N4008520R3014RFP New London B159.pdf

PDF 118 KB Posted

Attached to
Buildign 159 Renovations Federal contract opportunity
Solicitation number
N4008520R3014
Issued by
Department of the Navy Naval Facilities Engineering Command

View the file

Other files for this federal contract opportunity

Other files attached to Buildign 159 Renovations, newest first.
File Type Posted
(G) General Req Revised -9 2018.pdf PDF
(D) Base Access Pass Request1.pdf PDF
(G) General Req Revised -NCACS 5-2-2013.pdf PDF
(A) B159 Design Build RFP.pdf PDF
(B) Price Proposal Form.pdf PDF
(F) 01 31 23.13 20 ECMS Spec.pdf PDF
(C) CT20190024.pdf PDF
(E) NAVFAC RFI form.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N40085-20-R-3014 PROJECT TITLE: Building 159 Renovation

LOCATION: Naval Submarine Base New London, Groton CT

REQUEST FOR PROPOSAL

NAVAL FACILITIES ENGINEERING COMMAND

MID-ATLANTIC REGION

PUBLIC WORKS DEPT – FACILITIES ENGINEERING & ACQUISITION DIVISION

NAVAL SUBMARINE BASE NEW LONDON

PO BOX 400, BUILDING 135

GROTON, CT 06349-5026

POC: Shawn Drake (860) 694-5625, shawn.a.drake1@navy.mil

HUBZONE DESIGN-BUILD (DB), DESIGN-BID-BUILD (DBB) INDEFINITE DELIVERY,

INDEFINITE QUANTITY (IDIQ) MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC)

FOR FACILITIES IN THE NORTH INTEGRATED PRODUCT TEAM (IPT) AREA OF

RESPONSIBILITY (AOR) TO INCLUDE CONNECTICUT, DELAWARE, ILLINOIS, INDIANA,

MAINE, MARYLAND, MASSACHUSETTS, NEW HAMPSHIRE, NEW JERSEY, NEW YORK,

PENNSYLVANIA, RHODE ISLAND, AND VERMONT

**Only those Contractors listed below in MACC Solicitation will be allowed to Bid on this Proposal.

PROPOSED TASK ORDER:

PROJECT TITLE: Building 159 Renovations

LOCATION: Naval Submarine Base New London, Groton CT

REQUEST FOR PROPOSAL

DATE OF SOLICITATION: 8 May 2020

MACC CONTRACTS HOLDERS ML-C00050:

N40085-17-D-5038 The Oak Group Inc.

200 Federal Street, Suite 224 Camden, New Jersey 08103 POC: Eduard Eichen Phone: (856) 377-0060 Email: eje@oakgroup.net Cage Code: 02YA4

N40085-17-D-5039 Pontiac Drywall Systems, Inc.

20 W. Huron Street Pontiac, Michigan 48342 POC: LaVonte Travis Phone: (248) 332-3011 Email: lavontetravis@pdsicontractors.com Cage Code: 4X0G3

N40085-17-D-5040 QBS, Inc.

1548 Linden Avenue Alliance, Ohio 44601 POC: James Franks Phone: (330)821-8801 Email: jim@qbsinc.com Cage Code:1PHB1

N40085-17-D-5041 Smart ATI/KMK Joint Venture 16 Whitehall Road, Suite 2 Rochester, New Hampshire 03867 POC: Lori Smart, Teri Lavoie, Stephanie Mills Phone: (603) 330-3533 Email: lori@smartati.com teri@smartati.com smills@kmkconstruction.com Cage Code: 7PQB0

GENERAL REQUIREMENTS

NAVFAC Solicitation No.: N40085-20-R-3014

NAVFAC Specification Work Order No: 1612968

Title: Buildings 159 Renovations

Location of the work: Naval Submarine Base New London, Groton CT

Description of the work:

The scope of this project is to renovate building 159. Scope includes abatement of hazardous materials – asbestos and lead- associated with the project scope including floor finish removal, lead paint removal and plumbing removal. Replaces all the floor finishes in all the spaces except in the two stairwells. Remove all the resilient tile flooring, carpet and underlying resilient tiles and associated wall base. Replace the carpet with carpet tiles, resilient floor tiles with resilient floor tiles and replaces the wall base. Paints all interior surfaces. Removes and replace all the plumbing and sanitary system, plumbing fixtures and accessories. Replace damaged sanitary line and domestic water line in the tunnel. Remove walls to access and replace plumbing and all the wall and floor finishes in the toilets, shower and locker room area. Replace the existing fire alarm panel and repairs it to make the system operational.

FAR 36.204-(f) Disclosure of Magnitude of construction: $1,000,000 to $5,000,000.

NAICS Code: 236220

FSC\PSC: Z2JZ

Time for completion: All (CLIN 0001) work shall be completed within 330 calendar days after contract award.

Proposal Requirement: A full-time site Superintendent and a full-time Quality Control (QC)/ Site Safety and Health Officer (SSHO) are required to be on site for the duration of the project. The Quality Control Manager may serve as the Site Safety and Health Officer(SSHO) as long as all requirements in Section 01 35 26 (Governmental Safety Requirements) are met.

52.236-15 Schedules for Construction Contracts is incorporated into this task order.

Schedules for Construction Contracts (Apr 1984)

(a) The Contractor shall, within five days after the work commences on the contract, prepare and submit to the Contracting Officer for approval three copies of a practicable schedule showing the order in which the Contractor proposes to perform the work, and the dates on which the Contractor contemplates starting and completing the several salient features of the work (including acquiring materials, plant, and equipment). The schedule shall be in the form of a progress chart of suitable scale to indicate appropriately the percentage of work scheduled for completion by any given date during the period. If the

Contractor fails to submit a schedule within the time prescribed, the Contracting Officer may withhold approval of progress payments until the Contractor submits the required schedule.

(b) The Contractor shall enter the actual progress on the chart as directed by the Contracting Officer, and upon doing so shall immediately deliver three copies of the annotated schedule to the Contracting Officer. If, in the opinion of the Contracting Officer, the Contractor falls behind the approved schedule, the Contractor shall take steps necessary to improve its progress, including those that may be required by the Contracting Officer, without additional cost to the Government. In this circumstance, the Contracting Officer may require the Contractor to increase the number of shifts, overtime operations, days of work, and/or the amount of construction plant, and to submit for approval any supplementary schedule or schedules in chart form as the Contracting Officer deems necessary to demonstrate how the approved rate of progress will be regained.

(c) Failure of the Contractor to comply with the requirements of the Contracting Officer under this clause shall be grounds for a determination by the Contracting Officer that the Contractor is not prosecuting the work with sufficient diligence to ensure completion within the time specified in the contract. Upon making this determination, the Contracting Officer may terminate the Contractor’s right to proceed with the work, or any separable part of it, in accordance with the default terms of this contract.

(End of clause)

Wage Determination: The following Department of Labor (DOL) General Wage Decisions applies to this Task Order: General Decision Number General Decision Number: CT20190024 04/24/2020.

Should these wage determinations be updated by the DOL prior to award, the most current wage determination will be incorporated at time of award.

Additional Clauses included in this solicitation:

FAR 52.211–10 Commencement, Prosecution, and Completion of Work.

FAR Clause 52.211-12, Liquidated Damages—Construction Liquidated damages: $660.00 per calendar day for base and options.

CLIN CALENDAR DAYS

ITEM DESCRIPTION TO COMPLETE

0001 Base Price 330

52.228-1 Bid Guarantee.

As prescribed in 28.101-2 , insert a provision or clause substantially as follows:

BID GUARANTEE (SEPT 1996)

(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.

(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g.,bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier’s check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States. The Contracting Officer will return bid guarantees, other than bid bonds-

(1) To unsuccessful bidders as soon as practicable after the opening of bids; and

(2) To the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.

(c) The amount of the bid guarantee shall be __20____ percent of the bid price or $_2,500,000.00_, whichever is less.

(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.

(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.

(End of clause)

52.228-5 Insurance-Work on a Government Installation.

FAR 52.228-15, Performance and Payment Bonds – Construction

DFAR 252.232–7006 Wide Area Work Flow Payment Instructions.

UFGS 01 31 23.13 20 Electronic Construction and Facility Support Contract Management System (eCMS) is applicable to this solicitation. (See attachment G) https://www.navfac.navy.mil/products_and_services/ci/about_us/capital_improvements_documents.html

Utilities: The Contractor is responsible for providing all of their own utilities.

SITE VISIT: IMPORTANT

SITE VISIT: Thursday, May 21, 2020 10:00 AM EST. At the Naval Submarine Base New London, CT. Visitor requests must be received no later than 08:00 AM EST, May 20, 2020 via e-mail to:

To: leo.tancreti@navy.mil

Cc: shawn.a.drake1@navy.mil

This will be the ONLY Government scheduled site visit. Please select no more than two (2) individuals per company.

Contractors are urged to pick up their 1 DAY passes by 7:00AM on May 21, 2020 for 10:00 AM EST site visit.

2. Location: Meet at Bldg. 135. Please enter the main entrance on the west side of the building.

3. Pre-Site visit Requirements:

a. All visitors must show valid photo identification to enter. All vehicles must have current registration and insurance.

b. All visitors must be U.S. citizens.

4. Site Visit Restrictions: Cameras are allowed with a permit. Laptops and PDAs are permitted.

5. Badging: You must go to the pass and ID office before entering the base.

Contractors that do not currently have a Rapid Gate pass for SUBASE, must submit a one day pass request to Leo Tancreti at no later than COB, May 20, 2020

Site Visit One Day Pass Request Spreadsheet (Attachment D). All attachments are provided in SAM Beta at https://beta.sam.gov/search?index=opp. Search for N4008520R3014 under Contract Opportunities.

6. Request for Information (RFIs): RFIs must be submitted in writing via email utilizing the attached RFI form (Attachment F) to shawn.a.drake1@navy.mil. An amendment will be issued with the consolidated RFIs answered. No further questions will be taken after 28 May 2020 by close of business 4:00 PM.

LOCATION: Naval Submarine Base New London, Groton CT

Proposal Due Date: Wednesday, 10 June 2020 at 2:00 PM (EST)

Proposal Delivery Information: Proposals may be sent via Federal Express (FedEx), United Postal Service (UPS) or hand-carried to the following address:

ATTN: Shawn Drake

NAVFAC MIDLANT – PWD/FEAD

Naval Submarine Base New London Building 135; PO Box 400, 1st Floor Groton, CT. 06349-5026

EVALUATION FACTORS FOR AWARD:

1. The solicitation requires the evaluation of Price.

2. The proposed Task Order will be awarded to the lowest evaluated price.

PRICE

A. Price Submission:

1. PRICE BINDER: Offeror shall submit one (1) original, marked “Original”, and one (1) copy, each in a separate three ring binder (1 ½ inch minimum ring size), with the following:

• Price Proposal Form

• Copy of Representation and Certifications from ORCA

• Bid Bond

• 8 ½ X 11 format

• Times New Roman, 12 point font

• Include a cover page with Solicitation Number, Solicitation Title, Prime Contractor Name, Address, Phone Number, Fax Number, DUNS, Cage Code, Point of Contact, phone number, and email address. Cover Page will not be included in the page count.

B. Basis of Evaluation:

1. The Government will evaluate price based on the total price. Analysis will be performed by one or more of the following techniques to ensure a fair and reasonable price:

a. Comparison of proposed prices received in response to the RFP.

b. Comparison of proposed prices with the Independent Government Cost Estimate

(IGCE)

LOCATION: Naval Submarine Base New London, Groton CT

REQUEST FOR PROPOSAL

c. Comparison of Proposed prices with available historical information.

d. Comparison of market survey results.

EVALUATION

1. As stated in the solicitation, the Government intends to evaluate proposals and award a contract without discussions with offerors (except clarifications as described in FAR 15.306(a)).

The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary.

2. The process is selected as appropriate for this acquisition because the best value is expected to result from selection of the proposal with the lowest evaluated price.

ATTACHMENTS

ATTACHMENT A – Design Build RFP ATTACHMENT B – Price Proposal Form ATTACHMENT C – Wage Determination CT20190024 04/24/2020 ATTACHMENT D –Site Visit One Day Pass Request Spreadsheet (Uploaded Under Additional Documents) ATTACHMENT E – Request RFIs Form ATTACHMENT F - ECMS Contractors Guide, UFGS 01 31 23.13 20 ATTACHMENT G – Subase General Requirements