This document is an Amendment to a Solicitation for the FY24 MCAS New River Mat Repairs project. The amendment addresses questions and answers related to the project scope, including the requirement to dispose of concrete at a RCRA Subtitle D landfill due to potential PFAS impacts, and the mix design specifications for the "flexural portland cement concrete" that must conform to UFGS 32 13 13.43. The amendment indicates the time and date for receipt of proposals remains unchanged at 1400, 05 September 2024. Offerors must acknowledge receipt of this amendment when submitting their proposals. The solicitation is issued by the Department of the Navy Naval Facilities Engineering Command for the ROICC Camp Lejeune area of responsibility, and only Civil/Paving MACC Contractors listed on the General Requirements cover page may submit proposals.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 23-059 Amend 0002 Pages from 1130.1 - 32 13 14.13.31.1.D Mix Design 650 PSI - MBI.pdf | ||
| Amend 0001.pdf | ||
| 23-0059 DM.PDF | ||
| 23-0059 Dwgs.pdf | ||
| 23-0059 SOW.pdf | ||
| 23-0059 Specs.pdf | ||
| 23-0059 RFP.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICIATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 11)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPIRATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
N40085-23-R-2815 Amendment 0002
CONTINUATION SHEET
1. Question: We were trying to figure out why they had in the Scope of Work, the requirement that the concrete had to be removed to a RCRA Subtitle D Landfill? The concrete is a recyclable material and from what we had found when researching this, if it was a recyclable material it wasn't required to be taken to a RCRA Subtitle D Landfill.
Can this requirement be waived if the removed concrete is being taken to a concrete recycler?
Answer: Due to potential PFAS impacts, we cannot recycle the concrete. It must be removed to a subtitle D landfill.
2. Question: Also, in Scope of work item #3, it calls for "flexural portland cement concrete that conforms to UFGS32 13 13.43 high temperature concrete paving for airfields using lightweight and trap rock aggregates." The specification section noted was not included with the plans, therefore no particulars were given for the mix design strength, slump, or air entrainment. We've never seen a combination mix design that contained both lightweight shale and trap rock aggregates. Usually it either requires use of a lightweight shale aggregate or the trap rock aggregate. It also says that this is a "flexural portland cement concrete". If the trap rock aggregate is to be used, the beam breaks can be used for flexural testing. If the mix design is to contain the expanded lightweight shale aggregate, compressive breaks will need to be used in lieu of the flexural beam breaks for the concrete testing, as past history shows that the expanded shale lightweight aggregate does not test well with flexural beam breaks.
Answer: I’ll attach the mix design that is currently being used on the airfield for reference.
(See Attached)
3. All other terms and conditions remain unchanged.
| Amend 0002 230059 |
| Untitled |
| Untitled |
23-0059 SF30 Continuation Sheet
| IDCode: |
| Page: 1 |
| Pages: 3 |
| AmendNo: AMENDMENT NO. 0002 |
| EffDate: 8/30/24 |
| ReqNo: |
| ProjNo: 23-0038 |
| IssCode: N40085 |
| IssuedBy: NAVFAC Mid-Atlantic |
Resident Officer in Charge of Construction 1107A Birch Street Camp Lejeune, NC 28547-2521
| AdmCode: |
| AdminBy: See Item 6 |
| ContName: |
| ContStrt: |
| ContCnty: |
| ContSt: |
| ContZIP: |
| Code: |
| FacCode: |
| SolChgYs: Yes |
| SolChgNo: Off |
| SolAmdNo: N40085-24-R-2728 |
| AmendDate: 08/07/24 |
| ModNo: |
| ModDate: |
| NoCopies: 1 |
| Amended: Yes |
| OffrExt: Yes |
| OffrNoEx: Off |
| ApprData: |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| Descript: 23-0059 FY 24 MCAS New River Mat Repairs |
Amendment 0002, Add questions and answers to RFI.
The time and date for receipt of proposals remains 1400, 052September 2024.
This amendment should be acknowledged when your proposal is submitted. Failure to acknowledge the amendment may constitute grounds for rejection of a proposal.