Amendment 0006 for the N4008525B2506 solicitation provides responses to multiple Request for Information (RFI) questions regarding the Construct Range Operations Facility project at Marine Corps Air Station Cherry Point, NC. The amendment addresses technical details across multiple building systems, including mechanical controls, compressed air systems, VAV box controls, ductless split systems, and air handling unit damper configurations. Key responses instruct bidders to submit proposals in accordance with the Request for Proposal (RFP), specifications, drawings, and all amendments, with specific references to revised drawing numbers like 12883136, 12883141, and 12883149. The amendment does not change the proposal due date of 28 May 2025 at 1:00 PM local time and indicates that the deadline to submit pre-award RFIs has passed.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NAVFAC

SPECIFICATION

N4008525B2506 Construct Range Operations

Facility P196U

MCAS Cherry Point, NC

AMENDMENT #0006

IMPORTANT

This amendment should be acknowledged when your proposal is submitted. Failure to acknowledge the amendment may constitute grounds for rejection of the proposal.

If your proposal has been submitted prior to the receipt of this amendment, acknowledgement should be made by telegram, which should state whether the price contained in your proposal is to remain unchanged, is to be decreased by an amount, or is to be increased by an amount. The acknowledgement must be received prior to proposal opening time.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

1 2

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

0006 5/22/2025 N4008525B2506

6. ISSUED BY Code N40085 7. ADMINISTERED BY (If other than item 6.) Code CG MCAS Cherry Point

FACILITIES, ROICC

B-163, CURTIS ROAD

PSC BOX 8006

CHERRY POINT, NC 28533

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) 9A. AMENDMENT OF SOLICITATION

Construct Range Operations Facility P196U

9B. DATED (SEE ITEM 11)

AMENDMENT MUST BE ACKNOWLEDGED WITH YOUR PROPOSAL 10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning 1 copy of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (if required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14. ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATION CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103 (b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER: (specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return original to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

N4008525B2506 Construct Range Operations Facility P196U, Marine Corps Air Station Cherry Point, NC

Amendment 0006 is being issued to answer pre-award RFI’s.

The deadline to submit pre-award RFI’s HAS PASSED.

The proposal due date of 28 May 2025 at 1:00 PM local time REMAINS unchanged.

See Attached.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR (Same as Item 8) 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY

(Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV.1-83) 0224-3(10-90)

PREVIOUS EDITION UNUSABLE Prescribed by GSA

Amendment 0006 N4008525B2506 Construct Range Operations Facility P196U

RFI Responses:

1. Spec Section 13 34 19, Paragraph 2.3.1 states for the contractor to provide 1 shop coat of primer to an average dry film thickness of 1 mil according to SSPC SP 2 on the Pre-Engineered Metal Frames for the Training Shelter. Balance of painting and coating procedures must conform to SSPC Paint 15 and SSPC Painting Manual. However, Drawing A-203 indicates that the required Pre-Engineered Metal Frames for the Training Shelter are to be Galvanized. It appears that the note requiring the Pre-Engineered Metal Frames for the Training Shelter to be Galvanized is in contradiction with the project specifications and that the intention is to paint these frames during the PEB Erection process. If so, can the Coating Specifications for the Pre-Engineered Metal Framing be provided by Amendment?

If not, can the Specification guidance for having the Pre-Engineered Metal Frames galvanized after fabrication be provided by Amendment?

Response: Reference revised Section 13 34 19, Metal Building Systems.

2. Looking through the Specifications I do not see any specification that describes the (P-8) shower valves. What type of shower valve shall be required?

Response: Submit proposals in accordance with RFP, Specifications, Drawings and all amendments.

3. Looking through the specifications I do not see a listing for the (P-8) shower wall enclosure or shower basin. What type of shower walls and shower basin will be required for the (P-8) Shower?

4. Looking through the Plumbing specifications I do not see a specification listed for the (P-4) Urinal Trough. What are we to provide for this fixture? May we get this fixture added to the specifications?

5. Looking through the Plumbing specifications I do not see a specification listed for the (P-6) Lavatory Trough. What are we to provide for this fixture? May we get this fixture added to the specifications?

6. The Air Compressor Schedule on drawing P-601 Tag Id# AC-2 Air Compressor says to include a dryer. What kind of dryer is needed? Desiccant or refrigeration? What is the required dew point? To quote a dryer, I will need to know the ambient temperature of the location of the installation. Please provide.

Response:

See sheet(s) Drawing No. 12883136. Submit proposals in accordance with RFP, Specifications, Drawings and all amendments.

7. The Air Compressor Schedule on drawing P-601 Tag Id# AC-2 asks for a 200 gallon tank. I assume it needs to be rated to hold at least 3000 psig. Would a bank of (18) 11-gallon ASME vessels all manifolded together be acceptable? I would put the compressor, dryer, and tanks on a single skid. Is this acceptable? It wouldn’t be a single tank with everything mounted on top.

Response:

8. AD-1 and AD-2 Air Compressors call for refrigeration dryers. What flow should they be rated for, and what is the temperature of the inlet air?

Response:

9. The Air Receiver Tank Schedule on drawing P-601 Tag Id# ST-1 asks for 55 gallons of storage. Would a bank of (5) 11 gallons ASME cylinders manifolded together on a skid be acceptable to use in order to achieve 55 gallons of storage?

10 . Reference Wood Shop Room 104 (M101)

a) There are two louvers, L-5 and L-8. L-8 is outside air intake, L-5 is exhaust.

b) Plan Note 8 is applied to L-8 but is NOT applied to L-5.

c) Plan Note 8 reads in part “Provide louver with Class 1A motorized damper”.

d) There is no mention of motorized dampers in the louver schedule.

e) On M101 the motorized dampers associated with L-5 and L-8 appear to be in field installed duct, near the louver, but not integral to the louver.

Item 9, Question #1: Should Plan Note 8 be applied to L-5?

Item 9, Question #2: Should Plan Note 8 also be applied to L-1, L-2, L-3 (Bid Option 1),and L-4 all of which are also on M101?

Item 9, Question #3: Are motorized dampers to be factory installed integral to louvers as required by Plan Note 8, or are they to be field installed in ducts?

If the dampers are factory installed in louvers, are damper actuators also factory installed?

Note this question is intended to apply to all louvers on M101.

Note the dampers are required to provide position feedback to the ddc system. Since the dampers are all 2-position (i.e. either fully open or fully closed, not modulating) this feedback would take the form of end switches on the actuator or possibly damper blade switches. If you determine the dampers are factory installed, please clarify the position indication is included as part of the factory installation.

Response:

See sheet(s) Drawing No. 12883141 and 12883147. Submit proposals in accordance with RFP, Specifications, Drawings and all amendments.

11. Reference Wood Shop Room 104 (M101)

a. An equipment schedule note says EF-13 is controlled by a “wall switch installed by electrical contractor”. There is no mention in the equipment schedule of interlocking associated motorized EA and OA dampers with EF-13 operation. Also neither the wall switch nor damper interlocks are shown on the electrical plans (E102).

b. C2/M703 says in part “all fans must operate when the building is occupied and must be controlled by ddc”.

c. C2/M703 says (paraphrased) “upon activation of ATFP ESS the fan will shut down and dampers will close”.

d. EF-13 appears to be for human comfort and ventilation only, i.e. it is not associated with a dust exhaust hood.

Item 11, Question 1: Items 3a and 3b above are mutually exclusive. Which is correct? We recommend EF-13 be controlled by ddc, not a manual switch. That would allow coordination of EF-13 with the EUHs that serve the same space. One room temperature sensor could be used to control the two EUHs and EF-13. That would allow for logical coordination of heating and ventilation/cooling functions including a dead band between heating and cooling set points, and consideration of outside air temperature in operation of the systems. That ddc solution would also take care of the ATFP ESS shutdown requirement.

See sheet(s) Drawing No. 12883141, 12883147 and 12883150. Submit proposals in accordance with RFP, Specifications, Drawings and all amendments.

12. Reference A3/M701, DDC System Architecture. The architecture shows a Cisco Catalyst 3560-CX switch located inside the building seemingly as the “field point of connection”. On or about May, 2023, there was an “end of life” and “end of sale” announcement by Cisco for most models of the 3560-CX series switch.

Item 12, Question 1: What switch needs to be installed now that the 3560-CX is not available?

Item 12, Question 2: Who is responsible for providing the switch, the government or the ddc contractor?

See revised sheet Drawing No. 12883149. Submit proposals in accordance with RFP,

13. Duct-Free Split Systems

a. Reference A1/M701 control drawing, points list, and sequence.

b. A1/M701 indicates each system has a BACnet interface. There is no mention of a BACnet interface on the equipment schedule.

c. Equipment schedule note says “Provide unit with wired wall mounted thermostat.”

Item 13, Question 1: Should a split system equipment schedule note be added to insure a BACnet interface is provided on each system?

Item 13, Question 2: It is our interpretation of A1/M701that:

The room temperature sensor shown is the same sensor as the “wired wall mounted thermostat” required by the equipment schedule note to be provided with the split system.

Assuming the split system has a BACnet interface, the temperature reading of the thermostat-sensor provided with the split system is acquired by the ddc via the BACnet interface.

P-196U Construct Range Operations Facility-RFI List Therefore a separate ddc system sensor is NOT required to provide the zone temperature, high zone temperature alarm, or the zone setpoint adjust in the points list because those actions can be done via BACnet interface.

Is our interpretation of the documents as described in the bullets above correct? If not, please clarify. Our interpretation seems to be confirmed by the sequence which says “DDC shall monitor space temperature through the BACnet connection.”

Item 13, Question 3: The sequence in A1/M701 requires ATFP ESS activation to shut down the split system fan which must consequentially disable the split system entirely. None of the split systems involve transfer of air between indoors and outdoors, or between rooms. Also, it seems many of the split systems serve mission critical functions and would therefore normally be exempt from ATFP shutdown even if they did transfer air between indoors and outdoors. Should this ATFP shutdown paragraph be removed?

Item 13, Question 4: The sequence in A1/M701 requires general fire alarm activation to shut down the split system fan which must consequentially disable the split system entirely. For the same reasons covered in Item 5/Question 3 above, should this paragraph be removed from the sequence?

Item 13, Question 5: The sequence in A1/M701 refers to occupied and unoccupied modes. The rooms served by these systems are not normally occupied by people even during building occupied hours. Also, the equipment in the rooms served often need to function all day, every day, regardless of whether the building is occupied. Should this “Override Modes” paragraph be deleted from the sequence?

See sheet(s) Drawing No. 12883148 and 12883149. Submit proposals in accordance with RFP,

14. VAV Box Controls

a. A2/M703 (points list, control drawing, sequence) shows an AO signal from the ddc to the electric heat.

b. The vav box equipment schedule indicates heat control is staged, i.e. it is controlled onoff instead of being modulated.

Item 14, Question 1: Through no fault of the ddc controls, it is difficult to provide precise temperature control with staged electric heat. That is due to the “warmup” time for the element to reach full temperature when turned on, and the residual heat that continues to warm after the element is turned off. Would you consider requiring SCR heat controls on the boxes instead of staged?

Item 14, Question 2: If staged electric heat is retained, then the ddc signal in A2/M703 needs to be changed from AO to BO. If SCR heat is provided then the AO signal is appropriate. Please adjust based on your response to Item 6/Question 1.

See sheet(s) Drawing No. 12883148 and 12883149. Submit proposals in accordance with RFP,

15. AHU Damper Controls

a. M702 shows a motorized RA damper internal to the AHU. M101 shows a duct mounted RA damper inside the building. Thus there are two RA dampers in series.

b. M101 shows a motorized SA damper inside the building.

c. There is no sequence for the SA and RA dampers inside the building.

Item 15, Question 1: Please confirm the SA and RA dampers inside the building are 2-position isolation dampers, controlled by the building ddc, that are to open immediately before the AHU is enabled, and close immediately after the AHU is disabled. Correct?

See sheet(s) Drawing No. 12883141. Submit proposals in accordance with RFP, Specifications,

16. M702 shows room temperature and room RH sensors wired to AHU factory controls. Quantities are not indicated, and we do not find these sensors on MH101.

Item 16, Question 1: Are these T/RH sensors provided loose with the AHU? If yes, how many, and where are they located?

Item 16: Question 2: If the T/RH sensors are in fact the T/RH sensors provided for each vav box, shouldn’t M702

See sheet(s) Drawing No. 12883149 and 12883150. Submit proposals in accordance with RFP,

17. I wanted to bring to your attention that I found an issue with the compressed air. I am looking at two compressed air systems one is rated at 3,000 PSI (linked to AC-2) and one is rated at 250 PSI (linked to AC-1) both systems show two each ST-1 (55-gallon storage tanks rated at 5,000 PSI ) AC-1 should not require a 5,000 PSI rated tank, it should only require between 500-600 PSI max.

The 5,000 PSI tanks are very expensive and will drive up the cost quite considerably when it doesn’t need to be. Reference Plumbing Schedule on drawing P-601 and Detail A2 on drawing P-

703. Please let us know how you would like us to proceed.

See sheets(s) Drawings No. 12883133, 12883135, 12883136 and 12883139. Submit proposals in accordance with RFP, Specifications, Drawings and all amendments.

Subj: AMENDMENT TO WO 7290158, CONSTRUCT RANGE OPERATIONS FACILITY, P196U, MCAS CHERRY POINT NC

CONTINUATION SHEET

PROJECT TABLE OF CONTENTS

SECTION 13 34 19, METAL BUILDING SYSTEMS is deleted and 13 34 19, METAL BUILDING SYSTEMS, dated 22 MAY 2025, as shown in the footer, is added to the Project Table of Contents and accompanies this Amendment.

DOCUMENT 00 01 15

1.2 CONTRACT DRAWINGS

The following drawings are revised as of 21 MAY 2025:

NAVFAC DWG NO. TITLE

12883149 MECHANICAL CONTROLS, 21 MAY 2025

These drawings accompany this Amendment.

P-196U CONSTRUCT RANGE OPERATIONS FACILITY Station Project No. 7290158 MCAS, Cherry Point, NC 7 April 2023

SECTION 13 34 19

METAL BUILDING SYSTEMS

08/20, CHG 1: 02/21

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)

AISC 325 (2017) Steel Construction Manual

AISC 360 (2016) Specification for Structural Steel Buildings

AMERICAN IRON AND STEEL INSTITUTE (AISI)

AISC/AISI 121 (2007) Standard Definitions for Use in the Design of Steel Structures

AISI D100 (2017) Cold-Formed Steel Design Manual

AMERICAN SOCIETY OF CIVIL ENGINEERS (ASCE)

ASCE 7-16 (2017; Errata 2018; Supp 1 2018) Minimum Design Loads and Associated Criteria for Buildings and Other Structures

AMERICAN SOCIETY OF HEATING, REFRIGERATING AND AIR-CONDITIONING

ENGINEERS (ASHRAE)

ASHRAE 90.1 - IP (2019; Errata 1 2019; Errata 2-5 2020;

Addenda BY-CP 2020; Addenda AF-DB 2020;

Addenda A-G 2020; Addenda F-Y 2021;

Errata 6-8 2021; Interpretation 1-4 2020;

Interpretation 5-8 2021 Addenda AS-AQ 2022) Energy Standard for Buildings Except Low-Rise Residential Buildings

ASHRAE 90.1 - SI (2019; Errata 1-4 2020; Addenda BY-CP 2020; Addenda AF-DB 2020; Addenda A-G 2020; Addenda F-Y 2021; Errata 5-7 2021;

Interpretation 1-4 2020; Interpretation 5-8 2021; Addenda AU-BF 2020) Energy Standard for Buildings Except Low-Rise Residential Buildings

AMERICAN WELDING SOCIETY (AWS)

AWS A5.1/A5.1M (2012) Specification for Carbon Steel Electrodes for Shielded Metal Arc Welding

AWS D1.1/D1.1M (2020; Errata 1 2021) Structural Welding

SECTION 13 34 19 Page 1 REVISED 22 May 2025

Code - Steel

AWS D1.3/D1.3M (2018) Structural Welding Code - Sheet Steel

ASTM INTERNATIONAL (ASTM)

ASTM A36/A36M (2019) Standard Specification for Carbon Structural Steel

ASTM A53/A53M (2022) Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and Seamless

ASTM A193/A193M (2020) Standard Specification for Alloy-Steel and Stainless Steel Bolting Materials for High-Temperature Service and Other Special Purpose Applications

ASTM A307 (2021) Standard Specification for Carbon Steel Bolts, Studs, and Threaded Rod 60 000 PSI Tensile Strength

ASTM A475 (2022) Standard Specification for Metallic-Coated Steel Wire Strand

ASTM A500/A500M (2021a) Standard Specification for Cold-Formed Welded and Seamless Carbon Steel Structural Tubing in Rounds and Shapes

ASTM A501/A501M (2021) Standard Specification for Hot-Formed Welded and Seamless Carbon Steel Structural Tubing

ASTM A529/A529M (2019) Standard Specification for High-Strength Carbon-Manganese Steel of Structural Quality

ASTM A563 (2015) Standard Specification for Carbon and Alloy Steel Nuts

ASTM A563M (2007; R 2013) Standard Specification for Carbon and Alloy Steel Nuts (Metric)

ASTM A572/A572M (2021; E 2021) Standard Specification for High-Strength Low-Alloy Columbium-Vanadium Structural Steel

ASTM A606/A606M (2018) Standard Specification for Steel Sheet and Strip, High-Strength, Low-Alloy, Hot-Rolled and Cold-Rolled, with Improved Atmospheric Corrosion Resistance

ASTM A653/A653M (2020) Standard Specification for Steel Sheet, Zinc-Coated (Galvanized) or Zinc-Iron Alloy-Coated (Galvannealed) by the Hot-Dip Process

SECTION 13 34 19 Page 2 REVISED 22 May 2025

ASTM A780/A780M (2020) Standard Practice for Repair of Damaged and Uncoated Areas of Hot-Dip Galvanized Coatings

ASTM A992/A992M (2020) Standard Specification for Structural Steel Shapes

ASTM A1008/A1008M (2021a) Standard Specification for Steel, Sheet, Cold-Rolled, Carbon, Structural, High-Strength Low-Alloy, High-Strength Low-Alloy with Improved Formability, Solution Hardened, and Bake Hardenable

ASTM A1011/A1011M (2018a) Standard Specification for Steel Sheet and Strip, Hot-Rolled, Carbon, Structural, High-Strength Low-Alloy, High-Strength Low-Alloy with Improved Formability, and Ultra-High Strength

ASTM B117 (2019) Standard Practice for Operating Salt Spray (Fog) Apparatus

ASTM B209 (2014) Standard Specification for Aluminum and Aluminum-Alloy Sheet and Plate

ASTM B221 (2021) Standard Specification for Aluminum and Aluminum-Alloy Extruded Bars, Rods, Wire, Profiles, and Tubes

ASTM B221M (2021) Standard Specification for Aluminum and Aluminum-Alloy Extruded Bars, Rods, Wire, Profiles, and Tubes (Metric)

ASTM C518 (2021) Standard Test Method for Steady-State Thermal Transmission Properties by Means of the Heat Flow Meter Apparatus

ASTM C665 (2017) Standard Specification for Mineral-Fiber Blanket Thermal Insulation for Light Frame Construction and Manufactured Housing

ASTM C920 (2018) Standard Specification for Elastomeric Joint Sealants

ASTM C1363 (2019) Standard Test Method for Thermal Performance of Building Materials and Envelope Assemblies by Means of a Hot Box Apparatus

ASTM D522/D522M (2017) Mandrel Bend Test of Attached Organic Coatings

ASTM D523 (2014; R 2018) Standard Test Method for Specular Gloss

ASTM D714 (2002; R 2017) Standard Test Method for Evaluating Degree of Blistering of Paints

SECTION 13 34 19 Page 3 REVISED 22 May 2025

ASTM D822 (2013; R 2018) Filtered Open-Flame Carbon-Arc Exposures of Paint and Related Coatings

ASTM D968 (2017) Standard Test Methods for Abrasion Resistance of Organic Coatings by Falling Abrasive

ASTM D1056 (2020) Standard Specification for Flexible Cellular Materials - Sponge or Expanded Rubber

ASTM D1308 (2002; R 2013) Effect of Household Chemicals on Clear and Pigmented Organic Finishes

ASTM D1667 (2017) Standard Specification for Flexible Cellular Materials - Poly (Vinyl Chloride) Foam (Closed-Cell)

ASTM D2244 (2016) Standard Practice for Calculation of Color Tolerances and Color Differences from Instrumentally Measured Color Coordinates

ASTM D2247 (2015) Testing Water Resistance of Coatings in 100% Relative Humidity

ASTM D2794 (1993; R 2019) Standard Test Method for Resistance of Organic Coatings to the Effects of Rapid Deformation (Impact)

ASTM D3363 (2005; E 2011; R 2011; E 2012) Film Hardness by Pencil Test

ASTM D5359 (2015) Standard Specification for Glass Cullet Recovered from Waste for Use in Manufacture of Glass Fiber

ASTM DEFONLINE (2008) ASTM Online Dictionary of Engineering Science and Technology

ASTM E84 (2020) Standard Test Method for Surface Burning Characteristics of Building Materials

ASTM E1592 (2017) Standard Test Method for Structural Performance of Sheet Metal Roof and Siding Systems by Uniform Static Air Pressure Difference

ASTM E1646 (1995; R 2018) Standard Test Method for Water Penetration of Exterior Metal Roof Panel Systems by Uniform Air Pressure Difference

ASTM E1680 (2016) Standard Test Method for Rate of Air Leakage Through Exterior Metal Roof

SECTION 13 34 19 Page 4 REVISED 22 May 2025

Panel Systems

ASTM F436/F436M (2019) Standard Specification for Hardened Steel Washers Inch and Metric Dimensions

ASTM F844 (2019) Standard Specification for Washers, Steel, Plain (Flat), Unhardened for General Use

ASTM F1554 (2020) Standard Specification for Anchor Bolts, Steel, 36, 55, and 105-ksi Yield Strength

ASTM F1852 (2014) Standard Specification for "Twist Off" Type Tension Control Structural Bolt/Nut/Washer Assemblies, Steel, Heat Treated, 120/105 ksi Minimum Tensile Strength

ASTM F3125/F3125M (2019) Standard Specification for High Strength Structural Bolts and Assemblies, Steel and Alloy Steel, Heat Treated, Inch Dimensions 120 ksi and 150 ksi Minimum Tensile Strength, and Metric Dimensions 830 MPa and 1040 MPa Minimum Tensile Strength

ASTM G152 (2013; R 2021) Standard Practice for Operating Open Flame Carbon Arc Light Apparatus for Exposure of Nonmetallic Materials

ASTM G153 (2013; R 2021) Standard Practice for Operating Enclosed Carbon Arc Light Apparatus for Exposure of Nonmetallic Materials

METAL BUILDING MANUFACTURERS ASSOCIATION (MBMA)

MBMA MBSM (2018) Metal Building Systems Manual

NATIONAL ASSOCIATION OF ARCHITECTURAL METAL MANUFACTURERS (NAAMM)

NAAMM AMP 500 (2006) Metal Finishes Manual

SHEET METAL AND AIR CONDITIONING CONTRACTORS' NATIONAL ASSOCIATION

(SMACNA)

SMACNA 1793 (2012) Architectural Sheet Metal Manual, 7th Edition

U.S. ARMY CORPS OF ENGINEERS (USACE)

EM 385-1-1 (2014) Safety and Health Requirements Manual

U.S. DEPARTMENT OF DEFENSE (DOD)

UFC 3-301-01 (2019, with Change 1, 2022) Structural

SECTION 13 34 19 Page 5 REVISED 22 May 2025

Engineering

1.2 GENERAL REQUIREMENTS

1.2.1 Design Parameters

Design and construct pre-engineered metal buildings of size, shape, height, fenestration, siting, and configuration indicated. Coordinate site utility services, accessibility requirements, vehicular and pedestrian access, mechanical, electrical, plumbing and fire protection requirements, interior construction and finishes, and such other items as may be necessary for a complete, functional building.

1.2.2 Structural Performance

Provide metal building systems capable of withstanding the effects of gravity loads and the following loads and stresses within the limits and conditions indicated.

1.2.2.1 Engineering

Design metal building systems conforming to procedures described in

MBMA MBSM.

1.2.2.2 Design Loads

Design and construct to the requirements of UFC 3-301-01 , Structural Engineering.

1.2.3 Thermal Performance

Provide insulated metal panel assemblies with the following maximum U-factors when assemblies are tested or calculated according to ASHRAE 90.1 - SI ASHRAE 90.1 - IP Appendix A, and minimum R-values for opaque elements when tested according to ASTM C1363 or ASTM C518.

1.2.3.1 Metal Roof Panel Assemblies

a. U-Factor: U-0.034

b. R-Value: R-29

Roof insulation consists of two layers of unfaced fiberglass insulation, with the upper layer having an R-value of 19 and the lower layer having an R-value of 10. The installed thickness is 9 inches for an 8.5 inch purlin and achieves a total installed R-value of 29. Size layer thicknesses and widths to completely fill cavity depths and shapes.

1.2.4 Air Infiltration for Metal Roof Panels

Air leakage through assembly must not exceed 0.04 cfm/sq.ft. of roof area when lab tested according to ASTM E1680 at negative test-pressure difference of 1.57 lb/sq.ft..

1.2.5 Water Penetration for Metal Roof Panels

No water penetration when tested according to ASTM E1646 at test-pressure difference of 2.86 lbf/sq.ft..

SECTION 13 34 19 Page 6 REVISED 22 May 2025

1.2.6 Specular Gloss

Finished roof surfaces to have a specular gloss value of 30 plus or minus 5 at an angle of 60 degrees when measured in accordance with ASTM D523.

1.2.7 Wind-Uplift Resistance

Design for wind-uplift resistance in accordance with UFC 3-301-01 .

Marine Corps Air Station Cherry Point must resist a 140 mile per hour, ultimate design wind speed, Risk Category II, Surface Roughness Category C, Exposure Category C lateral load. Comply with ASCE 7 as applicable for building system designs and components.

1.2.8 Erection Plan

Provide plans and a written erection/lifting procedure with required plans clearly showing the intended sequence and method of erection in accordance with EM 385-1-1 "Safety - Safety and Health Requirements". Indicate required crane lifting requirements, temporary support structures, member size and locations of braced or guyed temporary supports, and locations of bracing or guys anchor points. Clearly define the required framing sequence and conditions necessary to ensure the structure is maintained in a properly braced and stable condition throughout the complete erection process.

1.3 DEFINITIONS

a. Bay: Dimension between main frames measured normal to frame (at centerline of frame) for interior bays, and dimension from centerline of first interior main frame measured normal to end wall (outside face of end-wall girt) for end bays.

b. Clear Span: Distance between supports of beams, girders, or trusses (measured from lowest level of connecting area of a column and a rafter frame or knee).

c. Eave Height: Vertical dimension from finished floor to eave (the line along the sidewall formed by intersection of the planes of the roof and wall).

d. Terminology Standard: Refer to MBMA "Metal Building Systems Manual" for definitions of terms for metal building system construction not otherwise defined in this Section or in referenced standards.

1.4 SYSTEM DESCRIPTION

General: Provide a complete, integrated set of mutually dependent components and assemblies that form a metal building system capable of withstanding structural and other loads, thermally induced movement, and exposure to weather without failure or infiltration of water into building interior. Include primary and secondary framing, metal liner soffit panels, and accessories complying with requirements indicated.

Provide metal building system of size and with spacing, slopes, and spans indicated.

SECTION 13 34 19 Page 7 REVISED 22 May 2025

1.4.1 Primary Frame Type

a. Rigid Clear Span: Solid-member, structural-framing system without interior columns.

1.4.2 Fixed End-Wall Framing

Provide manufacturer's standard fixed end wall, for buildings not required to be expandable, consisting of primary frame, capable of supporting one-half of a bay design load, and end-wall columns.

1.4.3 Secondary Frame Type

Provide manufacturer's standard purlins.

1.4.4 Eave Height

Eave height must be as indicated by nominal height on Drawings.

1.4.5 Bay Spacing

Bay Spacing must be as indicated in the drawings.

1.4.6 Roof Slope

Roof slope must be as indicated in the drawings.

1.4.7 Roof System

Provide roofing in accordance with Section 07 61 15.00 20, Aluminum Standing Seam Roofing.

1.5 SUBMITTALS

Government approval is required for submittals. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Manufacturer's Qualifications

SD-02 Shop Drawings

Detail Drawings

Erection Plan

SD-03 Product Data

Manufacturer's Catalog Data

Recycled Content for Structural Steel Shapes and Plates; S

Recycled Content for Steel Pipe; S

Recycled Content for Steel Sheet Materials; S

Recycled Content for Insulation Materials; S

SECTION 13 34 19 Page 8 REVISED 22 May 2025

SD-04 Samples

Coil Stock, 12 inches long by the actual panel width

Roof Panels, 12 inches long by actual panel width

Fasteners

Metal Closure Strips 10 inches long of each type

Insulation, approximately 8 by 11 inches

Vapor Barrier

Manufacturer's Color Charts and Chips, 4 by 4 inches

SD-05 Design Data

Manufacturer's Descriptive and Technical Literature

Manufacturer's Building Design Analysis

Lateral Force Calculations

SD-06 Test Reports

Test Reports

Coatings and Base Metals

Factory Color Finish Performance Requirements

SD-07 Certificates

System Components

Coil Stock Certificates

Aluminized Steel Repair Paint

Galvanizing Repair Paint

Enamel Repair Paint

Qualification of Manufacturer

Qualification of Erector

SD-08 Manufacturer's Instructions

Installation of Roof panels

Shipping, Handling, and Storage

1.6 QUALITY ASSURANCE

1.6.1 Pre-Erection Conference

After submittals are received and approved but before metal building

SECTION 13 34 19 Page 9 REVISED 22 May 2025 system work, including associated work, is performed, the Contracting Officer will hold a pre-erection conference to review the following:

a. The detail drawings, specifications, and manufacturer's descriptive and technical literature.

b. Finalize construction schedule and verify availability of materials, erector's personnel, equipment, and facilities needed to make progress and avoid delays.

c. Methods and procedures related to metal building system erection, including, but not limited to: qualification of manufacturer, qualification of erector, manufacturer's catalog data, manufacturer's building design analysis,lateral force calculations, written instructions and test reports. Lateral force calculations must include all analysis and confirmation of system components required to transfer lateral forces to the foundation.

d. Support conditions for compliance with requirements, including alignment between and erection of structural members.

e. Flashing, special roofing and siding details, roof and wall penetrations, openings, and condition of other construction that will affect the metal building system, including coatings and base metals, factory color finish performance requirements, system components, and coil stock certificates.

f. Governing regulations and requirements for, certificates, insurance, tests and inspections if applicable.

g. Temporary protection requirements for metal panel assembly during and after installation.

h. Samples of roof panels, aluminized steel repair paint, galvanizing repair paint, and enamel repair paint.

1.6.1.1 Pre-Roofing Installation Conference

After structural framing system erection and approval but before roofing, siding, insulation and vapor barrier work, including associated work, is performed; the Contracting Officer will hold a pre-roofing and siding conference to review the following:

a. Examine purlins and formed shapes conditions for compliance with requirements, including flatness and attachment to structural members.

b. Review structural limitations of purlins and formed shapes during construction and after roofing.

c. Review flashings, special roof and wall details, roof drainage, roof penetrations, roof equipment curbs, and condition of other construction that will affect the metal building system.

d. Review temporary protection requirements for metal roof panels' assembly during and after installation.

e. Review roof observation and repair procedures after metal building system erection.

SECTION 13 34 19 Page 10 REVISED 22 May 2025

1.6.2 Manufacturer's Technical Representative

The representative must have authorization from manufacturer to approve field changes and be thoroughly familiar with the products, erection of structural framing and installation of roof panels in the geographical area where construction will take place.

1.6.3 Manufacturer's Qualifications

Metal building system manufacturer must have a minimum of five years experience as a qualified manufacturer and a member of MBMA of metal building systems and accessory products.

Provide engineering services by an authorized currently licensed engineer in the geographical area where construction will take place, having a minimum of four years experience as an engineer knowledgeable in building design analysis, protocols and procedures for the "Metal Building Systems Manual" ( MBMA MBSM); ASCE 7-16 , the building code in the geographic area where the construction will take place and ASTM E1592. Provide certified engineering calculations using the products submitted for:

a. Roof and Wall Wind Loads with basic wind speed, exposure category, co-efficient, importance factor, designate type of facility, negative pressures for each zone, methods and requirements of attachment, taking into account roof metal and wall constructions furnished by other vendors and manufacturers.

b. Roof Dead and Live Loads

c. Collateral Loads

d. Foundation Loads

e. Roof Snow Load

f. Seismic Loads

1.6.4 Qualification of Erection Contractor

An experienced erector who has specialized in erecting and installing work similar in material, design, and extent to that indicated for this Project and must be approved and certified by the metal building system manufacturer.

1.6.5 Single Source

Obtain primary and secondary components and structural framing members, each type of metal roof, wall and liner panel assemblies, clips, closures and other accessories from the standard products of the single source from a single manufacturer to operate as a complete system for the intended use.

1.6.6 Welding

Qualify procedures and personnel according to AWS A5.1/A5.1M , AWS D1.1/D1.1M , and AWS D1.3/D1.3M .

1.6.7 Structural Steel

Comply with AISC 325 , AISC 360 , for design requirements and allowable

SECTION 13 34 19 Page 11 REVISED 22 May 2025 stresses.

1.6.8 Cold-Formed Steel

Comply with AISC/AISI 121 and AISI D100 for design requirements and allowable stresses.

1.6.9 Surface-Burning Characteristics

Provide metal panels having insulation and vapor barrier material with the following surface-burning characteristics as determined by testing identical products according to ASTM E84 by a qualified testing agency.

Identify products with appropriate markings of applicable testing agency showing:

a. Flame-Spread Index: 25 or less.

b. Smoke-Developed Index: 450 or less.

1.6.10 Fabrication

Fabricate and finish metal panels and accessories at the factory to greatest extent possible, by manufacturer's standard procedures and processes and as necessary to fulfill indicated performance requirements.

Comply with indicated profiles with dimensional and structural requirements. Provide metal panel profile, including major ribs and intermediate stiffening ribs, if any, for full length of panel. Aluminum and aluminum-alloy sheet and plate must conform to ASTM B209. Fabricate metal panel side laps with factory-installed captive gaskets or separator strips that provide a tight seal and prevent metal-to-metal contact, in a manner that will seal weather-tight and minimize noise from movements within panel assembly.

Sheet Metal Accessories: Fabricate flashing and trim to comply with recommendations in SMACNA 1793 that apply to the design, dimensions, metal, and other characteristics of item indicated:

a. Form exposed sheet metal accessories that are without excessive oil canning, buckling, and tool marks and that are true to line and levels indicated, with exposed edges folded back to form hems.

b. End Seams: Fabricate nonmoving seams with flat-lock seams. Form seams and seal with epoxy seam sealer. Rivet joints for additional strength.

c. Sealed Joints: Form non-expansion but movable joints in metal to accommodate elastomeric sealant to comply with SMACNA standards.

d. Conceal fasteners and expansion provisions where possible. Exposed fasteners are not allowed on faces of accessories exposed to view.

e. Fabricate cleats and attachment devices of size and metal thickness recommended by SMACNA or by metal building system manufacturer for application, but not less than thickness of metal being secured.

1.6.11 Finishes

Comply with NAAMM AMP 500 for recommendations for applying and designating finishes.

SECTION 13 34 19 Page 12 REVISED 22 May 2025

Appearance of Finished Work: Noticeable variations in same piece are not acceptable. Variations in appearance of adjoining components are acceptable if they are within the range of approved Samples and are assembled or installed to minimize contrast.

1.7 SHIPPING, HANDLING AND STORAGE

1.7.1 Delivery

Package and deliver components, sheets, metal panels, and other manufactured items so as not to be damaged or deformed and protected during transportation and handling.

1.7.2 Storage

Stack and store metal panels horizontally on platforms or pallets, covered with suitable weather-tight and ventilated covering to ensure dryness, with positive slope for drainage of water. Store in a manner to prevent bending, warping, twisting, and surface damage. Do not store metal soffit liner panels in contact with other materials that might cause staining, denting, or other surface damage. Retain strippable protective covering on metal panel for entire period up to metal panel installation.

1.7.3 Protection of Materials

Protect foam-plastic insulation as follows:

a. Do not expose to sunlight, except to extent necessary for period of installation and concealment.

b. Protect against ignition at all times. Do not deliver foam-plastic insulation materials to project site before installation time.

Complete installation and concealment of plastic materials as rapidly as possible in each area of construction to minimize ultraviolet exposure.

1.8 PROJECT CONDITIONS

1.8.1 Weather Limitations

Proceed with installation preparation only when existing and forecasted weather conditions permit Work to proceed without water entering into existing panel system or building.

1.8.2 Field Measurements

1.8.2.1 Established Dimensions for Foundations

Comply with established dimensions on approved anchor-bolt plans, established foundation dimensions, and proceed with fabricating structural framing. Do not proceed without verifying field measurements. Coordinate anchor-bolt installation to ensure that actual anchorage dimensions correspond to established dimensions.

1.8.2.2 Established Dimensions for Metal Panels

Where field measurements cannot be made without delaying the Work, either establish framing and opening dimensions and proceed with fabricating

SECTION 13 34 19 Page 13 REVISED 22 May 2025 metal panels without field measurements, or allow for field trimming metal panels. Coordinate construction to ensure that actual building dimensions, locations of structural members, and openings correspond to established dimensions.

1.8.2.3 Verification Record

Verify locations of all framing and opening dimensions by field measurements before metal panel fabrication and indicate measurements on Shop Drawings.

1.9 COORDINATION

Coordinate final design and placement of foundation between structural engineer of record, geotechnical engineer, MBMA and Contractor.

Coordinate size and location of concrete foundations and casting of anchor-bolt inserts into foundation walls and footings. Concrete, reinforcement, and formwork requirements are specified in section on

CAST-IN-PLACE CONCRETE.

Coordinate metal panel assemblies with rain drainage work, flashing, trim, and construction of supports and other adjoining work to provide a leak-proof, secure, and non-corrosive installation.

PART 2 PRODUCTS

2.1 STRUCTURAL FRAMING MATERIALS

2.1.1 Steel Shapes and Plates

Wide flange and WT shapes: ASTM A992/A992M ; ASTM A572/A572M or ASTM A529/A529M . Angles, Channels and Plates: ASTM A36/A36M, ASTM A572/A572M or ASTM A529/A529M . Provide structural steel shapes and plates containing a minimum of 80 percent recycled content. Submit data identifying percentage of recycled content for structural steel shapes and plates.

2.1.2 Steel Pipe

ASTM A36/A36M, ASTM A53/A53M, ASTM A572/A572M or ASTM A529/A529M . Provide steel pipe containing a minimum of 50 percent recycled content. Submit data identifying percentage of recycled content for steel pipe.

2.1.3 Cold-Formed and Hot Formed Hollow Structural Sections

Cold formed: ASTM A500/A500M or ASTM B221, ASTM B221M. Hot-formed:

ASTM A501/A501M .

2.1.4 Structural-Steel Sheet

Hot-rolled, ASTM A1011/A1011M or cold-rolled, ASTM A1008/A1008M .

2.1.5 Metallic-Coated Steel Sheet

ASTM A653/A653M , ASTM A606/A606M .

2.1.6 High-Strength Bolts, Nuts, and Washers

ASTM F3125/F3125M , heavy hex steel structural bolts; ASTM A563 heavy hex

SECTION 13 34 19 Page 14 REVISED 22 May 2025 carbon-steel nuts; and ASTM F436/F436M hardened carbon-steel washers.

Finish: Plain.

Tension-Control, High-Strength Bolt-Nut-Washer Assemblies: ASTM F1852, heavy-hex-head steel structural bolts with spline.

Finish: Plain.

2.1.7 Non-High-Strength Bolts, Nuts, and Washers

ASTM A307, ASTM A563, and ASTM F844.

Finish: Plain.

2.1.8 Anchor Rods

ASTM F1554.

a. Configuration: Straight.

b. Nuts: ASTM A563 hex carbon steel.

c. Plate Washers: ASTM A36/A36M carbon steel.

d. Washers: ASTM F436/F436M hardened carbon steel.

e. Finish: Plain.

2.1.9 Threaded Rods

ASTM A193/A193M .

a. Nuts: ASTM A563MASTM A563 hex carbon steel.

b. Washers: ASTM A36/A36M carbon steel.

c. Finish: Plain.

2.1.10 Primer

SSPC-Paint 15, Type I, red oxide.

2.2 FABRICATION

2.2.1 General

Comply with MBMA MBSM - "Metal Building Systems Manual": Chapter IV, Section 9, "Fabrication and Erection Tolerances."

2.3 STRUCTURAL FRAMING

2.3.1 General

Primary framing members, secondary framing members, accessories and fasterners are galvanized.

SECTION 13 34 19 Page 15 REVISED 22 May 2025

2.3.2 Primary Framing

Manufacturer's standard structural primary framing system includes transverse and lean-to frames; rafter, rakes, and canopy beams; sidewall, intermediate, end-wall, and corner columns; and wind bracing designed to withstand required loads and specified requirements. Provide frames with attachment plates, bearing plates, and splice members. Provide frame span and spacing indicated.

Shop fabricate framing components by welding or by using high-strength bolts to the indicated size and section with base-plates, bearing plates, stiffeners, and other items required. Cut, form, punch, drill, and weld framing for bolted field erection.

a. Rigid Clear-Span Frames: I-shaped frame sections fabricated from shop-welded, built-up steel plates or structural-steel shapes.

Interior columns are not permitted.

d. Exterior Column Type: Tapered.

e. Rafter Type: Uniform depth.

2.3.3 Secondary Framing

Manufacturer's standard secondary framing members, including purlins, eave struts, flange bracing, base members, gable angles, clips, headers, jambs, and other miscellaneous structural members. Fabricate framing from cold-formed, structural-steel sheet or roll-formed, metallic-coated steel sheet pre-painted with coil coating, unless otherwise indicated.

Shop fabricate framing components by roll-forming or break-forming to the indicated size and section with base-plates, bearing plates, stiffeners, and other plates required for erection. Cut, form, punch, drill, and weld secondary framing for bolted field connections to primary framing.

a. Purlins: C or Z-shaped sections; fabricated from steel sheet, built-up steel plates, or structural-steel shapes; minimum depth as required to comply with system performance requirements.

b. Eave Struts: Unequal-flange, C-shaped sections; fabricated from steel sheet, built-up steel plates, or structural-steel shapes; to provide adequate backup for metal panels.

c. Flange Bracing: Structural-steel angles or cold-formed structural tubing to stiffen primary frame flanges.

e. Sag Bracing: Structural-steel angles.

2.3.4 Bracing

Provide adjustable wind bracing as follows:

SECTION 13 34 19 Page 16 REVISED 22 May 2025

a. Rods: ASTM A36/A36M; ASTM A572/A572M ; or ASTM A529/A529M .

b. Cable: ASTM A475, extra-high-strength grade, zinc-coated; with threaded end anchors.

c. Angles: Fabricated from structural-steel shapes to match primary framing, of size required to withstand design loads.

d. Rigid Portal Frames: Fabricate from shop-welded, built-up steel plates or structural-steel shapes to match primary framing; of size required to withstand design loads.

e. Fixed-Base Columns: Fabricate from shop-welded, built-up steel plates or structural-steel shapes to match primary framing; of size required to withstand design loads.

f. Diaphragm Action of Metal Panels: Design metal building to resist wind forces through diaphragm action of metal panels.

g. Bracing: Provide wind bracing using any method specified above, at manufacturer's option, provided bracing does not obstruct openings or open walls as illustrated in the Instruments of Service.

2.4 PANEL MATERIALS

2.4.1 Steel Sheet

Roll-form steel roof, wall and liner panels to the specified profile, with fy = 24 gauge soffit liner panels of the depth as indicated. Steel sheets must contain a minimum recycled content of 25 percent. Provide data identifying percentage of recycled content for steel sheet materials.

Material must be plumb and true, and within the tolerances listed:

b. Individual panels to have continuous length to cover the entire length of any unbroken roof slope with no joints or seams and formed without warping, waviness, or ripples that are not part of the panel profile and free of damage to the finish coating system.

c. Provide panels with thermal expansion and contraction consistent with the type of system specified;

profile and coverage to be a minimum height and width from manufacturer's standard.

Smooth, flat Surface Texture.

2.4.2 Finish

All panels are to receive a factory-applied polyvinylidene fluoride of Kynar 500/Hylar 5000 finish consisting of a baked-on top-coat with a manufacturer's recommended prime coat conforming to the following:

a. Metal Preparation: All metal is to have the surfaces carefully prepared for painting on a continuous process coil coating line by alkali cleaning, hot water rinsing, application of chemical conversion coating, cold water rinsing, sealing with acid rinse, and thorough drying.

b. Prime Coating: A base coat of epoxy paint, specifically formulated to

SECTION 13 34 19 Page 17 REVISED 22 May 2025 interact with the top-coat, is to be applied to the prepared surfaces by roll coating to a dry film thickness of 0.20 plus 0.05 mils. This prime coat must be oven cured prior to application of finish coat.

c. Exterior Finish Coating: Apply the finish coating over the primer by roll coating to dry film thickness of 0.80 plus 0.05 mils for a total dry film thickness of 1.00 plus 0.10 mils. This finish coat must be oven-cured.

d. Interior Finish Coating: Apply a wash-coat on the reverse side over the primer by roll coating to a dry film thickness of 0.30 plus 0.05 mils for a total dry film thickness of 0.50 plus 0.10 mils. The wash-coat must be oven-cured.

e. Color: The exterior finish chosen from the manufacturer's color charts and chips.

f. Physical Properties: Coating must conform to the industry and manufacturer's standard performance criteria as listed by the following certified test reports:

Chalking: ASTM DEFONLINE Color Change and Conformity: ASTM D2244 Weatherometer: ASTM G152, ASTM G153 and ASTM D822 Humidity: ASTM D2247 and ASTM D714 Salt Spray: ASTM B117 Chemical Pollution: ASTM D1308 Gloss at 60 degrees: ASTM D523 Pencil Hardness: ASTM D3363 Reverse Impact: ASTM D2794 Flexibility: ASTM D522/D522M Abrasion: ASTM D968 Flame Spread: ASTM E84

2.4.3…