This submittal register outlines the submission requirements for a project to replace stairwells in Buildings 59 and 60 at Camp Lejeune. The contractor must submit plans, schedules, permits, reports and other documentation to the Navy at various stages of the project, including an accident prevention plan, construction schedule, traffic control plan if needed, environmental protection plan, quality control plan and other closeout documents. Key submission deadlines are provided. The related federal contract opportunity is a solicitation from the Department of the Navy to complete maintenance and repair work replacing the stairwells. Only contractors on the facility's Multiple Award Construction Contract may bid on the project by the response deadline.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT NO.
CONTRACTOR
SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A
C
T
I
O
N
C
D
E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A
C
T
I
D
E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
01 20 00
1.3
01 30 00
1.4.1
01 31 50
1.2
01 32 16
1.2
1.3
01 33 00
1.4.1
1.6.1
01 35 29
1.9
1.10
1.9.1
1.9.1
1.7.1.4
1.14
1.14.1
1.14.3
1.14.4
1.14.5
1.11
1.14.6
Crane Reports
SD-07 CERTIFICATES
Confined Space Entry Permit
SD-01 PRECONSTRUCTION SUBMITTALS
(d)
SD-11 CLOSEOUT SUBMITTALS
Interim DD1354, Transfer & Acceptance
SD-11 CLOSEOUT SUBMITTALS
Submittal Register
Complete Submittal Package
TITLE AND LOCATION
(Enter Contract Title and Locaiton Here)
Schedule of Prices
List of Contact Personnel
Construction Schedule of Military Real Property (If Applicable)
A
C
T
I
V
I
T
Y
T
R
A
N
S
M
I
T
T
A
L
Approving Authority Contractor
Schedule Dates
Contractor
Action
DESCRIPTION
ITEM SUBMITTED
(Enter Contractor Name Here)
Crane Work Plan (If Applicable)
Activity Hazard Analysis (AHA)
SD-06 TEST REPORTS
Certificate of Compliance
(Enter Contract No. Here)
SD-01 PRECONSTRUCTION SUBMITTALS
Accident Prevention Plan (APP)
SD-01 PRECONSTRUCTION SUBMITTALS
Equipment Delivery Schedule
SD-01 PRECONSTRUCTION SUBMITTALS
SUBMITTAL REGISTER
P
A
R
A
G
R
A
P
H
S
P
E
S
C
T
C
L
A
S
S
I
F
I
C
A
T
I
G
V
T
R
A
R
V
W
R
Crane Critical Lift Plan (If Applicable)
Crane Operators (If Applicable)
Reports
Accident Reports
Monthly Exposure Reports
Regulatory Citations and Violations
1.14.7
01 45 10
1.6
01 50 00
1.6.2.1
2.1
3.1
1.3
01 57 19
1.6.1
1.6.4
1.7.2
1.7
1.7
Third Party Certification of Barge-
Mounted Movile Cranes
SD-11 CLOSEOUT SUBMITTALS
Qaulity Control Plan (QC Plan)
SD-01 PRECONSTRUCTION SUBMITTALS
Traffic Control Plan (If Applicable)
Notice of Intent (If applicable)
Backflow Preventers Certificate (If Applicable)
SD-06 TEST REPORTS
SD-07 CERTIFICATES
Backflow Tester Certification (If Applicable)
Backflow Preventer Tests (If Applicable)
SD-03 PRODUCT DATA
MSDS for Class I ODS Waivered Product
SD-01 PRECONSTRUCTION SUBMITTALS
Permit for Storm Water Discharge (If applicable)
Environmental Protection Plan
Preconstruction Survey
Backflow Preventers (If Applicable)