Pier 11 Power Upgrade for CVN-78 Class Ships
Solicitation number
N4008525R0110
Issued by

About this file

These are electrical engineering design drawings dated 24/DEC/08 for Pier 11, likely part of a Naval Facilities Engineering Command (NAVFAC) project with contract number N40085-05-R-5000. The drawings detail comprehensive electrical infrastructure, including power distribution systems at 11.5kV and 34.5kV voltage levels, with primary and secondary unit substations, padmount switchgear, transformers, and detailed conduit and cable routing plans for both upper and lower decks. The drawings specify multiple cable well types, conduit entrance details, and include work notes describing electrical connection requirements, grounding specifications, and equipment placement guidelines. Key elements include power transmission from North and South substations, cable routing through various pier sections (Bents 1-51), and specific technical specifications for electrical equipment placement and interconnection.

The design encompasses extensive electrical infrastructure with precise technical specifications, including lower deck power equipment plans, primary power diagrams, cable schedules, conduit utilization schedules, and detailed section views of cable wells and conduit arrangements. The drawings provide a comprehensive blueprint for electrical system implementation, with annotations indicating demolition of existing circuits and installation of new power distribution networks. The project appears to be a significant electrical infrastructure upgrade for a naval facility, with meticulous attention to power transmission, equipment positioning, and system interconnectivity across multiple pier sections.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

z I

Q_ co <D w X z

0 � I w co w w ...J

D

C

4+-----1 y

B

4-1---- TO NB 2-8

SEE ED DRAWINGS FOR DEMOLmON OF -----, EXISTING 15KV CIRCUITS

W6A W384 W383

EXISTING 35KV PADMOUNT

SWITCHGEAR UNITS

PIER 11

300KVA Pl.ff

TRASH COMPACTOR

OLD PIER 11

SEE ED DRAWINGS FOR DEMOLITION OF

EXISTING 35KV CIRCUITS

11 .SKV UTILITY POWER DIAGRAM

1 2

NEW PIER 11

3 4

SEE SHEET E-102A FOR CONTINUATION

Z1

I MH 467

Zl

NORTH SUBSTATION 34.5KV SWITCHGEAR

75MVA

230KV - 34.5KV SUBSTATIONS

DOMINION VIRGINIA POWER

.-----�----.----.-----.--------i T3t---.--------.------r----.------, PIER 1 1

34.SKV UTILITY POWER

DIAGRAM

RECORD DRAWING

LETTER DATED

24/DEC/08

75MVA

230KV UG TRANSMISSION TO SOUTH SUBSTATION ____ t�-�t

V) z F

&3 I- C::: _J c::: - 0 :::J u m t- I z VJ C z w

..:m

DESIGNED & ENGINEERED BY,

��"if'[Q) D'W NAVAL FACIUTlES ENGINEERING COMWND

APPROVED

ACTIVTTY - SATISFACTORY TO

DATE

APPROVED

FOR EFD FOR COMMANDER NAVFAC

DATE

A/E

___ DESIGN

___ DRAWN

___ REVIEW

ac

EFD

DAE

DAE

HTO

___ CHIEF AAOi./ ENGR .

PRCJECT IMNAGER ___._K,...B..._ __

FIRE PROTECTION

BRANCH MANAGER

DESIGN DIRECTOR

C z z z c3 :Ii "'

C) " 0 a::

u ,i

> '-' _J z 0 y: w 0z z _J c3

0 z I-w a:: z w (/) ,= 0 :::, w � g z

:E <( _,z 0:::

io w c., z -

> <( 0

0 .....J 0:::

a.. w

(.) w � I- 0::::

z

0::::

i z w w I- a..

I z

0 V) 0 z ,_ _J w V)

� � _J il: ;::

w <( z C z

CODE ID. NO. 80091 SIZE D

SCALE, NONE

EFD NO.

STA. PROJ. NO. P-094

SPEC. NO. 05-05-5000

CONSTR. CONTR. NO.

N40085-05-R-5000

NAVFAC DRAWING NO.

4523403

SHEET 242 OF 305

E-1O1A

DRAWF'ORM REVISION MAY 2000

D

C

B

A frances.peppers1 Polygon

D

C

B z

I w ci -.. --

N

N -z

EiA �

I w z w

T1

PRIMARY

UNIT SUBSTATION

(TYPICAL)

6 \..----W

PMT3 ___ __.

T2

PADMOUNT

SWITCHGEAR UNT _ __J

(TYPICAL)

SW1103

I

SW1104

SECONDARY

UNIT SUBSTATION

(TYPICAL)

1 I

SW1102

S2B

34.SKV PRIMARY POWER DIAGRAM

PAD-MOUNTED

TRANSFORMER -

(TYPICAL)

S1A

PMT1 >-----i.--- SEE SHEET E-101A FOR CONTINUATION

-----t

� 0 --tt------

,) 17 1

1 I

SW1101

----I

--------------------1

S2A

RECORD DRAWING

LETTER DATED

24/DEC/08

z c::: _J c:::

m

I f./) z

< m

DESIGNED & ENGINEERED BY,

��[J[g) □'¥7 NAVAL FAaUTlES ENGINEERING COM�O

APPROVED

ACTMlY - SATISFACTORY TO

DATE

APPROVED

FOR EFD FOR COMl!ANDER NAVFAC

DATE

A/E

___ DESIGN

___ DRAWN

___ REVIEW

QC

EFD

DAE

DAE

HTO

___ CHIEF ARCH./ ENGR.

I C

PRCJECT -· ___,_K,.,.B"----

FIRE PROTECTION

BRANCH MANAGER ___ _

DESIGN DIRECTOR

0 z z CJ z

:i "' � " e:::

u ,i > "' _J z 0

::.:: w 0 z z _J

0 z w

I- O::'.

e::: w 0 :::, z

_,z ioz -w <( w O::'.

(_) w

<( 3:

.....J 0 a..

Q_ z w >- 0::::

O::'.

..... O::'.

..... Q_

0::::

i z w

� ,- z 0 f./) z ,- _J w V)

� _J � w <( z 0 z w L.!)

a..

,;;I- I")

CODE ID. NO. 80091 SIZE D

SCALE, NONE

EFD NO.

STA. PROJ. NO. P-094

SPEC. NO. 05-05-5000

CONSTR. CONTR. NO.

N40085-05-R-5000

NAVFAC DRAWING NO.

4523404

SHEET 243 OF 305

E-102A

DRAWF'ORM REVISION MAY 2000

D

C

B

A frances.peppers1 Polygon frances.peppers Callout

SWCH #328

Install GFE "SWCH 348" on this existing concrete pad.

File details come from the government source that posted it. Updated .