N4008522B2505 AMENDMENT 0004.pdf
PDF 181 KB Posted
- Attached to
- TRI-COMMAND ROOFING IDIQ FOR BEAUFORT, SC
- Solicitation number
- N4008522B2505
About this file
This document is an amendment to a solicitation for an indefinite delivery indefinite quantity contract for roofing services for the Beaufort, South Carolina area. The amendment provides a response to a question received regarding the ELIN spreadsheet, clarifying that the contractor is responsible for calculating all costs and that a revised spreadsheet is needed to avoid calculation errors by the user. No other changes are made to the solicitation terms or requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N4008522B2505 ABSTRACT OF OFFERS.pdf | ||
| N4008522B2505 AMENDMENT 0005.pdf | ||
| N4008522B2505 AMENDMENT 0003.pdf | ||
| N4008522B2505 AMENDMENT 0002.pdf | ||
| N4008522B2505 AMENDMENT 0001.pdf | ||
| Attachment A - TRI-COMMAND ROOFING IDIQ.pdf | ||
| N4008522B2505.pdf | ||
| Attachment C - PIEE Vendor Access Instructions.pdf | ||
| Attachment B - ELINs TRI-COMMAND ROOFING IDIQ.xlsx | XLSX spreadsheet | |
| Attachment D - PPI Log.xls | XLS spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
N40085-22-B-2505; TRI-COMMAND ROOFING IDIQ FOR BEAUFORT, SC
This amendment is issued to respond to PPI(s)
See continuation page(s)
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 13-Jun-2022
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008522B2505
X 9B. DATED (SEE ITEM 11)
12-May-2022
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
13-Jun-2022
CODE
NAVFACSYSCOM MID-ATLANTIC
CONTRACTING CORE
9324 VIRGINIA AVENUE
NORFOLK VA 23511-3095
N40085 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N4008522B2505
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0004
1. Provide response(s) to PPI(s) Question
No.
Date
Received
REFERENCE QUESTION GOVERNMENT
RESPONSE
Posted on Amend No.
Page Section Para.
5 6/10/2022 ELIN
Spreadsheet
The Elin schedule does not calculate the Base or Option
Years on the Summary Sheet, the Total Price for each Clin line item, the Total Cost for Construction Line Items, or the Total Contract Price for the Base Year or any of the Option Years. We believe a revised Schedule is needed to eliminate possible user calculation errors.
The Contractor is responsible for calculating all cost in the ELINs.
(End of Summary of Changes)
File details come from the government source that posted it. Updated .