Attachment L - Design Revision 01.pdf
PDF 644 KB Posted
- Attached to
- NSN, Bldg. X-70 CNSL Renovation for MRD Office
- Solicitation number
- N4008522R2792
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PWD Norfolk, Facilities Engineering and Acquisition Division Page 1 of 2
Design Revision 01 eProjects Work Order Number: 1714371
Construction Contract Number: n/a
Building: X-70
Project Title: CNSL RENOVATION FOR MRD OFFICE
Date: August 18, 2022
Design Revision Purpose
1. Revise superintendent, CQC, and SSHO requirements to allow superintendent to perform all roles simultaneously.
2. Revisions to select electrical drawings and specs in response to PPIs.
Drawing Revisions
The following drawings are revised as of August 18, 2022 and accompany this Design Revision:
NAVFAC Dwg. No. Title
Electrical
12,865,504 (EP101) PARTIAL POWER PLAN – NEW WORK
12,865,507 (EP501) ELECTRICAL DETAILS
On NAVFAC Drawing No 12,865,508 (EP701) PANEL WORK KEYNOTES: Add note #4 to read “All existing panels are GE A Series.”
Specification Revisions
DIVISION 01 – GENERAL REQUIREMENTS
SECTION 01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
1.7.1.1.1 Additional Site Safety and Health Officer (SSHO) Requirements and Duties
Change the second sentence to read: “The SSHO may serve as the Superintendent.”
SECTION 01 45 00.10 20 QUALITY CONTROL FOR MINOR CONSTRUCTION
1.5.1.1 Duties
Change the second sentence to read: “In addition to implementing and managing the QC program, the QC Manager may perform the duties of project superintendent.”
PWD Norfolk, Facilities Engineering and Acquisition Division Page 2 of 2
Section 27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
2.3.1.1 Horizontal Copper
Change the second sentence to read: “Provide four each individually twisted pair, minimum size 24 AWG conductors, category 6, with a blue or gray thermoplastic jacket.”
P
P P
P P
P
P
P
P
M
M
M
MMM M
P
LP1-1,3LP1-5,7
LP1-9,11
LP1-13,15
LP1-17,19
LP1-2,4
LP1-14,16
LP1-10,12
LP1-6,8
LP1-18,20
LP1-23
LP1-21
LP1-25LP1-24
LP1-22
LP1-27
LP1-26
LP1-29
LP1-28
AHU-3
AHU-1
AHU-2
(TYP.)
(TYP.)
MDP-19-5,7
MDP-19-1,3
MDP-19-9,11
MDP-19 LP1
MDP-14
MDP-16
EP401
C1
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G S
YS
TE
M S
C O
M M
AN
D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
M
ID
-A
TL
AN
TI
C
N
AV
AL
S
TA
TI
O N
N
O R
FO
LK
, V A
AS NOTED
8/
/2
:0 3:
A
M C
:\U se rs \b ria n.
ny pa ve r\D oc um en ts
\X -7
0_ C
N
SL
R en o_
1_ E_
R
_b ria n.
ny pa ve r.r vt
EP101
X-
C
NS
L
RE
NO
VA
TI
O
N
PA
RT
IA
L
PO
W
ER
P
LA
N
-N
EW
W O
RK
CJM
12,865,504
BMN BMN
05/23/2022
CDR CUNNINGHAM
FO
R
M
RD
O
FF
IC
E
Eric Sunderland, RA
1714371
N/A
NO
RF
OL
K, V
IR
GI
NI
A
NA
VA
L S
TA
TI
ON
N
OR
FO
LK
S. M. SWEENEY, P.E.
CJM
N/A
M
ID
LA
N
T
PW
D N
O R
FO
LK
EP
GENERAL NOTES
NEW WORK KEYNOTES
KEY PLAN
1 SYSTEMS FURNITURE IS 8-WIRE (4 HOT, 2 NEUTRAL, 2 GROUND)
CIRCUIT CONFIGURATION. CONNECT (2) SYSTEMS FURNITURE HOT
WIRES PER (1) FEEDER WIRE, (1) NEUTRAL PER NEUTRAL, AND (1)
GROUND PER GROUND WIRE PER CIRCUIT. PROVIDE HANDLE TIES
FOR CIRCUIT BREAKERS FEEDING GROUPED FURNITURE.
2 PROVIDE CAT 6 CABLE TO PATCH PANEL LOCATED IN RM 103. LABEL
CABLE FOR CROSS CONNECT AND PUNCH DOWN TO DATA RACK BY
OTHERS.
3 PROVIDE (3) CAT 6 CABLE, (2) DATA AND (1) TELEPHONE, PER
COMPUTER WORKSTATION. PULL DATA CABLES BACK TO DATA RACK
LOCATED IN RM 103, LABEL, AND COIL. PULL TELEPHONE CABLES
BACK TO TELEPHONE BACKBOARD.
4 EXISTING TELEPHONE BACKBOARD. PROVIDE (3) 48 PORT WALL
MOUNTED PATCH PANEL TO SERVE TELEPHONE DROPS.
5 PROVIDE 208Y/120V, 3PH, 4 WIRE, 42 PULL, 100A PANEL WITH 60A MCB.
PROVIDE (4) #8 AWG AND (1) #8 G IN 1" RGS C FROM 3P BREAKER IN
PANEL MDP-16.
6 PROVIDE 60A, 3P CIRCUIT BREAKER IN PANEL.
7 CONNECT FEEDER FOR MECHANICAL UNIT TO INTEGRAL DISCONNECT
AS RECOMMENDED BY MANUFACTURER.
8 PROVIDE (3) 48-PORT WALL MOUNTED PATCH PANELS ON 4'X8'
PLYWOOD BACKBOARD TO SERVE DATA DROPS.
9 PROVIDE SURFACE MOUNTED DATA PORT AND (2) CAT 6 CABLES FROM
PORT TO CROSS CONNECT IN ROOM 103.
0 4' 8' 16'
PLAN
NORTH
SCALE: 1/8" = 1'-0"
FIRST FLOOR POWER PLAN - NEW WORK
1 RECONNECT EXISTING LIGHT FIXTURES RETAINED DURING DEMOLITION
TO CIRCUITS AS INDICATED ON PLAN. PROVIDE CONDUIT AND WIRING TO
CONNECT FIXTURE TO POWER AND LIGHTING CONTROL CIRCUITS AS
NECESSARY.
2 REFER TO SHEET EP501 FOR OCCUPANCY SENSOR WIRING DIAGRAM.
3 EXISTING LIGHTING CIRCUITS FED FROM PANEL MDP-16, EXISTING POWER
FED FROM MDP-14, AND MECHANICAL UNITS FED FROM MDP-19.
4 REFER TO INTERIOR DESIGN PLANS FOR SYSTEMS FURNITURE POWER
AND DATA RECEPTACLE LAYOUT.
SY
M
DE
SC
R I
PT
IO
N
DA
TE
AP
PR
Re vis ion
8/1
8/2
BM
N
MRD OFFICE
AREA OF WORK
PLAN
NORTH
BRANCH CIRCUIT
CONTROLLED BY RELAY
SWITCH TO LIGHT
FIXTURESTO ADDITIONAL FIXTURES
CONTROLLED BY SAME RELAY
(AS APPLICABLE)
CEILING
OCCUPANCY SENSOR
LIGHT FIXTURE (TYP)
FLOOR
CONTROL WIRING AS
RECOMMENDED BY
MANUFACTURER
CONTROL
RELAY
120V UNSWITCHED
BRANCH CIRCUIT
LOCATED ON
LIGHTING PLANS
OFF SWITCH
NOTE:
SYMBOL ON PLANS REPRESENTS AN OCCUPANCY SENSOR AND ITS ASSOCIATED
CONTROL RELAY WHICH ARE NOT NECESSARILY COLOCATED. THE SYMBOL INDICATES
THE SENSOR FOR THE PURPOSE OF LOCATION ON THE CEILING AND THE CONTROL
RELAY FOR THE PURPOSE OF CIRCUITRY.
OS
216-1-3B
D-B01
D-A01
IB-182-014
BLU
E
(2) 4-PAIR CAT 6 CABLE (NIPRNET) TO
NMCI CABINET
BLUE
BLUE
PATCH PANEL #
DROP (SEAT) #
BLDG. #
RM. #
BLUE
LABEL
RJ-45 JACKS
COMM. RM
RACK #
IB - 182 - 014
V-A01
216-1-3B
(1) 4-PAIR CAT 6 CABLE
(TELEPHONE) TO BACKBOARD
GRAY
GRAY
PATCH PANEL #
DROP (SEAT )
BLDG #
RM. #
BLANK SPARE
LABEL
RJ-45 JACKS
COMM. RM
RACK #
AF-1APRIL 2015
GENERAL ARC FLASH WARNING LABEL
SKETCH DATE STYLE
NOTES:
1. PROVIDE SELF-ADHESIVE VINYL LABEL TO AFFIX TO ELECTRICAL EQUIPMENT TO WARN OF ARC
FLASH HAZARDS.
2. THE LABEL FORMAT AND TEXT SHALL BE IN ACCORDANCE WITH THE FIGURE.
3. THE LABEL SHALL BE LOCATED ON THE EQUIPMENT TO BE CLEARLY VISIBLE TO QUALIFIED PERSONS BEFORE EXAMINATION, ADJUSTMENT, SERVICING, OR MAINTENANCE OF THE EQUIPMENT.
4. THE SIZE OF THE LABEL SHALL BE MINIMUM:
EQUIPMENT TYPE HEIGHT WIDTH
INDOOR 2" 3"
OUTDOOR 3" 4.5"
5. A DOWNLOADABLE WINDOWS METAFILE IS AVAILABLE ON THE WHOLE BUILDING DESIGN GUIDE
WEBSITE (WWW.WDBG.ORG) FOR USE IN A LABEL MAKING MACHINE.
A. THE FILE IS LOCATED ON THE "NAVFAC CADD DETAILS" PAGE. TO NAVIGATE TO THIS LOCATION, FOLLOW: HOME > DOCUMENTS & REFERENCES > CCB > CADD LIBRARY > NAVFAC CADD
RESOURCES > NAVFAC CADD DETAILS.
B. ALTERNATIVELY, TYPE IN THE FOLLOWING ADDRESS IN INTERNET EXPLORER:
HTTP://WWW.WBDG.ORG/CCB/BROWSE_CAT.PHP?C=23
WIDTH
HEIGHT
LABEL
RJ-45 JACKS
123-1-3B
BLUE
W-5-111-014
4-PAIR CAT-6 CABLE
(NIPRNET) TO PATCH PANEL
4-PAIR CAT-6 CABLE
(TELEPHONE) TO PATCH
PANEL
D-B01D-A01
D-C01 D-D01
BLDG. #
RM. #
DROP(SEAT) #
COMM. RM
RACK #
PATCH PANEL #
BLANK
BLANKGRAY
BLUE
GRAY
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G S
YS
TE
M S
C O
M M
AN
D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
M
ID
-A
TL
AN
TI
C
N
AV
AL
S
TA
TI
O N
N
O R
FO
LK
, V A
AS NOTED
8/
/2
:0 3:
A
M C
:\U se rs \b ria n.
ny pa ve r\D oc um en ts
\X -7
0_ C
N
SL
R en o_
1_ E_
R
_b ria n.
ny pa ve r.r vt
EP501
X-
C
NS
L
RE
NO
VA
TI
O
N
EL
EC
TR
IC
AL
D
ET
AI
LS
CJM
12,865,507
BMN BMN
05/23/2022
CDR CUNNINGHAM
FO
R
M
RD
O
FF
IC
E
Eric Sunderland, RA
1714371
N/A
NO
RF
OL
K, V
IR
GI
NI
A
NA
VA
L S
TA
TI
ON
N
OR
FO
LK
S. M. SWEENEY, P.E.
CJM
N/A
M
ID
LA
N
T
PW
D N
O R
FO
LK
EP
NOT TO SCALEC1
OCCUPANCY SENSOR CONNECTION
DIAGRAM
NOT TO SCALEC2 DATA OUTLET DETAIL
SY
M
DE
SC
R I
PT
IO
N
DA
TE
AP
PR
Re vis ion
8/1
8/2
BM
N
NOT TO SCALEC4 TELEPHONE OUTLET DETAIL
NOT TO SCALEB2 QUAD DATA OUTLET DETAIL
| X-70_CNSL Reno_1714371_EP501 - ELECTRICAL DETAILS.pdf |
| Sheets |
| EP101 - PARTIAL POWER PLAN - NEW WORK |
| EP501 - ELECTRICAL DETAILS |
| X-70_CNSL Reno_1714371_EP101 - PARTIAL POWER PLAN - NEW WORK.pdf |
| Sheets |
| EP101 - PARTIAL POWER PLAN - NEW WORK |
| EP501 - ELECTRICAL DETAILS |
| X-70_CNSL Reno_1714371_EP101 - PARTIAL POWER PLAN - NEW WORK.pdf |
| Sheets |
| EP101 - PARTIAL POWER PLAN - NEW WORK |
| EP501 - ELECTRICAL DETAILS |
| X-70_CNSL Reno_1714371_EP501 - ELECTRICAL DETAILS.pdf |
| Sheets |
| EP101 - PARTIAL POWER PLAN - NEW WORK |
| EP501 - ELECTRICAL DETAILS |
2022-08-18T12:16:07-0400
2022-08-18T12:16:20-0400
2022-08-18T12:16:56-0400
2022-08-18T12:17:09-0400
File details come from the government source that posted it. Updated .