Attachment A - 1714371_SID.pdf
PDF 5 MB Posted
- Attached to
- NSN, Bldg. X-70 CNSL Renovation for MRD Office
- Solicitation number
- N4008522R2792
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
X-70 CNSL RENOVATION
FOR MEDICAL READINESS OFFICE
NAVAL STATION - NORFOLK, VA
FINAL STRUCTURAL INTERIOR DESIGN PACKAGE
JUNE 1, 2022
TABLE OF CONTENTS
1. STRUCTURAL INTERIOR DESIGN (SID) NARRATIVE
2. POINT OF CONTACT LIST
3. PLANS
4. FINISH BOARD
STRUCTURAL INTERIOR
DESIGN (SID)
NARRATIVE
X‐70 CNSL RENOVATION
Interior finishes in the X‐70 Interior Renovation have been selected on the basis of their durability and to provide a clean, modern aesthetic to the space.
The primary floor finish in the facility throughout the Corridors, Offices, and Consultation Rooms will be carpet tile. The Exam Rooms will have Solid Sheet Vinyl with integral base. The back portion of the Corridor will be Solid Vinyl Tile. All other area will have existing flooring to remain
Rubber base will be used throughout the renovated spaces, except in the exam rooms where an integral solid vinyl base will be used and those areas where existing finishes will remain.
Walls will be painted with a general and accent color.
The ceilings in areas with new interior finishes will be Acoustical Ceiling Tile. The ceilings in all other spaces will be existing to remain.
Cabinetry in the Lab will be High Pressure Laminate with Solid Surface countertop.
Exterior window shades will be existing to remain. All doors will be existing to remain.
POINTS OF CONTACT
POINTS OF CONTACT LIST
ACTIVITY REPRESENTATIVEP
Chief Jordan Wagner 757-445-5446
JORDAN.N.WAGNER.MIL@US.NAVY.MIL
PROJECT MANAGER
LACIE BEEMER
757-341-0652
LACIE.A.BEEMER.CIV@US.NAVY.MIL
DESIGN MANAGER
ERIC SUNDERLAND
757-341-0148
ERIC.J.SUNDERLAND.CIV@US.NAVY.MIL
INTERIOR DESIGNER
ANN PERRY
757-341-0141
VIRGINIA.B.PERRY.CIV@US.NAVY.MIL
PLANS
FINISH BOARDS
FINISH BOARD 1
This is for presentation only. See sheet IN601 and the Specifications for full description & locations.
X‐70 CNSL RENOVATION
SAPC1 /ACOUSTIC CEILING TILE /ARMSTRONG/ ULTIMA
TEGLUAR EDGE/ WHITE
PT4 / CEILING PAINT/ SHERWIN WILLIAMS/
SW7007 CEILING BRIGHT WHITE (EGGSHELL)
FINISH BOARD 2
This is for presentation only. See itemized Specifications for full description & locations.
X‐70 CNSL RENOVATION
CPT1 / CARPET TILE/ PATCRAFT/ COMPOSED LAYER 10605/ COLOR OPALITE 00400/ 18x36
(BRICK INSTALLATION)
ROOM SCENE- BRICK INSTALLTION
FINISH BOARD 3
X70 CNSL RENOVATION
CPT2 / CARPET TILE/ PATCRAFT/ PAINT TRANSFER 10608/ COLOR OPALITE 00400/ 18x36
(BRICK INSTALLATION)
ROOM SCENE- BRICK INSTALLTION
FINISH BOARD 4
X-70 CNSL RENOVATION
SV1/ SOLID VINYL SHEET / PATCRAFT/ 1422V
HOLISTIC / 00104 MIST
SVT1/ SOLID VINYL TILE / TARKETT / MELODIA
21020 / GREY MATTER 965
RB1/ RUBBER BASE/ ROPPE 123 CHARCOAL
COVE BASE: AT AREAS
WITHOUT ACCESS TILES
AND CORRIDOR 201
FINISH BOARD 5
X‐70 CNSL RENOVATION
PT1/ (FIELD PAINT)/ SHERWIN WILLIAMS/
SW7667 ZIRCON (EGGSHELL)
PT2/ (ACCENT PAINT)/ SHERWIN WILLIAMS/
SW 0048 BUNGLEHOUSE BLUE (EGGSHELL)
PT3/ (ACCENT PAINT)/ SHERWIN WILLIAMS/
SW7670 GREY SHINGLE (EGGSHELL)
PT5 / (DOOR TRIM) / SHERWIN WILLIAMS /
SW7667 ZIRCON (SEMI-GLOSS)
FINISH BOARD 6
X‐70 CNSL RENOVATION
PL1/ PLASTIC LAMINATE/ WILSONART/ ASIAN
NIGHT 7949K-18 / LINEARITY FINISH
SS1 SOLID SURFACE/ AVONITE / STONY PEAK 7747 / MATTE FINISH
PL2/ PLASTIC LAMINATE/ WILSONART/
3181 GREY
FINISH BOARD 7
X‐70 CNSL RENOVATION
CG1/ CORNER GUARD/ CLEAR
POLYCARBONATE 1.5”W X 8’H
File details come from the government source that posted it. Updated .