1. CONTRACT ID CODE PAGE OF PAGES

J 1 9

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. PROJECT NO. (If applicable) 0001 08/18/2022

6. ISSUED BY Code N40085 7. ADMINISTERED BY (If other than item 6.) Code

NAVFACSYSCOM MID-ATLANTIC

PWD NORFOLK

FACILITIES ENGINEERING & ACQ DIV

9324 VIRGINIA AVENUE

NORFOLK, VA 23511

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) 9A. AMENDMENT OF SOLICITATION NO.

N40085-22-R-2792

9B. DATED (SEE ITEM 11)

07/25/2022

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning _1 _ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (if required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14. ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATION CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103 (b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER: (specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

N4008522R2792, NSN, BUILDING X-70 CNSL Renovation for MRD Office

SEE SF 30 BLOCK 14 CONTINUATION PAGE

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR (Same as Item 8)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY

(Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV.1-83) 0224-3(10-90)

PREVIOUS EDITION UNUSABLE Prescribed by GSA

SECTION SF30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

AMENDMENT 0001

The purpose of this amendment is to provide:

1. Design Revision 01

2. Site Visit Log

3. Responses to Pre-Proposal Inquiries (PPIs)

All other terms and conditions remain unchanged.

1. Provide Design Revision 01

See Attachment L - Design Revision 01

Changes include the following:

DRAWING REVISIONS

The following drawings are revised as of August 18, 2022 and accompany this Design Revision:

NAVFAC Dwg. No. Title

Electrical

12,865,504 (EP101) PARTIAL POWER PLAN – NEW WORK

12,865,507 (EP501) ELECTRICAL DETAILS

On NAVFAC Drawing No 12,865,508 (EP701)

PANEL WORK KEYNOTES: Add note #4 to read “All existing panels are GE A Series.”

SPECIFICATION REVISIONS

DIVISION 01 – GENERAL REQUIREMENTS

SECTION 01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

1.7.1.1.1 Additional Site Safety and Health Officer (SSHO) Requirements and Duties

Change the second sentence to read: “The SSHO may serve as the Superintendent.”

SECTION 01 45 00.10 20 QUALITY CONTROL FOR MINOR CONSTRUCTION

1.5.1.1 Duties

Change the second sentence to read: “In addition to implementing and managing the QC program, the QC Manager may perform the duties of project superintendent.”

Section 27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM

2.3.1.1 Horizontal Copper

Change the second sentence to read: “Provide four each individually twisted pair, minimum size 24 AWG conductors, category 6, with a blue or gray thermoplastic jacket.”

2. Site Visit Log

See Attachment M – Site Visit Log

3. Responses to PPIs #1-9

PPI

Date Submitted

LEAVE

BLANK

Reference

Question

Page Section Paragrap h Response

1 07/28/22

01 35 26

01 45

00.10 20

1.7.1.1.1

1.5.1.1

The project cost range is $250-500,000 dollars. The specifications require that the superintendent cannot be the CQC/SSHO person on the project.

Essentially we will have two administrative positions that have no other duties doing a 5,000 sq foot renovation project. The cost of an individual with no other duties will add an excessive amount of cost to the project. Please consider that the superintendent can also function as the CQC and SSHO, essentially being triple hatted for this small of a project.

Refer to Design Revision 01.

Specifications have been modified to allow performance of CQC/SSHO responsibilities by the superintendent.

2 08/02/22 Drawin g E701

What is the current make and model of the existing panelboards on sheet E701, so we can procure the correct breakers for the existing panels?

Refer to Design Revision 01.

Panel Work Keynote #4 added to clarify make and model of existing panelboards.

3 08/11/22 10 27 10 00 2.3.1.1

The specification is calling for Category 6 cable, with a blue thermoplastic jacket. On Sheet EP501, C2 & C4 of the drawings, the colors being called out are blue, green and gray. Can the government clarify that green and gray color Cat 6 cables are also required?

Refer to Design Revision 01.

Specification section 27 10 00 Telecommunications Cabling System and detail C2 on sheet EP501 modified to clarify cabling colors.

4 08/11/22

According to the Drawings, Telephone/Data symbols in the Electrical Legend, Sheet E-001 also indicated on Sheet EP101, there shall be (2) Combination voice/data outlets for Rooms 104, 105,106, 107, 108, 109, 110, 111, 112, 115. Can the government confirm both outlets each to have a voice cable being blue and a data cable being green? Also that a gray cable for telephone is not required.

Refer to Design Revision 01.

Specification section 27 10 00 Telecommunications Cabling System and detail C2 on sheet EP501 modified to

5 08/11/22

Regarding Demolition Keynote #9 on Sheet ED101. Is it also the governments intent for the contractor to repurpose the existing cabling for the New Work?

Refer to Design Revision 01.

Note #9 on Sheet ED101 modified to clarify demolition instructions.

6 08/11/22

Regarding Demolition Keynote #9 on Sheet ED101. The government is calling for faceplates and ports to be salvaged for use in New Work.

Contractor cannot guarantee salvaged items will be in a condition to reuse or pass certified testing. Contractor recommends new faceplates and ports.

Refer to Design Revision 01.

Note #9 on Sheet ED101 modified to clarify demolition instructions.

7 08/11/22

Regarding New Work Keynote # 2 on sheet EP101. The government is calling for Cat 6 cable to the data rack be punched down by others. This creates a conflift on who'll be responsible for testing the cabling and who'll be responsible for providing test results as required for submittals? Contractor is requesting these responsibilities be provided by the others.

Refer to Design Revision 01.

Sheet EP101 reissued with changes

8 08/11/22

Regarding New Work Keynote # 2 on sheet EP101. The government is calling for Cat 6 cable to the data rack be punched down by others. Shall the contractor or others furnish the patch panels?

Refer to Design Revision 01.

Sheet EP101 reissued with changes

9 08/11/22

Contractor needs clarification on Sheet EP101, New Work Keynote #3. Shall there be a differnce in cable colors being pulled to the data rack in 103?

Refer to Design Revision 01.

Specification section 27 10 00 Telecommunications Cabling System and detail C2 on sheet EP501 modified to

(End of Summary of Changes)