24-0403 REPLACE STAIRWELL BLDG. 59 & 60 - SOW.pdf

PDF 370 KB Posted

Attached to
Replace Stairwell Bldgs. 59 & 60
Solicitation number
N4008524R2572
Issued by

About this file

This scope of work document outlines the requirements for replacing a stairwell at Buildings 59 and 60 located at Camp Lejeune, North Carolina. The contractor will demolish the existing steel stairwell, remove lead paint from channels, and install a new galvanized stairwell, concrete landing, and sidewalk section, including new galvanized handrails. The contractor must take field measurements, submit qualifications and product data, and follow waste disposal procedures. Drawings depict the building elevations, existing stairwell, and stairwell dimensions. Related solicitation N4008524R2572 is for this Replace Stairwell Bldgs. 59 & 60 project and is open only to M&R MACC contractors on the General Requirements cover page for the ROICC Camp Lejeune area of responsibility.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AutoCAD SHX Text

24-0403 REPLACEMENT OF STAIRWELL

AutoCAD SHX Text

PROJECT# 24M010CN24M010CN

AutoCAD SHX Text

CONTRACT# N40085-24-B-0403-0403

AutoCAD SHX Text

DWG: DANA WHITMORE

AutoCAD SHX Text

USMC CAMP LEJEUNE

AutoCAD SHX Text

BLDG #59 & 6059 & 60

AutoCAD SHX Text

SHEET OF OF OF

AutoCAD SHX Text

TITLE

AutoCAD SHX Text T1

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 24-0403 REPLACEMENT OF STAIRWELL SCOPE OF WORK: THE CONTRACTOR SHALL PROVIDE ALL MATERIAL, LABOR, EQUIPMENT AND THE CONTRACTOR SHALL PROVIDE ALL MATERIAL, LABOR, EQUIPMENT AND SUPERVISION REQUIRED TO ACCOMPLISH THE FOLLOWING. GENERAL DESCRIPTION: THIS SCOPE OF WORK IS TO BE ACCOMPLISHED AT BUILDING 12, THIS SCOPE OF WORK IS TO BE ACCOMPLISHED AT BUILDING 12, BUILDING 12 IS LOCATED ON POST LANE, ABOARD, CAMP LEJEUNE, NORTH CAROLINA. DETAILED REQUIREMENTS AND SPECIFICATIONS: THE CONTRACTOR SHALL TAKE HIS OWN FIELD : THE CONTRACTOR SHALL TAKE HIS OWN FIELD MEASUREMENTS IN DETERMINING REQUIRED MATERIALS AND COSTS FOR THE FOLLOWING. THE WORK INCLUDES DEMOLITION OF EXISTING STEEL STAIR WELL AT BUILDING 59 & 60, REMOVAL OF LEAD PAINT ON EXISTING CHANNELS FROM BUILDING FACE, CHANNELS SHALL REMAIN APPLY PRIMER AND TWO COATS OF NEW GALVANIZED PAINT. REMOVAL OF CONCRETE LANDING AND CONCRETE SECTION OF SIDEWALK. CONTRACTOR SHALL PROVIDE AND INSTALL NEW GALVANIZED STAIR WELL, NEW CONCRETE LANDING AND NEW SIDEWALK SECTION, NEW GALVANIZED HAND RAILS SHALL BE INCLUDED. SPECIAL SCHEDULING AND ACCESS: ACCESS AND SCHEDULING TO THE WORK AREA SHALL BE ACCESS AND SCHEDULING TO THE WORK AREA SHALL BE ARRANGED THROUGH CONTRACTING OFFICER"S REPRESENTATIVE FOR THE OICC OFFICE AND THE TENANT OF THE BUILDING. POINT OF CONTACT FOR ACCESS TO BUILDING. NOTES: 1. THE MEASUREMENTS AND QUANTITIES FURNISHED HERE ARE FOR REFERENCE ONLY. THE THE MEASUREMENTS AND QUANTITIES FURNISHED HERE ARE FOR REFERENCE ONLY. THE CONTRACTOR IS RESPONSIBLE FOR ACTUAL FIELD VERIFICATION PRIOR TO BIDDING, ORDERING MATERIAL AND DURING EVERY STEP OF CONSTRUCTION FOR EXISTING SURFACES, DIMENSIONS AND CONDITIONS. 2. REPAIR, REFINISH OF AREAS DAMAGED OR DISTURBED BY NEW WORK TO BE PROVIDED REPAIR, REFINISH OF AREAS DAMAGED OR DISTURBED BY NEW WORK TO BE PROVIDED UNDER THIS CONTRACT. 3. CONTRACTOR MAY ONLY USE THE CAMP LEJEUNE SANITARY LANDFILL FOR THE DISPOSAL OF CONTRACTOR MAY ONLY USE THE CAMP LEJEUNE SANITARY LANDFILL FOR THE DISPOSAL OF ASBESTOS CONTAINING MATERIALS, BUILDING PRODUCTS WITH TIGHTLY ADHERED LEAD CONTAINING PAINT, NON-COMTAMINATED CLEAN DIRT AND CLEAN GRAVEL. THE HOURS OF OPERATIONS ARE 0730-1530 MONDAY- THURSDAY AND 0730-1430 ON FRIDAY. DELIVERY OF ACCEPTABLE MATERIALS (IDENTIFIED ABOVE) SHALL BE BY APPOINTMENT ONLY. APPOINTMENT MADE BY PHONE AT 1-910-457-5011 OR 1-910-451-2946. 4. ALL OTHER CONTRACTOR GENERATED MATERIAL SHALL BE WEIGHED THROUGH THE BASE ALL OTHER CONTRACTOR GENERATED MATERIAL SHALL BE WEIGHED THROUGH THE BASE LANDFILL SCALES BEFORE BEING REMOVED FROM THE BASE. CONTRACTOR UTILIZING THE BASE SCALE WILL REQUIRE CONTRACTING OFFICERS ASSISTED PER-REGISTRATION WITH THE LANDFILL MANAGER. 5. THE CONTRACTING OFFICER WILL REGISTER THE CONTRACT VIA E-MAIL, WITH THE BASE THE CONTRACTING OFFICER WILL REGISTER THE CONTRACT VIA E-MAIL, WITH THE BASE LANDFILL. ALL HAUL VEHICLES WILL MAINTAIN A SECURE VEHICLE PLACED AS A CONDITION TO UTILIZE THE SCALE. E-MAIL THE CONTRACTORS INFORMATION TO THE LANDFILL CLERK, INCLUDE THE NAME ON THE PRIME CONTRACTOR, CONTRACT NUMBER, JOB NAME / DESCRIPTION, COMPLETION DATE AND WHETHER OR NOT ANY ABOVE MATERIAL WILL BE DELIVERED TO THE LANDFILL. 6. PRIOR TO PERFORMING "HOT WORK" (WELDING, CUTTING, ECT.) OR OPERATING OTHER FLAME PRIOR TO PERFORMING "HOT WORK" (WELDING, CUTTING, ECT.) OR OPERATING OTHER FLAME -PRODUCING SPARK PRODUCING DEVICES, A WRITTEN PERMIT SHALL BE REQUESTED FROM THE FIRE DIVISION. CONTRACTORS ARE REQUIRED TO MEET ALL CRITERIA BEFORE A PERMIT IS ISSUED. THE CONTRACTOR WILL PROVIDE AT LEAST TWO (2) TWENTY (20) POUND 4A:20 BC RATED EXTINGUISHERS FOR NORMAL "HOT WORK". ALL EXTINGUISHERS SHALL BE CURRENT INSPECTION TAGGED, APPROVED SAFETY PIN AND TAMPER RESISTANT SEAL. IT IS ALSO MANDATORY TO HAVE A DESIGNATED FIRE WATCH FOR ANY "HOT WORK" DONE AT THIS ACTIVITY. THE FIRE WATCH SHALL BE TRAINED IN ACCORDANCE WITH NFPA 51B AND REMAIN ON SITE FOR A MINIMUM OF THIRTY (30) MINUTES AFTER WORK IS COMPLETED. 7. CONTRACTOR IS TO BE AWARE OF ALL RULES, REGULATION AND CODES REQUIRED FOR CONTRACTOR IS TO BE AWARE OF ALL RULES, REGULATION AND CODES REQUIRED FOR SUCCESSFUL COMPLETION OF PROJECT.

AutoCAD SHX Text SUBMITTALS: 1. CONTRACTOR SHALL MAKE ELECTRONIC COPIES OF ALL SUBMITTALS, INCLUDE CONTRACTOR SHALL MAKE ELECTRONIC COPIES OF ALL SUBMITTALS, INCLUDE THE APPROVED TRANSMITTAL SHEETS AND PROVIDE TWO (2) CD/DVD'S CONTAINING ALL SUBMITTALS FOR PROJECT. THE CD/DVD'S SHALL BE MARKED "COMPLETE SUBMITTAL PACKAGE - "24-0403 REPLACEMENT OF STAIRWELL" WITH CONTRACT # "N40085-24-B-0403" 2. AFTER AWARD: THE CONTRACTOR SHALL FURNISH THE CONTRACTING OFFICER, AFTER AWARD: THE CONTRACTOR SHALL FURNISH THE CONTRACTING OFFICER, MATERIAL, SPECIFICATIONS FOR SELECTION AND APPROVAL PRIOR TO THE ORDERING AND INSTALLATION OF SAID MATERIALS. 3. THE CONTRACTOR IS REQUIRED TO SUBMIT A SCHEDULE DETAILING WHEN THEY THE CONTRACTOR IS REQUIRED TO SUBMIT A SCHEDULE DETAILING WHEN THEY AND OR ANY SUBCONTRACTOR WILL BE WORKING. THE SCHEDULE MUST BE APPROVED BY GOVERNMENT BEFORE BEGINNING WORK. 4. THE CONTRACTOR SHALL SUBMIT TO THE CONTRACTING OFFICER, THE THE CONTRACTOR SHALL SUBMIT TO THE CONTRACTING OFFICER, THE MANUFACTURE'S PRODUCT SPECIFICATIONS, COMPLETE WITH TECHNICAL PRODUCTS DATA FOR ALL OF THE MATERIAL BEING USED IN THIS PROCESS. THE PRODUCT SPECIFICATION SHALL AS A MINIMUM, PROVIDE THE TECHNICAL DETAILS ON THE FOLLOWING ITEMS. 5. SUBMIT: SUBMIT: A. SHOP DRAWINGS. SHOP DRAWINGS. B. INSTALLATION DRAWINGS /SHOP DRAWINGS INSTALLATION DRAWINGS /SHOP DRAWINGS C. PRODUCT DATA PRODUCT DATA C.A. MANUFACTURES TECHNICAL DATA SHEET MANUFACTURES TECHNICAL DATA SHEET C.B. MATERIAL SAFETY DATA SHEETS (MADA) MATERIAL SAFETY DATA SHEETS (MADA) C.C. MAINTENANCE DATA MAINTENANCE DATA D. WARRANTY (COMMERCIAL LIMITED WARRANTY) WARRANTY (COMMERCIAL LIMITED WARRANTY) E. AS-BUILT DRAWINGS PROVIDE TWO(2) CD/DVD IN ADOBE PDF FORMATS AS-BUILT DRAWINGS PROVIDE TWO(2) CD/DVD IN ADOBE PDF FORMATS MARKED "COMPLETE SUBMITTAL PACKAGE CONTRACT "#24M010CN 24-0403 REPLACEMENT OF STAIR WELL" 6. QUALIFICATIONS: QUALIFICATIONS: 6.1. FABRICATOR QUALIFICATIONS: MINIMUM OF THREE YEARS DOCUMENTED FABRICATOR QUALIFICATIONS: MINIMUM OF THREE YEARS DOCUMENTED EXPERIENCE IN FABRICATING GALVANIZED STAIR WELL SIMILAR IN SCOPE AND COMPLEXITY TO THIS PROJECT. CURRENTLY CERTIFIED BY THE MANUFACTURER AS ACCEPTABLE FABRICATOR. 6.2. INSTALLER QUALIFICATION: MINIMUM OF THREE YEARS DOCUMENTED INSTALLER QUALIFICATION: MINIMUM OF THREE YEARS DOCUMENTED INSTALLATION EXPERIENCE FOR PROJECT SIMILAR IN SCOPE AND COMPLEXITY TO THIS PROJECT AND CURRENTLY CERTIFIED BY MANUFACTURER AS AN ACCEPTABLE INSTALLER.

AutoCAD SHX Text

24-0403 REPLACEMENT OF STAIRWELL

AutoCAD SHX Text T1

AutoCAD SHX Text

TITLE

AutoCAD SHX Text A1

AutoCAD SHX Text

BUILDING 59 & 60 ELEVATION

AutoCAD SHX Text A2

AutoCAD SHX Text

STAIR WELL ELEVATION

AutoCAD SHX Text A3

STAIR WELL DIMENSION

M

O

L

L

Y

P

I T

C

H

E

R

L

U

C

Y

B

R

E

W

E

A

V

E

V

I R

G

I N

I

D

E

D

ALZ11

S180

HP55

HP57

HP56

37A

SHP88A

AutoCAD SHX Text

SECOND FLOOR

AutoCAD SHX Text

ELEV.

AutoCAD SHX Text

FIRST FLOOR

AutoCAD SHX Text

ELEV.

AutoCAD SHX Text

24-0403 REPLACEMENT OF STAIRWELL

AutoCAD SHX Text

PROJECT# 24M010CN24M010CN

AutoCAD SHX Text

CONTRACT# N40085-24-B-0403-0403

AutoCAD SHX Text

DWG: DANA WHITMORE

AutoCAD SHX Text

USMC CAMP LEJEUNE

AutoCAD SHX Text

BLDG #59 & 6059 & 60

AutoCAD SHX Text

SHEET OF OF OF

AutoCAD SHX Text

LOCATION

AutoCAD SHX Text A1

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

BUILDING ELEVATION

AutoCAD SHX Text

BLDG. 59 & 60 EXISTING STAIRWELL

AutoCAD SHX Text A1

AutoCAD SHX Text

AutoCAD SHX Text 1/8"=1'-0"

AutoCAD SHX Text

BLDG. 59 & 60 SITE VIEW

AutoCAD SHX Text A1

AutoCAD SHX Text

AutoCAD SHX Text 1/16"=1'-0"

AutoCAD SHX Text

BLDG. 59 & 60 EXISTING STAIRWELL

AutoCAD SHX Text A1

AutoCAD SHX Text

AutoCAD SHX Text 1/8"=1'-0"

AutoCAD SHX Text

BLDG. 59 & 60 LOCATION STAIRWELL

AutoCAD SHX Text A1

AutoCAD SHX Text

1/32"=1'-0"

AutoCAD SHX Text

PROJECT# 24M010CN24M010CN

AutoCAD SHX Text

CONTRACT# N40085-24-B-0403-0403

AutoCAD SHX Text

DWG: DANA WHITMORE

AutoCAD SHX Text

USMC CAMP LEJEUNE

AutoCAD SHX Text

BLDG #59 & 6059 & 60

AutoCAD SHX Text

SHEET OF OF OF

AutoCAD SHX Text

STAIRWELL

AutoCAD SHX Text A2

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

PLAN

AutoCAD SHX Text A2

AutoCAD SHX Text

AutoCAD SHX Text

ELEVATION DEMOLITION

AutoCAD SHX Text 3/16"=1'-0"

AutoCAD SHX Text

MATCHING RAILS

AutoCAD SHX Text A2

AutoCAD SHX Text A2

AutoCAD SHX Text A2

AutoCAD SHX Text A2

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

CONSTRUCTION ELEVATION

AutoCAD SHX Text 1/4"=1'-0"

AutoCAD SHX Text

RAILING ELEVATION

AutoCAD SHX Text 3/4"=1'-0"

AutoCAD SHX Text

ELEVATION STEP,RAIL.SIDEWALK

AutoCAD SHX Text 1/2"=1'-0"

AutoCAD SHX Text

CONSTRUCTION PLAN

1/4"=1'-0"

AutoCAD SHX Text

PROJECT# 24M010CN24M010CN

AutoCAD SHX Text

CONTRACT# N40085-24-B-0403-0403

AutoCAD SHX Text

DWG: DANA WHITMORE

AutoCAD SHX Text

USMC CAMP LEJEUNE

AutoCAD SHX Text

BLDG #59 & 6059 & 60

AutoCAD SHX Text

SHEET OF OF OF

AutoCAD SHX Text

STAIRWELL PLAN

AutoCAD SHX Text A3

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

DIMENSIONS

AutoCAD SHX Text A3

AutoCAD SHX Text

AutoCAD SHX Text

EXTERIOR RAILING

AutoCAD SHX Text 3/4"=1'-0"

AutoCAD SHX Text A3

AutoCAD SHX Text

AutoCAD SHX Text

TOP VIEW PLAN

AutoCAD SHX Text 1/4"=1'-0"

AutoCAD SHX Text

17 TREADS AT 11"

AutoCAD SHX Text

18 RISERS AT 7.5"

AutoCAD SHX Text A3

AutoCAD SHX Text

AutoCAD SHX Text

ELEVATION PLAN

AutoCAD SHX Text 1/4"=1'-0"

AutoCAD SHX Text A3

AutoCAD SHX Text

AutoCAD SHX Text

EXTERIOR RAILING

AutoCAD SHX Text 1"=1'-0"

AutoCAD SHX Text

FIELD VERIFY

AutoCAD SHX Text

FIELD VERIFY

FIELD VERIFY

Sheets and Views
STAIRWELL REPLACEMENT-TITLES
STAIRWELL REPLACEMENT-BLDG. 59 & 60 ELEVATION
STAIRWELL REPLACEMENT-STAIRWELL ELAVATION
STAIRWELL REPLACEMENT-STAIRWELL DIMENSION

File details come from the government source that posted it. Updated .