PPI 2 MIG GOV DN355 answered.xlsx.pdf
PDF 9 KB Posted
- Solicitation number
- N4008523R2779
About this file
This document contains responses to questions regarding a federal solicitation for roof repair work at Building 355 at the Dam Neck Annex. The solicitation number is N4008523R2779 and is issued by the Department of the Navy Naval Facilities Engineering Command. The work requires replacing a DAHU unit in Room 211 and finishing the exposed drywall ceiling to match the existing finish, including painting. The existing roof is not under any manufacturer warranty. Bidders are to use a certified roofing manufacturer installer. The cut-off date for responses is 20 July 2023.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 0004.pdf | ||
| Oceana IDIQ Front End SPECS.pdf | ||
| Amendment 0003.pdf | ||
| Site Visit DAHU.pdf | ||
| Amendment 0002.pdf | ||
| Amendment 0001.pdf | ||
| DN-355 A-16.jpg | JPG image | |
| DN-355 - Roof - 1.jpg | JPG image | |
| 2nd FL DN-355 - 2.jpg | JPG image | |
| 2nd FL DN-355 - 1.jpg | JPG image | |
| PPI- MIG GOV 7.6.23 (003) DN-355 Replace DAHU 16 in room 211.pdf | ||
| DN-355 - M6.jpg | JPG image | |
| DN-355 2nd Fl.jpg | JPG image | |
| DN-355 - M7.jpg | JPG image | |
| DN-355 - 2nd Fl.jpg | JPG image | |
| DN-355 - Roof.jpg | JPG image | |
| va167 (1).txt | TXT text file | |
| PPI Spreadsheet.xlsx | XLSX spreadsheet | |
| BLANK SPONSOR VERIFICATION SPREADSHEET.xls | XLS spreadsheet | |
| PROVISION 52.204-24.pdf | ||
| SOW (W)15554116 REPLACE DAHU 16 IN ROOM 211 - DN-355.pdf | ||
| SECNAV 5512.pdf | ||
| BASE ACCESS INSTRUCTION.pdf | ||
| GENERAL REQUIREMENTS RM 211 BLDG 355.pdf |
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Page Section Para. Dwg #
1 MIGGov 07/10/23 7 of 18
Work
Requirem ent
7.9
To what level of finish should the drywall ceiling be installed?
Drywall ceiling shall be fully finished, ready for paint and matching existing ceiling finish.
2 MIGGov 07/10/23 Are we to paint the new drywall ceiling? If so, can we receive information on the paint finish type?
Yes, the Contractor shall paint the new finished drywall ceiling. New ceiling paint and finish shall match the existing ceiling finish and paint type/color.
3 MIGGov 07/10/23 8 of 18
Work
Requirem ent
7.22
Is the existing roof still under a roof warranty? If so, can we receive information on which manufacturer and/or roofing subcontractor holds the roof warranty?
The existing roof is not under warranty.
Contractor shall use a Certified Manufacturer
Installer for roofing repairs.
Project Title: REPLACE DAHU 16 IN ROOM 211, BLDG 355, DAM NECK ANNEX
Solicitation / RFP#: N4008523R2779 - PPI Cut Off Date: 20 July 2023
Amend No.
GOVERNMENT RESPONSE
PPI No.
Offeror
Date
Submitted
REFERENCE
QUESTION