AMND 0004.pdf
PDF 54 KB Posted
- Attached to
- Construct AARF Fire Trainer Pad, SAS3455
- Solicitation number
- N4008521R0119
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amend 0007 200071.pdf | ||
| Amend 0006 200071.pdf | ||
| AMND 0005 200071.pdf | ||
| 60033564_REV 001_Flat.pdf | ||
| 60033565_REV 001_Flat.pdf | ||
| 26 42 14.00 10.pdf | ||
| S-401 REV 001.pdf | ||
| 60033567_REV 001_Flat.pdf | ||
| S-501 REV 001.pdf | ||
| S-101 REV 001.pdf | ||
| Amend 0003 200071.pdf | ||
| 26 42 14.00 10.pdf | ||
| Amend 0001 200071.pdf | ||
| N4008520B0071 Specs.pdf | ||
| N4008520B0071 Dwgs.pdf | ||
| RFP 200071.pdf |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
2. AMENDMENT/MODIFIC T ON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLIC TION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 11)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPIRATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
1 3
AMENDMENT NO. 0004 05/28/21 20-0071
N40085
NAVFAC Mid-Atlantic Resident Officer in Charge of Construction 1005 Michael Road Camp Lejeune, NC 28547-2521
See Item 6
✘ N40085-21-R-0119
5/11/21
20-0071, Construct AARF Fire Trainer Pad, SAS3455 Amendment 0004, Answer Requests for Information
The time and date for receipt of proposals remains 1400, 3 June 2021.
This amendment should be acknowledged when your proposal is submitted. Failure to acknowledge the amendment may constitute grounds for rejection of a proposal.
See Continuation Page(s)
N40085-21-R-0119 Amendment 0004
CONTINUATION SHEET
1. QUESTION: Can the number of days to perform the work be changed to 180 days?
ANSWER: No. The following revised schedule shall be followed for this project:
The new fire trainer system is slated to arrive on 9/1/21. The concrete pad must be poured, cured, and ready for the trainer to be installed by 9/1/21. This also includes any necessary utilities and conduits. All other aspects of the project that are not necessary to be completed by the installation date may be completed afterwards. The Contractor is to confirm with the installation contractor and/or manufacturer what work must be completed for installation.
Overall CCD is 150 days.
2. QUESTION: What access point will be authorized to enter the airfield?
ANSWER: ECP 67
3. QUESTION: What are the special requirements for movement control by the Tower on the airfield?
ANSWER: Check out a radio from Base Ops daily.
4. QUESTION: What are the special vehicle marking or flagging requirements for travel on the airfield?
ANSWER: Amber light on top of the escort vehicle. Single vehicle must have a light as well.
5. QUESTION: What are the special communications equipment requirements for talking to the Tower?
ANSWER: Check out a radio from Base Ops daily.
6. QUESTION: What are the vehicle operator training requirements required to operate on the airfield?
ANSWER: AVOC Course provided by ATC each Monday at Base Theatre (0900)
7. QUESTION: After contract award, when are the vehicle operator training classes scheduled?
ANSWER: AVOC Course provided by ATC each Monday at Base Theatre (0900)
N40085-21-R-0119 Amendment 0004
8. QUESTION: What are the Security Requirements for MCAS New River?
ANSWER: Background security checks are coordinated by the ROICC and administered by PMO Physical Security IAW Access Control Policy.
9. QUESTION: Section 1.3.3 calls for minimum amounts of Anode and Bond wires however the quantities are marked out and none are provided. It appears that the engineer needs to provide a drawing showing the intent of this section. Is there a drawing showing what is required for this work?
ANSWER: Delete Spec Section 26 42 14.000 10 and replace with the revised Spec Section 26 42 14.000 10.
10. QUESTION: Section 1.3.4 calls for "approved zinc grounding cells or sealed weatherproof lightning arrestor devices shall be installed across insulated flanges or fittings installed in underground piping as indicated on drawings". It appears that the engineer needs to provide a drawing showing the intent of this section. Is there a drawing showing what is required for this work?
ANSWER: This specification section includes performance based requirements, including delegated design of the cathodic protection system to a “Corrosion Expert.” Drawings for the design and installation of the cathodic protection system are required to be submitted as shop drawings for review and approval. To help clarify, references in the specification to “drawings” have been revised to “shop drawings.” See amended specification section, dated 5/26/2021.
11. QUESTION: Section 2.1 System Description says "The Contractor shall furnish and install a complete, operating, sacrificial anode cathodic protection system in complete compliance with NFPA 70, with all applicable Federal, State, and local regulations and with the minimum requirements of this contract." However various section are lacking information in regards to quantities required as well as which items are being protected. It appears that the engineer needs to provide a drawing showing the intent of this section. Is there a drawing showing what is required for this work?
ANSWER: This specification section includes performance based requirements, including delegated design of the cathodic protection system to a “Corrosion Expert.” Drawings for the design and installation of the cathodic protection system are required to be submitted as shop drawings for review and approval. The cathodic protection system specification section has been amended throughout to clarify this intent. See amended specification section, dated 5/26/2021.
12. All other terms and conditions remain unchanged.
| Draft Amend 0004 |
| Draft Amend 0004 SF30 Continuation Sheet |
File details come from the government source that posted it. Updated .