22R2509 Amend 0002.pdf

PDF 445 KB Posted

Attached to
Bullet Traps Operation & Maintenance and Lead Cleaning for Breach & Shooting Houses
Solicitation number
N40085-22-R-2509
Issued by

View the file

Other files

File Type Posted
22R2509 Amend 0004.pdf PDF
22R2509 Amend 0003.pdf PDF
22R2509 Amend 0001.pdf PDF
Pre-Solicitation 222509.pdf PDF
22R2509 Attachments.pdf PDF
22R2509 Solicitation.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ACQR5873480

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Solicitation N40085-22-R-2509 Bullet Traps (M&R) and Lead Cleaning for Breach and Shooting Houses, and Indoor Ranges

See Continuation Pages (s)

1. CONTRACT ID CODE PAGE OF PAGES

J 1 8

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 08-Jan-2022

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008522R2509

X 9B. DATED (SEE ITEM 11)

15-Dec-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

08-Jan-2022

CODE

NAVFACSYSCOM MID-ATLANTIC

ROICC CAMP LEJEUNE

1005 MICHAEL ROAD

CAMP LEJEUNE NC 28547-2521

N40085 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N4008522R2509

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0002

Solicitation N40085-22-R-2509 Bullet Traps Operations, Maintenance, Repairs, and Lead Cleaning for Breach/Shooting Houses, and Indoor Ranges

This amendment should be acknowledged when your proposal is submitted. Failure to acknowledge may constitute grounds for rejection of your proposal.

1. Question: Will the Government only evaluate three (3) past performance examples or can the contractor submit up to five (5) total in consideration of technical capability to perform the service requirements? For example, a minimum of three (3) and a maximum of five (5).

Answer: The contractors are required to provided three (3) past performance, the three (3) past performance must match the reference for the technical experiences. If the contractor provides more than what is required, they are not following the instructions of the solicitation. This would be deem, non-compliant and a deficiency. A deficiency is rated not acceptable. A not acceptable rating is not considered for award.

2. Question: According to the pre-solicitation notice, proof of certification of the certified technician would be required in the proposal packet. However, on page 61 under Section F- Deliveries or Performances of the solicitation, we shall submit the certification, training, and licensing documents within 15 days of contract award. Please clarify.

Answer: The solicitation dictates the final requirements as stated in Section F.

3. Question: On page 93 under Section M- Evaluation Factors for Award, an item of the Price factor includes the completed proposed CLIN pricing and ELIN pricing. Is that to be completed in Section B - Supplies or Services and Prices provided on pages 4-11 in the solicitation and/or in Attachment # J-0200000-07 "Exhibit Line Item Numbers" provided on pages 41-65 of the attachments?

Answer: All pricing must be completed in Section B. pages 5 through 11 of the solicitation and all prices must be completed in Attachment J-0200000-07. (Revised Attachment J-0200000-07 provided)

4. Question: Are pages 56-65 in Attachment # J-0200000-07 "Exhibit Line Item Numbers" duplicates of the previous pages 41-55 for pricing?

Answer: Pages 56-65 in Attachment J-0200000-07 "Exhibit Line Item Numbers" are duplicates of the previous pages 41-55 for pricing. Page 41 through page 55 and page 56 – page 65 will be replaced with a revised Attachment J-0200000-07 in this amendment to correct another typo.

5. Question: If Attachment # J-0200000-07 "Exhibit Line Item Numbers" is the pricing sheet we use for submittal, where do we place the pricing for the possible 6-month extension?

Answer: A revision to the Attachment J-0200000-07 is provide. You are required to submit total sum pricing in Section B – Supplies or Services and Prices. The prices for the 6-month extension is at the end of the fourth option of Section B – Supplies or Services and Prices, which now has a revised format attached to this amendment. The Optional Extension of the fourth Option services will be less burdensome to both parties if the requirement is extended in increments of 1-month, 3-months, and 6-months.

6. Question: For ELINS A002AA-A002AD, B004AA - B004AD, C006AA - C006AD, D008AA - D008AD, E010AA - E010AD, is the $3,000,000 represented as a Not-To-Exceed (NTE) price? Also are ELINS B004AA

- B004AD, C006AA - C006AD, D008AA - D008AD, E010AA - E010AD supposed to be titled "Base Year" or should they be "Option Years"?

Answers:

Part 1. ELINS A002AA-A002AD, B004AA - B004AD, C006AA - C006AD, D008AA - D008AD, E010AA - E010AD, are Not-To-Exceed (NTE) prices and $3,000,000 represents the NTE amount per year.

Part 2. ELINS B004AA - B004AD, C006AA - C006AD, D008AA - D008AD, E010AA - E010AD are options years, see revised Attachment J-0200000-07 in this amendment.

7. Question: Page 10: Optional Extension of 4th Option Period - Please confirm if this pricing is required in the proposal submittal or if this is only there for future reference if necessary. Also, if it is part of this proposal -will it be factored into the overall price evaluations calculations?

Answer: The Option Extension of the 4th Option Period pricing is required in the proposal submittal, and will be factored into the overall price evaluation calculations.

8. Question: Please confirm if all on-site employees are required to have 40-hr HAZWOPER training since they will be most likely handling hazardous waste to fulfill the requirements of this contract.

Answer: Yes, the on-site employees handling hazardous waste are required to have 40-hr HAZWOPER training.

9. Question: We conservatively estimate that at least 500 miles per week must be driven in order to fulfill the inspection requirements based on the number of ranges, locations, and the overall size of the installation. Given the economic fluctuations in the cost of fuel, will the Government allow an equitable adjustment request should the cost of fuel significantly increase during the course of the contract?

Answer: This is a firm-fix price contract, no fluctuation for fuel cost will be considered for equitable adjustments.

10. Question: Please confirm if the contractor is responsible for the actual cost of disposal for all hazardous waste generated during this contract, to include the bullet trap, DCUs, and shooting houses locations. We understand this may include lead contaminated water, lead dust/debris, and other associated cleaning wastes.

Answer: The contractor shall dispose of all excess sample material, which includes lead contaminated water, lead dust/debris, and other associated cleaning wastes. Once a contract is awarded, it is the contractor’s responsibility for the removal and proper disposal of hazardous waste contaminates and must follow the instructions of Attachment J- 1502000-14, for the removal and transporting hazardous waste contaminates.

11. Question: Section 3.2.4 for the shooting houses indicates that the shooting houses are on a quarterly cleaning cycle, which conflicts with the ELIN pricing and cleaning frequency. Please confirm which is accurate.

Answer: Correction, “The Contractor shall perform Semi-annual lead cleaning of the (2000 sq. ft.) Brass Collection area at Landfill field testing and laboratory services to Building 978.

12. Question: Section 3.2.4 (pg. 55) - Please confirm the cleaning standard for this area.

Answer: Performed on a Semi-annual basis.

13. Question: Please confirm if the entire Safety, Factor 3 is limited to 2 pages in the proposal.

Answer: Factor 3, Safety submittal requirements is as follows: The Technical Approach to Safety narrative shall be limited to two (2) single-sided pages or one (1) double-sided page. (Confirmed)

14. Question: Please confirm if past performance will be evaluated and accepted for contracts that were performed under a Joint Venture structure.

Answer: Factor 4, Past Performance does not address the use of a Joint Venture structure; however, Factor 2, Corporate Experience states, “The Government will not evaluate projects performed by parent, affiliate, subsidiary, sister or any other company with a similar relationship to the offeror. Teaming arrangements and joint ventures are excluded from this competition.” Contractors have the instructions of Factor 2 to base their decision on the PPQ references to provide with their proposal.

15. Question: Please describe the terrain and access to move materials and waste drums so that the appropriate size/type of skid steer may be considered.

Answer: There are various terrains throughout the base, some may be gravel, paved roads, or grass areas.

16. Question: Please confirm if there are any unique requirements for the eleven (11) ISO containers (A001AN) on the ELIN schedule. Since these will be used for the storage of hazardous waste, we assume these containers must comply with requirements for hazardous waste storage/accumulation containment.

Answer: The containers should be leak proof and seal tight. The contractor is required to provide inspection sheets on all (11) ISO containers to the Base Environmental Management Division (EMD) on a weekly basis. Specifics can be addressed with EMD after award.

17. Question: Please confirm whether a full time Quality Control Inspector must be present on site at all times per the Key Personnel section 2.7.

Answer: No, a full time Quality Control Inspector is not required to be present on site at all times.

18. Question: Please confirm if any confined space entry is required for the performance of this contract.

Answer: There are no confined space entry requirements.

19. Question: It appears that there are several new requirements that have been added to the contract as compared to the previous contract requirement. In particular, there are 2 more bullet trap systems to inspect, more frequency of inspection services, the entire brass collection service requirements appear to be new to the contract, as well as many other requirements. Can you confirm if the overall new contract value is expected to increase based on the addition of these requirements to the consolidated contract structure?

Answer: It is highly probable that the contract value could increase.

20. Question: Amendment 1 posted contract values for the incumbent contracts. Please confirm that although these contracts have been consolidated, there appears to be new service requirements that have been added to the PWS compared to the previous contract. These include additional inspection frequencies, number of ranges (new locations), and brass room cleaning (to name a few).

Answer: Although the requirements for this performance work statement are the consolidation of two pervious services, new work was added to accommodate the customers’ needs in support of the Marines training.

21. Question: The ELIN listed under G-3/5, RTAM appears to have A001AX (Y?) in duplicate. Please confirm.

Answer: The ELIN listed under G-3/5, RTAM “AX” has a duplication error throughout the Attachment J-0200000- 07 and will be corrected with a revised Attachment J-0200000-07 with this amendment.

22. Question: Please confirm whether the semi-annual landfill cleaning requirements and quarterly lead cleaning are a new requirement for the consolidated shooting houses cleaning contract. These cleaning requirements include the collection areas at the landfill field testing and lab services to building 978 and for the contractor to ensure the facilities are in normal working order and function properly.

Answer: Building 978 Brass Collection at the Landfill is a new semi-annual service for this requirement.

23. Question: Can you provide the size of each range that is being cleaned and or decontaminated (length, Width, Height)? Without this information we cannot determine time and materials needed in those areas.

Answer: There are 13 bullets traps and 12 shooting houses and they all vary in size. Walls are rearranged for training exercises in the shooting houses. There is no available data to provide the length, width, or height for these areas. You can see most of the variations for the facilities at the site visit.

24. Question: PWS does not mention walls and ceilings included in decontamination, is this a requirement?

Answer: All indoor surface areas such as walls and floor surfaces must be cleaned.

25. Question: Concerning ranges with rubber backstop, will the facility be providing additional material (Rubber), or will this be supplied by contractor?

Answer: When repairs are required a non-reoccurring task order will be issued, which will require a request for quote (RFP); that should include cost for all needed materials.

26. Question: What is the size and dimensions of rubber range?

Answer: The actual size and dimensions of each complete berm rubber trap is not available, however most of the ranges have at least six (6) lanes.

27. Question: Is the facility or the contractor responsible for supplying filters for the ventilation and

DCU?

Answer: Air Filtration Filter Exchange is listed as a firm-fixed price item for this requirement.

28. Question: If contractor supplies filters what is the part numbers and supplier of filters?

Answer: The HEPA filters and Pleated filters sizes are in Attachment J-0200000-07. Once awarded the awardee can gather that information from each unit. There is no database with this information readily available.

29. Question: Who will supply drums for bullets monthly? The facility or contractor?

Answer: When repairs are required a non-reoccurring task order will be issued, which will require a request for quote (RFP); that should include cost for all needed materials.

30. Question: Who is responsible for disposal of Hazardous Waste? The facility or contractor?

Answer: The contractor is responsible for disposal of Hazardous Waste.

31. Question: Is there a contractor area where a Site Office, Conex for storage equipment, Port-A-

John, and work truck?

Answer: Some contractors have site offices aboard base; this contract has never required a lay-area for equipment or a site office. Contractor can use conex for storage of equipment.

32. Question: Is there somewhere we can stow a fuel tank?

Answer: Some contractors use conex containers to stow items at site locations with secured locks.

33. Question: Will contractor have internet access?

Answer: This requirement never required a need for internet access and no office space is provided.

34. Question: Is there any way to arrange a site visit to see all of the ranges prior to us bidding this work?

Answer: There will be a one-time only Site Visit scheduled on Thursday, 13 January 2022, at 8:00 AM.

Follow these instructions:

A. All interested contractors must send an email to both parties listed below.

Sharon E. Humphrey sharon.e.humphrey.civ@us.navy.mil and Regenia D. Guest regenia.d.guest.civ@us.navy.mil

B. You must provide the names of your attendees. Attendee’s names must be submitted, as it appears on their drivers licenses. (No nicknames) include proof of drivers insurance.

C. Provide email with names no later than 11 January 2022 by 1:30 PM. Any substitutes must be provided immediately.

D. Attendees must meet in the parking lot at Main Gate on Holcomb Blvd Contractors vetting office. (Please do not go into the building) Prior arrangements will be made for you from your email response.

(End of Summary of Changes)

REVISION TO SECTION B. SUPPLIES/SERVIES

ITEM 0009 AND 0010

DETAILS OF OPTION TO EXTEND

Optional Extension of the Fourth Option Services In reference to FAR Clause 52.217‐8, Option to Extend Services (NOV 1999), the Government may require continued performance of services for a period not to exceed 6 months. The terms and conditions of the contract will remain in effect if this optional extension is exercised. The Contractor shall provide pricing for the optional extension and the Contracting Officer may exercise the optional extension by written notice to the Contractor within 60 days.

Firm-Fixed Price Recurring Services:

Description Quantity Unit Price Total Amount

1-month of Services $_____________ $_________________ $_______________

3-months of Services $_____________ $_________________ $_______________

6-months of Services $_____________ $_________________ $_______________

Indefinite Delivery/Indefinite Quantity Non-Recurring Services:

Description Quantity Unit Price Total Amount

1-month of Services $_____________ $_________________ $_______________

3-months of Services $_____________ $_________________ $_______________

6-months of Services $_____________ $_________________ $_______________

1800000 – Environmental Table of Contents

Spec Item Title

1 General Information

1.1 Concept of Operations

2 Management and Administration

2.1 Definitions and Acronyms

2.2 Personnel

2.2.1 Laboratory Accreditation and Certification

2.2.1.2 Sampling, Testing and Laboratory Personnel Training

2.3 Special Requirements

2.3.1 Lead Removal Plan

2.4 References and Technical Documents

3 FFP/Recurring Work

3.1 Sampling, Field Testing and Laboratory Services

3.1.1 Sample Collection Logs

3.1.2 Field Testing Results

3.1.3 Laboratory Services

3.2 Monthly Cleaning of Flat Range

3.2.1 Annual Lead Cleaning of (Deceleration Chamber and Auger Room)

3.2.2 Semi-annual Lead Cleaning of Flat Range

3.2.3 Monthly Cleaning of Air Showers

3.2.4 Semi-Annual Landfill Cleaning Requirements

4 IDIQ/Non-recurring Work

Spec Item Title Description 1 General Information The Contractor shall provide all labor, management, supervision, tools, material, and equipment required to perform environmental services at Marine Corps Air Station-New River and Marine Corps Base Camp Lejeune, NC.

1.1 Concept of Operations The Contractor shall provide all labor, management, supervision, tools, material, and equipment required perform monthly, semi-annual, and annual cleaning, removal, and disposal of all lead in the breach/shooting houses.

Annex 0100000 and Annex 0200000 contain general information and on-site project management and administration requirements.

Annex 18 contains the technical requirements.

Annex 0100000 Annex 0100000 – General Information Annex 0200000 Annex 0200000 – Management and Administration Annex 1800000 Annex 1800000 – Cleaning of Breach and Shooting Houses

Spec Item Title Description 2 Management and

Administration

2.1 Definitions and Acronyms Definitions and Acronyms are listed in (J-0200000-01).

2.2 Personnel The Contractor shall provide personnel with the qualifications, technical knowledge, experience and skills required for efficient operations within the semi-annual cleaning of in-door range function.

2.2.1 Laboratory Accreditation and

Certification

Only certified laboratories that have appropriate credentials can perform testing. In the absence of certification requirements, laboratories shall demonstrate competency to perform environmental testing through accreditation. All laboratories shall acquire the required accreditation from a Federal (including Navy), state, or National Environmental Laboratory Accreditation Program (NELAP), for all environmental testing performed by the laboratory.

2.2.1.2 Sampling, Testing and

Laboratory personnel Training

The Contractor shall develop a written training plan and documentation of training for all sampling, testing and laboratory personnel to demonstrate technical proficiency. Demonstration of proficiency must take place within established guidelines that are documented in the Laboratory Quality Assurance Manual or other referenced instructions.

2.3 Special Requirements N/A to this contract.

2.3.1 Lead Removal Plan The Contractor shall submit a lead removal plan 15 days after award which includes lead removal procedures, site conditions and air monitoring protocols to the KO prior to the start of work on the Contract.

2.4 References and Technical

Documents

References and Technical Documents are listed in (J-1800000-01).

Spec Item Title

Performance Objective Related Information Performance Standard

3 FFP/Recurring Work

The Contractor shall perform quarterly cleaning, removal and disposal of all lead in the shooting/breach houses.

The Contractor shall comply with all Federal, state and local statutes and regulations, and with DoD policies, instructions and guidance such as those listed in the References and Technical Documents in (J-1800000-01).

The Contractor shall comply with all maintenance standards and requirements the Snail Type Auger Manual, provided in (J- 1800000-02).

All employees shall be attired in proper personal protection equipment.

Contractor shall submit a lead removal plan prior to the start of work on the contract.

Locations are provided in (J- 1800000-05 & 05-1).

Cleaning shall comprise of the removal and disposal of all lead Contaminated dust from all interior surfaces to include, but not limited to any targets in the buildings.

Only one shooting house and one breach house may be shut down for cleaning at any time.

When the final results of the current house are approved, the contractor shall clean the remaining shooting houses.

If environmental related procedures or operations are found to be out of compliance the Contractor shall immediately notify the KO and the Installation Environmental Program Manager with recommendations for appropriate action.

Services are performed in a timely manner and in compliance with Federal, state and local statutes and regulations, and with DoD policies, instructions and guidance.

No documented citations such as NOV, NON, warning letters or citizen suits due to Contractor’s non-performance, mismanagement or negligence.

All deficiencies noted in internal compliance inspection corrected in a timely manner.

Spec Item Title

Performance Objective Related Information Performance Standard

3.1 Sampling, Field

Testing and Laboratory Services

The Contractor shall provide environmental sampling, field testing, laboratory analysis report of Lead Dust whip results 7 days after cleaning, per Section F.

The Contractor shall comply with Federal, state and local statutes and regulations, and with DoD and Navy policies, instructions and guidance.

The Contractor shall develop and submit proposed Sampling Plan for approval per Section F.

Testing of the floors shall be conducted by an independent certified laboratory.

The Contractor shall dispose of all excess sample material in accordance with applicable Federal and state requirements..

Sample collection, field testing, and laboratory services must comply with the approved sampling plan, \\hich must include floor surface testing.

The floor surfaces shall be tested (8 wipe samples per building) to obtain a result of 200 micrograms per square foot.

3.1.1 Sample

Collection Logs

The Contractor shall conduct timely sample collection to ensure the installation complies with sampling plan.

The Contractor shall provide reports in accordance with the sampling plan or Contractor shall submit copies of Sample Collection Logs per Section F.

Sample collection complies with the approved sampling plan.

Samples are collected within two days of notification or in accordance with the schedule included in the sampling plan.

3.1.2 Field Testing

Results

The Contractor shall conduct timely field testing to ensure the installation complies with the sampling plan.

The Contractor shall provide Field Testing Reports in accordance with the sampling plan and submit per Section F.

Field testing complies with the approved sampling plan.

Field tests are completed within two days of notification or in accordance with the schedule included in the sampling plan.

3.1.3 Laboratory

Services

The Contractor shall provide laboratory services to ensure the installation complies with the sampling plan.

The laboratory shall be certified by NELAP.

The Contractor shall provide Laboratory Analysis Reports in accordance with the approved sampling plan and submit per Section F.

Data shall be qualified in accordance with EPA Data Quality Objectives (DQO)

Laboratory services comply with the approved sampling plan.

Samples are analyzed and results are reported within 14 days of receipt of sample.

Spec Item Title

Performance Objective Related Information Performance Standard

3.2 Monthly

Cleaning of Flat Range

The Contractor shall perform Monthly cleaning of Flat Range, sampling, field testing and laboratory services to Buildings RR501 and RR530A/B ramp.

Testing of the floors shall be conducted by an independent certified laboratory.

The Contractor shall dispose of all excess sample material.

The floor surfaces shall be tested (4 random wipe samples per building to obtain result of 800 micrograms per square foot or less.)

Facilities, systems equipment, are in normal working condition and function properly in accordance with specified standards.

3.2.1 Annual Lead

Cleaning of (Deceleration Chamber and Auger Room)

The Contractor shall perform Annual lead cleaning of the (REAR) portion of the range room that contains the Deceleration chamber and Auger for RR530A/B Range.

The Contractor shall dispose of all excess sample material.

Facilities, systems equipment, are in normal working condition and function properly in accordance with specified standards.

3.2.2 Semi-annual

Lead Cleaning of Flat Range perform Semi-annual lead cleaning of flat range, sampling, field testing and laboratory services to Building RR530A/B to include the live fire area (excluding areas behind red line where bullet trap starts).

Testing of the floors shall be conducted by an independent certified laboratory.

The Contractor shall dispose of all excess sample material.

Facilities, systems equipment, are in normal working condition and function properly in accordance with specified standards.

3.2.3 Monthly

Cleaning of Air Showers perform Preventative Maintenance (PM) on the Air Showers Monthly. Monthly Cleaning of Air Showers tasks is provided in (J-1800000-03).

Testing of the Air Showers (wall surfaces and floor surfaces) shall be conducted by an independent certified laboratory.

The Contractor shall dispose of all excess sample material.

The wall surfaces and floor surfaces shall be tested (4 random wipe samples per building to obtain result of 200 micrograms per square or less).

Facilities, systems equipment, are in normal working condition and function properly in accordance with specified standards.

Spec Item Title

Performance Objective Related Information Performance Standard

3.2.4 Semi-annual

Landfill Cleaning Requirements

The Contractor shall perform Semi-annual lead cleaning of the (2000 sq ft) Brass Collection area at Landfill field testing and laboratory services to Building 978.

Testing of the floors shall be conducted by an independent certified laboratory.

The Contractor shall dispose of all excess sample material.

Semi-Annual Cleaning Requirements for Building 978 outlined in (J-1800000-07).

Contractor must wipe down all surfaces to include walls, shaker, and sifting machines, clean and vacuum floors.

Once final wipe test is conducted the facility and equipment shall be free of any detectable lead contaminants.

Spec Item Title Performance Objective Related Information Performance Standard 4 IDIQ Work IDIQ work may be ordered utilizing a task order in accordance with the PROCEDURES FOR

ISSUING ORDERS

clause in Section G. The order will specify the exact locations and types of work to be accomplished. The period of performance will be specified in each order.

Refer to IDIQ ELINs for task listings, descriptions, and related requirements. All periods of performance are measured from issue date of order to acceptance of the work. Performance standards for IDIQ work will be the same as those in Spec Item 3 where applicable.

ELIN DESCRIPTION QTY

UNIT OF

ISSUE

FREQ UNIT PRICE TOTAL

A001AA

Perform Quarterly Cleaning of Breach and Shooting Houses, Sampling, Field Testing and Laboratory Services SRR‐249E,SRR‐

249F,SRR‐249G

3 EA 4

A001AB

Perform Quarterly Cleaning of Breach and Shooting Houses, Sampling, Field Testing and Laboratory Services RR‐243

1 EA 4

A001AC

Perform Quarterly Cleaning of Breach and Shooting Houses, Sampling, Field Testing and Laboratory Services RR‐249

1 EA 4

A001AD

Perform Quarterly Cleaning of Breach and Shooting Houses, Sampling, Field Testing and Laboratory Services SCR‐138

1 EA 4

A001AE

Perform Semi‐ Annual Cleaning of Breach and Shooting Houses, Sampling, Field Testing and Laboratory Services RR‐500

1 EA 2

A001AF

Perform Semi‐ Annual Cleaning of Breach and Shooting Houses, Sampling, Field Testing and Laboratory Services RR‐505

1 EA 2

A001AG

Perform Semi‐ Annual Cleaning of Breach and Shooting Houses, Sampling, Field Testing and Laboratory Services RR‐531

1 EA 2

A001AH

Perform Semi‐ Annual Cleaning of Breach and Shooting Houses, Sampling, Field Testing and Laboratory Services RR‐532

1 EA 2

A001AJ

Perform Semi‐ Annual Cleaning of Breach and Shooting Houses, Sampling, Field Testing and Laboratory Services RR‐534

1 EA 2

A001AK

Perform Semi‐ Annual Cleaning of Breach and Shooting Houses, Sampling, Field Testing and Laboratory Services RR‐534‐A

1 EA 2

G‐3/5, RTAM

G‐3/5, RTAM Sub‐Total A001AA ‐ A001AD

G‐7 MARSOC

G‐7 MARSOC Sub‐Total A001AE ‐ A001AK

PRICES FOR CLEANING OF BREACH AND SHOOTING HOUSES ‐ RECURRING (FIRM‐FIXED PRICE) WORK ‐ IN ACCORDANCE WITH ANNEX 1502000/ANNEX 1800000, SECTION C, SPEC ITEM 3, ELINS A001AA THROUGH A001AK ‐ BASE YEAR

SOLICITATION N40085‐22‐R‐2509 REVISED ATTACHMENT J‐0200000‐07

ISSUE

FREQ UNIT PRICE TOTAL

A001AL Monthly Preventative Maintenance Services for 12 Bullet Traps 12 MO 12 ‐$

A001AM Annual Lead Disposal 12 EA 1 ‐$

A001AN ISO Containers 11 EA 1 ‐$

A001AP Air Filtration Filter Exchange, Replace 36 HEPA Filters 99.97%

Efficiency (24"x24"x12) (Semi‐Annual)

36 Semi‐

Annual

2 ‐$

A001AQ Air Filtration Filter Exchange, Replace 124 HEPA Filters (To Include

Air Showers ) 99.97% Efficiency (24"x24"x12) (Semi‐Annual)

124 Semi‐

Annual

2 ‐$

A001AR Air Filtration Filter Exchange, Replace 36 HEPA Filters (24"x24"x2)

(Quarterly)

36 Quarterly 4 ‐$

A001AS Air Filtration Filter Exchange, Replace 200 Pleated Filters (24"x24"x2)

(Quarterly)

200 Quarterly 4 ‐$

A001AT Air Filtration Filter Exchange, Replace 88 Pleated Filters 99/97%

Efficiency (24"x20"x2) (Quarterly) (To Include Air Showers )

88 Quarterly 4 ‐$

A001AU Cleaning of In‐Door Range, Sampling, Field Testing and Laboratory

Services ‐ Live Firing RR530 A/B

2 Semi‐

Annual

2 ‐$

A001AV Lead Cleaning of In‐Door Range Ramps, Sampling, Field Testing and

Laboratory Services RR530 A/B

2 Monthly 12 ‐$

A001AW Lead Cleaning of the Rear portion of the range room (Deceleration chamber and Auger) RR530A/B

2 Annual 1 ‐$

A001AX Air Filtration Filter Exchange at Building 249, Replace 18 HEPA Filters

99.97% Efficiency (24"x24"x12) (Semi‐Annual)

18 Semi‐

Annual

2 ‐$

A001AY Air Filtration Filter Exchange at Building 249, Replace 36 Pleated

Filters (24"x24"x2) (Quarterly)

36 Quarterly 4 ‐$

G‐7 MARSOC

A001AZ Perform Semi‐Annual Cleaning of Flat Range, Sampling, Field Testing and Laboratory Services Bullet Trap ‐ RR501

1 Semi‐

Annual

2 ‐$

A001BA Perform Monthly Cleaning of Flat Range, Sampling, Field Testing and

Laboratory Services ‐ RR501

1 Monthly 12 ‐$

A001BB

Perform Semi‐Annual Cleaning of the (2000 sq ft) Brass Collection area at Landfill to include Sampling, Field Testing and Laboratory

Services at 978

Semi‐

Annual 2

Sub‐Total A001AL ‐ A001AN

G‐7 MARSOC

Sub‐Total A001AP ‐ A001AS

G‐3/5, RTAM

Sub‐Total A001AT ‐ A001AY

PRICES FOR CLEANING OF LANDFILL BRASS COLLECTION AREA ‐ RECURRING (FIRM‐FIXED PRICE) WORK ‐ IN ACCORDANCE WITH ANNEX 1502000/ANNEX 1800000, SECTION C, SPEC ITEM 3, ELINS A001BB ‐ BASE YEAR

Sub‐Total A001AZ ‐ A001BA

LANDFILL

G‐3/5, RTAM

PRICES FOR BULLET TRAP OPERATIONS, MAINTENANCE, AND REPAIR ‐ RECURRING (FIRM‐FIXED PRICE) WORK ‐ IN ACCORDANCE WITH ANNEX 1502000/ANNEX

1800000, SECTION C, SPEC ITEM 3, ELINS A001AM THROUGH A001BA ‐ BASE YEAR

LANDFILL Sub‐Total A001BB

Total Base Year ELINs A001AA ‐ A001BB

ELIN DESCRIPTION ‐ 1502000 FACILITY INVESTMENT QTY

Unit of

Issue Freq UNIT PRICE

TOTAL AMOUNT

G‐3/5, RTAM

A002AA Labor Hour for Technician ‐ (NTE $80,000.00) HR 1 ‐$

A002AB Materials ‐ (NTE $200,000.00) LS ‐$

A002AC Specialized Equipment LS ‐$

A002AD Emergency Services Calls 6 EA 1 ‐$

$300,000.00 (NTE YEARLY)

PRICES FOR BULLET TARP OPERATIONS, MAINTENANCE, AND REPAIR ‐ Non‐Recurring (IDIQ) ‐ IN ACCORDANCE WITH ANNEX 1502000/ANNEX 1800000, SECTION C, SPEC ITEM 3, ELINS A002AA THROUGH A002AD ‐ BASE YEAR

Total Base Year ELINS A002AA ‐ A002AD

ISSUE

FREQ UNIT PRICE TOTAL

B003AA

Perform Quarterly Cleaning of Breach and Shooting Houses, Sampling, Field Testing and Laboratory Services SRR‐249E,SRR‐

249F,SRR‐249G

3 EA 4

B003AB

Perform Quarterly Cleaning of Breach and Shooting Houses, Sampling, Field Testing and Laboratory Services RR‐243

1 EA 4

B003AC

Perform Quarterly Cleaning of Breach and Shooting Houses, Sampling, Field Testing and Laboratory Services RR‐249

1 EA 4

B003AD

Perform Quarterly Cleaning of Breach and Shooting Houses, Sampling, Field Testing and Laboratory Services SCR‐138

1 EA 4

B003AE

Perform Semi‐ Annual Cleaning of Breach and Shooting Houses, Sampling, Field Testing and Laboratory Services RR‐500

1 EA 2

B003AF

Perform Semi‐ Annual Cleaning of Breach and Shooting Houses, Sampling, Field Testing and Laboratory Services RR‐505

1 EA 2

B003AG

Perform Semi‐ Annual Cleaning of Breach and Shooting Houses, Sampling, Field Testing and Laboratory Services RR‐531

1 EA 2

B003AH

Perform Semi‐ Annual Cleaning of Breach and Shooting Houses, Sampling, Field Testing and Laboratory Services RR‐532

1 EA 2

B003AJ

Perform Semi‐ Annual Cleaning of Breach and Shooting Houses, Sampling, Field Testing and Laboratory Services RR‐534

1 EA 2

B003AK

Perform Semi‐ Annual Cleaning of Breach and Shooting Houses, Sampling, Field Testing and Laboratory Services RR‐534‐A

1 EA 2

G‐3/5, RTAM Sub‐Total B003AA ‐ B003AD

G‐7 MARSOC

G‐7 MARSOC Sub‐Total B003AE ‐ B003AK

PRICES FOR CLEANING OF BREACH AND SHOOTING HOUSES ‐ RECURRING (FIRM‐FIXED PRICE) WORK ‐ IN ACCORDANCE WITH ANNEX 1502000/ANNEX 1800000, SECTION C, SPEC ITEM 3, ELINS B003AA THROUGH B003AK ‐ FIRST OPTION

G‐3/5, RTAM

ISSUE

FREQ UNIT PRICE TOTAL

B003AL Monthly Preventative Maintenance Services for 12 Bullet Traps 12 MO 12 ‐$

B003AM Annual Lead Disposal 12 EA 1 ‐$

B003AN ISO Containers 11 EA 1 ‐$

B003AP Air Filtration Filter Exchange, Replace 36 HEPA Filters 99.97%

Efficiency (24"x24"x12) (Semi‐Annual)

36 Semi‐

Annual

2 ‐$

B003AQ Air Filtration Filter Exchange, Replace 124 HEPA Filters (To Include

Air Showers ) 99.97% Efficiency (24"x24"x12) (Semi‐Annual)

124 Semi‐

Annual

2 ‐$

B003AR Air Filtration Filter Exchange, Replace 36 HEPA Filters (24"x24"x2)

(Quarterly)

36 Quarterly 4 ‐$

B003AS Air Filtration Filter Exchange, Replace 200 Pleated Filters (24"x24"x2)

(Quarterly)

200 Quarterly 4 ‐$

B003AT Air Filtration Filter Exchange, Replace 88 Pleated Filters 99/97%

Efficiency (24"x20"x2) (Quarterly) (To Include Air Showers )

88 Quarterly 4 ‐$

B003AU Cleaning of In‐Door Range, Sampling, Field Testing and Laboratory

Services ‐ Live Firing RR530 A/B

2 Semi‐

Annual

2 ‐$

B003AV Lead Cleaning of In‐Door Range Ramps, Sampling, Field Testing and

Laboratory Services RR530 A/B

2 Monthly 12 ‐$

B003AW Lead Cleaning of the Rear portion of the range room (Deceleration chamber and Auger) RR530A/B

2 Annual 1 ‐$

B003AX Air Filtration Filter Exchange at Building 249, Replace 18 HEPA Filters

99.97% Efficiency (24"x24"x12) (Semi‐Annual)

18 Semi‐

Annual

2 ‐$

B003AY Air Filtration Filter Exchange at Building 249, Replace 36 Pleated

Filters (24"x24"x2) (Quarterly)

36 Quarterly 4 ‐$

G‐7 MARSOC

B003AZ Perform Semi‐Annual Cleaning of Flat Range, Sampling, Field Testing and Laboratory Services Bullet Trap ‐ RR501

1 Semi‐

Annual

2 ‐$

B003BA Perform Monthly Cleaning of Flat Range, Sampling, Field Testing and

Laboratory Services ‐ RR501

1 Monthly 12 ‐$

B003BB

Perform Semi‐Annual Cleaning of the (2000 sq ft) Brass Collection area at Landfill to include Sampling, Field Testing and Laboratory

Services at 978

Semi‐

Annual 2

PRICES FOR CLEANING OF LANDFILL BRASS COLLECTION AREA ‐ RECURRING (FIRM‐FIXED PRICE) WORK ‐ IN ACCORDANCE WITH ANNEX 1502000/ANNEX 1800000, SECTION C, SPEC ITEM 3, ELINS B003BB ‐ FIRST OPTION

LANDFILL

LANDFILL Sub‐Total B003BB

Total First Option ELINs B003AA ‐ B003BB

PRICES FOR BULLET TRAP OPERATIONS, MAINTENANCE, AND REPAIR ‐ RECURRING (FIRM‐FIXED PRICE) WORK ‐ IN ACCORDANCE WITH ANNEX 1502000/ANNEX

1800000, SECTION C, SPEC ITEM 3, ELINS B003AM THROUGH B003BA FIRST OPTION

Sub‐Total B003AZ ‐ B003BA

Sub‐Total B003AP ‐ B003AS

G‐3/5, RTAM

Sub‐Total B003AT ‐ B003AY

G‐3/5, RTAM

Sub‐Total B003AL ‐ B003AN

G‐7 MARSOC

Issue Freq UNIT PRICE

TOTAL AMOUNT

G‐3/5, RTAM

B004AA Labor Hour for Technician ‐ (NTE $80,000.00) HR 1 ‐$

B004AB Materials ‐ (NTE $200,000.00) LS ‐$

B004AC Specialized Equipment LS ‐$

B004AD Emergency Services Calls 6 EA 1 ‐$

$300,000.00 (NTE YEARLY)

PRICES FOR BULLET TARP OPERATIONS, MAINTENANCE, AND REPAIR ‐ Non‐Recurring (IDIQ) ‐ IN ACCORDANCE WITH ANNEX 1502000/ANNEX 1800000, SECTION C, SPEC ITEM 3, ELINS B004AA THROUGH B004AD ‐ FIRST OPTION

Total First Option ELINS B004AA ‐ B004AD

ISSUE

FREQ UNIT PRICE TOTAL

C005AA

Perform Quarterly Cleaning of Breach and Shooting Houses, Sampling, Field Testing and Laboratory Services SRR‐249E,SRR‐

249F,SRR‐249G

3 EA 4

C005AB

Perform Quarterly Cleaning of Breach and Shooting Houses, Sampling, Field Testing and Laboratory Services RR‐243

1 EA 4

C005AC

Perform Quarterly Cleaning of Breach and Shooting Houses, Sampling, Field Testing and Laboratory Services RR‐249

1 EA 4

C005AD

Perform Quarterly Cleaning of Breach and Shooting Houses, Sampling, Field Testing and Laboratory Services SCR‐138

1 EA 4

C005AE

Perform Semi‐ Annual Cleaning of Breach and Shooting Houses, Sampling, Field Testing and Laboratory Services RR‐500

1 EA 2

C005AF

Perform Semi‐ Annual Cleaning of Breach and Shooting Houses, Sampling, Field Testing and Laboratory Services RR‐505

1 EA 2

C005AG

Perform Semi‐ Annual Cleaning of Breach and Shooting Houses, Sampling, Field Testing and Laboratory Services RR‐531

1 EA 2

C005AH

Perform Semi‐ Annual Cleaning of Breach and Shooting Houses, Sampling, Field Testing and Laboratory Services RR‐532

1 EA 2

C005AJ

Perform Semi‐ Annual Cleaning of Breach and Shooting Houses, Sampling, Field Testing and Laboratory Services RR‐534

1 EA 2

C005AK

Perform Semi‐ Annual Cleaning of Breach and Shooting Houses, Sampling, Field Testing and Laboratory Services RR‐534‐A

1 EA 2

PRICES FOR CLEANING OF BREACH AND SHOOTING HOUSES ‐ RECURRING (FIRM‐FIXED PRICE) WORK ‐ IN ACCORDANCE WITH ANNEX 1502000/ANNEX 1800000, SECTION C, SPEC ITEM 3, ELINS C005AA THROUGH C005AK ‐ SECOND OPTION

G‐3/5, RTAM

G‐3/5, RTAM Sub‐Total C005AA ‐ C005AD

G‐7 MARSOC Sub‐Total C005AE ‐ C005AK

ISSUE

FREQ UNIT PRICE TOTAL

C005AL Monthly Preventative Maintenance Services for 12 Bullet Traps 12 MO 12 ‐$

C005AM Annual Lead Disposal 12 EA 1 ‐$

C005AN ISO Containers 11 EA 1 ‐$

C005AP Air Filtration Filter Exchange, Replace 36 HEPA Filters 99.97%

Efficiency (24"x24"x12) (Semi‐Annual)

36 Semi‐

Annual

2 ‐$

C005AQ Air Filtration Filter Exchange, Replace 124 HEPA Filters (To Include

Air Showers ) 99.97% Efficiency (24"x24"x12) (Semi‐Annual)

124 Semi‐

Annual

2 ‐$

C005AR Air Filtration Filter Exchange, Replace 36 HEPA Filters (24"x24"x2)

(Quarterly)

36 Quarterly 4 ‐$

C005AS Air Filtration Filter Exchange, Replace 200 Pleated Filters (24"x24"x2)

(Quarterly)

200 Quarterly 4 ‐$

C005AT Air Filtration Filter Exchange, Replace 88 Pleated Filters 99/97%

Efficiency (24"x20"x2) (Quarterly) (To Include Air Showers )

88 Quarterly 4 ‐$

C005AU Cleaning of In‐Door Range, Sampling, Field Testing and Laboratory

Services ‐ Live Firing RR530 A/B

2 Semi‐

Annual

2 ‐$

C005AV Lead Cleaning of In‐Door Range Ramps, Sampling, Field Testing and

Laboratory Services RR530 A/B

2 Monthly 12 ‐$

C005AW Lead Cleaning of the Rear portion of the range room (Deceleration chamber and Auger) RR530A/B

2 Annual 1 ‐$

C005AX Air Filtration Filter Exchange at Building 249, Replace 18 HEPA Filters

99.97% Efficiency (24"x24"x12) (Semi‐Annual)

18 Semi‐

Annual

2 ‐$

C005AY Air Filtration Filter Exchange at Building 249, Replace 36 Pleated

Filters (24"x24"x2) (Quarterly)

36 Quarterly 4 ‐$

G‐7 MARSOC

C005AZ Perform Semi‐Annual Cleaning of Flat Range, Sampling, Field Testing and Laboratory Services Bullet Trap ‐ RR501

1 Semi‐

Annual

2 ‐$

C005BA Perform Monthly Cleaning of Flat Range, Sampling, Field Testing and

Laboratory Services ‐ RR501

1 Monthly 12 ‐$

C005BB

Perform Semi‐Annual Cleaning of the (2000 sq ft) Brass Collection area at Landfill to include Sampling, Field Testing and Laboratory

Services at 978

Semi‐

Annual 2

G‐7 MARSOC

Sub‐Total C005AP ‐ C005AS

G‐3/5, RTAM

Sub‐Total C005AT ‐ C005AY

Sub‐Total C005AZ ‐ C005BA

PRICES FOR BULLET TRAP OPERATIONS, MAINTENANCE, AND REPAIR ‐ RECURRING (FIRM‐FIXED PRICE) WORK ‐ IN ACCORDANCE WITH ANNEX 1502000/ANNEX

1800000, SECTION C, SPEC ITEM 3, ELINS C005AM THROUGH C005BA ‐ SECOND OPTION

G‐3/5, RTAM

Sub‐Total C005AL ‐ C005AN

PRICES FOR CLEANING OF LANDFILL BRASS COLLECTION AREA ‐ RECURRING (FIRM‐FIXED PRICE) WORK ‐ IN ACCORDANCE WITH ANNEX 1502000/ANNEX 1800000, SECTION C, SPEC ITEM 3, ELINS C005BB ‐ SECOND OPTION

LANDFILL

LANDFILL Sub‐Total C005BB

Total Second Option ELINs C005AA ‐ C005BB

Issue Freq UNIT PRICE

TOTAL AMOUNT

G‐3/5, RTAM

C006AA Labor Hour for Technician ‐ (NTE $80,000.00) HR 1 ‐$

C006AB Materials ‐ (NTE $200,000.00) LS ‐$

C006AC Specialized Equipment LS ‐$

C006AD Emergency Services Calls 6 EA 1 ‐$

$300,000.00 (NTE YEARLY)

PRICES FOR BULLET TARP OPERATIONS, MAINTENANCE, AND REPAIR ‐ Non‐Recurring (IDIQ) ‐ IN ACCORDANCE WITH ANNEX 1502000/ANNEX 1800000, SECTION C, SPEC ITEM 3, ELINS C006AA THROUGH C006AD ‐ SECOND OPTION

Total Second Option ELINS C006AA ‐ C006AD

ISSUE

FREQ UNIT PRICE TOTAL

D007AA

Perform Quarterly Cleaning of Breach and Shooting Houses, Sampling, Field Testing and Laboratory Services SRR‐249E,SRR‐

249F,SRR‐249G

3 EA 4

D007AB

Perform Quarterly Cleaning of Breach and Shooting Houses, Sampling, Field Testing and Laboratory Services RR‐243

1 EA 4

D007AC

Perform Quarterly Cleaning of Breach and Shooting Houses, Sampling, Field Testing and Laboratory Services RR‐249

1 EA 4

D007AD

Perform Quarterly Cleaning of Breach and Shooting Houses, Sampling, Field Testing and Laboratory Services SCR‐138

1 EA 4

D007AE

Perform Semi‐ Annual Cleaning of Breach and Shooting Houses, Sampling, Field Testing and Laboratory Services RR‐500

1 EA 2

D007AF

Perform Semi‐ Annual Cleaning of Breach and Shooting Houses, Sampling, Field Testing and Laboratory Services RR‐505

1 EA 2

D007AG

Perform Semi‐ Annual Cleaning of Breach and Shooting Houses, Sampling, Field Testing and Laboratory Services RR‐531

1 EA 2

D007AH

Perform Semi‐ Annual Cleaning of Breach and Shooting Houses, Sampling, Field Testing and Laboratory Services RR‐532

1 EA 2

D007AJ

Perform Semi‐ Annual Cleaning of Breach and Shooting Houses, Sampling, Field Testing and Laboratory Services RR‐534

1 EA 2

D007AK

Perform Semi‐ Annual Cleaning of Breach and Shooting Houses, Sampling, Field Testing and Laboratory Services RR‐534‐A

1 EA 2

PRICES FOR CLEANING OF BREACH AND SHOOTING HOUSES ‐ RECURRING (FIRM‐FIXED PRICE) WORK ‐ IN ACCORDANCE WITH ANNEX 1502000/ANNEX 1800000, SECTION C, SPEC ITEM 3, ELINS D007AA THROUGH D007AK ‐ THIRD OPTION

G‐3/5, RTAM

G‐3/5, RTAM Sub‐Total D007AA ‐ D007AD

G‐7 MARSOC Sub‐Total D007AE ‐ D007AK

ISSUE

FREQ UNIT PRICE TOTAL

D007AL Monthly Preventative Maintenance Services for 12 Bullet Traps 12 MO 12 ‐$

D007AM Annual Lead Disposal 12 EA 1 ‐$

D007AN ISO Containers 11 EA 1 ‐$

D007AP Air Filtration Filter Exchange, Replace 36 HEPA Filters 99.97%

Efficiency (24"x24"x12) (Semi‐Annual)

36 Semi‐

Annual

2 ‐$

D007AQ Air Filtration Filter Exchange, Replace 124 HEPA Filters (To Include

Air Showers ) 99.97% Efficiency (24"x24"x12) (Semi‐Annual)

124 Semi‐

Annual

2 ‐$

D007AR Air Filtration Filter Exchange, Replace 36 HEPA Filters (24"x24"x2)

(Quarterly)

36 Quarterly 4 ‐$

D007AS Air Filtration Filter Exchange, Replace 200 Pleated Filters (24"x24"x2)

(Quarterly)

200 Quarterly 4 ‐$

D007AT Air Filtration Filter Exchange, Replace 88 Pleated Filters 99/97%

Efficiency (24"x20"x2) (Quarterly) (To Include Air Showers )

88 Quarterly 4 ‐$

D007AU Cleaning of In‐Door Range, Sampling, Field Testing and Laboratory

Services ‐ Live Firing RR530 A/B

2 Semi‐

Annual

2 ‐$

D007AV Lead Cleaning of In‐Door Range Ramps, Sampling, Field Testing and

Laboratory Services RR530 A/B

2 Monthly 12 ‐$

D007AW Lead Cleaning of the Rear portion of the range room (Deceleration chamber and Auger) RR530A/B

2 Annual 1 ‐$

D007AX Air Filtration Filter Exchange at Building 249, Replace 18 HEPA Filters

99.97% Efficiency (24"x24"x12) (Semi‐Annual)

18 Semi‐

Annual

2 ‐$

D007AY Air Filtration Filter Exchange at Building 249, Replace 36 Pleated

Filters (24"x24"x2) (Quarterly)

36 Quarterly 4 ‐$

G‐7 MARSOC

D007AZ Perform Semi‐Annual Cleaning of Flat Range, Sampling, Field Testing and Laboratory Services Bullet Trap ‐ RR501

1 Semi‐

Annual

2 ‐$

D007BA Perform Monthly Cleaning of Flat Range, Sampling, Field Testing and

Laboratory Services ‐ RR501

1 Monthly 12 ‐$

D007BB

Perform Semi‐Annual Cleaning of the (2000 sq ft) Brass Collection area at Landfill to include Sampling, Field Testing and Laboratory

Services at 978

Semi‐

Annual 2

Sub‐Total D007AP ‐ D007AS

G‐3/5, RTAM

Sub‐Total D007AT ‐ D007AY

Sub‐Total D007AZ ‐ D007BA

PRICES FOR CLEANING OF LANDFILL BRASS COLLECTION AREA ‐ RECURRING (FIRM‐FIXED PRICE) WORK ‐ IN ACCORDANCE WITH ANNEX 1502000/ANNEX 1800000, SECTION C, SPEC ITEM 3, ELINS D007BB ‐ THIRD OPTION

PRICES FOR BULLET TRAP OPERATIONS, MAINTENANCE, AND REPAIR ‐ RECURRING (FIRM‐FIXED PRICE) WORK ‐ IN ACCORDANCE WITH ANNEX 1502000/ANNEX

1800000, SECTION C, SPEC ITEM 3, ELINS D007AM THROUGH D007BA ‐ THIRD OPTION

G‐3/5, RTAM

Sub‐Total D007AL ‐ D007AN

G‐7 MARSOC

LANDFILL

LANDFILL Sub‐Total D007BB

Total Third Option ELINs D007AA ‐ D007BB

Issue Freq UNIT PRICE

TOTAL AMOUNT

G‐3/5, RTAM

D008AA Labor Hour for Technician ‐ (NTE $80,000.00) HR 1 ‐$

D008AB Materials ‐ (NTE $200,000.00) LS ‐$

D008AC Specialized Equipment LS ‐$

D008AD Emergency Services Calls 6 EA 1 ‐$

$300,000.00 (NTE YEARLY)Total Third Option ELINS D008AA ‐ D008AD

PRICES FOR BULLET TARP OPERATIONS, MAINTENANCE, AND REPAIR ‐ Non‐Recurring (IDIQ) ‐ IN ACCORDANCE WITH ANNEX 1502000/ANNEX 1800000, SECTION C, SPEC ITEM 3, ELINS D008AA THROUGH D008AD ‐ THIRD OPTION

ISSUE

FREQ UNIT PRICE TOTAL

E009AA

Perform Quarterly Cleaning of Breach and Shooting Houses, Sampling, Field Testing and Laboratory Services SRR‐249E,SRR‐

249F,SRR‐249G

3 EA 4

E009AB

Perform Quarterly Cleaning of Breach and Shooting Houses, Sampling, Field Testing and Laboratory Services RR‐243

1 EA 4

E009AC

Perform Quarterly Cleaning of Breach and Shooting Houses, Sampling, Field Testing and Laboratory Services RR‐249

1 EA 4

E009AD

Perform Quarterly Cleaning of Breach and Shooting Houses, Sampling, Field Testing and Laboratory Services SCR‐138

1 EA 4

E009AE

Perform Semi‐ Annual Cleaning of Breach and Shooting Houses, Sampling, Field Testing and Laboratory Services RR‐500

1 EA 2

E009AF

Perform Semi‐ Annual Cleaning of Breach and Shooting Houses, Sampling, Field Testing and Laboratory Services RR‐505

1 EA 2

E009AG

Perform Semi‐ Annual Cleaning of Breach and Shooting Houses, Sampling, Field Testing and Laboratory Services RR‐531

1 EA 2

E009AH

Perform Semi‐ Annual Cleaning of Breach and Shooting Houses, Sampling, Field Testing and Laboratory Services RR‐532

1 EA 2

E009AJ

Perform Semi‐ Annual Cleaning of Breach and Shooting Houses, Sampling, Field Testing and Laboratory Services RR‐534

1 EA 2

E009AK

Perform Semi‐ Annual Cleaning of Breach and Shooting Houses, Sampling, Field Testing and Laboratory Services RR‐534‐A

1 EA 2

G‐3/5, RTAM

G‐3/5, RTAM Sub‐Total E009AA ‐ E009AD

G‐7 MARSOC

G‐7 MARSOC Sub‐Total E009AE ‐ E009AK

PRICES FOR CLEANING OF BREACH AND SHOOTING HOUSES ‐ RECURRING (FIRM‐FIXED PRICE) WORK ‐ IN ACCORDANCE WITH ANNEX 1502000/ANNEX 1800000, SECTION C, SPEC ITEM 3, ELINS E009AA THROUGH E009AK ‐ FOURTH OPTION

ISSUE

FREQ UNIT PRICE TOTAL

E009AL Monthly Preventative Maintenance Services for 12 Bullet Traps 12 MO 12 ‐$

E009AM Annual Lead Disposal 12 EA 1 ‐$

E009AN ISO Containers 11 EA 1 ‐$

E009AP Air Filtration Filter Exchange, Replace 36 HEPA Filters 99.97%

Efficiency (24"x24"x12) (Semi‐Annual)

36 Semi‐

Annual

2 ‐$

E009AQ Air…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .