Volts T1-T3 477 Volts Motor Amps T1 21.30 Amps Motor Amps T2 22.50 Amps Motor Amps T3 21.80 Amps Motor RPM 1784 RPM

Motor Frame 256T Motor HP 20 HP Motor RPM 1765 RPM Motor Rated Volts 460 Volts Motor Phase 3 Motor Hertz 60 Hz Motor F.L. Amps 24.00 Amps

Valve-01 Nexus NXFB5

5 354.00 340.00 340.00 13.80 12.70 12.70 96 96

Totals: - - - 354.00 340.00 340.00 - - - 96 96 - - -

P-09 Balance Valve Summary

SYSTEM/UNIT: P-10

AREA: BLDG 137 Secondary Water

Log: P-10 6/30/2022 Butch Norris Flow determined by balancing valve.

Pump Model Number FI3011E4JAJ1L0DB1944D Pump Serial Number T40160/21/1 Rated Waterflow 354.00 GPM

Rated Amps Range 15-45 set @ 24 Amps

Design Waterflow 354 GPM Actual Waterflow 342.00 GPM Motor Volts T1-T2 480 Volts Motor Volts T2-T3 479 Volts Motor Volts T1-T3 477 Volts Motor Amps T1 21.80 Amps Motor Amps T2 21.50 Amps Motor Amps T3 22.00 Amps Motor RPM 1785 RPM

Motor Frame 256T Motor HP 20 HP Motor RPM 1765 RPM Motor Rated Volts 460 Volts Motor Phase 3 Motor Hertz 60 Hz Motor F.L. Amps 24.00 Amps

System/Unit Area Served Manufact

Bldg. 137

4 354.00 319.00 338.00 33.12 27.00 30.20 90 95

Bldg 137 bldg.

Loop Return

4 241.00 236.30 236.30 15.35 14.76 14.76 98 98

Bldg 137 bldg.

Loop Return

Nexus NXFB3

3 113.00 106.25 106.25 10.95 9.68 9.68 94 94

Loop-1(E)HP- 01-1*

15.00

02-1*

27.00

03-1*

4.80

04-1*

5.90

05-1 - 121

121 Gerand 1E 1 ½ 11.00 10.80 13.50 13.00 98

06-1*

18.00

07-1

140 Gerand 1D 1¼ 12.00 12.00 16.00 15.80 100

08-1 - 114

113 Gerand 4B ¾ 3.50 3.50 18.00 18.00 100

P-10 Balance Valve Summary

09-1 - corridor

206*

206 Gerand 1C 1 6.80

10-1 - 228*

228 16.50

11-1 - 208*

207 Gerand 1E 1 ½ 16.50

12-1 - 211

211 Gerand 1D 1¼ 7.30 7.20 6.00 5.80 99

12-1 - between

255 & 260*

13-1 - 212 255 Gerand 1C 1 6.80 6.60 28.00 27.50 97

13-1 - 255*

212 6.80

14-1 - 211*

14-1 - 212*

206 21.50

15-1 - 256*

232 6.00

15-1 - corridor

232*

256 Gerand 1C 1 6.00 22.00

16-1*

9.00

17-1*

232 7.30

18-1 - corridor

232*

232 Gerand 1D 1¼ 14.00 22.00

19-1 - 109*

109 Gerand 2D 1¼ 14.50

20-1*

9.00

21-1 corridor

108*

108 Gerand 3B ¾ 4.00 2.00 12.00 12.00 50

Loop-2(E) closest to the door* Loop-2(E)Far side of room

124*

Gerand 5B ¾ 5.90 5.70 13.50 13.00 97

Loop-2(E)HP- 01-2 - 132B

151 Gerand 1E 1 ½ 2.70 15.00 6.00 5.80 556

01-2 - 151

132B Griswold ¾ 15.00 15.00 12.00 11.80 100 19.8

02-2

135 Griswold 30301

DF

1 3.90 3.70 7.90 7.80 95 9

02-2 - 135*

147 3.90

03-2 - 146*

146 Griswold 30301

¾ 2.70 3.3

04-2 - 145

145 Griswold 30301

1 9.50 9.30 8.50 8.30 98 19.2

05-2 - 141

141 Griswold 30301

¾ 9.00 8.80 12.80 12.00 98 11.4

06-2*

270 6.00

06-2 - 111*

111 Gerand 1E 1 ½ 6.00

06-2 - 270*

07-2*

272 5.30

08-2 - 266*

266 6.00

09-2*

261 6.00

10-2*

264 8.20

11-2*

254 11.30

12-2*

254 11.30

13-2*

3.50

14-2*

8.00

15-2*

3.50

16-2*

11.90

17-2*

272 4.00

Pump-10 Nexus NXFB5

5 354.00 342.00 342.00 13.80 12.90 12.90 97 97

Totals: - - - 1454.80 1003.5

1122.15 - - - 69 77 -

Log: P-10/Loop-1(E)HP-01-1 6/30/2022 Butch Norris Not found drawings.

P-10/Loop-1(E)HP-02-1 6/30/2022 Butch Norris Not found drawings.

P-10/Loop-1(E)HP-03-1 6/30/2022 Butch Norris Not found drawings.

P-10/Loop-1(E)HP-04-1 6/30/2022 Butch Norris Not found drawings.

P-10/Loop-1(E)HP-06-1 6/30/2022 Butch Norris Not found drawings.

P-10/Loop-1(E)HP-09-1 - corridor 206 6/30/2022 Butch Norris Unit valves are shut.

P-10/Loop-1(E)HP-11-1 - 208 6/30/2022 Butch Norris Not able to connect to valve.

P-10/Loop-1(E)HP-12-1 - between 255 & 260

6/30/2022 Butch Norris Secured area. No access

P-10/Loop-1(E)HP-13-1 - 255 6/30/2022 Butch Norris Secured area. No access

P-10/Loop-1(E)HP-14-1 - 211 6/30/2022 Butch Norris Not found drawings.

P-10/Loop-1(E)HP-15-1 - 256 6/30/2022 Butch Norris Secured area. No access

P-10/Loop-1(E)HP-16-1 6/30/2022 Butch Norris Not found drawings.

P-10/Loop-1(E)HP-17-1 6/30/2022 Butch Norris Unit valves are shut.

P-10/Loop-1(E)HP-20-1 6/30/2022 Butch Norris Not found drawings.

P-10/Loop-1(E)HP-21-1 corridor 108 6/30/2022 Butch Norris Valve tag is 2 GPM @ 12". Set valve to scheduled

GPM.

P-10/Loop-2(E)closest to the door 6/30/2022 Butch Norris Unit valves are shut.

P-10/Loop-2(E)Far side of room 124 6/30/2022 Butch Norris No HP identification on drawings

P-10/Loop-2(E)HP-06-2 6/30/2022 Butch Norris Not found drawings.

P-10/Loop-2(E)HP-06-2 - 270 6/30/2022 Butch Norris unit has been replaced with a split system.

P-10/Loop-2(E)HP-07-2 6/30/2022 Butch Norris Secured area. No access

P-10/Loop-2(E)HP-08-2 - 266 6/30/2022 Butch Norris unit has been replaced with a split system.

P-10/Loop-2(E)HP-09-2 6/30/2022 Butch Norris Secured area. No access

P-10/Loop-2(E)HP-10-2 6/30/2022 Butch Norris Secured area. No access

P-10/Loop-2(E)HP-11-2 6/30/2022 Butch Norris Secured area. No access

P-10/Loop-2(E)HP-12-2 6/30/2022 Butch Norris Secured area. No access

P-10/Loop-2(E)HP-13-2 6/30/2022 Butch Norris Not found drawings.

P-10/Loop-2(E)HP-14-2 6/30/2022 Butch Norris Not found drawings.

P-10/Loop-2(E)HP-15-2 6/30/2022 Butch Norris Not found drawings.

P-10/Loop-2(E)HP-16-2 6/30/2022 Butch Norris Not found drawings.

P-10/Loop-2(E)HP-17-2 6/30/2022 Butch Norris Secured area. No access

P-10/Loop-1(E)HP-10-1 - 228 6/30/2022 Butch Norris Not accessible

P-10/Loop-1(E)HP-14-1 - 212 6/30/2022 Butch Norris No balancing valve found.

P-10/Loop-1(E)HP-15-1 - corridor 232 6/30/2022 Butch Norris Ports clogged. Unable to obtain measurements.

P-10/Loop-1(E)HP-18-1 - corridor 232 6/30/2022 Butch Norris Ports clogged. Unable to obtain measurements.

P-10/Loop-1(E)HP-19-1 - 109 6/30/2022 Butch Norris Valve missing port (replaced with plug). Unable to obtain measurements.

P-10/Loop-2(E)HP-02-2 - 135 6/30/2022 Butch Norris Not accessible.

P-10/Loop-2(E)HP-03-2 - 146 6/30/2022 Butch Norris Unit valved off

P-10/Loop-2(E)HP-06-2 - 111 6/30/2022 Butch Norris Ports clogged. Unable to obtain measurements.

3.5

2.0

10.8

See note in report

8.8

See note in report see note in report

15 3.7

9.3

7.2

6.6

No access

See notes in report

No access No access

236.3

106.25

103.62

104.35

PUMP P-11 & P-12

SYSTEM/UNIT: P-11

AREA: BLDG 137 Heating Water

Pump Model Number FI2506E4CAH1L0DB1937D Pump Serial Number T40160/20/1 Rated Waterflow 105.00 GPM

Starter Manufacturer A-B Starter Model 509 - A0D Installed Thermals W 34 Rated Amps 1.73 Amps Required Thermals W 37 Required Amps 2.28 Amps

Design Waterflow 105 GPM Actual Waterflow 103.62 GPM Motor Volts T1-T2 482 Volts Motor Volts T2-T3 478 Volts Motor Volts T1-T3 479 Volts Motor Amps T1 2.10 Amps Motor Amps T2 2.10 Amps Motor Amps T3 2.00 Amps Motor RPM 1775 RPM

Motor Frame 145T Motor HP 1.5 HP Motor RPM 1753 RPM Motor Rated Volts 460 Volts Motor Phase 3 Motor Hertz 60 Hz Motor F.L. Amps 2.20 Amps

2.5 105.00 60.25 103.62 21.87 7.20 21.30 57 99

Totals: - - - 105.00 60.25 103.62 - - - 57 99 - - -

P-11 Balance Valve Summary

SYSTEM/UNIT: P-12

AREA: BLDG 137 Heating Water

Pump Model Number FI2506E4CAH1L0DB1937D Pump Serial Number T40160/20/1 Rated Waterflow 105.00 GPM

Starter Manufacturer A-B Starter Model 509 - A0D Installed Thermals W 34 Rated Amps 1.73 Amps Required Thermals W 37 Required Amps 2.28 Amps

Design Waterflow 105 GPM Actual Waterflow 104.35 GPM Motor Volts T1-T2 481 Volts Motor Volts T2-T3 478 Volts Motor Volts T1-T3 478 Volts Motor Amps T1 2.20 Amps Motor Amps T2 2.10 Amps Motor Amps T3 2.10 Amps Motor RPM 1779 RPM

Motor Frame 145T Motor HP 1.5 HP Motor RPM 1753 RPM Motor Rated Volts 460 Volts Motor Phase 3 Motor Hertz 60 Hz Motor F.L. Amps 2.20 Amps

2.5 105.00 58.12 104.35 21.87 6.70 21.60 55 99

Totals: - - - 105.00 58.12 104.35 - - - 55 99 - - -

P-12 Balance Valve Summary

Cooling Tower

SYSTEM/UNIT: CCC-01

Unit Manufacturer Marlry

Unit Serial Number 10166619-A1

MHF7101MAEJNGG1SBF201

Test Data

Motor Volts T1-T2 Field Measurement not Possible Volts

Motor Amps T1 Field Measurement not Possible Amps

Motor Frame 213T Motor Manufacturer Marley Motor HP 7.5 HP Motor RPM 1765 RPM Motor Rated Volts 460 Volts Motor Phase 3 Motor Hertz 60 Hz Motor F.L. Amps 9.18 Amps Motor Service Factor 1.25

Water Test Data Design Water Flow 354 GPM Actual Water Flow 342 GPM Design EWT 105 Deg F Actual EWT 104 Deg F Design LWT 95 Deg F Actual LWT 95 Deg F

Submittal Transmittal 07-27-22 Tabs.pdf

Sheet1

Sheet2

Final Report Revised 7-26-22

Table Of Contents

Heat Pump

WWHP-1

Hydronic Pump

P-01

P-02

P-03

P-04

P-05

P-06

P-07

P-08

P-09

P-10

P-11

P-12

Cooling Tower

CCC-01

david.w.gregory

Polygon

EXISTING BUILDING 232 TELECOMMUNICATIONS SERVER ROOM

OUTSIDE DOOR (REAR) TO TELECOMMUNICATIONS SERVER ROOM

232-M-1

232-E-1

Page Section Para. Dwg #

1 Baron- Rand 12/19/24

Are there any as-builts or end of year construction tabs available for review?

Refer to "Attachment (A) eProjects

1374448 BUILDING 230 232 AND 137 -

REPAIRS TO GEOTHERMAL CONDENSER

WATER SYSTEM"

2 Baron- Rand 12/19/24

Are TAB Reports available for the buildings? Refer to "Attachment (B) - eProjects

1374448 Certified Final Tab Report for

Proportional Balancing"

3 Baron- Rand 12/19/24

Could the government provide load calculations? This project is executed as a Design Build

(DB) Request for Proposal (RFP) where the

Prime Contractor's Designer of Record (DoR) provides the design. The RFP Part 3 section

D3030 provides the minimum requirements for the Closed Circuit Evaporative Cooler, otherwise the Prime Contractor's DoR provides the design and load calculations for this Scope of Work

Project Title:Provide Closed Circuit Evaporative Cooler, Buildings

230, 232 and 137 Naval Air Station Oceana, Virginia Beach, Virginia

Solicitation / RFP#: N4008525R2565 - PPI Cut Off Date: 12/23/24

Amend No.

GOVERNMENT RESPONSE

PPI No.

Offeror Date Submitted

REFERENCE

QUESTION

File details come from the government source that posted it. Updated .