24-0403 REPLACE STAIRWELL BLDG. 59 & 60 - PROJECT DESCRIPTION.pdf

PDF 44 KB Posted

Attached to
Replace Stairwell Bldgs. 59 & 60
Solicitation number
N4008524R2572
Issued by

About this file

This project description outlines requirements for replacing a stairwell at buildings 59 and 60. The work includes demolishing an existing steel staircase and removing lead paint from existing channels, which will remain and receive two new coats of galvanized paint. The contractor will also remove an existing concrete landing and section of sidewalk, and provide and install a new landing, concrete sidewalk, and galvanized stairwell with new handrails. The facility will remain operational during construction, so the contractor must conduct work to minimize interference. The same person may serve as superintendent, quality control manager, and safety officer if qualified in all three roles.

The related federal contract opportunity is solicitation number N4008524R2572 to replace the stairwell at buildings 59 and 60. Only contractors listed on the MACC general requirements cover page may submit a proposal, which is an ROICC Camp Lejeune area of responsibility project. The attached documents provide the scope of work and applicable drawings. The issuing agency is the Department of the Navy Naval Facilities Engineering Command.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT DESCRIPTION

The work includes Demo existing steel staircase at building 59 & 60, remove lead paint from existing channels from building face, channels shall remain apply two coats of new galvanized paint. Remove concrete landing and section of concrete sidewalk. Contractor shall provide and install new landing, new concrete sidewalk, and new galvanized stair well with new galvanized handrails and incidental related work.

SPECIAL SCHEDULING

The facility/activity will remain in operation during the entire construction period. The Contractor shall conduct his operations to cause the least possible interference with normal operations of the facility/activity.

SUPERVISION

One person may fill the roles of Superintendent, Quality Control Manager, and Safety & Health Officer, if duly qualified for all three positions as defined in the project specification.