N4008524R2604 Attachment J-0200000-13 ELINs .xlsx
XLSX spreadsheet 128 KB Posted
- Solicitation number
- N4008524R2604
About this file
This document is an attachment providing Exhibit Line Item Numbers (ELINs) for a federal contract opportunity related to railroad track maintenance and repair services in the Hampton Roads area of Virginia. The solicitation number is N4008524R2604.
The ELINs cover recurring and non-recurring facility investment services for the maintenance and repair of railroad, ground level, and elevated crane rail systems at the Norfolk Naval Shipyard and surrounding naval installations within a 50 mile radius. The services include emergency repairs, preventative maintenance, and replacement/installation of various rail components such as switches, crossties, rails, and frogs. Pricing is provided for both labor and materials, with unit prices for specific tasks. The contract has a base period and four option periods. No other details about the overall contract requirements, timeline, or award information are provided in this attachment.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUMMARY
| Summary | ||
| ** NOTE** (EA Annually) and (XX EA) in ELINs to refer to Annex 0200000 Management and Administration Section J Acronyms and Definitions. | ||
| Period | Recurring | Nonrecurring |
| BASE | $ - 0 | $ - 0 |
| OPTION 1 | $ - 0 | $ - 0 |
| OPTION 2 | $ - 0 | $ - 0 |
| OPTION 3 | $ - 0 | $ - 0 |
| OPTION 4 | $ - 0 | $ - 0 |
| OPTION 5 | $ - 0 | $ - 0 |
| Totals | $ - 0 | $ - 0 |
| Total Aggregated | $ - 0 |
ELIN-Base Period Recurring
| ATTACHMENT J-0200000-13 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT N40085-24-R-2604 |
| EXHIBIT A |
| Line Item 0001 Recurring Work Price - Base Period |
| PROVIDE PRICES FOR FACILITY INVESTMENT - RECURRING WORK PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 |
| ELIN A001 |
| ELIN /Sub ELIN | Description | Quantity | Unit of Issue | Unit Price | Total |
| A001 | NORFOLK NAVAL SHIPYARD Spec Item 3 | ||||
| 1502000 Facilities Investment | |||||
| Service Orders Spec. Item 3.1 | |||||
| A002AA | Emergency Service Orders, Spec Item 3.1.1 (6 EA Annualy) | 12 | MO | $ - 0 | $ - 0 |
| A001AB | Urgent Service Orders, Spec item 3.1.2 (12 EA Annually) | 12 | MO | $ - 0 | $ - 0 |
| A001AC | Routine Service Orders, Spec Item 3.1.3 (25 EA Annually) | 12 | MO | $ - 0 | $ - 0 |
| Preventive Maintenance Program (PM) Spec. Item 3.2 | $ - 0 | $ - 0 | |||
| A001AD | Rail Swithc Spec Item 3.2.1 (38 EA) | 12 | MO | $ - 0 | $ - 0 |
| A001AE | 115/135 LB Crane Rail Switch Spec Item 3.2.2 (13 EA) | 12 | MO | $ - 0 | $ - 0 |
| A001AF | 115/175 LB Crane Rail Switch Spec Item 3.2.3 (14 EA) | 12 | MO | $ - 0 | $ - 0 |
| A001AG | Turntable Frogs Spec Item 3.2.4 (14 EA) | 12 | MO | $ - 0 | $ - 0 |
| A001AH | Derails Spec Item 3.2.5 (2 EA) | 12 | MO | $ - 0 | $ - 0 |
| A001AJ | RR / CR Expansion Joints Spec Item 3.2.6 (5 EA) | 12 | MO | $ - 0 | $ - 0 |
| A001AK | Flang Ways Spec Item 3.2.7 (34,120 TF) | 12 | MO | $ - 0 | $ - 0 |
| A001AL | Vegitation Control Spec Item 3.2.8 (34,120 TF) | 12 | MO | $ - 0 | $ - 0 |
| A001AM | Ultra Sonic Testing of Elevated Crane Rail and Guard Level Rail Trackage Spec Item 3.2.9 (35,640 TF) | 12 | MO | $ - 0 | $ - 0 |
NORFOLK Naval Shipyard Subtotal $ - 0
TOTAL RECURRING BASE PERIOD $ - 0
SECTION J
EXHIBIT A
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6'
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Barbwire Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Wood Fence.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
IN ACCORDANCE WITH SECTION C,
ELIN through Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence.
Including Fabric, Posts, Gates, Rails, Tension Wire, Barbwire/Barbed Tape.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Wood Fence. Including Posts and Gates.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Post Cut-off Flush.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Driven Post.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Posts Set in Concrete/Asphalt.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Square Foot to Patch and Refinish Concrete or Asphalt Surface.
Surface Depth to Match Surrounding.
Unit Price Each to Remove and Dispose of or Save and Store (for reuse) Barbwire Single Arm Support.
Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.
Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered
SECTION J
EXHIBIT A
Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN to . Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
PROVIDE A UNIT PRICE TO PERFORM EXPEDITED SERVICES.
IN ACCORDANCE WITH SECTION C,
ELIN
Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
SECTION J
EXHIBIT A
PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.
IN ACCORDANCE WITH SECTION C,
ELIN THROUGH
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
6' Fence Height Driven Posts
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, 6' Height
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, 6' Height, Free-Standing
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
With Barbwire, 7' Fence Height
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, With Barbwire, 7' Height
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, With Barbwire, 7' Height, Free-Standing
ELIN-Base Period-Nonrecurring
| ATTACHMENT J-0200000-13 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT N40085-24-R-2604 |
| EXHIBIT A |
| Line Item 0002 Non-Recurring Work Price - Base Period |
| PROVIDE PRICES FOR FACILITY INVESTMENT - NONRECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 |
| ELINs A700 Through A775 |
| ELIN | Product Name (120 Characters) | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price |
| A700 | Composite Skilled UPL Rate Work - Subject to the Applicable Service Contract Act (SCA).MUST BE NEGOTIATED BY KO | The Contractor shall provide one composite skilled labor hour performed by highly trained, certified, and/or licensed craftsmen and technicians, such as carpenters, painters, electricians, plumbers, equipment mechanics, electronics technicians, and pest controllers, per the scope and delivery schedule specified in the task order. | 500 | HR | $ - 0 | $ - 0 |
| A701 | Composite UPL Rate Work - Subject to the Wage Rate Construction. MUST BE NEGOTIATED BY KO | The Contractor shall provide one composite skilled labor hour of performed by substantially and highly trained, certified, and/or licensed craftsmen and technicians, such as carpenters, painters, electricians, plumbers, equipment mechanics, electronics technicians, and pest controllers, per the scope and delivery schedule specified in the order. | 500 | HR | $ - 0 | $ - 0 |
| A702 | Material Costs- MUST BE NEGOTIATED BY KO. | The Contractor shall provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Use with ELIN A700, A701, and 703. | 15,000 | EA | $ - 0 | $ - 0 |
| A703 | Equipment Costs- MUST BE NEGOTIATED BY KO. | The Contractor shall provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Use with ELIN A700, A701, and 702. | 15,000 | EA | $ - 0 | $ - 0 |
| A704 | Emergency Switch Cleanings | The Contractor shall respond to emergency calls and arrest emergent conditions to minimize and mitigate damage to the rail system and components and danger to personnel as per J-1502000-08 Work Plans | 12 | EA | $ - 0 | $ - 0 |
| A705 | Thawing of Frogs and Switches | The Contractor shall return the frozen frog and switch to working order - as per J-1502000-08 Work Plans | 12 | EA | $ - 0 | $ - 0 |
| A706 | Thawing of Rails | The Contractor shall return the frozen rails to working order as per J-1502000-08 Work Plans | 1,600 | TF | $ - 0 | $ - 0 |
| A707 | Minor Adjustments to Railroad and Crane Rail Switch Points | The Contractor shall provide all labor, material, etc. to adjust the railroad and crane rail switch points to be aligned within 3/16 inch of either stock rails as per J-1502000-08 Work Plans | 24 | EA | $ - 0 | $ - 0 |
| A708 | Replacement of Loose / Missing Spikes | The Contractor shall provide all labor, material, etc. to replace loose / missing spikes as per J-1502000-08 Work Plans | 100 | EA | $ - 0 | $ - 0 |
| A709 | Install New or Relay Tie Plates | The Contractor shall provide all labor, material, etc. to install new or relay tie plates as per J-1502000-08 Work Plans | 100 | EA | $ - 0 | $ - 0 |
| A710 | Replacement of Crosstie | The Contractor shall provide all labor, material, etc. to remove and replace crossties as per J-1502000-08 Work Plans | 200 | EA | $ - 0 | $ - 0 |
| A711 | Replacement of Switch Tie | The Contractor shall provide all labor, material, etc. to remove and replace switch tie as per J-1502000-08 Work Plans | 300 | LF | $ - 0 | $ - 0 |
| A712 | Alignment to Railroad Track | The Contractor shall provide all labor, material, etc. for alignment as per J-1502000-08 Work Plans | 100 | TF | $ - 0 | $ - 0 |
| A713 | Install Gage Rods | The Contractor shall provide all labor, material, etc. install gage rods as per J-1502000-08 Work Plans | 10 | EA | $ - 0 | $ - 0 |
| A714 | Install Rail Anchors | The Contractor shall provide all labor, material, etc. to remove and replace rail anchors as per J-1502000-08 Work Plans | 100 | EA | $ - 0 | $ - 0 |
| A715 | Ballast | The Contractor shall provide all labor, material, etc. to provide and install ballast as per J-1502000-08 Work Plans | 50 | TN | $ - 0 | $ - 0 |
| A716 | Replacement of Railroad Rail (Straight and Bent Sections) | The Contractor shall provide all labor, material, etc. to replace railroad rail. (Straight and Bent Sections)-as per J-1502000-08 Work Plans | 200 | LF | $ - 0 | $ - 0 |
| A717 | Replace Railroad Track (Complete) | The Contractor shall provide all labor, material, etc. to replace (complete) railroad track as per J-1502000-08 Work Plans | 200 | TF | $ - 0 | $ - 0 |
| A718 | Replace Railroad Split or Double Tongue Switch and Turnout (Complete) | The Contractor shall provide all labor, material, etc. to replace railroad split or double tongue switch and turnout (complete) as per J-1502000-08 Work Plans | 2 | EA | $ - 0 | $ - 0 |
| A719 | Adjust Railroad Switch | The Contractor shall provide all labor, material, etc. to adjust railroad switch as per J-1502000-08 Work Plans | 5 | EA | $ - 0 | $ - 0 |
| A720 | Replacement of Switch Stand | The Contractor shall provide all labor, material, etc. to replace switch stand as per J-1502000-08 Work Plans | 5 | EA | $ - 0 | $ - 0 |
| A721 | Replacement of Switch with Alterations | The Contractor shall provide all labor, material, etc. to replace switch stand with alterations as per J-1502000-08 Work Plans | 2 | EA | $ - 0 | $ - 0 |
| A722 | Removal of Flange way from Rail | The Contractor shall provide all labor, material, etc. to remove flange way from rail as perJ-1502000-08 Work Plans | 100 | LF | $ - 0 | $ - 0 |
| A723 | Removal of Abandoned Railroad Turnout | The Contractor shall provide all labor, material, etc. to remove abandoned railroad turnout as per J-1502000-08 Work Plans | 2 | EA | $ - 0 | $ - 0 |
| A724 | Removal of Abandoned Railroad Tracks | The Contractor shall provide all labor, material, etc. to remove abandoned railroad tracks as per J-1502000-08 Work Plans. | 200 | TF | $ - 0 | $ - 0 |
| A725 | Removal, Fabrication and Installation of Switch Paving Frame | The Contractor shall provide all labor, material, etc. to remove, fabricate, and install switch paving frame as per J-1502000-08 Work Plans | 2 | EA | $ - 0 | $ - 0 |
| A726 | Railroad Inspection Excavation | The Contractor shall provide all labor, material, etc. to provide railroad inspection excavation as per J-1502000-08 Work Plans | 200 | LF | $ - 0 | $ - 0 |
| A727 | Tensioning of Existing Bolts | The Contractor shall provide all labor, material, etc. to provide tensioning of existing bolts as per J-1502000-08 Work Plans | 100 | EA | $ - 0 | $ - 0 |
| A728 | Install New Bolts, Nuts, and Spring Washers | The Contractor shall provide all labor, material, etc. to install new bolts, nuts, and spring washers as per J-1502000-08 Work Plans | 500 | EA | $ - 0 | $ - 0 |
| A729 | Replacement of Joint Bars / Compromise Joint Bars | The Contractor shall provide all labor, material, etc. to replace joint bars / compromise joint bars as per J-1502000-08 Work Plans | 12 | PR | $ - 0 | $ - 0 |
| A730 | Drill Holes in Blank Joint Bars / Compromise Bars | The Contractor shall provide all labor, material, etc. to drill holes in blank joint bars / compromise bars as per J-1502000-08 Work Plans | 12 | PR | $ - 0 | $ - 0 |
| A731 | Repairing Defective Welds By Installing Joint Bars | The Contractor shall provide all labor, material, etc. to repair defective welds by installing joint bars as per J-1502000-08 Work Plans | 12 | EA | $ - 0 | $ - 0 |
| A732 | Repair Rail Heads and Rail Ends | The Contractor shall provide all labor, material, etc. to repair rail heads and rail ends as per J-1502000-08 Work Plans | 12 | EA | $ - 0 | $ - 0 |
| A733 | Repair Railroad or Crane Rail Switch Point or Frog Point by Welding and Grinding | The Contractor shall provide all labor, material, etc. to repair railroad or crane rail switch point or frog point by welding and grinding as perJ-1502000-08 Work Plans | 10 | EA | $ - 0 | $ - 0 |
| A734 | Fabrication and Installation of Station Markers | The Contractor shall provide all labor, material, etc. to fabricate and install station markers as per J-1502000-08 Work Plans | 12 | EA | $ - 0 | $ - 0 |
| A735 | Replace Switch Cover Plates | The Contractor shall provide all labor, material, etc. to replace switch cover plates as perJ-1502000-08 Work Plans | 6 | EA | $ - 0 | $ - 0 |
| A736 | Repair/Replace Switch Cover Hinges (Camber Style) for Railroad and Crane Switches | The Contractor shall provide all labor, material, etc. to repair/replace switch cover hinges (Camber Style) for railroad and crane switches as per J-1502000-08 Work Plans | 10 | SET | $ - 0 | $ - 0 |
| A737 | Removal and Disposal of Existing Bituminous | The Contractor shall provide all labor, material, etc. to remove and dispose of existing bituminous asphalt as per J-1502000-08 Work Plans | 50 | TN | $ - 0 | $ - 0 |
| A738 | Provide Asphalt Pavement | The Contractor shall provide all labor, material, etc. to provide and install bituminous asphalt as per J-1502000-08 Work Plans | 50 | TN | $ - 0 | $ - 0 |
| A739 | Remove/Replace Concrete | The Contractor shall provide all labor, material, etc. to remove/replace Concrete as per J-1502000-08 Work Plans | 10 | CF | $ - 0 | $ - 0 |
| A740 | Steel Cotter Pin Installation | The Contractor shall provide all labor, material, etc. to install steel cotter pin as per J-1502000-08 Work Plans | 36 | EA | $ - 0 | $ - 0 |
| A741 | Minor Weld Repairs | The Contractor shall provide all labor, material, etc. to provide minor weld repairs as per J-1502000-08 Work Plans | 24 | EA | $ - 0 | $ - 0 |
| A742 | Repair to Railroad Paving Frame or Crane Rail Switch Boxes | The Contractor shall provide all labor, material, etc. to repair railroad paving frame or crane rail switch boxes as per J-1502000-08 Work Plans | 6 | EA | $ - 0 | $ - 0 |
| A743 | Repair/Replace Cover Bolts for Crane Rail Switch Systems | The Contractor shall provide all labor, material, etc. to repair/ replace cover bolts for crane rail switch systems as perJ-1502000-08 Work Plans | 25 | EA | $ - 0 | $ - 0 |
| A744 | Repair Railroad and Crane Rail by Thermite Welding | The Contractor shall provide all labor, material, etc. to repair railroad and crane rail by thermite welding as per J-1502000-08 Work Plans | 24 | EA | $ - 0 | $ - 0 |
| A745 | Weld Repair Broken Frog Rail | The Contractor shall provide all labor, material, etc. to weld repair broken frog rail as per J-1502000-08 Work Plans | 12 | EA | $ - 0 | $ - 0 |
| A746 | Remove and Replace Rigid Frog 135 LB / 175 LB | The Contractor shall provide all labor, material, etc. to remove and replace rigid frog 135 LB / 175 LB. as per J-1502000-08 Work Plans | 2 | EA | $ - 0 | $ - 0 |
| A747 | Remove Bolted on Crane or Railroad Wheel Stops | The Contractor shall provide all labor, material, etc. to remove bolted on crane or railroad wheel stops as per J-1502000-08 Work Plans | 12 | PR | $ - 0 | $ - 0 |
| A748 | Install Bolted on Crane or Railroad Wheel Stops | The Contractor shall provide all labor, material, etc. to install bolted on crane or railroad wheel stops as per J-1502000-08 Work Plans | 12 | PR | $ - 0 | $ - 0 |
| A749 | Install Core Drilled Anchor Bolt | The Contractor shall provide all labor, material, etc. to install core drilled anchor bolt as per J-1502000-08 Work Plans | 120 | EA | $ - 0 | $ - 0 |
| A750 | Install HVA Anchor Bolt | The Contractor shall provide all labor, material, etc. to install HVA anchor bolt as perJ-1502000-08 Work Plans | 120 | EA | $ - 0 | $ - 0 |
| A751 | Install 1 inch by 12 inch steel plate | The Contractor shall provide all labor, material, etc. to install 1 inch X 12 inch steel plate as per J-1502000-08 Work Plans | 6 | LF | $ - 0 | $ - 0 |
| A752 | Removal of Abandoned Railroad Crossing Frogs in Crane Rail | The Contractor shall provide all labor, material, etc. to repair railroad or crane switch as per J-1502000-08 Work Plans | 5 | PR | $ - 0 | $ - 0 |
| A753 | Repair Railroad or Crane Switch | The Contractor shall provide all labor, material, etc. to install weld on studs with rail clips as per J-1502000-08 Work Plans | 5 | EA | $ - 0 | $ - 0 |
| A754 | Install Weld on Studs with Rail Clips | The Contractor shall provide all labor, material, etc. to install weld on alignment bars as per J-1502000-08 Work Plans | 12 | EA | $ - 0 | $ - 0 |
| A755 | Install Weld on Alignment Bars | The Contractor shall provide all labor, material, etc. to provide epoxy resin grout (2Part, 48 LB. Nominal, 5 Gallon Container) as per J-1502000-08 Work Plans | 12 | EA | $ - 0 | $ - 0 |
| A756 | Provide Epoxy Resin Grout (2Part, 48 LB. Nominal, 5 Gallon Container) | The Contractor shall provide all labor, material, etc. to perform destructive testing (NDT) /ultrasonic testing (UT) as per J-1502000-08 Work Plans | 12 | EA | $ - 0 | $ - 0 |
| A757 | Perform Non-Destructive Testing (NDT) / Ultrasonic Testing (UT) | The Contractor shall provide all labor, material, etc. to remove welded on crane rail stops as per J-1502000-08 Work Plans | 5,280 | FT | $ - 0 | $ - 0 |
| A758 | Removal of Welded on Crane Rail Stops | The Contractor shall provide all labor, material, etc. to install weld on rail stops as per J-1502000-08 Work Plans | 12 | PR | $ - 0 | $ - 0 |
| A759 | Install Weld on Rail Stops | The Contractor shall provide all labor, material, etc. to provide the alignment of crane rail as per J-1502000-08 Work Plans | 12 | PR | $ - 0 | $ - 0 |
| A760 | Alignment of Crane Rail | The Contractor shall provide all labor, material, etc. to replace 135 LB. or 175 LB. crane rail as per J-1502000-08 Work Plans | 12 | LF | $ - 0 | $ - 0 |
| A761 | Replacement of Crane Rail 135 LB. Or 175 LB. (Straight or Curve) | The Contractor shall provide all labor, material, etc. to adjust 135 LB. crane rail switch as per J-1502000-08 Work Plans | 100 | TF | $ - 0 | $ - 0 |
| A762 | Adjust 135 LB. Crane Rail Switch | The Contractor shall provide all labor, material, etc. to adjust 135 LB. crane rail switch as per J-1502000-08 Work Plans | 100 | SET | $ - 0 | $ - 0 |
| A763 | Adjust 175 LB. Crane Rail Switch | The Contractor shall provide all labor, material, etc. to adjust 175 LB. crane rail switch as per J-1502000-08 Work Plans . | 4 | SET | $ - 0 | $ - 0 |
| A764 | Re-grouting of Pumping Crane Rail and Joints | The Contractor shall provide all labor, material, etc. to re-grout pumping crane rail and joints as per J-1502000-08 Work Plans | 4 | LF | $ - 0 | $ - 0 |
| A765 | Replace 135 LB. Or 175 LB. Crane Switch Throw Handle | The Contractor shall provide all labor, material, etc. to replace 135 LB. or 175 LB. crane switch throw handle as perJ-1502000-08 Work Plans | 50 | EA | $ - 0 | $ - 0 |
| A766 | Repair Turntable Frog | The Contractor shall provide all labor, material, etc. to repair turntable frog as per J-1502000-08 Work Plans. | 2 | EA | $ - 0 | $ - 0 |
| A767 | Repair/Replace Lifting Handle on Turntable Frog | The Contractor shall provide all labor, material, etc. to repair/ replace lifting handle on turntable frog as per J-1502000-08 Work Plans | 2 | EA | $ - 0 | $ - 0 |
| A768 | Reset and Secure Crane Rail Turntable Frog Handle Sockets | The Contractor shall provide all labor, material, etc. to reset and secure crane rail turntable frog handle sockets as per J-1502000-08 Work Plans | 4 | EA | $ - 0 | $ - 0 |
| A769 | Replace Turntable Frog Handle Sockets | The Contractor shall provide all labor, material, etc. to replace turntable frog handle sockets as per J-1502000-08 Work Plans | 6 | EA | $ - 0 | $ - 0 |
| A770 | Replace Turntable Frog Turn Handle | The Contractor shall provide all labor, material, etc. to replace turntable frog turn handle as per J-1502000-08 Work Plans | 6 | EA | $ - 0 | $ - 0 |
| A771 | Tensioning of existing bolts | The Contractor shall provide all labor, material, etc. to apply tensioning of existing bolts. (on elevated or sidewall crane rail systems) as per J-1502000-08 Work Plans | 6 | EA | $ - 0 | $ - 0 |
| A772 | Replacement of Rail Clips or Rail Clamps: Rail Sizes; 40 to 60 lbs. ASCE, Rail Sizes; 70 to 90 lbs. ASCE, Rail Sizes; 100 to 135 lbs. ASCE | The Contractor shall provide all labor, material, etc. to replace rail clips or rail clamps. (on elevated or sidewall crane rail systems) as per J-1502000-08 Work Plans | 50 | EA | $ - 0 | $ - 0 |
| A773 | Replacement of Hook Bolts: Rail Sizes; 40 to 60 lbs. ASCE, Rail Sizes; 70 to 90 lbs. ASCE, Rail Sizes; 100 to 135 lbs. ASCE | The Contractor shall provide all labor, material, etc. to hook bolts (on elevated or sidewall crane rail systems) as per J-1502000-08 Work Plans | 12 | EA | $ - 0 | $ - 0 |
| A774 | Remove or Install Portable Rail Stops | The Contractor shall provide all labor, material, etc. to remove or install portable rail stops. (on elevated or sidewall crane rail systems) as per J-1502000-08 Work Plans | 12 | EA | $ - 0 | $ - 0 |
| A775 | Alignment of Elevated Crane Rail | The Contractor shall provide all labor, material, etc. to align elevated crane rail as perJ-1502000-08 Work Plans | 24 | EA | $ - 0 | $ - 0 |
TOTAL NON-RECURRING WORK BASE YEAR $ - 0
ELIN-Option 1 Period Recurring
| ATTACHMENT J-0200000-13 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT N40085-24-R-2604 |
| EXHIBIT B |
| Line Item 0003 Recurring Work Price - Option 1 Period |
| PROVIDE PRICES FOR FACILITY INVESTMENT - RECURRING WORK PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 |
| ELIN B001 |
| ELIN /Sub ELIN | Description | Quantity | Unit of Issue | Unit Price | Total |
| B001 | NORFOLK NAVAL SHIPYARD Spec Item 3 | ||||
| 15020000 Facility Investment | |||||
| Service Orders Spec. Item 3.1 | |||||
| B001AA | Emergency Service Orders, Spec Item 3.1.1 (6 EA) | 12 | MO | $ - 0 | $ - 0 |
| B001AB | Urgent Service Orders, Spec item 3.1.2 (12 EA Annually) | 12 | MO | $ - 0 | $ - 0 |
| B001AC | Routine Service Orders, Spec Item 3.1.3 (25 EA) | 12 | MO | $ - 0 | $ - 0 |
| Preventive Maintenance Program (PM) Spec. Item 3.2 | |||||
| B001AD | Rail Swithc Spec Item 3.2.1 (38 EA) | 12 | MO | $ - 0 | $ - 0 |
| B001AE | 115/135 LB Crane Rail Switch Spec Item 3.2.2 (13 EA) | 12 | MO | $ - 0 | $ - 0 |
| B001AF | 115/175 LB Crane Rail Switch Spec Item 3.2.3 (14 EA) | 12 | MO | $ - 0 | $ - 0 |
| B001AG | Turntable Frogs Spec Item 3.2.4 (14 EA) | 12 | MO | $ - 0 | $ - 0 |
| B001AH | Derails Spec Item 3.2.5 (2 EA) | 12 | MO | $ - 0 | $ - 0 |
| B001AJ | RR / CR Expansion Joints Spec Item 3.2.6 (5 EA) | 12 | MO | $ - 0 | $ - 0 |
| B001AK | Flang Ways Spec Item 3.2.7 (34,120 TF) | 12 | MO | $ - 0 | $ - 0 |
| B001AL | Vegitation Control Spec Item 3.2.8 (34,120 TF) | 12 | MO | $ - 0 | $ - 0 |
| B001AM | Ultra Sonic Testing of Elevated Crane Rail and Guard Level Rail Trackage Spec Item 3.2.9 (35,640 TF) | 12 | MO | $ - 0 | $ - 0 |
NORFOLK Naval Shipyard Subtotal $ - 0
TOTAL 1ST OPTION PERIOD RECURRING $ - 0
SECTION J
EXHIBIT A
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
ELIN through Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.
Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered
Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN to . Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
PROVIDE A UNIT PRICE TO PERFORM EXPEDITED SERVICES.
IN ACCORDANCE WITH SECTION C,
Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
SECTION J
EXHIBIT A
PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.
IN ACCORDANCE WITH SECTION C,
ELIN THROUGH
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
ELIN-Opt 1 Period-Nonrecurring
| ATTACHMENT J-0200000-13 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT N40085-24-R-2604 |
| EXHIBIT B |
| Line Item 0004 Non-Recurring Work Price - Option 1 Period |
| PROVIDE PRICES FOR FACILITY INVESTMENT - NONRECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 |
| ELINs B700 through B775 |
| ELIN | Product Name (120 Characters) | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price |
| B700 | Composite Skilled UPL Rate Work - Subject to the Applicable Service Contract Act (SCA).MUST BE NEGOTIATED BY KO | The Contractor shall provide one composite skilled labor hour performed by highly trained, certified, and/or licensed craftsmen and technicians, such as carpenters, painters, electricians, plumbers, equipment mechanics, electronics technicians, and pest controllers, per the scope and delivery schedule specified in the task order. | 500 | HR | $ - 0 | $ - 0 |
| B701 | Composite UPL Rate Work - Subject to the Wage Rate Construction. MUST BE NEGOTIATED BY KO | The Contractor shall provide one composite skilled labor hour of performed by substantially and highly trained, certified, and/or licensed craftsmen and technicians, such as carpenters, painters, electricians, plumbers, equipment mechanics, electronics technicians, and pest controllers, per the scope and delivery schedule specified in the order. | 500 | HR | $ - 0 | $ - 0 |
| B702 | Material Costs- MUST BE NEGOTIATED BY KO. | The Contractor shall provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Use with ELIN B700, B701, and 702. | 15,000 | LS | $ - 0 | $ - 0 |
| B703 | Equipment Costs- MUST BE NEGOTIATED BY KO. | The Contractor shall provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Use with ELIN B700, B701, and 702. | 15,000 | EA | $ - 0 | $ - 0 |
| B704 | Emergency Switch Cleanings | The Contractor shall respond to emergency calls and arrest emergent conditions to minimize and mitigate damage to the rail system and components and danger to personnel as per J-1502000-08 Work Plans | 12 | EA | $ - 0 | $ - 0 |
| B705 | Thawing of Frogs and Switches | The Contractor shall return the frozen frog and switch to working order - as per J-1502000-08 Work Plans | 12 | EA | $ - 0 | $ - 0 |
| B706 | Thawing of Rails | The Contractor shall return the frozen rails to working order as per J-1502000-08 Work Plans | 1,600 | TF | $ - 0 | $ - 0 |
| B707 | Minor Adjustments to Railroad and Crane Rail Switch Points | The Contractor shall provide all labor, material, etc. to adjust the railroad and crane rail switch points to be aligned within 3/16 inch of either stock rails as per J-1502000-08 Work Plans | 24 | EA | $ - 0 | $ - 0 |
| B708 | Replacement of Loose / Missing Spikes | The Contractor shall provide all labor, material, etc. to replace loose / missing spikes as per J-1502000-08 Work Plans | 100 | EA | $ - 0 | $ - 0 |
| B709 | Install New or Relay Tie Plates | The Contractor shall provide all labor, material, etc. to install new or relay tie plates as per J-1502000-08 Work Plans | 100 | EA | $ - 0 | $ - 0 |
| B710 | Replacement of Crosstie | The Contractor shall provide all labor, material, etc. to remove and replace crossties as per J-1502000-08 Work Plans | 200 | EA | $ - 0 | $ - 0 |
| B711 | Replacement of Switch Tie | The Contractor shall provide all labor, material, etc. to remove and replace switch tie as per J-1502000-08 Work Plans | 300 | LF | $ - 0 | $ - 0 |
| B712 | Alignment to Railroad Track | The Contractor shall provide all labor, material, etc. for alignment as per J-1502000-08 Work Plans | 100 | TF | $ - 0 | $ - 0 |
| B713 | Install Gage Rods | The Contractor shall provide all labor, material, etc. install gage rods as per J-1502000-08 Work Plans | 10 | EA | $ - 0 | $ - 0 |
| B714 | Install Rail Anchors | The Contractor shall provide all labor, material, etc. to remove and replace rail anchors as per J-1502000-08 Work Plans | 100 | EA | $ - 0 | $ - 0 |
| B715 | Ballast | The Contractor shall provide all labor, material, etc. to provide and install ballast as perJ-1502000-08 Work Plans | 50 | TN | $ - 0 | $ - 0 |
| B716 | Replacement of Railroad Rail (Straight and Bent Sections) | The Contractor shall provide all labor, material, etc. to replace railroad rail. (Straight and Bent Sections)-as per J-1502000-08 Work Plans | 200 | LF | $ - 0 | $ - 0 |
| B717 | Replace Railroad Track (Complete) | The Contractor shall provide all labor, material, etc. to replace (complete) railroad track as per J-1502000-08 Work Plans | 200 | TF | $ - 0 | $ - 0 |
| B718 | Replace Railroad Split or Double Tongue Switch and Turnout (Complete) | The Contractor shall provide all labor, material, etc. to replace railroad split or double tongue switch and turnout (complete) as per J-1502000-08 Work Plans | 2 | EA | $ - 0 | $ - 0 |
| B719 | Adjust Railroad Switch | The Contractor shall provide all labor, material, etc. to adjust railroad switch as per J-1502000-08 Work Plans | 5 | EA | $ - 0 | $ - 0 |
| B720 | Replacement of Switch Stand | The Contractor shall provide all labor, material, etc. to replace switch stand as perJ-1502000-08 Work Plans | 5 | EA | $ - 0 | $ - 0 |
| B721 | Replacement of Switch with Alterations | The Contractor shall provide all labor, material, etc. to replace switch stand with alterations as pJ-1502000-08 Work Plans | 2 | EA | $ - 0 | $ - 0 |
| B722 | Removal of Flange way from Rail | The Contractor shall provide all labor, material, etc. to remove flange way from rail as per J-1502000-08 Work Plans | 100 | LF | $ - 0 | $ - 0 |
| B723 | Removal of Abandoned Railroad Turnout | The Contractor shall provide all labor, material, etc. to remove abandoned railroad turnout as per J-1502000-08 Work Plans | 2 | EA | $ - 0 | $ - 0 |
| B724 | Removal of Abandoned Railroad Tracks | The Contractor shall provide all labor, material, etc. to remove abandoned railroad tracks as per J-1502000-08 Work Plans | 200 | TF | $ - 0 | $ - 0 |
| B725 | Removal, Fabrication and Installation of Switch Paving Frame | The Contractor shall provide all labor, material, etc. to remove, fabricate, and install switch paving frame as per J-1502000-08 Work Plans | 2 | EA | $ - 0 | $ - 0 |
| B726 | Railroad Inspection Excavation | The Contractor shall provide all labor, material, etc. to provide railroad inspection excavation as J-1502000-08 Work Plans | 200 | LF | $ - 0 | $ - 0 |
| B727 | Tensioning of Existing Bolts | The Contractor shall provide all labor, material, etc. to provide tensioning of existing bolts as per J-1502000-08 Work Plans | 100 | EA | $ - 0 | $ - 0 |
| B728 | Install New Bolts, Nuts, and Spring Washers | The Contractor shall provide all labor, material, etc. to install new bolts, nuts, and spring washers as per J-1502000-08 Work Plans | 500 | EA | $ - 0 | $ - 0 |
| B729 | Replacement of Joint Bars / Compromise Joint Bars | The Contractor shall provide all labor, material, etc. to replace joint bars / compromise joint bars as per J-1502000-08 Work Plans | 12 | PR | $ - 0 | $ - 0 |
| B730 | Drill Holes in Blank Joint Bars / Compromise Bars | The Contractor shall provide all labor, material, etc. to drill holes in blank joint bars / compromise bars as per J-1502000-08 Work Plans | 12 | PR | $ - 0 | $ - 0 |
| B731 | Repairing Defective Welds By Installing Joint Bars | The Contractor shall provide all labor, material, etc. to repair defective welds by installing joint bars as per J-1502000-08 Work Plans | 12 | EA | $ - 0 | $ - 0 |
| B732 | Repair Rail Heads and Rail Ends | The Contractor shall provide all labor, material, etc. to repair rail heads and rail ends as per J-1502000-08 Work Plans | 12 | EA | $ - 0 | $ - 0 |
| B733 | Repair Railroad or Crane Rail Switch Point or Frog Point by Welding and Grinding | The Contractor shall provide all labor, material, etc. to repair railroad or crane rail switch point or frog point by welding and grinding as perJ-1502000-08 Work Plans. | 10 | EA | $ - 0 | $ - 0 |
| B734 | Fabrication and Installation of Station Markers | The Contractor shall provide all labor, material, etc. to fabricate and install station markers as per J-1502000-08 Work Plans | 12 | EA | $ - 0 | $ - 0 |
| B735 | Replace Switch Cover Plates | The Contractor shall provide all labor, material, etc. to replace switch cover plates as per J-1502000-08 Work Plans | 6 | EA | $ - 0 | $ - 0 |
| B736 | Repair/Replace Switch Cover Hinges (Camber Style) for Railroad and Crane Switches | The Contractor shall provide all labor, material, etc. to repair/replace switch cover hinges (Camber Style) for railroad and crane switches as J-1502000-08 Work Plans | 10 | SET | $ - 0 | $ - 0 |
| B737 | Removal and Disposal of Existing Bituminous | The Contractor shall provide all labor, material, etc. to remove and dispose of existing bituminous asphalt as per J-1502000-08 Work Plans | 50 | TN | $ - 0 | $ - 0 |
| B738 | Provide Asphalt Pavement | The Contractor shall provide all labor, material, etc. to provide and install bituminous asphalt as J-1502000-08 Work Plans | 50 | TN | $ - 0 | $ - 0 |
| B739 | Remove/Replace Concrete | The Contractor shall provide all labor, material, etc. to remove/replace Concrete as per J-1502000-08 Work Plans | 10 | CF | $ - 0 | $ - 0 |
| B740 | Steel Cotter Pin Installation | The Contractor shall provide all labor, material, etc. to install steel cotter pin as per J-1502000-08 Work Plans. | 36 | EA | $ - 0 | $ - 0 |
| B741 | Minor Weld Repairs | The Contractor shall provide all labor, material, etc. to provide minor weld repairs as per J-1502000-08 Work Plans. | 24 | EA | $ - 0 | $ - 0 |
| B742 | Repair to Railroad Paving Frame or Crane Rail Switch Boxes | The Contractor shall provide all labor, material, etc. to repair railroad paving frame or crane rail switch boxes as per J-1502000-08 Work Plans | 6 | EA | $ - 0 | $ - 0 |
| B743 | Repair/Replace Cover Bolts for Crane Rail Switch Systems | The Contractor shall provide all labor, material, etc. to repair/ replace cover bolts for crane rail switch systems as per J-1502000-08 Work Plans | 25 | EA | $ - 0 | $ - 0 |
| B744 | Repair Railroad and Crane Rail by Thermite Welding | The Contractor shall provide all labor, material, etc. to repair railroad and crane rail by thermite welding as per J-1502000-08 Work Plans | 24 | EA | $ - 0 | $ - 0 |
| B745 | Weld Repair Broken Frog Rail | The Contractor shall provide all labor, material, etc. to weld repair broken frog rail as perJ-1502000-08 Work Plans | 12 | EA | $ - 0 | $ - 0 |
| B746 | Remove and Replace Rigid Frog 135 LB / 175 LB | The Contractor shall provide all labor, material, etc. to remove and replace rigid frog 135 LB / 175 LB. as per J-1502000-08 Work Plans | 2 | EA | $ - 0 | $ - 0 |
| B747 | Remove Bolted on Crane or Railroad Wheel Stops | The Contractor shall provide all labor, material, etc. to remove bolted on crane or railroad wheel stops as per J-1502000-08 Work Plans | 12 | PR | $ - 0 | $ - 0 |
| B748 | Install Bolted on Crane or Railroad Wheel Stops | The Contractor shall provide all labor, material, etc. to install bolted on crane or railroad wheel stops as per J-1502000-08 Work Plans | 12 | PR | $ - 0 | $ - 0 |
| B749 | Install Core Drilled Anchor Bolt | The Contractor shall provide all labor, material, etc. to install core drilled anchor bolt as per J-1502000-08 Work Plans | 120 | EA | $ - 0 | $ - 0 |
| B750 | Install HVA Anchor Bolt | The Contractor shall provide all labor, material, etc. to install HVA anchor bolt as per J-1502000-08 Work Plans | 120 | EA | $ - 0 | $ - 0 |
| B751 | Install 1 inch by 12 inch steel plate | The Contractor shall provide all labor, material, etc. to install 1 inch X 12 inch steel plate as per J-1502000-08 Work Plans | 6 | LF | $ - 0 | $ - 0 |
| B752 | Removal of Abandoned Railroad Crossing Frogs in Crane Rail | The Contractor shall provide all labor, material, etc. to repair railroad or crane switch as per J-1502000-08 Work Plans | 5 | PR | $ - 0 | $ - 0 |
| B753 | Repair Railroad or Crane Switch | The Contractor shall provide all labor, material, etc. to install weld on studs with rail clips as per J-1502000-08 Work Plans | 5 | EA | $ - 0 | $ - 0 |
| B754 | Install Weld on Studs with Rail Clips | The Contractor shall provide all labor, material, etc. to install weld on alignment bars as per J-1502000-08 Work Plans | 12 | EA | $ - 0 | $ - 0 |
| B755 | Install Weld on Alignment Bars | The Contractor shall provide all labor, material, etc. to provide epoxy resin grout (2Part, 48 LB. Nominal, 5 Gallon Container) as per J-1502000-08 Work Plans | 12 | EA | $ - 0 | $ - 0 |
| B756 | Provide Epoxy Resin Grout (2Part, 48 LB. Nominal, 5 Gallon Container) | The Contractor shall provide all labor, material, etc. to perform destructive testing (NDT) /ultrasonic testing (UT) as per J-1502000-08 Work Plans | 12 | EA | $ - 0 | $ - 0 |
| B757 | Perform Non-Destructive Testing (NDT) / Ultrasonic Testing (UT) | The Contractor shall provide all labor, material, etc. to remove welded on crane rail stops as per J-1502000-08 Work Plans | 5,280 | FT | $ - 0 | $ - 0 |
| B758 | Removal of Welded on Crane Rail Stops | The Contractor shall provide all labor, material, etc. to install weld on rail stops as perJ-1502000-08 Work Plans | 12 | PR | $ - 0 | $ - 0 |
| B759 | Install Weld on Rail Stops | The Contractor shall provide all labor, material, etc. to provide the alignment of crane rail as per J-1502000-08 Work Plans | 12 | PR | $ - 0 | $ - 0 |
| B760 | Alignment of Crane Rail | The Contractor shall provide all labor, material, etc. to replace 135 LB. or 175 LB. crane rail as per J-1502000-08 Work Plans | 12 | LF | $ - 0 | $ - 0 |
| B761 | Replacement of Crane Rail 135 LB. Or 175 LB. (Straight or Curve) | The Contractor shall provide all labor, material, etc. to adjust 135 LB. crane rail switch as per J-1502000-08 Work Plans | 100 | TF | $ - 0 | $ - 0 |
| B762 | Adjust 135 LB. Crane Rail Switch | The Contractor shall provide all labor, material, etc. to adjust 135 LB. crane rail switch as per J-1502000-08 Work Plans. | 100 | SET | $ - 0 | $ - 0 |
| B763 | Adjust 175 LB. Crane Rail Switch | The Contractor shall provide all labor, material, etc. to adjust 175 LB. crane rail switch as per J-1502000-08 Work Plans | 4 | SET | $ - 0 | $ - 0 |
| B764 | Re-grouting of Pumping Crane Rail and Joints | The Contractor shall provide all labor, material, etc. to re-grout pumping crane rail and joints as per J-1502000-08 Work Plans | 4 | LF | $ - 0 | $ - 0 |
| B765 | Replace 135 LB. Or 175 LB. Crane Switch Throw Handle | The Contractor shall provide all labor, material, etc. to replace 135 LB. or 175 LB. crane switch throw handle as per J-1502000-08 Work Plans | 50 | EA | $ - 0 | $ - 0 |
| B766 | Repair Turntable Frog | The Contractor shall provide all labor, material, etc. to repair turntable frog as per J-1502000-08 Work Plans | 2 | EA | $ - 0 | $ - 0 |
| B767 | Repair/Replace Lifting Handle on Turntable Frog | The Contractor shall provide all labor, material, etc. to repair/ replace lifting handle on turntable frog as per J-1502000-08 Work Plans | 2 | EA | $ - 0 | $ - 0 |
| B768 | Reset and Secure Crane Rail Turntable Frog Handle Sockets | The Contractor shall provide all labor, material, etc. to reset and secure crane rail turntable frog handle sockets as per J-1502000-08 Work Plans | 4 | EA | $ - 0 | $ - 0 |
| B769 | Replace Turntable Frog Handle Sockets | The Contractor shall provide all labor, material, etc. to replace turntable frog handle sockets as per J-1502000-08 Work Plans | 6 | EA | $ - 0 | $ - 0 |
| B770 | Replace Turntable Frog Turn Handle | The Contractor shall provide all labor, material, etc. to replace turntable frog turn handle as per J-1502000-08 Work Plans | 6 | EA | $ - 0 | $ - 0 |
| B771 | Tensioning of existing bolts | The Contractor shall provide all labor, material, etc. to apply tensioning of existing bolts. (on elevated or sidewall crane rail systems) as per J-1502000-08 Work Plans | 6 | EA | $ - 0 | $ - 0 |
| B772 | Replacement of Rail Clips or Rail Clamps: Rail Sizes; 40 to 60 lbs. ASCE, Rail Sizes; 70 to 90 lbs. ASCE, Rail Sizes; 100 to 135 lbs. ASCE | The Contractor shall provide all labor, material, etc. to replace rail clips or rail clamps. (on elevated or sidewall crane rail systems) as per J-1502000-08 Work Plans. | 50 | EA | $ - 0 | $ - 0 |
| B773 | Replacement of Hook Bolts: Rail Sizes; 40 to 60 lbs. ASCE, Rail Sizes; 70 to 90 lbs. ASCE, Rail Sizes; 100 to 135 lbs. ASCE | The Contractor shall provide all labor, material, etc. to hook bolts (on elevated or sidewall crane rail systems) as per J-1502000-08 Work Plans | 12 | EA | $ - 0 | $ - 0 |
| B774 | Remove or Install Portable Rail Stops | The Contractor shall provide all labor, material, etc. to remove or install portable rail stops. (on elevated or sidewall crane rail systems) as per J-1502000-08 Work Plans | 12 | EA | $ - 0 | $ - 0 |
| B775 | Alignment of Elevated Crane Rail | The Contractor shall provide all labor, material, etc. to align elevated crane rail as perJ-1502000-08 Work Plans | 24 | EA | $ - 0 | $ - 0 |
TOTAL NON-RECURRING 1st OPTION YEAR $ - 0
ELIN-Option 2 Period Recurring
| ATTACHMENT J-0200000-13 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT N40085-24-R-2604 |
| EXHIBIT C |
| Line Item 0005 Recurring Work Price - Option 2 Period |
| PROVIDE PRICES FOR FACILITY INVESTMENT - RECURRING WORK PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 |
| ELIN C001 |
| ELIN /Sub ELIN | Description | Quantity | Unit of Issue | Unit Price | Total |
| C001 | NORFOLK NAVAL SHIPYARD Spec Item 3 | ||||
| 1502000 Facilities Investment | |||||
| Service Orders Spec. Item 3.1 | |||||
| C001AA | Emergency Service Orders, Spec Item 3.1.1 (6 EA) | 12 | MO | $ - 0 | $ - 0 |
| C001AB | Urgent Service Orders, Spec item 3.1.2 (12 EA Annually) | 12 | MO | $ - 0 | $ - 0 |
| C001AC | Routine Service Orders, Spec Item 3.1.3 (25 EA) | 12 | MO | $ - 0 | $ - 0 |
| Preventive Maintenance Program (PM) Spec. Item 3.2 | |||||
| C001AD | Rail Swithc Spec Item 3.2.1 (38 EA) | 12 | MO | $ - 0 | $ - 0 |
| C001AE | 115/135 LB Crane Rail Switch Spec Item 3.2.2 (13 EA) | 12 | MO | $ - 0 | $ - 0 |
| C001AF | 115/175 LB Crane Rail Switch Spec Item 3.2.3 (14 EA) | 12 | MO | $ - 0 | $ - 0 |
| C001AG | Turntable Frogs Spec Item 3.2.4 (14 EA) | 12 | MO | $ - 0 | $ - 0 |
| C001AH | Derails Spec Item 3.2.5 (2 EA) | 12 | MO | $ - 0 | $ - 0 |
| C001AJ | RR / CR Expansion Joints Spec Item 3.2.6 (5 EA) | 12 | MO | $ - 0 | $ - 0 |
| C001AK | Flang Ways Spec Item 3.2.7 (34,120 TF) | 12 | MO | $ - 0 | $ - 0 |
| C001AL | Vegitation Control Spec Item 3.2.8 (34,120 TF) | 12 | MO | $ - 0 | $ - 0 |
| C001AM | Ultra Sonic Testing of Elevated Crane Rail and Guard Level Rail Trackage Spec Item 3.2.9 (35,640 TF) | 12 | MO | $ - 0 | $ - 0 |
NORFOLK Naval Shipyard Subtotal $ - 0
TOTAL 2ND OPTION PERIOD RECURRING $ - 0
SECTION J
EXHIBIT A
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
ELIN through Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.
Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered
Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN to . Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
PROVIDE A UNIT PRICE TO PERFORM EXPEDITED SERVICES.
IN ACCORDANCE WITH SECTION C,
Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
SECTION J
EXHIBIT A
PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.
IN ACCORDANCE WITH SECTION C,
ELIN THROUGH
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards,…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .