This document is a Questions and Answers (Q&A) form for a federal contract opportunity. Three primary questions were submitted:
- There is a discrepancy in the proposal due date between the solicitation email (August 28, 2025 at 2:00pm EDT) and the RFP (August 25, 2025 at 2:00pm EDT). The government confirmed the solicitation due date is August 25, 2025 EDT. 2. A request was made to provide the previous RAWP (Remedial Action Work Plan), which the government indicated can be provided via DoD SAFE. 3. A question was raised about an IDW (Investigation Derived Waste) storage location in Attachment 3, to which the government responded that the contractor will need to propose an area for IDW storage with installation approval. Additionally, there was a request to provide the draft 2025 Remedial Design (RD), but the government noted that pre-design actions are still being prepared and the draft RD cannot be provided at this time.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AMENDMENT 0003 FOR 25R0059.pdf | ||
| PPI LOG 03 for 25R0059.pdf | ||
| PPI LOG 02.pdf | ||
| AMENDMENT 0002 FOR 25R0059.pdf | ||
| AMENDMENT 0001 FOR 25R0059.pdf | ||
| 2017 GW RA RAWP.pdf | ||
| Newport Site 8 Sediment and GW RD.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Page Section Para.
1 8/12/2025 3 Proposal 1
In the solicitation email the proposal due date is "2:00pm EDT 28 August 2025" while the RFP states "2:00pm EDT 25 August 2025". Please confirm which is correct.
The Solictation due date is August 25, 2025 EDT
2 8/12/2025 N/A N/A N/A Please provide the previous RAWP. This can be provided via DoD SAFE.
3 8/12/2025 5 Attachment N/A
It appears that "Attachment_6_2016_Remedial_Design_for_Site_8.pdf" is actually the 2020 CCR. As such, please provide the 2016 RD.
This can be provided via Dod SAFE.
8/12/2025 7 WE‐6 1
In Attachment 3 there is no identified location for storage of IDW. Is there an IDW storage location that contractors can use while waiting for disposal?
Per instruction from the installation, the contractor will need to propose an area to use as IDW storage for installation approval.
10 8/12/2025 2 1.2 4 If possible, please provide the draft 2025 RD.
Pre‐design actions and remedial design work plans are still being prepared. Unfortunately, a draft 2025 RD cannot be provided at this time, hence all assumptions are based on the previous effort.
GOVERNMENT RESPONSEQUESTION GOV'T RESPONDER
NAME, E‐MAIL
REFERENCE
Date
SubmittedPPI No.
Amend No.