SOL22R2559 Annex 1800000.pdf
PDF 3 MB Posted
- Attached to
- Forestry Services Federal contract opportunity
- Solicitation number
- N4008522R2559
About this file
This document contains definitions and acronyms related to a federal contract for environmental services at Marine Corps Base Camp Lejeune in North Carolina. The contractor will be required to obtain and hold the necessary environmental permits and EPA identification numbers for the facility. The contractor will be responsible for managing all hazardous materials, hazardous wastes, and discarded hazardous wastes/hazardous and radioactive wastes in accordance with RCRA and other applicable regulations. The contractor must develop and adhere to a Hazardous Waste Management Plan that identifies regulatory requirements, assigns responsibilities, and describes procedures for waste generation, handling, storage, treatment, disposal, documentation, training, and contingency response. The contractor will also be responsible for completing hazardous waste manifests and retaining signature authority for transportation of hazardous wastes.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SOL22R2559 Amendment 0002.pdf | ||
| SOL22R2559 Amendment 0001.pdf | ||
| Revised Annex and Attachments.pdf | ||
| SOL22R2559.pdf | ||
| SOL22R2559 Annex 0200000.pdf | ||
| SOL22R2559 Annex 1503050.pdf | ||
| Pre-Sol Notice 22R2559.pdf | ||
| Sources Sought.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT J-1800000-01
DEFINITIONS AND ACRONYMS
DEFINITION/ACRONYM DESCRIPTION
Environmental Permits The facility environmental permits and EPA ID numbers shall be obtained and held by Marine Corps Base, Camp Lejeune, N.C.
Hazardous Material (HM) Any material designated by the Department of Transportation (DOT) as posing a potential threat while being transported. Hazardous materials are listed in 49 CFR
Part 172.
Hazardous Waste (HW) Any discarded solid waste (liquid, semi-solid, solid, or gaseous) that meets the definition of a hazardous waste by USEPA, state authorities, or the Navy. In accordance with RCRA, a solid waste is a listed hazardous waste if it is specifically listed, or it is a characteristic hazardous waste if it exhibits the characteristics of ignitability, corrosivity, reactivity, or toxicity. Discarded HM/HWORW in this contract is all waste that may be turned in to the Environmental Services contractor, including RCRA hazardous waste, state regulated waste, Universal Waste, Toxic
Substance Control Act (TSCA) regulated waste, and non-hazardous waste.
Hazardous Waste
Management Plan
In accordance with OPNAVINST 5090.1C, every Navy shore activity that generates
HW shall develop and use a HW Management Plan or a HW management component in its P2 Plan and EMS. A HW Management Plan shall:
– Identify applicable federal, state, and local regulations pertaining to the generation and management of HW.
– Identify training requirements and describe procedures for obtaining training and maintaining training records.
– Assign responsibilities for the generation, designation, handling, storage, treatment, disposal, and all documentation.
– Describe all HW generation and management procedures.
– Include or reference the HW minimization plan and goals.
– Include or reference contingency plans and emergency response procedures.
The plan shall be kept up to date to include changes in HW generation and management procedures, as well as changes in applicable federal, state, and local HW regulations. The plan shall include or reference minimization procedures sufficient to achieve DOD minimization goals. Tenant activities may be covered by the host
CO's HW Management Plan.
HW Manifest A HW manifest as defined in 40 CFR 260 is required for the transport of hazardous waste. The installation commanding officer (ICO) or the ICO’s designated representative shall retain signature authority for HW manifests.
Installation Environmental
Program Manager (IEPM)
The Government function on the Installation that has the authority to implement the
Navy's environmental policies and decision-making regarding environmental compliance issues as well as environmental operational issues. <<Note to Spec
Writer: Tailor to installation's command structure regarding environmental concerns.>> The IEPM is the primary liaison for all federal, state, and local regulatory agencies and government officials, and the point of contact for all inquiries from outside the installation (e.g., public or news media inquiries) unless otherwise specified in writing.
Less-than-90-day
Accumulation Areas or
Storage Facilities
Accumulation areas that are not RCRA permitted hazardous waste storage facilities but can serve as temporary accumulation areas for hazardous waste subject to a 90-day time limit in accordance with 40 CFR 262 or state equivalent regulations.
Memorandums of
Agreement/Understanding
The installation commanding officer or his designated representative shall retain signature authority for all MOAs and MOUs.
Other Regulated Waste
(ORW)
Wastes that are not hazardous under federal RCRA regulations, but may be regulated by other federal programs (e.g., TSCA, OSHA, CERCLA, DOT) or state agency.
ATTACHMENT J-1800000-01
DEFINITIONS AND ACRONYMS
DEFINITION/ACRONYM DESCRIPTION
Sampling Plan Plan and procedures to conduct sampling, field testing and laboratory analysis for a defined testing objective.
Satellite Accumulation
Areas
Temporary hazardous waste accumulation areas that have a maximum capacity limit of 55 gallons per area in accordance with 40 CFR 262 or state equivalent regulations.
Spill Prevention Control and
Countermeasure (SPCC)
Plan
Plan and procedures for the installation to exercise oil spill prevention measures and to provide effective countermeasures in the event of oil spill ashore.
Treatment, Storage and
Disposal Facility (TSDF)
Facilities that are permitted by RCRA regulations to provide treatment, storage and disposal services for hazardous wastes.
BUMEDINST Bureau of Medicine and Surgery Instruction
CFR Code of Federal Regulations
DRMO Defense Reutilization and Marketing Office
EPA Environmental Protection Agency
FISC Fleet Industrial Supply Center
HAZMART A centralized repository for the control of all hazardous materials that will order, receive, distribute, store, dispose of and track all hazardous materials used in
Installation operations.
HMTID Hazardous Material Turned in for Disposal
HMTIS Hazardous Material Turned in for Storage
NAVSEA Naval Sea Systems Command
NELAP National Environmental Laboratory Accreditation Program
NEPA National Environmental Policy Act
NON Notices of Noncompliance
NOV Notices of Violation
OHS Oil and Hazardous Substances
OPNAVINST Chief of Naval Operations Instruction
P2ADS Pollution Prevention Annual Disposal Summary
POC Point of Contact
QA/QC Quality Assurance and Quality Control
RCRA Resource Conservation and Recovery Act
SPCC Spill Prevention Control and Countermeasures
TSDF Treatment Storage and Disposal Facilities
ATTACHMENT J-1800000-02
REFERENCES AND TECHNICAL DOCUMENTS
References Titles OPNAVINST 5090.1 Environmental and Natural Resources Program Manual NAVSEA T0300-AZ-PRO-010 Navy Environmental Compliance Sampling & Field Testing Procedures Manual DoD Instruction 4715.4 Pollution Prevention BUMEDINST 6280.1 Management of Infectious Waste DoD Publication 4715.5-G Overseas Environmental Baseline Guidance Document EPA 833-B-92-001 NPDESW Stormwater Sampling Guidance EPA SW-846 Test Methods for Evaluating Solid Waste, Physical/Chemical Methods EPA PB83-124503 Handbook for Sampling and Sample Preservation of Water and Wastewater.
EPA/600/4-85/013 Methods for Measuring the Acute Toxicity of Effluents to Freshwater and
Marine Organisms Environmental permits 40 CFR 112 Protection of the Environment – Oil Pollution Protection Site Specific Plan (ie SPCC, STMP) Overseas Environmental Baseline Guidance Document (OEBGD)
ATTACHMENT J-180000-03
TABLE 1
POND NAME POND NUMBER MANAGEMENT ACRES
Henderson Pond 1 A 14 Hickory Pond 2 A 2.4 Orde Pond 3 A 3.1 Cedar Point Pond 4 A 2 Mile Hammock Bay Pond 5 A 1.5 Oak Pond 6 A 0.5 Old Wilmington Pond 7 B 2.5
Old Landfill Pond 8 C 17.5 Ward Pond 9 C 1.5 Wilson Blvd. Pond 10 C 30
FRESHWATER FISHING PONDS
TABLE 1
ATTACHMENT J-1800000-04
TABLE 2
POND NAME ALKALINITY PH HARDNESS
Henderson 28 7 30 Hickory 16 6.25 28 Orde 22 7.5 36 Cedar Point 16 6 16 Oak 42 6.5 28 Mile Hammock 8 6 20 Old Wilmington 22 6.5 18
TABLE 2 2019
ATTACHMENT J-1800000-04
EXAMPLE WATER ANALYSIS RESULTS
ATTACHMENT J-1800000-05
TABLE 3
POND NAME POND NUMBER ACRES
LARGEMOUTH BASS ADULT BREAM SPECIES
(BLUEGILL/RED EARED
SUNFISH/SHELL CRACKER)
CHANNEL CATFISH GRASS CARP
Average > 1 lbs. Average > 5" Average > 1 lbs. 12-14" Henderson Pond 1 14 135 350 100 30 Hickory Pond 2 2.4 25 150 50 10 Orde Pond 3 3.1 40 100 75 10 Cedar Point Pond 4 2 40 100 25 0 Mile Hammock Bay Pond 5 1.5 20 50 50 5 Oak Pond 6 0.5 20 50 0 0 Old Wilmington Pond 7 2.5 20 100 20 5
TOTALS 26 300 900 320 60
FISH STOCKING
TABLE 3
ATTACHMENT J-1800000-06
TABLE 4
POND NAME POND NUMBER ACRES
LARGEMOUTH BASS ADULT BREAM SPECIES
(BLUEGILL/RED EARED
SUNFISH/SHELL CRACKER)
CHANNEL CATFISH GRASS CARP
Average > 1 lbs. Average > 5" Average > 1 lbs. 12-14" Orde Pond 3 3.1 0 300 0 0
3.1 0 50 0
3.1 50 0
TOTALS 3.1 50 300 50 0
FISH STOCKING
TABLE 4
YOUTH FISH DAY FISH STOCKING
N E W R I V E R
N E W R I V E R
HWY 172
HWY 210
WI
LM
IN
GT
ON
H
WY
HWY 172
A T L A N T I C
O C
E A N
OLD
WILMINGTON
POND
OAK POND
ORDE POND
MILE
HAMMOCK
POND
CEDAR
POINT POND
HICKORY POND
HENDERSON
POND
EDITION 001 SER IES U0474C
MCB Camp Lejeune
0 580 1,160
Meters 0 4,400 8,800
Feet
Map generated u sing th e Geograph ic Inform ation System Managed by th e Installation Geospatial Inform ation & Services Office
R egional Geospatial Inform ation & Services Division, G-F, Marine Corps Installations East – Marine Corps Base Cam p Lejeu ne
FOR R EFER ENCE ONLY
FOR OFFICIAL USE ONLY (FOUO)
NOT TO BE USED FOR TAR GETING OR NAVIGATION
Disclaim er:
Alth ou g h every effort h as been m ade to ensu re th e acc u racy of inform ation, errors and conditions originating from th e ph ysical sou rces u sed to develop th e database m ay be reflected in th e data su pplied. Th e requ estor m u st b e aware of data conditions and u ltim ately bear responsibility for th e appropriate u se of th e inform ation with respect to possib le errors, original m ap scale, collection m eth odology, cu rrency of data, and oth er specific conditions to certain data.
Th is inform ation does not depict all possib le resou rces. Field verification of all data is requ ired for site-specific projects. Th is inform ation is deem ed reliab le, b u t not g u aranteed.
Fishing Ponds MCB Camp Lejeune -J-18000000-07-1
This MCIEAST-MCB CAMLEJ Map was produced by the IGI&S Office at
MCB Camp Lejeune, Bldg 12 Post Lane LejeuneIGISOMB@usmc.mil
910-451-8915 Published: 08 May 2019
CONTACT INFORMATION
SPHER OID . . . . . . . . . . . . . . . . . . . . GEODETIC R EFER ENCE SYSTEM 1980 PR OJECTION . . . . . . . . . . . . . . . . . . . . . . . . .TR ANSVER SE MER CATOR
HOR IZONTAL DATUM . . . . . . . . . . . . . . . . NOR TH AMER ICAN DATUM 1983
CONTR OLLED BY . . . . . . . . USGS, NATIONAL GEODETIC SUR VEY POINTS
GR ID . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1,000 - METER UTM ZONE 18
GR ATICULE . . . . . . . . . . . . . . . TEN SECOND LATITUDE-LONGITUDE TICS
PROJECTION, DATUM AND
REFERENCE GRID STATEMENT
1:23,750SCALE
Onslow County Roads
CEDAR POINT POND
HENDERSON POND
HICKORY POND
OAK POND
OLD WILMINGTON POND
ORDE POND
MILE HAMMOCK POND
Water
Hunting Area No Hunting
Bow Hunting
Shotgun Hunting
Wilson Pond
Old Landfill Pond
Ward Pond emily.gaydos Line emily.gaydos Polygonal Line emily.gaydos Polygonal Line emily.gaydos Pencil emily.gaydos Pencil emily.gaydos Line
Pond Vegetation Treated Herbicide Used Planned Return Date
For Aquatic Plant and Weed Control
Treatment Date:___________________
Contractor shall:
Make contact with Required Contacts listed below prior to or upon arrival to base property Complete this form on each visit to perform aquatic plant/weed control Submit this form to ECON representative and COR/PAR within 48 hours of visit
ATTACHMENT J-1800000-08
CONTRACTOR'S ACTIVITY REPORT
ATTACHMENT J-1503020-09
APPROVED PESTICIDE LIST FOR CAMP LEJEUNE NC
Per OPNAVINST 6250.4C "All personnel applying pesticides shall be certified"
IPM - APPENDIX E Updated: 03 March 2015
EPA Reg # Trade Name Intended Use REMARKS
***Approve Must be secured inside tamper-resistant bait boxes
100-1055
WeatherBlok XT (formerly 10182-339) (NOTE: Must be secured inside tamper-resistant bait boxes)
Rodenticide
Approve:certified applicators only
100-1091
Reward (NSN#6840-01-005-7523)
AQUATIC weeds
100-1111
Archer
Roaches
100-1134
Monument 75WG
Weeds
100-1139
Barricade 4FL
Insecticide
100-1218
Demon Max
100-834
Barricade 65 WG
Crabgrass,weeds
100-937
Primo MAXX
Growth Regulator
10182-100
Demon WP
10182-105
Demon EC
Insecticide/Gen Household
10182-339
Weather Block (NOTE:Must be secured inside tamper-resistant bait boxes)
10182-361
Demand CS
1021-1641-57056
Conquer
1021-1691-149
TERRO ANT KILLER SPRAY T401 (16 oz) "issued to units thru SELF HELP 451-0072 (WO needed)"
Ants
Approve: SELF HELP or certified applicators only
1021-1815
Onslaught Microencapsulated Insecticide
1021-2574
Onslaught Fastcap
11540-1
ULD BP-300
11540-9
ULD BP-100
11649-7
Avitrol Whole Corn (LABELED "RESTRICTED USE")
Avicide
12455-69
Contrac Bait (NOTE: use only OUTSIDE of bldgs)
12455-79
Contrac All Weather Bait Blocks (NSN#6840-01-501-2858)
12455-82
Contrac Blox (Super Size)
149-8-64405
Terro Ant Bait Gel
1812-307
K-Tea
Algaecide
19713-60
Simazine 4L
Weeds & Vines
19713-623
Drexel Imitator Aquatic Herbicide
Aquatic Weeds
2217-774
Gordans Brushmaster
Poison Ivy/Vines
2217-833
SpeedZone
2217-835
Southern Speedzone
228-480
Polaris AC (G10 Aerial Spray approved 5/18/2010)
Herbicide
228-534
Polaris
228-675
Nufarm Diquat SPC 2 L
Aqautic Weeds
241-322
Amdro Pro Fire Ant Granular Bait
241-341
Pendulum
241-372
Sahara DG Herbicide
Cracks, Concrete
241-392
Phantom (NSN#6840-01-525-7139)
241-426
Habitat (NSN#6840-01-532-5403) (NOTE:only MCAS is approved for use to control alligator weeds)
241-430
Chopper Gen2 (approved for Wildlife)
2724-274
Golden Malrin (NSN#6840-01-183-7244)
Flying insects
2724-351
Gentrol IGR (NSN#6840-01-318-7416)
2724-404-50809
Petcor Flea Spray
IGR
2724-490
Precor 2000 Plus / Premise
279-3062
Dragnet
279-3168
Talstar PL
279-3206
Talstar One (Pre-treat for Termites)(NSN#6840-01-525-6888)
3125-390
Tempo Ultra WP
352-439
Escort XP
Kudzu
352-627
Advion Fire Ant Bait Granular
352-643
TranXit
352-652
Advion Cockroach Gel Bait
Insecticide/Roaches
352-668
Advion Roach Arena
352-746
Advion Ant Gel Bait
352-776
Arilon
42750-29
Weed-Hoe 108
432-1217
TOP CHOICE Fire Ant / Fipronil (NSN#6840-01-585-9950)
Insecticide/Fire Ants
432-1223
ProStar 70 WP
Fungicide
432-1254
Maxforce Gel Bait
432-1256
Maxforce Ant Bait Stations (NSN#6840-01-298-1122)
432-1257
Maxforce FC (Sml Roach)
432-1264
Maxforce FC Ant Killer Bait Gel (NSN#6840-01-500-4579)
432-1331
Premise (Pre Construction Insecticide)
432-1332
Premise 75 / Centerfire 75 WSP
Termites
432-1332-73748
Imaxx Pro
432-1363
Bayer Tempo Ultra SC
432-1375
Maxforce Fly Granular Bait (NSN#6840-01-518-5807)
Flying insects
432-1391
Premise Foam
432-1433
MaxForce FC Fire Ant Bait
432-1455
Maxforce Fly Spot Bait (NSN#6840-01-555-9369)
432-1460
Maxforce FC Magnum Roach Killer Bait Gel
432-1483
Temprid SC
Ants, Roaches
432-1514
Suspend Polyzone
432-716
SCOURGE (LABELED "RESTRICTED USE")
432-763
Suspend SC
432-772
Delta Dust (NSN#6840-01-431-3345)
Bees,Wasps,Hornets
432-992
Drione Dust
Insecticide/Gen Household
499-153
Whitmire Wasp Freeze
499-290
PT 565 Plus XLO (NSN#6840-00-823-7849)
499-294
Avert Dry Flowable Cockroach Bait/ Whitmire AvertPT310 Abamectin Dust (NSN#6840-01-561- 9766)
499-304
Cy-Kick CS Prescription Treatment
499-310
Whitmire PT 566 Pyrethrum
499-404
Ultracide Flea IGR & Adulticide
499-450
BP-100
499-452
BP-300
499-462
Pro-Control Plus
499-465
Pro-Control
499-470
Cy-Kick (NSN#6840-01-561-9717)
499-473
Whitmire PT 221L Residual Insecticide
499-527
PT Alpine Dust
499-535
Cyhalocap CS
Pesticide
499-540
Alpine Flea Insecticide
499-561
Alpine WSG
56-73
JT Eaton Boric Acid
50404-5
Permethrin
50534-202
Daconil Ultrex
Fungicide
524-343
Aqua Master
AQUATIC Herbicide
524-454
Honcho Plus Herbicide
524-475
ROUND-UP PRO / Ranger Pro (NSN#6840-01-108-9578)
Herbicide/Weeds
524-529
ROUND-UP PRO Concentrate
524-535
Quick Pro ROUND-UP (NSN#6840-01-399-0673)
524-549
ROUND-UP Powermax
53871-3
Stimukill Fly Bait
53883-118
Bifenthrin
53883-124
Bifen LP Granules
53883-328
Fuse
Termiticide/Insecticide
55809-3
Wasp & Hornet Killer Plus "Available SERVMART-GSA or issued to units thru SELF HELP 451-0071 (WO needed)"
Approve: SERVMART-GSA / SELF HELP or certified applicators only
58007-1
Ultrathon Insect Repellant
59639-31
Orthene PCO Pellets
6218-47
Mosquito Dunks
62719-260
Crossbow Brush Killer
62719-324
Rodeo / Accord (NSN#6840-01-356-8893)
AQUATIC herbicide
62719-40
GARLON 4 / Element 4
62719-426
Dimension EC
62719-553
Garlon XRT
63120-1
Insect/Arthropod Repellent Fabric Treatment (NSN#6840-01- 334-2666) (Note:PrevMed Use only)
63120-3
Insect/Arthropod Repellent Fabric Treatment (NSN#6840-01- 345-0237) (Note:PrevMed Use only)
64248-10
Maxforce Ant Bait F1
64248-14
Maxforce FC Roach Killer Bait Gel
64248-6
Maxforce Ant Killer/Granular Bait
64405-1
Bora-Care
Insect/Fungicide
64405-2
Niban Fine Granular Bait
Fire Ants
64405-8
Tim-Bor
Wood Destroying Fungi
655-798
ExciteR
655-802
Larva-Lur
66222-22
PRAMITOL 25E (NSN#6840-00-145-0013)
67425-15
EcoPCO WPX
6754-22-5802
Drione
67760-34
Malathion
6959-79
CESSCO 5 E
71995-33
7113)
71995-36
ROUND-UP READY TO USE-PLUS POISON IVY
Poison Ivy/Vines
72155-58
Tempo 2.5 SC Ultra
73342-1
AMDRO Fire Ant Bait
73342-6
AMDRO Fire Ant Bait
73079-2
In Tice granular bait
73079-4
BorActin Insecticide Powder
73079-6
InTice Perimeter Baits
73079-8
InTice Gelanimo Ant Bait
7969-209
Termidor 80 WG (NSN#6840-01-483-3072)
7969-210
Termidor SC T/L (NSN#6840-01-483-3068)
7969-272
Drive XLR8
Grasses
7969-285
PT Phantom Pressurized Insecticide
8033-109-279
Transport Mikron
81927-7
Alligare MSM 60 (Base Stables)
81927-11
Triclopyr 4E
8329-40
Biomist 1.5+7.5 ULV
Mosquitos
83487-1
Uncle Albert's Super Smart Ant Bait
901-82 d-Phenothrin
9444-129
Borid
9444-183
Intruder HPX Aerosol
9444-217
D-Force HPX (NSN#6840-01-561-9745)
9688-187
TAT ANT & ROACH KILLER SPRAY (12 oz)
Ants/Roaches
9688-239-8845
HotShot Ultra LIQUID Roach Baits
9688-242-8845
HotShot Ultra LIQUID Ant Baits
***BELOW LIST DOES NOT REQUIRE CERTIFIED
APPLICATORS (NOT REGULATED OR EXEMPT)***
FIFRA Exempt
Eco Exempt IC
Approve:certified applicators NOT required
Not regulated
Bac A Zap
Bacteria/Odor/Drain Fly
Deer Stopper Concentrate-Messina Wildlife
Deer
Locally approved:certified applicators NOT required
Osmocote Slow Release
Fertilizer not pesticide
Kleer-Out - Geraniol
Locally approved:certified applicators NOT required
***BELOW LIST DOES NOT REQUIRE CERTIFIED
APPLICATORS (NOT REGULATED OR EXEMPT)***
EcoSMART (Flying & Crawling Insects) (available thru
SERVMART-GSA)
Flying & Crawling insects
Locally approved:SERVMART-GSA / certified applicators NOT required
Liquid Fertilizer
Housing area
Eco Exempt D
Eco Exempt G
Mosquito Barrier
Mosquitos
Allure Pheromone Moth Traps
Moth
StorGard Pheromone Traps
Moth
CatchMaster Glueboards
Rodents & Insects
Predascent (available thru SERVMART-GSA)
Snake Repellent
Approve:SERVMART-GSA / certified applicators NOT required
Pyrethiums
Fruit Bug
Not requlated
Cazamoscas Fly Catcher (Base Stables)
Flys
Snake-A-Way
Repellent
Camp Lejeune Pest Management Coordinator:
William Parkin (Environmental Management Department) (910) 451-7018 email william.parkin@usmc.mil
Link to the AUL for the PMP:
For External Site: http://www.lejeune.marines.mil/OfficesStaff/EnvironmentalMgmt/HazardousWasteMaterialManagement.aspx
For Internal Site :https://em.usmc.mil/sites/le/default.aspx
ATTACHMENT J-1800000-10
FIELD PESTICIDE/HERBICIDE MANAGEMENT RECORD FORM
MCIEAST-MCB
CAMLEJO 5090.14
PROJECT/CONTRACT#
Instructions: A separate form will be filled out for EACH formulation at EACH location of building (if treating inside AND outside of a building, you will use two separate forms).
1. Date of Application:
2. Location: (Check One).
3. Building # and/or Name:
4. Test of Pest Control Operation:
_ (i.e. Baiting, Power Spray, Manual application of pesticide, ULV, etc.)
5. Site Description: ----------------------------
---------------- (i.e. Office, Barracks, Housing, Warehouse, Snack Bar, Lawn, Unimproved Grounds, etc.)
6. Pest Type:
_ (i.e. Ants, Fire Ants, Cockroaches, Spiders, Termites, etc.)
7. Contractor/Subcontractor's Company Name:
8. Pesticide Used:
8a. Pesticide Trade Name:
Be. EPA Registration#:
8d. Formulation (i.e. Liquid, Granular, Gel, EC, Aerosol, etc.)
9a. Units: (i.e. SF, LF, AC, CF, EA (for baiting, aerosol cans), etc.)
1Oa. Units: (i.e. FLoz, DRoz, LB, Gal, Qt, Pint, Pkt, Bait Block, Bait Stations, Briquet, ML, ATTACHMENT J-1800000-10
FIELD PESTICIDE/HERBICIDE MANAGEMENT RECORD FORM
LT, etc.)
11. Quantity of Dilutant applied: (if applicable)
11a. Type of Dilutant: (i.e. Water, Oil, etc.)
11b. Units: (i.e. FLoz, Gal, ML, LT, etc.)
12. Comments: (Survey results, wind conditions, sanitation deficiencies, etc.)
13. Print Name of Applicator: _ 13a. Signature of Applicator:
14. Certification# of Applicator: ------------------------
---------------- MCIEAST-MCB CAMLEJ/G-
F/EMD/5090.14/32 (7/14)
ATTACHMENT J-1800000-11
PERFORMANCE ASSESSMENT PLAN
PAP
PERFORMANCE
ASSESSMENT
PLAN
N40085-22-R-2559
Fishing Pond Management and Forestry Services
Marine Corps Base Camp Lejeune, NC
PREPARED BY:
Facilities Support Contracts (FSC)
7 March 2022
Version 2.1 Updated 21MAY14
Performance Assessment Plan Contents
1. Introduction
1.1 Purpose
1.2 Partnering
2. Roles and Responsibilities
3. Training
4. Safety
5. Security
6. Submittals
6.1 Quality Management Plan Submittal
6.2 Accident Prevention Plan Submittal
7. Meetings
8. Methods of Assessment (MOA)
9. Quality Management System (QMS)
10. Performance Assessment Process
10.1 Post-Award Planning
10.2 Scheduling Assessments
10.3 Non-recurring Task Orders
10.4 Assessment Procedures
10.4.1 AL1 Assessments
10.4.2 AL2/3 Assessments
10.4.3 Safety Assessment
10.4.4 Management and Administration Assessment
10.4.5 Contract Discrepancy Reports
11. Assessment Summary and Evaluation
11.1 Monthly Performance Assessment Summary (MPAS)
11.2 Invoice Validation and Withholdings
11.3 COR Activity File
11.4 Performance Assessment Board (PAB)
12. Summary
List of Attachments
Attachment A: Functional Assessment Plan (FAP)
Attachment B: Performance Assessment Worksheet
Attachment C: QMS Pre-performance Review Checklist
Attachment D: Customer Comment Record
Attachment E: QMS In-process Review Checklist
Attachment F: Contract Discrepancy Report (CDR)
Attachment G: FSC Safety Assessment Checklist
Attachment H: Annex 2 – Management and Administration Evaluation Checklist
Attachment I: MPAS Coversheet
Attachment J: PAB Rating Summary
Performance Assessment Plan
1. Introduction
1.1 Purpose
The Performance Assessment Plan (PAP) establishes Performance Assessment (PA) provisions for Contract N40085-22-R-2559, Fish Pond Management and Forestry Services.
The PAP describes the methodology for assessing the Contractor’s performance that will be used to provide Contractor feedback, update Contractor Performance Assessment Rating System (CPARS).
The PAP includes the Functional Assessment Plan (FAP), Attachment A, and standard Performance Assessment Worksheets (PAW), Attachment B, to document and report Government observations of Contractor performance. The Government’s role is to assess Contractor’s work against measurable performance standards, and per the principles of Performance Based Services Acquisition (PBSA), the Contractor’s role is to ensure its quality through successful implementation of its Quality Management System (QMS). Per FAR Subpart 46.4, Government PA “shall be performed at such times and places as may be necessary to determine that the supplies or services conform to contract requirements” in order to ensure payments are made only for services that meet performance standards specified in the contract.
1.2 Partnering
Effective partnering and establishing a positive relationship between the Government and the Contractor is essential in fulfilling a performance-based requirement. The Government’s relationship with the Contractor should be one that promotes a strong and positive business alliance to achieve mutually beneficial goals, such as timely delivery and acceptance of high-quality services through the use of efficient business practices. Business relationships should seek to create a cooperative environment to ensure effective communication between the parties. Teamwork, cooperation, and good-faith performance are important for meeting mission objectives and resolving conflicts and problems. Each party should clearly understand the goals, objectives, and needs of the other. It is essential that the Government and the Contractor work together as a team to communicate expectations, agree on common goals, develop a common understanding of measurable standards, and identify and address problems early in the contract to achieve desirable outcomes.
2. Roles and Responsibilities
The Government’s key roles and responsibilities for performance assessment are as follows:
FSC Management and Facility Services (FMFS) Branch Head. The FMFS Branch Head provides direct supervision of SPARs, PARs, Spec Writers, etc assigned to the FMFS Branch. The FMFS branch head is responsible for ensuring adequate funding and staffing to support the specification development, contract management, and performance assessment function of the branch as well as all personnel management responsibilities. The COR and PAR are assigned for this contract.
Facilities Support Contract Manager (FSCM). The FSCM is the overall technical lead for the management of Facility Support Contract requirements from cradle to grave.
Contracting Officer (KO). The ACO and/or PCO assigned to the contract. The KO has final responsibility for Contractor PA per FAR Part 42—Contract Administration and Audit Services, non-conformance modifications, and unilateral determination of incentives.
Contracting Officer’s Representative (COR). The COR is responsible for monitoring the Contractor’s technical compliance and progress based on the contract requirements specified in the PWS and in accordance with the PAP. The COR performs a variety of contract administration duties that includes oversight of PA, documenting and rating Contractor performance, reviewing invoices, and acceptance of work.
Senior PAR (SPAR). The SPAR is responsible for coordinating efforts of multiple PARs assigned to this contract. The SPAR reviews PA schedules and PA documentation for sufficiency and consistency of oversight.
Performance Assessment Representative (PAR). The PAR is assigned as a Technical Point of Contact (TPOC) / Subject Matter Expert (SME) to the COR to perform duties as the on-site representative who assesses Contractor performance. The PAR periodically observes Contractor performance, reviews delivered services, reviews quality management corrective actions, periodically assesses and documents Contractor performance on Performance Assessment Worksheets (PAWs) and the Monthly Performance Assessment Summary (MPAS), and communicates findings as necessary with the Contractor, Senior PAR (SPAR), and Contracting Officer Representative (COR).
Note: Throughout NAVFAC policy, processes, and training, the term Performance Assessment Representative (PAR) refers to anyone responsible for conducting assessments of a NAVFAC administered Facility Support Contract. The term PAR will be used in reference to any individual assigned as a TPOC/SME to provide support to the COR, including as a collateral duty of other PWD or customer personnel, regardless of billet. All personnel assigned these duties must follow the guidance and direction provided to PARs.
Performance Assessment Board (PAB). The PAB is comprised of key technical and administrative personnel appointed in writing by the KO. The PAB will convene on a regular basis to review Contractor performance documentation for the prior evaluation period, and prepare and forward a summary report of findings and recommendations to the KO. The PAB makes recommendations for CPARS and provides input for the determination of contract incentives, if applicable. Details of PAB membership and the process for convening the PAB are provided in paragraph 11.4 below.
3. Training
To effectively implement the PA Program, individuals who monitor the Contractor’s performance should be experienced in the annex/sub-annex areas for which they are assigned and adequately trained. Mandatory training standards for all personnel performing PA of NAVFAC contracts are specified in BMS B-14.3, Performance Assessment. Additionally, safety training requirements are detailed in BMS B-14.18, FSC Safety and training for those assigned as CORs is promulgated by NFAS 1.602 and detailed in NAVFAC Instruction 4200.1.
CORs assigned to provide oversight of this contract must meet the applicable training requirements and must be appointed in writing by the KO per BMS S-18.3.6. PARs providing support as TPOC/SME for the COR must meet the applicable training requirements and must be assigned in writing by per BMS S-18.3.6 and B-14.3.
4. Safety
Proper oversight of Contractor safety is an integral part of effective performance assessment. The PAR must ensure that the Contractor is in compliance with safety requirements specified in Spec Item 2.9 of the contract. The PAR should be present during any local Safety briefings. If the PAR observes a violation of any safety requirements by the Contractor, the PAR should:
Report the safety hazard resulting from unsafe acts or conditions, defective tools, materials, or equipment used by the Contractor to the COR.
When imminent danger is apparent (where, if the hazard is not immediately corrected, there is a high probability that a serious accident will occur, life will be in danger or there will be extensive property damage), immediately inform the Contractor and request immediate action is taken to correct the hazard. If the Contractor does not voluntarily take corrective action, require the Contractor to stop work and immediately notify the COR.
Further detail of safety assessment procedures is provided in paragraph 10.4.3 below.
5. Security
The PAR should become familiar with all security requirements specified in Spec Item 2.8.7 of the contract and report any observed violations to the KO.
6. Submittals
The PAR should review reports and other submittals identified in Section F to ensure they comply with applicable requirements and specifications.
6.1 Quality Management Plan Submittal
The Quality Management System Pre-Performance Review Checklist, Attachment C, should be used for the review of the Contractor’s QM Plan submittal and as a guideline for discussion of the Contractor’s QMS during the post-award kickoff/pre-performance conference. The PAR, SPAR, Contractor Quality Manager and Project Manager, and any applicable subcontractor quality representatives should sign off on the QMS review checklist.
6.2 Accident Prevention Plan Submittal
Per BMS B-14.18, FSC Safety, the FMFS Pre-Performance Safety Checklist should be used for the review of the Contractor’s Accident Prevention Plan submittal (including Activity Hazard Analyses (AHAs) and Occupational Risk and Compliance Plans and Programs) and as a guideline for discussion of the Contractor’s Safety Program during the post-award kickoff/pre-performance conference. The PAR should coordinate with the local command Safety Representative for assistance in review of Contractor’s APP. The PAR, SPAR, Contractor Site Safety and Health
Officer (SSHO) and Project Manager, and any applicable subcontractor safety representatives should sign off on the Safety review checklist. The Contractor must submit and have an approved APP before any work may begin on site. Additionally, new or revised AHAs must be submitted and reviewed at the beginning of each work phase, when new hazards are identified, or when a new work crew is brought on site.
7. Meetings
The PAR should attend and be prepared for required meetings, including partnering sessions. The PAR should be familiar with the Spec Items in Annex 2 titled “Required Conferences and Meetings” and “Partnering.” The FSC Partnering process is addressed in BMS B-14.16.
8. Methods of Assessment (MOA)
The PAR will periodically assess services for conformance to contract performance objectives and standards using the following MOAs:
Periodic Sampling (PS) – requires a pre-determined plan for assessing a portion of the work, using sample size and frequency at the applicable assessment level.
Validated Customer Comments (VCC) – consists of customers observing the performance of services they have received and using a pre-determined procedure to provide feedback and/or report observations to the PAR for validation.
Unscheduled Visits (UV) – impromptu assessments of performance standards and objectives whenever practical.
Customer’s Evaluation (CE) – consists of collected survey data of Contractor performance from the customer’s perspective through the use of a feedback form.
The MOAs used for assessment of each performance objective and standard are identified within the FAP included in Attachment A.
9. Quality Management System (QMS)
When the Government’s assessment of the Contractor’s performance reveals that the quality management efforts are not effective in ensuring performance objectives and standards are achieved, further action is required. The PAR will conduct a review of the Contractor’s QMS processes and quality inspection and surveillance records for the work item(s) where deficiencies are noted to validate the accuracy and effectiveness of the Contractor’s QMS.
For QMS to be considered acceptable, the Contractor must demonstrate to the Government through quality management and QC corrective and preventive actions that the risk of failure to meet performance standards has been satisfactorily mitigated.
Further detail of the QMS review process is provided within the assessment procedures in paragraph
10.4 below.
10. Performance Assessment Process
10.1 Post-Award Planning
Performance Assessment personnel should review and understand the final contract requirements, including any amendments made during the solicitation period, paying particular attention to performance objectives and standards and any changes in the scope of work. Performance Assessment personnel should also review the Contractor’s technical proposal received in response to the solicitation and initial submittals, such as the QMS program (including Quality Management Plan), Accident Prevention Plan (including Activity Hazard Analyses (AHAs) and Occupational Risk and Compliance Plans and Programs), list of key personnel and employee listing.
Performance Assessment personnel should also meet with customer representatives to review details of the contract and discuss the process for reporting and handling of customer comments and review the contract requirements for partnering and the process described in BMS B-14.16, FSC Partnering, to be prepared for these meetings.
10.2 Scheduling Assessments
Performance Assessment personnel should develop a planned assessment schedule based upon factors such as selected MOAs, Contractor’s recurring performance schedule, population of work, and local priorities and conditions. Certain work requirements may necessitate increased assessment based on performance risk considerations, e.g., services that are mission critical or have life safety impacts. Increased assessment may be conducted by adding AL2 or AL3 assessments or by targeting specific samples during routine AL1 assessment. Risk is measured based on two things:
the likelihood (or probability) and event will occur and the consequence (or impact) if the event does occur.
The FAP, Attachment A, along with the starting point for assessments based on risk determination should be compared against the Contractor’s work schedules as applicable to develop the initial assessment schedule. This schedule may be adjusted when required based on Contractor performance as detailed within the assessment procedures in paragraph 10.4 below.
10.3 Non-recurring Task Orders
Non-recurring Task Orders (TO) require 100% assessment. This means that all TOs must be verified as satisfactorily complete prior to payment. For EMALL Task Orders, verification is performed by the customer through the validation of the credit card payment and acceptance in EMALL. EMALL orders that involve high-risk evolutions will be indicated as “HIGH RISK” in the EMALL short description. The customer must notify the COR by email or phone immediately upon ordering a high-risk Non-recurring TO. The COR will schedule appropriate safety oversight for these evolutions. For all other Non-recurring TOs, validation is the responsibility of PA personnel.
Scheduling of assessments must be planned based on the nature of the work (i.e. simple, short duration tasks performed at a single location vs. complex work performed over a longer period at multiple locations) and added to the assessment schedule after TO award.
10.4 Assessment Procedures
Every assessment must be documented on a Performance Assessment Worksheet (PAW) using the form provided in Attachment B. The assessment procedures based on the scheduled level of assessment performed are detailed below.
10.4.1 AL1 Assessments
The flowchart in Figure 1 below and corresponding descriptions shown below detail the performance assessment process used by the PAR to observe, assess, and document Contractor’s performance for 2-digit Spec Items (AL1).
Step 8:
Performance Assessment
Rating is Unsatisfactory
Step 5:
Defect(s) warrant evaluation of QMS?
Yes
No Yes
Yes
No
NoStep 4:
Rework if Necessary
Step 6:
Evaluate
QMS
Step 10:
Recommend withholding if necessary
Step 3:
Document and Notify Contractor
Step 2:
Defect(s) Found?
Yes No
Step 13:
Performance
Assessment Rating is Satisfactory or higher
Step 7:
Is QMS acceptable
Step 1:
Assess
Performance
@ AL1
Step 9:
Add a lower
Assessment Level for Spec Item and/or
Location deficiencies
Step 16:
Continue “Normal”
Sampling
Step 17:
Consider “Reduced”
Sampling
Step 15:
Positive Trend?
Step 12:
Document Assessment
Step 11:
Performance
Assessment Rating is Marginal or
Unsatisfactory
Step 14:
Performance
Assessment Rating is Satisfactory
Figure 1. Performance Assessment Process for Assessment Level 1 (AL1)
Step 1: Assess Performance at AL1 – This is the typical starting point of assessment. Assess the Contractor’s performance using the MOA, frequencies, and sample sizes indicated at AL1 of the FAP. The starting point may include additional PA at lower assessment levels for mission critical, safety, or environmental related services as determined based on the risk assessment performed during post-award planning. A Performance Assessment Worksheet (PAW) must be used for each assessment indicating this is an AL1 assessment. A PAW is the form used to document and report Government observations and rate Contractor performance.
Step 2: Defect(s) Found – The PAR should evaluate the Contractor’s performance of work looking for both failures to comply with performance objectives and standards as well as instances of value-added services or work that exceeds performance standards. Any observation of work that fails to meet any of the specified performance standards will be documented as a defect. Instances of non-conforming work discovered during unscheduled visits (UV) should also be documented as defects.
Where customer comments are received (VCC), all alleged defects must be evaluated within a reasonable time to validate that the performance standards were not met. Documentation will be completed using the Customer Comment Record, Attachment D. Documentation of UVs will be completed on a PAW. DECISION: If a defect is found, continue. If not, jump to Step 12.
Step 3: Document and Notify Contractor – Document any observed negative performance that fails to meet contract performance standards with supporting narrative on the Performance Assessment Worksheet (PAW). If defects are found, the PAR will forward a copy of the PAW to the Contractor. The Contractor shall sign and return the PAW within the specified timeframe to acknowledge receipt of the document. The Contractor’s signature does not constitute agreement with the Government’s assessment, it merely acknowledges that the Contractor has been notified of a Government observed defect. Should the Contractor disagree with the Government’s observations, discussions should be conducted to reach a common understanding of performance objectives and standards.
Step 4: Rework if Necessary – In the case of unsatisfactory or non-performed work, the Government may, at its option, allow the Contractor an opportunity to correct by reperformance at no additional cost to the Government. Rework shall be completed within the timeframe specified in Section E, Consequences of Contractor’s Failure to Perform Required Services clause of the contract.
Step 5: Defect(s) Warrant Evaluation of QMS? – Defects warrant evaluation of QMS if: 1) they are “Significant”, 2) a “Trend” has been established, or 3) the work is not considered “Substantially Complete”. Significant defects include the Contractor’s failure to meet performance objectives and standards that result in damage to the Government, or incomplete major or critical work items.
Significant defects are subjective and should be discussed in initial partnering sessions with the Contractor. Trends are defects that may be considered minor but are recurring and have not been corrected through the Contractors QMS. Trends are typically defects found in the same or similar work requirements repeated consistently over several periods of the assessment frequency.
Substantially complete means that the performance standard is fully met except for minor or trivial non-conformances per FAR 46.407. A service will be judged to be fully conforming to the contract performance standards if the nonconformance is minor or trivial and there is no omission of essential work, and approximately 95% of the total work (population) assessed meets the performance standard. Substantial completion can be measured based on the total work requirement being assessed or based on any one element of work performance. DECISION: If QMS evaluation is warranted, continue. If not, jump to Step 14.
Step 6: Evaluate QMS – The PAR should evaluate the Contractor’s QMS to verify proper controls are in place to ensure the delivery of quality services. The PAR should follow the QMS In-Process Review Checklist, Attachment E, and document findings on this form. This review should begin with a focus on the Spec Items and/or location where defects have been found as opposed to a complete audit of the Contractor’s QMS (use Parts A & B of the checklist). The evaluation should identify corrective actions the Contractor is taking for specific discrepancies and identify any QMS changes the Contractor is implementing to preclude systemic problems, avoid repeat discrepancies, and regain Quality Control (QC). If the initial evaluation identifies deficiencies in the Contractor’s QMS with insufficient planned corrective actions or QMS changes, or, if corrective actions and QMS changes planned during previous QMS reviews have been ineffective, then broaden the evaluation to a more comprehensive review of the Contractor’s QMS program (use Parts C through F of the checklist).
Step 7: Is QMS Acceptable? – The Contractor must demonstrate to the Government that they have taken corrective actions and identified QMS changes to preclude systemic problems, avoid repeat discrepancies, and regain QC. QMS is considered “Acceptable” if the Contractor’s actions will satisfactorily reduce the risk of continued failure to meet performance standards. DECISION: If QMS is unacceptable, continue. If QMS is acceptable, jump to Step 10.
Step 8: Performance Assessment Rating is Unsatisfactory – If the Contractor’s QMS is unacceptable, then the PAR should document all findings, including a summary of the findings associated with the Contractor’s QMS, on the PAW. The PAR should rate the Contractor Unsatisfactory in accordance with the evaluation ratings definitions included in the PAB Rating Summary. The PAR should also document recommendations for withholding of payment on the PAW for non-conforming services when defects cannot be corrected by reperformance.
Step 9: Add a lower Assessment Level for Spec Item and/or Location deficiencies – When the Contractor’s performance is Unsatisfactory at AL1 and QMS is Unacceptable, additional PA at Assessment Level 2 or 3 (AL2 or AL3) should be conducted for the Spec Item and/or location deficiencies as shown in Figure 3. [End of this assessment]
Step 10: Recommend withholding if necessary – Even if the QMS is acceptable and the Contractor has implemented or planned appropriate corrective actions, withholdings may still be warranted. The PAR should document recommendations for withholding of payment on the PAW for non-conforming services when defects cannot be corrected by reperformance.
Step 11: Performance Assessment Rating is Marginal or Unsatisfactory – The PAR shall document all findings, including a summary of the findings associated with the Contractor’s QMS evaluation, on the PAW. The PAR should rate the Contractor Marginal or Unsatisfactory in accordance with the evaluation ratings definitions included in the PAB Rating Summary. The PAR should continue sampling the size identified as “Normal” in the FAP at AL1. [End of this assessment]
Step 12: Document Assessment – Document results of assessment particularly noting how it was validated that performance complied with contract requirements and detailing any instances of value-added services or work that exceeds contract performance standards, with supporting narrative on the PAW.
Step 13: Performance Assessment Rating is Satisfactory or Higher – If the Contractor has performed all work in accordance with the performance objectives and standards, then a performance rating of Satisfactory or higher should be assigned. The PAR should rate the Contractor Satisfactory, Very Good, or Exceptional in accordance with the evaluation ratings definitions included in the PAB Rating Summary. Jump to Step 15.
Step 14: Performance Assessment Rating is Satisfactory – The PAR shall document all findings, including details of the failures to comply with performance objectives and standards on the PAW.
Per the evaluation ratings definitions included in the PAB Rating Summary, Satisfactory is defined as "contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory." Therefore, the PAR should rate the Contractor Satisfactory and continue sampling the size identified as “Normal” in the FAP at AL1. [End of this assessment]
Step 15: Positive Trend Established? – If the Contractor has established a trend of Satisfactory, Very Good or Exceptional performance, repeated consistently over several periods of the assessment frequency, the PAR should consider sampling at the reduced level (Jump to Step 17). If a trend has not yet been established the PAR should continue normal sampling.
Step 16: Continue “Normal” Sampling – The PAR should continue sampling the size identified as “Normal” in the FAP at AL1. [End of this assessment]
Step 17: Consider “Reduced” Sampling – The PAR should adjust sampling to the size identified as “Reduced” in the FAP at AL1. [End of this assessment]
10.4.2 AL2/3 Assessments
The flowchart in Figure 2 below and corresponding descriptions shown below detail the performance assessment process used by the PAR to observe, assess, and document Contractor’s performance for 3-digit and 4-digit Spec Items (AL2/3).
Yes
No Yes
Step 4:
Rework if
Necessary
Step 3:
Document and Notify Contractor
Step 10:
Recommend withholding if necessary
NoStep2:
Defect(s) Found?
Step 7:
Is QMS acceptable
Yes
No
Step 6:
Re-evaluate
QMS
Step 8:
Recommend appropriate administrative action
Step 1:
Assess
Performance @ AL2 or AL3
Step 9:
Continue Current
Assessment Level or go to lower
Assessment Level if applicable
Step 11:
Performance
Assessment Rating is Unacceptable
Step 13:
Performance
Assessment Rating is Acceptable
Step 12:
Document
Assessment
Step 5:
Defect(s) warrant evaluation of QMS?
Yes No Step 16:
Continue Current Assessment Level
Step 17:
Return to Higher
Assessment Level
Step 15:
Positive Trend?
Step 14:
Performance
Assessment Rating is Unacceptable
Figure 2. Performance Assessment Process for Assessment Level 2 or 3 (AL2 or AL3)
Step 1: Assess Performance at AL2 or AL3 – Start additional assessment(s) at a lower level if the rating on PAW 1 was Unsatisfactory and QMS was unacceptable. Certain work requirements may necessitate normal assessment at AL2 or AL3 based on performance risk considerations, e.g., services that are mission critical or have life safety impacts. Assess the Contractor’s performance using the MOA, frequencies, and sample sizes indicated at the appropriate assessment level, e.g., AL2 or AL3 of the FAP.
Step 2: Defect(s) Found – If the Contractor has performed all work in accordance with the performance objectives and standards, then a performance rating of Acceptable should be assigned.
The PAR will document any instances of value-added services or work that exceeds performance standards with supporting narrative on the Performance Assessment Worksheet (PAW). When the assessed work fails to comply with performance objectives and standards, the PAR will document the defect on the PAW and notify the Contractor. Instances of non-conforming work discovered during unscheduled visits (UV) should also be documented as defects. Where customer comments (VCC) are received, all alleged defects must be evaluated within a reasonable time to validate that the performance standards were not met. Documentation will be completed using the Customer Comment Record, Attachment D. Documentation of UV will be completed on a PAW. DECISION:
If defect is found, continue. If not, jump to Step 12.
Step 3: Document and Notify Contractor – Document instances of value-added performance that exceeds contract performance standards, and negative performance that fails to meet contract performance standards, with supporting narrative on the PAW. If defects are found the PAR will forward a copy of the PAW to the Contractor. The Contractor shall sign and return the PAW within the specified timeframe to acknowledge receipt of the document. The Contractor’s signature does not constitute agreement with the Government’s assessment, it merely acknowledges that the Contractor has been notified of a Government observed defect. Should the Contractor disagree with the Government’s observations, discussions should be conducted to reach a common understanding of performance objectives and standards.
Step 4: Rework if Necessary – In the case of unsatisfactory or non-performed work, the Government may, at its option, allow the Contractor an opportunity to correct by re-performance at no additional cost to the Government. Rework shall be completed within the timeframe specified in Section E, Consequences of Contractor’s Failure to Perform Required Services clause of the contract.
Step 5: Defect(s) Warrant Evaluation of QMS? – Defects warrant evaluation of QMS if 1) they are “Significant”, 2) a “Trend” has been established, or 3) the work is not considered “Substantially Complete”. Significant defects include the Contractor’s failure to meet performance objectives and standards that result in damage to the Government, or incomplete major or critical work items.
Significant defects are subjective and should be discussed in initial…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .