Attachment L - Design Revision 01.pdf

PDF 644 KB Posted

Attached to
NSN, Bldg. X-70 CNSL Renovation for MRD Office
Solicitation number
N4008522R2792
Issued by

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PWD Norfolk, Facilities Engineering and Acquisition Division Page 1 of 2

Design Revision 01 eProjects Work Order Number: 1714371

Construction Contract Number: n/a

Building: X-70

Project Title: CNSL RENOVATION FOR MRD OFFICE

Date: August 18, 2022

Design Revision Purpose

1. Revise superintendent, CQC, and SSHO requirements to allow superintendent to perform all roles simultaneously.

2. Revisions to select electrical drawings and specs in response to PPIs.

Drawing Revisions

The following drawings are revised as of August 18, 2022 and accompany this Design Revision:

NAVFAC Dwg. No. Title

Electrical

12,865,504 (EP101) PARTIAL POWER PLAN – NEW WORK

12,865,507 (EP501) ELECTRICAL DETAILS

On NAVFAC Drawing No 12,865,508 (EP701) PANEL WORK KEYNOTES: Add note #4 to read “All existing panels are GE A Series.”

Specification Revisions

DIVISION 01 – GENERAL REQUIREMENTS

SECTION 01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

1.7.1.1.1 Additional Site Safety and Health Officer (SSHO) Requirements and Duties

Change the second sentence to read: “The SSHO may serve as the Superintendent.”

SECTION 01 45 00.10 20 QUALITY CONTROL FOR MINOR CONSTRUCTION

1.5.1.1 Duties

Change the second sentence to read: “In addition to implementing and managing the QC program, the QC Manager may perform the duties of project superintendent.”

PWD Norfolk, Facilities Engineering and Acquisition Division Page 2 of 2

Section 27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM

2.3.1.1 Horizontal Copper

Change the second sentence to read: “Provide four each individually twisted pair, minimum size 24 AWG conductors, category 6, with a blue or gray thermoplastic jacket.”

P

P P

P P

P

P

P

P

M

M

M

MMM M

P

LP1-1,3LP1-5,7

LP1-9,11

LP1-13,15

LP1-17,19

LP1-2,4

LP1-14,16

LP1-10,12

LP1-6,8

LP1-18,20

LP1-23

LP1-21

LP1-25LP1-24

LP1-22

LP1-27

LP1-26

LP1-29

LP1-28

AHU-3

AHU-1

AHU-2

(TYP.)

(TYP.)

MDP-19-5,7

MDP-19-1,3

MDP-19-9,11

MDP-19 LP1

MDP-14

MDP-16

EP401

C1

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G S

YS

TE

M S

C O

M M

AN

D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D

M

ID

-A

TL

AN

TI

C

N

AV

AL

S

TA

TI

O N

N

O R

FO

LK

, V A

AS NOTED

8/

/2

:0 3:

A

M C

:\U se rs \b ria n.

ny pa ve r\D oc um en ts

\X -7

0_ C

N

SL

R en o_

1_ E_

R

_b ria n.

ny pa ve r.r vt

EP101

X-

C

NS

L

RE

NO

VA

TI

O

N

PA

RT

IA

L

PO

W

ER

P

LA

N

-N

EW

W O

RK

CJM

12,865,504

BMN BMN

05/23/2022

CDR CUNNINGHAM

FO

R

M

RD

O

FF

IC

E

Eric Sunderland, RA

1714371

N/A

NO

RF

OL

K, V

IR

GI

NI

A

NA

VA

L S

TA

TI

ON

N

OR

FO

LK

S. M. SWEENEY, P.E.

CJM

N/A

M

ID

LA

N

T

PW

D N

O R

FO

LK

EP

GENERAL NOTES

NEW WORK KEYNOTES

KEY PLAN

1 SYSTEMS FURNITURE IS 8-WIRE (4 HOT, 2 NEUTRAL, 2 GROUND)

CIRCUIT CONFIGURATION. CONNECT (2) SYSTEMS FURNITURE HOT

WIRES PER (1) FEEDER WIRE, (1) NEUTRAL PER NEUTRAL, AND (1)

GROUND PER GROUND WIRE PER CIRCUIT. PROVIDE HANDLE TIES

FOR CIRCUIT BREAKERS FEEDING GROUPED FURNITURE.

2 PROVIDE CAT 6 CABLE TO PATCH PANEL LOCATED IN RM 103. LABEL

CABLE FOR CROSS CONNECT AND PUNCH DOWN TO DATA RACK BY

OTHERS.

3 PROVIDE (3) CAT 6 CABLE, (2) DATA AND (1) TELEPHONE, PER

COMPUTER WORKSTATION. PULL DATA CABLES BACK TO DATA RACK

LOCATED IN RM 103, LABEL, AND COIL. PULL TELEPHONE CABLES

BACK TO TELEPHONE BACKBOARD.

4 EXISTING TELEPHONE BACKBOARD. PROVIDE (3) 48 PORT WALL

MOUNTED PATCH PANEL TO SERVE TELEPHONE DROPS.

5 PROVIDE 208Y/120V, 3PH, 4 WIRE, 42 PULL, 100A PANEL WITH 60A MCB.

PROVIDE (4) #8 AWG AND (1) #8 G IN 1" RGS C FROM 3P BREAKER IN

PANEL MDP-16.

6 PROVIDE 60A, 3P CIRCUIT BREAKER IN PANEL.

7 CONNECT FEEDER FOR MECHANICAL UNIT TO INTEGRAL DISCONNECT

AS RECOMMENDED BY MANUFACTURER.

8 PROVIDE (3) 48-PORT WALL MOUNTED PATCH PANELS ON 4'X8'

PLYWOOD BACKBOARD TO SERVE DATA DROPS.

9 PROVIDE SURFACE MOUNTED DATA PORT AND (2) CAT 6 CABLES FROM

PORT TO CROSS CONNECT IN ROOM 103.

0 4' 8' 16'

PLAN

NORTH

SCALE: 1/8" = 1'-0"

FIRST FLOOR POWER PLAN - NEW WORK

1 RECONNECT EXISTING LIGHT FIXTURES RETAINED DURING DEMOLITION

TO CIRCUITS AS INDICATED ON PLAN. PROVIDE CONDUIT AND WIRING TO

CONNECT FIXTURE TO POWER AND LIGHTING CONTROL CIRCUITS AS

NECESSARY.

2 REFER TO SHEET EP501 FOR OCCUPANCY SENSOR WIRING DIAGRAM.

3 EXISTING LIGHTING CIRCUITS FED FROM PANEL MDP-16, EXISTING POWER

FED FROM MDP-14, AND MECHANICAL UNITS FED FROM MDP-19.

4 REFER TO INTERIOR DESIGN PLANS FOR SYSTEMS FURNITURE POWER

AND DATA RECEPTACLE LAYOUT.

SY

M

DE

SC

R I

PT

IO

N

DA

TE

AP

PR

Re vis ion

8/1

8/2

BM

N

MRD OFFICE

AREA OF WORK

PLAN

NORTH

BRANCH CIRCUIT

CONTROLLED BY RELAY

SWITCH TO LIGHT

FIXTURESTO ADDITIONAL FIXTURES

CONTROLLED BY SAME RELAY

(AS APPLICABLE)

CEILING

OCCUPANCY SENSOR

LIGHT FIXTURE (TYP)

FLOOR

CONTROL WIRING AS

RECOMMENDED BY

MANUFACTURER

CONTROL

RELAY

120V UNSWITCHED

BRANCH CIRCUIT

LOCATED ON

LIGHTING PLANS

OFF SWITCH

NOTE:

SYMBOL ON PLANS REPRESENTS AN OCCUPANCY SENSOR AND ITS ASSOCIATED

CONTROL RELAY WHICH ARE NOT NECESSARILY COLOCATED. THE SYMBOL INDICATES

THE SENSOR FOR THE PURPOSE OF LOCATION ON THE CEILING AND THE CONTROL

RELAY FOR THE PURPOSE OF CIRCUITRY.

OS

216-1-3B

D-B01

D-A01

IB-182-014

BLU

E

(2) 4-PAIR CAT 6 CABLE (NIPRNET) TO

NMCI CABINET

BLUE

BLUE

PATCH PANEL #

DROP (SEAT) #

BLDG. #

RM. #

BLUE

LABEL

RJ-45 JACKS

COMM. RM

RACK #

IB - 182 - 014

V-A01

216-1-3B

(1) 4-PAIR CAT 6 CABLE

(TELEPHONE) TO BACKBOARD

GRAY

GRAY

PATCH PANEL #

DROP (SEAT )

BLDG #

RM. #

BLANK SPARE

LABEL

RJ-45 JACKS

COMM. RM

RACK #

AF-1APRIL 2015

GENERAL ARC FLASH WARNING LABEL

SKETCH DATE STYLE

NOTES:

1. PROVIDE SELF-ADHESIVE VINYL LABEL TO AFFIX TO ELECTRICAL EQUIPMENT TO WARN OF ARC

FLASH HAZARDS.

2. THE LABEL FORMAT AND TEXT SHALL BE IN ACCORDANCE WITH THE FIGURE.

3. THE LABEL SHALL BE LOCATED ON THE EQUIPMENT TO BE CLEARLY VISIBLE TO QUALIFIED PERSONS BEFORE EXAMINATION, ADJUSTMENT, SERVICING, OR MAINTENANCE OF THE EQUIPMENT.

4. THE SIZE OF THE LABEL SHALL BE MINIMUM:

EQUIPMENT TYPE HEIGHT WIDTH

INDOOR 2" 3"

OUTDOOR 3" 4.5"

5. A DOWNLOADABLE WINDOWS METAFILE IS AVAILABLE ON THE WHOLE BUILDING DESIGN GUIDE

WEBSITE (WWW.WDBG.ORG) FOR USE IN A LABEL MAKING MACHINE.

A. THE FILE IS LOCATED ON THE "NAVFAC CADD DETAILS" PAGE. TO NAVIGATE TO THIS LOCATION, FOLLOW: HOME > DOCUMENTS & REFERENCES > CCB > CADD LIBRARY > NAVFAC CADD

RESOURCES > NAVFAC CADD DETAILS.

B. ALTERNATIVELY, TYPE IN THE FOLLOWING ADDRESS IN INTERNET EXPLORER:

HTTP://WWW.WBDG.ORG/CCB/BROWSE_CAT.PHP?C=23

WIDTH

HEIGHT

LABEL

RJ-45 JACKS

123-1-3B

BLUE

W-5-111-014

4-PAIR CAT-6 CABLE

(NIPRNET) TO PATCH PANEL

4-PAIR CAT-6 CABLE

(TELEPHONE) TO PATCH

PANEL

D-B01D-A01

D-C01 D-D01

BLDG. #

RM. #

DROP(SEAT) #

COMM. RM

RACK #

PATCH PANEL #

BLANK

BLANKGRAY

BLUE

GRAY

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G S

YS

TE

M S

C O

M M

AN

D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D

M

ID

-A

TL

AN

TI

C

N

AV

AL

S

TA

TI

O N

N

O R

FO

LK

, V A

AS NOTED

8/

/2

:0 3:

A

M C

:\U se rs \b ria n.

ny pa ve r\D oc um en ts

\X -7

0_ C

N

SL

R en o_

1_ E_

R

_b ria n.

ny pa ve r.r vt

EP501

X-

C

NS

L

RE

NO

VA

TI

O

N

EL

EC

TR

IC

AL

D

ET

AI

LS

CJM

12,865,507

BMN BMN

05/23/2022

CDR CUNNINGHAM

FO

R

M

RD

O

FF

IC

E

Eric Sunderland, RA

1714371

N/A

NO

RF

OL

K, V

IR

GI

NI

A

NA

VA

L S

TA

TI

ON

N

OR

FO

LK

S. M. SWEENEY, P.E.

CJM

N/A

M

ID

LA

N

T

PW

D N

O R

FO

LK

EP

NOT TO SCALEC1

OCCUPANCY SENSOR CONNECTION

DIAGRAM

NOT TO SCALEC2 DATA OUTLET DETAIL

SY

M

DE

SC

R I

PT

IO

N

DA

TE

AP

PR

Re vis ion

8/1

8/2

BM

N

NOT TO SCALEC4 TELEPHONE OUTLET DETAIL

NOT TO SCALEB2 QUAD DATA OUTLET DETAIL

X-70_CNSL Reno_1714371_EP501 - ELECTRICAL DETAILS.pdf
Sheets
EP101 - PARTIAL POWER PLAN - NEW WORK
EP501 - ELECTRICAL DETAILS
X-70_CNSL Reno_1714371_EP101 - PARTIAL POWER PLAN - NEW WORK.pdf
Sheets
EP101 - PARTIAL POWER PLAN - NEW WORK
EP501 - ELECTRICAL DETAILS
X-70_CNSL Reno_1714371_EP101 - PARTIAL POWER PLAN - NEW WORK.pdf
Sheets
EP101 - PARTIAL POWER PLAN - NEW WORK
EP501 - ELECTRICAL DETAILS
X-70_CNSL Reno_1714371_EP501 - ELECTRICAL DETAILS.pdf
Sheets
EP101 - PARTIAL POWER PLAN - NEW WORK
EP501 - ELECTRICAL DETAILS

2022-08-18T12:16:07-0400

2022-08-18T12:16:20-0400

2022-08-18T12:16:56-0400

2022-08-18T12:17:09-0400

File details come from the government source that posted it. Updated .