N4008521R2570 I Elevator (Base Contract) Solicitation.pdf
PDF 2 MB Posted
- Solicitation number
- N4008521R2570
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N4008521R2570 I Elevator (Base Contract) Solicitation Amendment 3.pdf | ||
| N4008521R2570 I Elevator (Base Contract) Solicitation Amendment 2.pdf | ||
| Corrected IGE VTE complete 5-27-21.xlsx | XLSX spreadsheet | |
| N4008521R2570 I Elevator (Base Contract) Solicitation Amendment 1.pdf | ||
| New Newport Elevator Inventory.xlsx | XLSX spreadsheet | |
| ELINS VTE.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
N4008521R2570 04-May-2021
b. TELEPHONE NUMBER
401-841-1564
8. OFFER DUE DATE/LOCAL TIME
01:00 PM 04 Jun 2021
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
N400859. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
CAMERON H. ORMISTON
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED ORX
SMALL BUSINESS
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
NAVFACSYSCOM MID-ATLANTIC
PWD NEWPORT
BLDG 1 SIMONPIETRI DRIVE
NAVAL STATION NEWPORT
NEWPORT RI 02841-1712
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS AX
13b. RATING
DO-C2
CODE15. DELIVER TO CODE N44211 16. ADMINISTERED BY
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
NAVFACSYSCOM MID-ATLANTIC
CHRISTOPHER BOYETTE
BLDG 1, SIMONPIETRI DRIVE
NEWPORT RI 02841-0000
TEL: 4018413222 FAX:
FAX:
TEL: SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
$16,500,000
NAICS:
238290
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF253
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
Section SF 1449 - CONTINUATION SHEET
GENERAL REQUIREMENTS
GENERAL REQUIREMENTS
1. Contract Title: Elevator Maintenance Services at the Naval Complex Newport, Newport
RI
2. Type of Contract: Recurring (Firm-Fixed Price) with Non-Recurring (Indefinite Delivery Indefinite Quantity) provisions.
3. Set-aside: None
4. NAICS Code: The NAICS Code is 238290. The size standard is $16,500,000.00. Refer to On-Line Representations and Certifications Applications (ORCA) at http://orca.bpn.gov
5. Wage Determination: Service Contract Act wages are included in this solicitation. They are effective for the base period of the contract only and apply to all work subject to the Service Contract Act. New wage determinations will be incorporated at the time an option to extend the contract term is exercised. Price adjustments for option years shall be in accordance with FAR Clauses 52.217-43, Fair Labor Standards Act and Service Contract Act – Price Adjustments (Multiple Year and Option Contracts). Accordingly, prices in the Firm-Fixed Price portion of this contract shall not include any contingency to cover increased costs for which adjustment is provided under this clause.
6. Bid Guarantee/ Bonding Requirements: NOT REQUIRED for this procurement.
7. Contract Term: This contract contains provisions for one (1) base period and four (4) option periods. The Government has the option to extend the term of the contract in accordance with Contract Clause, FAR 52.217- 8, Option to Extend Services (Nov 1999).
8. Period of Performance: Base year (12 months) and four, 12-month options. The start and completion dates will be determined at time of award. Refer to Section F, Deliveries or Performance.
9. Contract Line Items:
a. Bidders shall enter unit prices and amounts for CLINS and ELINS in the schedule contained in the attached spreadsheet titled “Bid Schedule Elevator Services”.
b. In the event there is a difference between the unit price and the extended total amount, the unit price will be held to be the intended bid price and the total of the CLIN and ELIN will be recomputed accordingly. If the bidder provides a total amount for a ELIN, but fails to enter the unit price, the total amount divided by the ELIN quantity will be held to be the intended unit price.
c. The Schedule of the Recurring (Firm-Fixed Price) Work (CLIN 0001, 0003, 0005, 0007, 0009) and Schedule of Non-Recurring (Indefinite Quantity) Work (CLIN 0002, 0004, 0006, 0008, 0010), will be used as the basis for deductions in accordance with the “CONSEQUENCES OF CONTRACTOR’S FAILURE TO
PERFORM REQUIRED SERVICES” CLAUSE.
10. Indefinite Quantity Individual Contract Line Item Quantities: Once the estimated quantities for individual line items shown in the Schedule have been ordered, additional quantities may be ordered as long as the overall not-to-exceed (NTE) amount of the contract per year is not exceeded and the Contractor agrees by signing the task order.
11. Period of Performance: See above
12. Government Purchase Card: Indefinite quantity work may be ordered at the prices offered by two ways: 1) By the issuing activity using a DD Form 1155: Order for supplies and Services”, 2) Or by an authorized Government user via a Government Purchase Card (GPC). When receiving GPC orders against Section B, the contractor shall provide the supplies and services at the offered price without additional markup or handling fee.
13. Contractor Support of FEDMALL: This procurement will not be using FEDMALL for issuing orders.
14. Incorporation of Technical Proposal: N/A
15. Request for Information /Clarification Questions: Contractors are required to review the entire solicitation package before submitting questions. Submit all questions via one document by emailing cameron.ormiston@navy.mil at least 7 days before proposals are due. This is the most efficient way to ensure all questions are addressed in a timely manner.
16. Proposal Files: Solicitations are posted to the beta.sam.gov website as mandated by our Agency. By necessity, these files are protected to prevent unauthorized editing. It is the sole responsibility of the offeror to obtain the RFP files, along with any amendments, from this website.
17. NOTICE TO BIDDERS/OFFERORS: Bidders/Offerors are required to submit Bid Schedule and Exhibit Line Items (ELINS) with their bid.
18. RFP DELIVERY:
Submitting Your Proposal:
Both Electronic and Hard Copy Bids should include the documents listed in “THE FOLLOWING DOCUMENTS SHALL BE SUBMITTED:” (see below)
Due to COVID -19 Electronically submit bid to Point of Contact listed above by 4 June 2021 at 1:00PMEST
Along with the electronic Proposal, please send a copy via the United States Postal Service or a commercial carrier, such as Federal Express, shall be addressed to:
Cam Ormiston NAVFAC MIDLANT-PWD Newport Facilities Engineering & Acquisition Division (FEAD) 1 Simonpietri Drive N4008521B2502 Newport, RI 02841
NOTICE TO ALL OFFERORS
Due to increased security at all military installations, bidders who do not currently have a valid Contractor’s ID must allow sufficient time to obtain a one-day pass to permit entry to the base. In accordance with Naval Station Newport security regulations, all prospective visitors and contractor personnel are hereby notified that in order to obtain a one-day visitor’s pass the person must present their driver’s license and vehicle registration and/or rental car contract.
Contractor personnel who do not have a valid Contractor’s ID must submit a written request via email, requesting a one-day pass to access Naval Station Newport, Rhode Island. The written request shall be on company letterhead (including the company’s name, complete address, and phone number) and include the full legal name of the representative. Please include their date of birth and place of birth. The request shall be sent to:
Kim Prashaw, Procurement Technician, email information to kim.prashaw@navy.mil five business days prior to the proposal due date.
Personnel and vehicle one-day pass must be obtained at Naval Station Newport Pass Office, Building 1377, located in Cloyne Court outside of Gate 1.
It is imperative that all offerors adhere to this notice in order to avoid delays in submitting your proposals.
Also, be advised by this notice that the level of security at Naval Station Newport may change at any time. As the level of security heightens, the amount of time required to gain access to Naval Station Newport also increases.
Note: the Terms “bidder” and “bid” are used interchangeably with “offeror” and “offer” and/or “proposer” and “proposal.”
THE FOLLOWING DOCUMENTS SHALL BE SUBMITTED:
1. Standard Form 1449 – Solicitation, Contract/Order for Commercial Items (Block 30a -30b completed and signed, All Contract Line Items (CLINS) priced plus Bid Schedule Summary Sheet)
2. Any amendments that have been issued must be acknowledged.
3. ELIN Schedule
FAILURE TO SUBMIT ANY OF THE ABOVE INFORMATION MAY RESULT IN
THE BIDDER BEING REJECTED AS NONRESPONSIVE PER FAR 14.301(a).
EVALUATION OF OFFER(s)
Offeror shall submit a total price for Section 00 10 00, CLIN 0001 as well as an separate itemized breakdown of proposal cost. Proposal should include a breakdown in sufficient detail to permit a comprehensive review and evaluation of all labor, material, and equipment costs.
The Government will evaluate the offer for the purpose to determine a fair and reasonable price. The basis for Award will be Lowest Price Technically Acceptable in accordance with Submission of Items 1-4 (listed above).
0100000 C GENERAL INFORMATION
0100000 – General Information Spec Item Title Description 1 General Information
1.1 Outline of Services Except where otherwise stated, the Contractor shall furnish all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items necessary to provide the services outlined below and described in this Performance Work Statement (PWS) at Naval Complex, Newport, RI by means of a combination Recurring Work and Non-Recurring Work Contract
The PWS is organized into annexes. Annex 1 is "General Information".
Annex 2 contains the on-site project management and administration requirements. Annexes 3 through 18 contain the technical requirements.
The annex numbers are identified as 1 through 18 in the description column, but the full expanded annex numbers include seven digits (e.g., Annex 1 expanded number is 0100000 as shown in the header row at the top of this page)
Annex 1 General Information Annex 2 Management and Administration Annex 3 Command and Staff N/A Annex 4 Public Safety N/A Annex 5 Air Operations N/A Annex 6 Port Operations N/A Annex 7 Ordnance N/A Annex 8 Range Operations N/A Annex 9 Health Care Support N/A Annex 10 Supply N/A Annex 11 Personnel Support N/A Annex 12 Morale, Welfare and Recreation Support N/A Annex 13 Galley N/A Annex 14 Housing N/A Annex 15 Facilities Support
150200 Facilities Investment Annex 16 Utilities N/A Annex 17 Base Support Vehicles and Equipment N/A Annex 18 Environmental N/A
1.2 Project Location The work shall be performed at various locations throughout Naval Complex, Newport, RI could vary from location to location. The following is the dispersion of work at the various locations.
(1) Maintenance and Repair of Elevators and escalators: various locations
(2) This contract covers, but is not limited to, equipment in the following commands at the Naval Complex in Newport, RI: Naval Station Newport (NAVSTANPT), Naval Undersea Warfare Center (NUWC), Naval War College (NWC), and Naval Ambulatory Care Clinic (NACC).
1.3 Acquisition of
Additional Work
The Government reserves the right to acquire additional Maintenance and Repair of Elevators services at additional locations in addition to the services and locations identified in the recurring work requirements of this contract. Additional services will be incorporated into the contract in accordance with the CHANGES clause, SECTION I or ordered under the indefinite quantity provisions of the contract. Items of work not covered by this contract but within the general intent are considered in the scope of this contract.
1.4 Background Information Naval Station Newport is home to more than 42 naval and defense commands and activities. Newport is the Navy’s premier site for training officers, officer candidates, senior enlisted personnel and midshipman candidates, as well as conducting advanced undersea warfare and development systems. Naval Station Newport’s mission is to fulfill the diverse requirements of its tenant commands by providing the facilities and infrastructure that are essential to their optimum performance. Navy personnel assigned to Newport come from all parts of the United States and many free nations of the world. Newport is the home of the Navy’s most prestigious educational institution, the Naval War college. Each year, over 500 outstanding mid‐career level officers of the Navy, all other services, civilian federal agencies, and international naval officers come here to pursue a rigorous 10 month course of post‐graduate studies.
Military and civilian personnel get deeply involved in local community affairs. Naval station Newport is the largest employer in Newport County both in terms of personnel and payroll, with approximately 5,800 employees and an additiona15, 000 students attending classes each year
1.5 Verification of
Workload and Conditions
Throughout the PWS, the workload data is generally referred to as being located in Section J. Section J provides data such as inventories, maps, floor plans, and tables to represent the type, quantity and location of services to be provided. However, offerors are encouraged to visit the project site during the site visit for offerors and to visit the technical library during posted hours as part of its due diligence to assess the nature of work and conditions under which work is to be performed.
1.6 Climate Patterns local weather is strongly influenced by the Atlantic Ocean, due to the close proximity to the coast. Rhode Island has a humid continental climate with warm summer and cold winter. The climate is generally milder along the The coast, particularly in the winter. January temperatures in Newport RI average 38 degrees F high and 23 degrees F low. July temperatures average 78 degrees F high to 64 degrees F low. However, summer temperatures may reach the lower 90 degrees F and temperatures in the winter can fall below 0 degrees F.
Precipitation (rainfall and snowfall) in Rhode Island is distributed throughout the year Most areas receive approximately 46 inches of liquid
1.7 Related Information There are four types of Related Information that can be found in the Description and Related Information columns of the specification as follows:
Informational Notes as used throughout this PWS provides additional information to offerors to be used in developing a thorough understanding of the work to be performed in this contract. Any block of text marked “Informational Notes” throughout Annexes 1 through 18 is subject to this disclaimer. Offerors may not rely upon the "Informational Notes" as material representations of the Government. Information provided in "Informational Notes" does not create a contractual requirement on either party to this contract.
Clarifying Information describes client expectations in a more detailed manner than the Performance Objective and Performance standard alone.
Constraining Information describes limitations to the work performed to meet the Performance Objective and Performance Standard.
Requirement Information further describes client requirements associated with each Performance Objective.
Page 10 of
1.8 Navy Approach to
Service Contracting The Department of Navy (DoN) spends over $1 billion in annual obligations to meet global requirements for facility operations and maintenance provided through Facility Support Contracts (FSC) and additional billions to provide other base operations support services (OBOS). The Head of the Contracting Activity (HCA) of the Naval Facilities Engineering Command (NAVFAC) has focused increased attention on re-engineering FSC contracts in response to customer and industry feedback, budget constraints, and the impact of a variety of contracting, program management and financial management regulations.
The Navy also supports the following principles
1.8.1 Partnering Philosophy The first principle is that the Navy views its contractors as partners and not just abstract service providers. The Navy wants its contractors to succeed because partners' success drives the Navy's successful mission completion.
Within the bounds of acquisition policy the Navy intends to work to find solutions that will be beneficial to both the Government and its partners.
1.8.2 Contractor's Knowledge The second principle is that the Navy will receive insightful management from its contractors. This management will include the knowledge, skills, authority and willingness to use contractor resources to find better ways of serving Navy clients’ strategic and operational goals and objectives. The Navy's use of performance-based objectives evidences this principle. Although performance work statements will typically contain several levels of performance assessment, the Navy wants its contractors to exercise maximum discretion within bounds of prudent risk management to adjust processes and resources needed to reach specified objectives at the highest performance level
1.8.3 Industry Best Practices The third principle is that the Navy will adopt industry best commercial practices and maintain state-of-the-art service delivery. It is the Navy's and contractor's responsibility as partners to reach this goal. To that end, the Navy's emphasis will be in evaluating performance objectives (end results).
1.9 Standard Template Key to implementing a programmatic approach is using a standard template that ensures Navy-wide consistency yet affords appropriate tailoring to meet local needs. This contract conforms to the standard template and has been tailored for this solicitation. NAVFAC intends to use this template-based approach for future service contracts. Offerors should develop an understanding of the template as part of performing due diligence in reaching an understanding of the Navy’s requirements and expectations.
The standard template contains 18 standard annexes. Annex 1 will always contain information that is relevant to the entire scope of the contract.
Annex 2 contains on-site project management and administration requirements that are relevant to the entire scope of the contract. Annexes 3 through 18 contain the technical information and requirements peculiar to that technical annex. Within each technical annex, the organization of information and requirements are also standardized. Specification item 1 will always contain General Information. Specification item 2 will always contain the management and administrative requirements. Specification item 3 will always contain the Recurring Work requirements.
Specification item 4 will always contain the Non-recurring Work requirements. Requirements and standards for higher level specification items apply to all subordinate specification items, e.g., Specification Item 3 standards apply to all recurring work specification items. Specification
Page 11 of
Item 3.1 is applicable to all 3.1 subordinate specification items.
Specification Items 3.2 and 3.3 are not considered subordinate to 3.1. All costs associated with Annexes 1 and 2 and Specification items 1 and 2 must be priced and distributed within Specification Item 3 of Annexes 3 through 18
0100000 – General Information
Spec Item Title Description
1.10 Navy PBSA Approach The Navy’s approach to performance-based service acquisition (PBSA) includes four component parts which are 1) performance outcomes, 2) measurable standards, 3) consideration of incentives, and 4) performance assessment plan.
1.11 Technical Proposal
Certification
The Contractor warrants that its proposal incorporated herein by reference will meet or exceed the performance objectives set forth in this contract.
0200000 MANAGEMENT & ADMIN
0200000 – Management and Administration Spec Item Title 2 Management and Administration
2.1 Definitions and Acronyms
2.2 General Information
2.2.1 Government Regular Working Hours
2.2.1.1 Observed Federal Holidays
2.2.1.2 Restriction to Contractor Working Hours
2.2.2 Wage Determinations
2.2.3 Requirements Hierarchy
2.3 General Administrative Requirements
2.3.1 Required Conferences and Meetings
2.3.2 Training for Maintenance and Operation of New and Replacement Systems and Equipment
2.3.3 Partnering
2.3.3.1 Informal Partnering
2.3.3.2 Contract Partnering Administration
2.3.3.3 Contract Partnering Session Attendees
2.3.4 Permits and Licenses
2.3.5 Insurance
2.3.5.1 Certificate of Insurance
2.3.5.2 Minimum Insurance Amounts
2.3.6 Protection of Government Property
2.3.7 Government Information Technology (IT) System
2.3.8 Directives, Instructions, and References
2.3.9 Invoicing Procedures
2.3.10 Forms
2.4 Government-Furnished Property, Materials and Services N/A
2.4.1 Government-Furnished Facilities (GFF) N/A
2.4.2 Government-Furnished Utilities N/A
2.4.3 Government-Furnished Materials (GFM) N/A
2.4.4 Government-Furnished Equipment (GFE) N/A
2.4.5 Government-Furnished Services (GFS) N/A
2.5 Contractor-Furnished Items
2.6 Management
2.6.1 Work Reception
Page 12 of
Spec Item Title
2.6.2 Work Control
2.6.3 Work Schedule
2.6.4 Deliverables
2.6.5 Service Interruptions
2.6.6 NAVFAC MAXIMO
2.6.6.1 MAXIMO Data
2.6.6.2 MAXIMO Method of Data Entry
2.6.6.3 MAXIMO Access
2.6.6.4 MAXIMO Training N/A
2.6.7 Quality Management System (QMS)
2.6.7.1 Quality Management (QM) Plan
2.6.7.2 Quality Inspection and Surveillance
2.6.7.3 Quality Inspection and Surveillance Report
2.6.8 Property Management Plan
2.6.9 System and Equipment Replacement
2.7 Personnel Requirements
2.7.1 Key Personnel
2.7.1.1 Project Manager (PM)
2.7.1.2 Quality Manager
2.7.1.3 Site Safety and Health Officer (SSHO)
2.7.1.4 Environmental/Energy Manager N/A
2.7.2 Employee Requirements
2.7.2.1 Employee Certification and Training
2.7.2.2 Employee Appearance
2.7.2.3 Employee Conduct
2.7.2.4 Identification as Contractor Employee
2.7.2.5 Removal of Employees
2.7.2.6 Proof of Legal Residency
2.7.3 Enterprise-wide Contractor Manpower Reporting Application (eCMRA)
2.8 Security Requirements
2.8.1 Employee Listing
2.8.2 Vehicles
2.8.3 Passes and Badges
2.8.4 Access to Installation
2.8.4.1 DBIDS Program
2.8.4.2 DBIDS Credentials
2.8.5 Access to Buildings
2.8.6 Access Arrangements
2.8.6.1 Escort Arrangement for Secured Areas
2.8.7 Security Clearances
2.8.8 Access to Sensitive Unclassified Information N/A
2.8.9 Access to Navy Marine Corps Intranet (NMCI) N/A
2.8.10 Employee Status
2.9 Contractor Safety Program
2.9.1 Accident Prevention Plan (APP)
2.9.2 Activity Hazard Analysis (AHA)
2.9.3 Safety and Occupational Health (SOH) Risks and Compliance Plans
2.9.3.1 Alcohol and Drug Abuse Prevention Plan
2.9.3.2 Chemical Hazard Communication Program
2.9.3.3 Confined Space Program
2.9.3.4 Critical Lift Plan
Page 13 of
2.9.3.5 Fall Prevention and Protection Plan
2.9.4 Crane Operations N/A
2.9.4.1 Crane Inspections N/A
2.9.4.2 Rigging Gear N/A
2.9.4.3 Crane Operators N/A
2.9.5 Accident and Damage Reporting
2.9.5.1 Accident Reporting and Notification Criteria
2.9.6 Fire Protection
2.9.7 Monthly On-Site Labor Report
2.9.8 OSHA Citations and Violations
2.9.9 Safety Inspections and Monitoring
2.9.10 Safety Certification
2.9.11 Safety Apparel on Jobsites
2.9.12 Emergency Medical Treatment
2.9.13 Excavations
2.10 Environmental Management and Sustainability N/A
2.10.1 Energy Management Program N/A
2.10.1.1 Water Conservation Plan N/A
2.10.1.2 Energy Efficient Products
2.10.2 Environmental Protection
2.10.2.1 Sampling, Testing and Laboratory Services N/A
2.10.2.2 ODS Requirements for Refrigerant Recycling N/A
2.10.2.3 Solid Waste Management and Recycling
2.10.2.4 Non-Regulated Waste Disposal N/A
2.10.2.5 Regulated Waste Disposal N/A
2.10.2.6 Universal Waste N/A
2.10.2.7 Spill Prevention, Containment, and Clean-up
2.10.2.8 Hazardous Material Management N/A
2.10.2.9 Protection of Endangered and Threatened Species (Flora and Fauna) N/A
2.10.2.10 Noise Control N/A
2.10.2.11 Salvage
2.10.2.12 Asbestos Containing Material (ACM)
2.10.2.13 Clean Air Act (CAA) N/A
2.10.3 Sustainable Procurement and Practices N/A
2.10.3.1 Environmentally Preferable Products N/A
2.10.3.2 Use of Recovered Materials N/A
2.10.3.3 Use of Biobased Products N/A
2.11 Disaster Preparedness
2.12 Technical Library
2.13 Warranty Management
2.14 Recurring Work Procedures
2.14.1 Notification to the Government for Work Above the Recurring Work Limitations
2.14.2 Recurring Work Exhibit Line Item Numbers (ELINs)
2.15 Non-Recurring Work
2.15.1 Unit Priced Task (UPT) Work (Non-Negotiated)
2.15.1.1 Acceptance and Performance
2.15.1.2 Invoicing and Receiving Payment
2.15.2 Unit Priced Labor (UPL)Work (Negotiated)
2.15.2.1 Non-recurring Preparation of Proposals
2.15.2.1.1 Labor Requirements
2.15.2.1.2 Material and Equipment Requirements
Page 14 of
2.15.2.2 Issuance of Final Task Order
2.15.3 Non-Recurring Work ELINS
Page 15 of
0200000 - Management and Administration
2 Management and
Administration
2.1 Definitions and
Acronyms
Definitions and Acronyms are listed in J-0200000-01.
2.2 General
Information
2.2.1 Government
Regular Working Hours
The Government's regular working hours are from 0700-1600, five days per week, Monday through Friday, except observed Federal holidays. Exceptions to the regular hours of operation are detailed in subsequent sections of this PWS. Work in certain annexes or sub-annexes require Contractor continuous operations, 24 hours a day, every day of the year including holidays. The performance of other work requirements shall be accomplished within the Government’s regular working hours unless the specific work requirement specified herein necessitates otherwise. Any other work outside Government regular working hours requires prior KO approval.
2.2.1.1 Observed Federal
Holidays
The Government observes the following holidays: New Year’s Day, Martin Luther King Jr.’s Birthday, President’s Day, Memorial Day, Independence Day, Labor Day, Columbus Day, Veterans’ Day, Thanksgiving Day, and Christmas Day.
2.2.1.2 Restriction to
Contractor Working Hours
If the Contractor wishes to work outside of the Government's regular working hours for the Contractor’s convenience, the Contractor shall submit a written Request to Work Outside Government’s Regular Working Hours per Section F. Excludes work to be performed during specified hours.
2.2.2 Wage
Determinations
Wage Determinations are included in J-0200000-02.
2.2.3 Requirements
Hierarchy
Requirements or definitions specified in each spec item of this contract apply to subordinate paragraphs. For example, requirements shown in spec item 3.1 would apply to spec items 3.1.1, 3.1.2, 3.1.2.1 and so on.
Likewise, Performance Standards specified at a lower digit level (i.e. spec item 3.1.1, 3.1.2, 3.1.2.1) apply when performance is assessed at a higher tier (i.e., spec item 3.1) based on the composite work requirements.
2.3 General
Administrative Requirements
2.3.1 Required
Conferences and Meetings
The Contractor shall attend administrative and coordination meetings. The Contractor shall provide sign-in sheets and prepare minutes of all meetings and submit per Section F for review and comments. Comments received within two working days shall be incorporated into the minutes and a copy of the final revision shall be submitted per Section F for concurrence.
Historically, there have been approximately four meetings per week.
2.3.2 Training for
Maintenance and Operation of New and Replacement Systems and Equipment
When construction, renovation, or repair work is performed by means other than this contract, the Contractor shall attend Government provided training, as applicable, for maintenance and operation of new and replacement systems and equipment at no additional cost to the Government.
Page 16 of
2.3.3 Partnering To increase the likelihood of successful performance of this contract, the
Government requires cohesive partnerships with its Contractors and subcontractors. Key stakeholders, including the supported commands who will receive services, principal individuals from NAVFAC, the performance assessment team, and representative(s) of the installation(s) will be invited to participate in the partnering process. Key members of the prime and sub-contractor teams, including senior management personnel must participate.
The partnership will draw on the strength of each organization in an effort to achieve quality contract services done right the first time, within the contract price, as scheduled, and without any safety mishaps.
Partnering should accomplish three goals:
- The first goal is to develop a cohesive team with common purpose, commitment and established communication processes.
- The second goal of partnering is contract specific, identifying risks and opportunities for the team to address.
- The third goal is to sustain the Partnership throughout the contract by identifying and addressing issues that affect the Partnership.
2.3.3.1 Informal Partnering The Contracting Officer shall organize the initial Partnering Meeting with key personnel of the project team, including Contractor's personnel and Government personnel. The initial session will be scheduled concurrent with the Pre-Performance Conference and held no later than 30 days after award and will be held at a Government provided facility as designated by the KO.
The Initial Informal Partnering Session will be conducted and facilitated using electronic media (a video and accompanying forms) provided by Contracting Officer. The senior Government stakeholder present will lead the meeting, however, the Contractor’s PM or senior representative is encouraged to participate as co-lead.
The Partners will determine the frequency of the follow-on sessions.
2.3.3.2 Contract Partnering
Administration
Upon award, the ACO will contact the Contractor, supported command(s), Region, and Installation(s) stakeholders, and the performance assessment team to discuss implementation of partnering. A partnership agreement, The Charter, should be in place as early as possible so issues arising, even before work begins, can be resolved using the issues resolution process.
Replacement of Core Management Team members (stakeholders who attended the initial session and manage the contract work day-to-day) is discouraged since it will disrupt the synergy that has been developed. If replacement of a team member proves to be unavoidable, a follow-on partnering session must be held to officially turn the responsibilities of the position over to the new member.
The Core Management Team consisting of the attendees below must be present during the initial and all follow-on partnering sessions. These are the core mandatory attendees. Other stakeholders may attend if they desire or as recommended by the partners.
Page 17 of
2.3.3.3 Contract Partnering
Session Attendees
The Contractor shall bring the necessary personnel to successfully partner on this contract. Asterisk indicates mandatory personnel.
President/Vice President
* Project Manager
* Quality Manager Site Safety and Health Officer
2.3.4 Permits and
Licenses
The Contractor shall obtain all required permits, licenses, and authorizations to perform work under this contract and comply with all the applicable Federal, state and local laws and regulations. The Contractor shall submit copies of Permits and Licenses per Section F.
2.3.5 Insurance The Contractor shall submit a Certificate of Insurance per Section F as evidence of the existence of the following insurance coverage in amounts not less than the amounts specified below in accordance with the FAR Clause
52.228-5, INSURANCE – WORK ON A GOVERNMENT
INSTALLATION. This insurance must be maintained during the performance period.
2.3.5.1 Certificate of
Insurance
The Certificate of Insurance shall provide for at least 15 calendar days written notice to the KO by the insurance company prior to cancellation or material change in policy coverage. Other requirements and information are contained in the aforementioned insurance clause.
2.3.5.2 Minimum
Insurance Amounts
The Contractor shall procure and maintain, during the entire period of performance under this contract, the following minimum insurance coverage:
Comprehensive General Liability: $500,000 per occurrence
Automobile Liability: $200,000 per person, $500,000 per occurrence, $20,000 per occurrence for property damage
Workmen's Compensation: As required by Federal and state worker's compensation and occupational disease statutes
Employer's Liability coverage: $100,000, except in states where worker's compensation may not be written by private carriers
Other as required by state law
2.3.6 Protection of
Government Property
During execution of the work, the Contractor shall protect Government property. The Contractor shall return areas damaged as a result of negligence under this contract to their original condition at no cost to the Government.
2.3.7 Government
Information Technology (IT) System
If applicable, ensure local IT system rates and policies are incorporated.
Additional information about NMCI may be obtained at http://www.eds.com/nmci.
2.3.8 Directives, Instructions, and References
Department of Defense (DoD), Secretary of the Navy (SECNAV), Chief of Naval Operations (OPNAV), and other applicable Directives, Instructions, and References are listed in J-0200000-XX. The Contractor shall comply with the most current version of directives, instructions, and references including versions published during the term of the contract.
Page 18 of
2.3.9 Invoicing
Procedures Refer to Section G for invoicing instructions. Refer to Invoice Form in J- 0200000-04 for sample.
2.3.10 Forms Forms referenced in this Annex, e.g. accident reporting, and damage reporting are included among the Forms in J-0200000-05
2.4 Government-
Furnished Property, Materials and Services
N/A
2.4.1 Government-
Furnished Facilities
(GFF)
2.4.2 Government-
Furnished Utilities
2.4.3 Government-
Furnished Materials (GFM)
2.4.4 Government-
Furnished Equipment (GFE)
2.4.5 Government-
Furnished Services
(GFS)
2.5 Contractor-
Furnished Items
Except for items identified as Government Furnished, the Contractor shall provide all equipment, materials, parts, supplies, components, and facilities to perform the requirements of this contract. The KO may inspect Contractor-furnished items for adequacy and compliance with contract requirements.
Inadequate or unsafe items shall be removed and replaced by the Contractor at no cost to the Government. Materials containing asbestos, lead, and polychlorinated biphenyls (PCBs) shall not be brought onsite. Energy efficient tools and equipment shall be used when available. The KO may at any time require Samples, Safety Data Sheets (SDS) or Manufacturer’s Data Cut Sheets of Materials used in this contract.
2.6 Management The Contractor shall manage the total work effort associated with the services required herein to meet the performance objectives and standards. Such management includes but is not limited to planning, scheduling, cost accounting, report preparation, establishing and maintaining records, and quality assurance. The Contractor shall provide a staff with the necessary management expertise to ensure performance objectives and standards are met.
2.6.1 Work Reception
Phone Numbers
The Contractor shall provide the capability to receive, prioritize, correspond, and respond to trouble/service calls and task orders during Government regular working hours and provide a point of contact at a local or toll free number who can perform the above function during other than Government regular working hours. Furnish 10 days prior to the start of the Contract
2.6.2 Work Control The Contractor shall implement all necessary work control procedures to ensure timely accomplishment of work requirements, as well as to permit tracking and reporting of work in progress. The Contractor shall plan and schedule work to assure material, labor, and equipment are available to complete work requirements within the specified time limits and in conformance with the quality standards established herein. Verbal scheduling and work status updates shall be provided when requested by the KO. A status update of any item of work must be provided within two hours of the
Page 19 of inquiry during regular working hours, and by 0800 the following work day for inquiries after regular working hours.
2.6.3 Work Schedule The Contractor's work shall not interfere with normal Government business.
In those cases where some interference is unavoidable, the Contractor shall minimize the impact and effects of the interference. The Contractor shall provide advance access of all of its work schedules to the Government. The Contractor shall notify the KO of any difficulty in scheduling work due to Government controls. The contractor will submit PM Schedules 5 work days prior to the beginning of each month. All schedules will be clear and concise noting building/asset/inventory etc. schedule for a specific day of the month the work will be performed.
2.6.4 Deliverables Records and reports are specified in Sections C, F, H, I, J, and within the Directives, Instructions, and References. The Contractor shall submit accurate and complete documents within the specified timeframes. The Contractor shall revise/modify records and reports, as directed by the KO, at no additional cost to the Government.
Except where otherwise specified, all deliverables shall be submitted electronically in a Microsoft Office Version 2010 compatible format.
Deliverables shall be unprotected and capable of being sorted by CLIN, work order number, asset number, section, annex/sub-annex, spec item and ELIN/Sub-ELIN or clause. All formulas shall be traceable.
Government acceptance of deliverables shall not relieve the Contractor of the responsibility for any error or omission which may exist in the deliverable, as the Contractor is responsible for all requirements of this contract.
The Contractor shall establish and maintain a secure website for posting an electronic copy of all deliverables listed in Section F. The Contractor shall allow only authorized Government and Contractor personnel to access the website. Government personnel access shall be limited to viewing and downloading of deliverables, but restricted from posting to the website. The Contractor shall notify the Government by email whenever there are new or updated deliverables posted to the website. Each deliverable posting on the website and each email notification shall include the title of the deliverable, the spec item requiring the deliverable, and the date and time the deliverable was posted. All deliverables shall be available to authorized Government personnel 24 hours/day and 365 days/year for the duration of the contract.
2.6.5 Service
Interruptions
If any utilities or other services must be discontinued (even temporarily) due to scheduled contract work, the Contractor shall notify the KO/PAR, affected tenants, and customers in accordance with local procedures. If the discontinued service is due to an emergency break down the Contractor shall notify the KO/PAR, affected tenants and customers as soon as practicable.
2.6.6 NAVFAC
MAXIMO
Work order, asset, specification, and condition assessment data created by the Contractor is recorded in NAVFAC MAXIMO through flat files spreadsheet for all work performed in 1501000 Facility Management,. This spec item should be included for all FSC/BOS contracts above the SAP threshold at Navy PWDs per BMS B-24.8 Facility Support Contractor Data in NAVFAC MAXIMO. Consult with your local PWD FMD, UEM Director and BSVE Director or FEC FM&S PLC, UEM PLC, and BSVE PLC for further guidance.
The information and format for data submission provided in Section J.
Page 20 of
MAXIMO is the Computerized Maintenance Management System (CMMS) used by the Government for work order history, asset management, and condition assessment. The Contractor shall provide all required data for NAVFAC MAXIMO as identified below:
2.6.6.1 MAXIMO Data Required data fields for work orders are indicated in the Service Provider Information provided in J-0200000-07. Asset inventory data requirements are indicated in the Asset Information provided in J-0200000-08, The Service Provider, Asset, Specification, and Characteristic Meter Reading Interfaces are used in multiple processes for loading data into MAXIMO by the Government and the format may be updated periodically.
As part of the update the Contractor may be asked to modify the file to add/move columns in their submission. The Contractor also shall provide up to 10 extra data elements or columns with as many as 150 characters per element for the Government to define during contract performance at no additional cost to the Government. The Government will provide the Contractor 60 calendar days’ notice of modifications to the Service Provider, Asset, Specification, or Characteristic Meter Reading Interfaces file format.
2.6.6.2 MAXIMO Method
of Data Entry
The following section should be tailored to specify the appropriate method(s) for providing work order, asset, specification, and condition assessment data.
Consult with your local PWD FSC FMD, to determine the proper methods based on local requirements.
The Contractor shall provide data for NAVFAC MAXIMO using the methods detailed below:
FLAT FILE: The Contractor shall electronically record and report compiled service performance data for exportation of asset and specification data to FMD/FSC . The Contractor shall submit asset and specification data in a spreadsheet flat-file following the NAVFAC MAXIMO Data Reporting process described in J-0200000-09 per Section F.
The Contractor shall submit work order and condition assessment data in a pipe flat-file following the NAVFAC MAXIMO Data Reporting process described in J-0200000-09 per Section F. Any failures in processing of the pipe flat-file shall be corrected and resubmitted by the Contractor. In order to demonstrate the ability to properly format the pipe delimited flat-file, the Contractor shall provide a Sample Pipe Delimited Flat-file prior to contract performance per Section F.
The Contractor shall submit asset and specification data in a spreadsheet flat-file following the NAVFAC MAXIMO Data Reporting process described in J-0200000-09 per Section F.
2.6.6.3 MAXIMO Access Not currently available, Maybe required for future use
2.6.6.4 MAXIMO
Training
Page 21 of
2.6.7 Quality
Management System (QMS)
The Contractor shall establish and maintain a complete QMS program in accordance with the provisions specified herein. The Contractor’s QMS program shall provide an effective and efficient means of identifying and correcting problems throughout the entire scope of operations. The Contractor's QMS program shall address:
Accurate documentation of work processes, procedures, and output measures.
A systematic procedure for assessing compliance with performance objectives and standards.
Accurate documentation of quality inspections and surveillance conducted throughout the execution of work.
Assessment-driven corrective actions and process adjustments as appropriate in a timely manner.
2.6.7.1 Quality
Management (QM) Plan
The Contractor shall develop and submit a QM Plan per Section F. The QM Plan shall describe the QMS methodology and approaches used under this contract. If any changes are made during the period of performance, submit to the KO a revised QM Plan for acceptance.
The Contractor’s QM Plan shall include, at a minimum, the following:
• Policy and objectives of Quality Management System (QMS)
• Quality organization o List of personnel o Responsibilities & lines of authority o Training and qualifications
• Approach to assuring quality of services provided and conformance with performance objectives and standards
• Methods and procedures for effective planning, operation and control of processes and performance of work
• Procedures for inspection and surveillance of services o Scheduling and performance of inspection and surveillance o Measurement, data collection and analysis o Corrective action, preventive action, and continuous improvement o Oversight of subcontracted work
• Documentation and records management
• Communication with government (customers)
2.6.7.2 Quality Inspection
and Surveillance
The Contractor shall establish and maintain an inspection and surveillance system in accordance with the FAR Clause 52.246-4, INSPECTION OF SERVICES – FIXED PRICE, to ensure that the work performed conforms to the contract requirements. The Contractor shall document and maintain a file of all scheduled and performed inspections and surveillances, inspection and surveillance results, and dates and details of corrective and preventive actions. The quality inspection and surveillance file shall be the property of the Government and made available during the Government’s regular working hours. The file shall be submitted to the KO/PAR after termination of the contract per Section F.
2.6.7.3 Quality Inspection
and Surveillance Report
The Contractor shall submit a copy of the Contractor Quality Inspection and Surveillance Report per Section F. The Contractor Quality Inspection and Surveillance Report shall include a summary and results of the quality inspection and surveillance events performed and assessment-driven
Page 22 of corrective actions and process adjustments during the previous month. The Government may adjust the frequency of the submittal based on the Contractor’s quality of performance.
2.6.8 Property
Management Plan
The Contractor shall establish and maintain a plan that meets the contract clause requirements of Specification Item 2.4, Government-Furnished Property, Materials and Services, of this Annex. This plan shall identify the Contractor’s policies, procedures, and practices in receiving and performing physical inventories, repairing and maintaining, preserving and protecting, and reporting the disposition of accepted government property in its possession. The Property Management Plan shall be submitted per Section F.
2.6.9 System and
Equipment Replacement
The Contractor shall maintain the integrity and performance of existing energy saving, water conservation or other sustainability design features of systems and equipment in the performance of repair and replacement work.
Except where otherwise specified, replacement components shall be of the same model/style or equivalent as the component being replaced. Substitutes for replacement components must be accepted by the KO/PAR prior to use.
The KO/PAR will furnish available information for the existing systems and equipment.
2.7 Personnel
Requirements
The Contractor shall comply with the personnel requirements stated below.
2.7.1 List of Key
Personnel and Qualifications
The Contractor shall submit a List of Key Personnel and Qualifications per Section F. The Contractor shall provide any additional information requested by the KO/PAR necessary to certify their qualifications.
The Contractor shall submit an Organizational Chart per Section F showing lines of authority of the key personnel and on-site supervisor(s) for this contract. The chart shall include names of personnel and their position title in this contract. As a minimum, include the PM, Quality Manager, SSHO, and on-site supervisor(s) and who they will report directly to for this contract.
The key personnel shall be revised as applicable for the contract.
2.7.1.1 Project Manager
(PM)
The Contractor shall provide a PM and designated alternate, as applicable, who has the have full authority to act for the Contractor on all contract matters relating to this contract. The PM or alternate shall be on-site during the Government's regular working hours and shall be available on-site within two (2) hours after the Government's regular working hours.
The PM shall have at least three years of experience in managing a workforce providing services on contracts of similar size, scope and complexity.
2.7.1.2 Quality Manager The Quality Manager must report directly to a senior corporate official and shall not report directly to the Project Manager.
The Quality Manager shall have fulfilled the following…