(A) B159 Design Build RFP.pdf
PDF 10 MB Posted
- Attached to
- Buildign 159 Renovations Federal contract opportunity
- Solicitation number
- N4008520R3014
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| (G) General Req Revised -9 2018.pdf | ||
| (B) Price Proposal Form.pdf | ||
| (D) Base Access Pass Request1.pdf | ||
| (F) 01 31 23.13 20 ECMS Spec.pdf | ||
| (C) CT20190024.pdf | ||
| (E) NAVFAC RFI form.pdf | ||
| (G) General Req Revised -NCACS 5-2-2013.pdf | ||
| N4008520R3014RFP New London B159.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
For the best experience, open this PDF portfolio in
Acrobat X or Adobe Reader X, or later.
Get Adobe Reader Now!
http://www.adobe.com/go/reader
AB, Replace Carpet and Interior Painting – B159 WON 1612968 New London Naval Submarine Base, Groton, CT
Part 06: Attachment 01
Scope of Work:
Background: B159 is a Navy Undersea Medicine Institute Building supporting the New London Naval
Base motor pool needs.
It is a three story building with approximately 9,900 sf per floor. The building is constructed of concrete structure with wooden posts and floors for upper floors. The exterior walls are metal studs with brick back up.
This building has gone through many repairs and alterations through the years. The building was originally built in 1944 as a Dormitory Building. It was converted to a Barracks building and then to a
Navy Undersea Medicine Institute Facility. Major renovation was done in 1978 and in 1998. The floor finishes were partially replaced during both of these renovations. The 1978 renovation replaced the
VATs with new VATs. And 1998 renovation replaced only some of the floor finishes. Most of the areas have carpet over old VCT. A recent renovation of the building in 2018 replaced roof as well as mechanical and electrical systems in the building. This renovation did not replace any of the floor and wall finishes. Some of the asbestos containing flooring was removed during the earlier renovations.No comprehensive HAZMAT survey has been conducted recently for the building. So the extent of asbestos and lead content in the finishes is unknown.
Existing Conditions:
Site: The building is located on a hill with the south side entrance on the Basement floor and North side entrance on the first floor. The grade drops sharply on the west of the building. The parking for the building is across the street.
Building Exterior: Overall Building exterior is in good condition. The windows were replaced during 1998 renovation and the roof was replaced during 2018 renovation. The masonry construction seems to be in good condition visually. The water infiltration on the east wall in the basement was fixed during 2018 renovation.
Building Interior:
Flooring: Most of the spaces on all floors have carpet over old VCT and vinyl/rubber base. Only a few of the spaces have 12”x12” VCT and vinyl/rubber base. The existing resilient flooring as well as carpet is in poor condition. Finishes in the building have not been replaced under the recent renovation project. A complete survey for asbestos containing materials is not available. The old HAZMAT reports refer to
9”x9” tiles but all the VCTs are 12”x12” except for a few spaces including room 012, storage room and area near mechanical room has 9”x9” gray tiles. The ramp and steps in the corridor also have carpet as the floor finish. The floors have plumbing holes where old plumbing has been removed. Carpet is torn at some locations and VCTs are also damaged. Room 010 has exposed mastic in a portion of the room and need some repairs before the finishes can be installed. The walls in the corridor as well as in the rooms have electrical raceway along the walls. The corridor side of the Auditorium wall has rows of display rails. Many areas have painted brick. The lead containing paint on the brick wall as well as the plaster has been peeling. The fan coil units have been removed from the exterior walls in most of the rooms and the marker boards have been removed from some of the rooms. The walls will require patching and proper preparation before painting. Most of the rooms have light wells so the soffit would also require painting. The window sills, trims and aprons are painted wood.
Plumbing: Building has gang toilets with showers and locker rooms on the top two floors that have floor mounted toilets, urinal and wall mounted lavatories, gang showers and locker area. The plumbing is through plumbing chases. The plumbing is leaking and fixtures and toilet partitions are very old. The flooring and walls are covered with ceramic tiles but they are patched at many locations where the plumbing fixtures have been relocated. The leaking pipes in the mechanical room are covered with poly.
The domestic water line and sanitary line run along to building in the tunnel before they exit out of the building on the southwest corner. These pipes are leaking and contain ACM. The tunnel is a confined space.
Fire Alarm: The existing conventional fire alarm system is not operational. Some of the areas show trouble and duct detectors in the new AHU are not connected.
References available:
Record drawings for various repair and renovation projects are available for review. The Floor Plans and the Finish schedules for 1978 Renovations and 2000 Renovations are provided in Part 6 _ Attachments.
AutoCAD files are available upon request.
Data regarding asbestos survey for some spaces is also provided in Part 6‐ Attachments
Objective: The intent of this project is:
1: To replace the existing floor and wall finishes in all the spaces in the building except staircases. and do some miscellaneous repairs/replacements.
2: Replace plumbing system, plumbing fixtures, accessories and finishes in toilets, shower rooms and locker rooms.
3: Make required repairs to Fire Alarm system to make it operational.
Scope: The scope of work shall include the following:
Architectural:
1: Conduct Hazardous Materials Survey of the building including but not limited to flooring and associated mastic in all the spaces on all floors, any HAZMAT related to the sanitary pipe and domestic water pipe replacement in the tunnel area, within the mechanical room and within the plumbing chase walls and lead testing in all painted surfaces.
2: Provide abatement design and removal of all HAZMAT associated with the scope of work under this contract.
3: Remove all carpet and resilient tiles and base from all spaces on all floors. Remove resilient tiles below carpet as well. Patch and prepare floors. Install underlayment where required to prepare surface to receive new finishes. and replace with new solid vinyl tiles and carpet tiles.
4: Remove peeling lead based paint. Patch all holes and damaged wall surfaces. Prepare surface for new finish and repaint all the interior walls, trims, raceways, rails, railings, bases, sills, soffits and any other painted and exposed surfaces and elements.
5: Repair and finish DECON area 013. This may include building a small partition wall with a door.
Plumbing:
1: Renovate all restrooms, showers and locker room areas. This will include removal of all existing plumbing and sanitary lines, plumbing fixtures, accessories, toilet partitions and finishes and replacement of all.
2: Replace all damaged and old plumbing and sanitary lines in the mechanical room.
3: Replace the entire length of existing sanitary line in the tunnel.
7: Replace existing domestic water line in the tunnel.
Fire Alarm:
1: Prior to any fire alarm work starting, perform a complete test of the fire alarm system and report any issues that are not described here to the contracting office. The base fire alarm technician should be present for the testing.
2: Replace existing conventional fire alarm panel with new addressable fire alarm panel, monitor all existing zones, and provide booster panels as needed to power all notification appliances. The King
Fisher radio transmitter is to remain.
3: Connect the duct detectors in the RTUs installed during the 2018 renovation to the existing fire alarm zone(s). Verify that the 24VDC power circuit is connected and that this circuit provides power to the elevator recall smoke detectors.
4: Replace the smoke detector at the top of the South Stairwell.
5: Replace the conductors in kind on the Ground Floor Manual Pull Station zone between the North Stair manual pull station and the South Stair manual pull station.
6: Perform a complete test of the new fire alarm control panel.
End of Document
Floor plans- B159
B159 Plumbing
Finish schedule-1978
Finish schedule-2000
Gilbane | 1655 Grant Street | Concord, CA 94520 | Tel: 925-946-3100 | Fax: 925-256-8998 www.gilbaneco.com
28 November 2017 Document Control # J241000700.0014
Department of the Army
Huntsville Center, Corps of Engineers
4820 University Square
Huntsville, AL 35816
Attention: Mr. Steve Talley
Subject: Contract No. W912DY-12-D-0014, Task Order 0007 Repair/Renew Building 159 Naval
Undersea Medical Institution, Groton, CT.
Reference: Hazardous Material Survey Report
Dear Mr. Talley, As you are aware; Section 2.3.2.8 of the revised SOW dated 29 July 2017, states that Gilbane is to conduct a hazardous material survey and provide a hazardous material report to the government upon completion and that if hazardous material were identified within the building, a modification to the task order may be executed in order to abate the hazardous materials.
Gilbane Federal (Gilbane) is pleased to hereby submit the attached copy of the hazardous material survey report as prepared by Mystic Air Quality Consultants, Inc. dated 17 Nov 2017.
Based on the revised scope of work described in the SOW dated 29 July 2017; we anticipate having to abate the asbestos containing materials such as the black wrap & pipe fittings at the crawl spaces and/or basement, white field top rolled roofing, flashing mastic at seams of rolled roofing, flashing mastic at penetrations (pipes, ducts, frames), transite ceiling panels, light ballasts, thermostats, sheetrock walls for new duct chase at the third floor, drop ceilings, duct caulking and pipe insulation.
Gilbane request the USACE review the aforementioned hazardous material survey report and that the
Contracting Officer provide an RFP for Gilbane to price and perform the necessary abatement of the hazardous materials prior to commencement of the base contract work for the areas directly affected.
If you have any questions or if you would like to discuss this information in further detail please contact me at 210-536-6772 or 210-445-8625 (cell).
Respectfully, Luis R. Gonzalez Sr. Project Manager
Enclosures: Enclosure A – Hazardous Material Survey Report
SMALL PROJECT TEMPLATE - PART 2 GENERAL REQUIREMENTS - Page 1
Part 2 General Requirements
PART 2
GENERAL REQUIREMENTS
TABLE OF CONTENTS
2/18
• 00 00 00 GENERAL REQUIREMENTS
• 01 11 00 SUMMARY OF WORK
• 01 14 00.05 20 WORK RESTRICTIONS
• 01 20 00.05 20 PRICE AND PAYMENT PROCEDURES
• 01 30 00.05 20 ADMINISTRATIVE REQUIREMENTS
• 01 31 19.05 20 POST AWARD MEETINGS
• 01 31 23.13 20 ELECTRONIC CONSTRUCTION AND FACILITY SUPPORT CONTRACT
MANAGEMENT SYSTEM
• 01 32 16.05 20 SMALL PROJECT DESIGN AND CONSTRUCTION SCHEDULE
• 01 33 00.05 20 CONSTRUCTION SUBMITTAL PROCEDURES
• 01 33 10.05 20 DESIGN SUBMITTAL PROCEDURES
• 01 35 26.05 20 GOVERNMENT SAFETY REQUIREMENTS
• 01 45 00.05 20 QUALITY CONTROL
• 01 50 00.05 20 TEMPORARY FACILITIES AND CONTROLS
• 01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS
• 01 74 19.05 20 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT FOR
DESIGN-BUILD
SMALL PROJECT TEMPLATE - PART 2 GENERAL REQUIREMENTS - Page 2
00 00 00 GENERAL REQUIREMENTS
1.1 Definitions
As used throughout the contract, the following terms have the meaning set forth below:
Contracting Officer (KO): The individual designated to administer the contract. Throughout this contract this individual will be responsible and possess the authority to act on behalf of the Government with respect to the specific contract.
Contracting Officer Representative (COR): The individual designated by the Contracting Officer as the authorized representative of the Contracting Officer. The COR is responsible for monitoring performance and technical management of the effort required and should be contacted regarding questions or problems of a technical nature.
Contract: Contract or task order.
Contractor: The term Contractor refers to both the prime Contractor and all subcontractors, whether in contract with the Prime Contractor or other subcontractors at any tier, including the Designer of Record.
Designer of Record (DOR): Licensed architect/engineer working as subcontractor to or partner with prime Contractor who provides design for this contract.
Quality Control (QC): Contractor's system to control the quality of design, material, equipment and construction.
Quality Assurance (QA) Program: Government's program to evaluate the effectiveness of the Contractor's quality control. The Government's QA Program is not a substitute for the Contractor's QC Program.
Federal Holidays: New Year's Day, Martin Luther King Jr. Day, President's Day, Memorial Day, Independence Day; Labor Day, Columbus Day, Veterans Day, Thanksgiving Day, and Christmas Day.
1.2 Accessibility
Provide barrier-free design in accordance with UFC 1-200-01, DoD Building Code.
1.3 Changes
No oral statement by any person other than the Contracting Officer, as provided in the Federal Acquisition Regulation (FAR) clause 52.243-5 entitled, "CHANGES AND CHANGED CONDITIONS," will in any manner or degree modify or otherwise affect the terms of this contract.
1.4 No Waiver by the Government
The failure of the Government in any one or more instances to insist upon strict performance to any of the terms of this contract or to exercise any option herein conferred is not to be construed as a wavier or relinquishment to any extent of the right to assert or rely upon such terms or options on any future occasion.
1.5 Equitable Adjustments
SMALL PROJECT TEMPLATE - PART 2 GENERAL REQUIREMENTS - Page 3
a. Whenever the Contractor submits a claim for equitable adjustment under a clause which provides for equitable adjustment of the contract, such claim must include all types of adjustments in the total amounts to which the clause entitles the Contractor, including, but not limited to, adjustment arising out of delays or disruptions.
b. Except as the parties may otherwise expressly agree, the Contractor must be deemed to have waived: (1) any adjustments to which he otherwise might be entitled under the clause where such claim fails to request such adjustments; and (2) any increase in the amount of equitable adjustments additional to those requested in its claim.
c. If required by the Contracting Officer, the Contractor agrees to execute a release, in form and substance satisfactory to the Contracting Officer, as part of the supplemental agreement setting forth the aforesaid equitable adjustment. The Contractor further agrees that such release will discharge the Government, including its officers, agents, and employees, from any further claims, including, but not limited to, further claims arising out of delays or disruptions caused by the aforesaid change.
1.6 Warranty
Warrant all materials and work for not less than one year after final acceptance of the work, except as otherwise indicated in this RFP. If required to provide remedial repair of previously installed work due to latent defect or unacceptable work performance, warrant the repaired work for one year after the completion and acceptance of the repair. For warranted items, furnish the manufacturer’s original written warranty accompanied by a copy of the supplier's receipt showing place of purchase, telephone number of supplier, address, delivery order number if applicable, and ticket number.
01 11 00 SUMMARY OF WORK
1.0 Protection of Government Property
Take special care to protect Government property. Return areas damaged as a result of construction under this contract to their original condition. In addition to FAR 52.236-9, Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements, perform the following:
a. Remove or alter existing work or facilities in such a manner as to prevent injury or damage to any portion of the existing work or facilities that remain.
b. Repair or replace portions of existing work altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work must be in a condition equal to or better than that which existed before new work started.
c. Preserve the natural resources in accordance with the approved environmental protection plan prepared in accordance with UFGS 01 57 19 Temporary Environmental Controls.
1.1 Government Furnished Material and Equipment
If applicable, the Government will furnish the materials and equipment for installation by the
SMALL PROJECT TEMPLATE - PART 2 GENERAL REQUIREMENTS - Page 4
Contractor pursuant to contract clause FAR 52.245-2, Government Property (Fixed Price Contracts). Notify the Contracting Officer in writing at least 15 calendar days before the materials and equipment are required. Pick up materials and equipment no later than 30 calendar days after such date. When materials and equipment are not picked up by the 30th day, the Contractor will be charged for storage at the prevailing rate. The Contracting Officer will specify the location of materials and equipment and the delivery location.
01 14 00.05 20 WORK RESTRICTIONS
1.1 Existing Underground Utilities
Verify on-site utilities and have them marked out by a third party utility locator service prior to the start of construction. Determine the elevations of existing utilities and underground obstructions indicated as existing to remain in locations to be traversed by new utilities and other work provided herein before new work is laid closer than the nearest manhole or other structure at which an adjustment in grade could be made. Where dig permits are required, obtain permits and notify the Contracting Officer 30 calendar days prior to any excavation.
Maintain all utility markings for the duration of the contract.
a. Special Requirements:
1) Dig Permit
1.2 Work Hours, Access and Passes
All Contractor employees, including subcontractors, subcontractors' employees, suppliers, and suppliers' employees are required to comply with the Installation Security Requirements regarding personnel, vehicle, and equipment security passes and access the jobsite. Nothing in the contract is to be construed in any way to limit the authority of the Commanding Officer to prescribe new, or to enforce existing security regulations governing the admission or exclusion of persons and the conduct of persons while aboard the station, including but not limited to, the rights of search of all persons or vehicles aboard thestation.
Coordinate with the Contracting Officer for specific security and access requirements.
a. Access to Buildings/ Occupied Buildings: The Contractor may work in or around existing occupied buildings. The Contractor is responsible, via the Contracting Officer, to obtain access to building and facilities and arrange for them to be opened and closed. Do not enter the building(s) without prior approval of the Contracting Officer. Keep the existing buildings and their contents secure at all times. Provide temporary closures as required to maintain security. Contract personnel will not be permitted in security-regulated buildings or areas unless cleared by the Security Officer.
b. Passes and Badges: Contractor employees and representatives performing work under this contract are required to be either United States citizens or documented legal residents (status verified by prime contractor). All Contractor employees must obtain the required employee and vehicle passes. Each employee is required to wear the Government issued badge over the front of the outer clothing. Failure to obtain security and base access passes must not be a cause for contract performance time extension.
The Contractor is required to immediately turn in all terminated employee's badges to the
SMALL PROJECT TEMPLATE - PART 2 GENERAL REQUIREMENTS - Page 5 issuing office.
Obtain access to Navy installations through participation in the Defense Biometrics Identification
System (DBIDS). Requirements for Contractor employee registration, and transition for employees currently under Navy Commercial Access Control System (NCACS), are available at https://www.cnic.navy.mil/om/dbids.html. No fees are associated with obtaining a DBIDS credential. Participation in the DBIDS is not mandatory, and Contractor personnel may apply for One-Day Passes at the Base Visitor Control Office to access an installation. Registration for DBIDS includes: Present a letter or official award document (i.e. DD Form 1155 or SF 1442) from the Contracting Officer, that provides the purpose for access, to the base Visitor Control Center representative.
• Present valid identification, such as a passport or Real ID Act-compliant state driver's license
• Provide completed SECNAV FORM 5512/1 to the base Visitor Control Center representative to obtain a background check. This form is available for download at <URL>https://www.cnic.navy.mil/om/dbids.html</URL >
• Upon successful completion of the background check, the Government will complete the DBIDS enrollment process, which includes Contractor employee photo, finger prints, base restriction and several other assessments
• Upon successful completion of the enrollment process, the Contractor employee will be issued a DBIDS credential, and will be allowed to proceed to worksit
DBIDS Eligibility Requirements: Throughout the length of the contract, the Contractor employee must continue to meet background screen standards. Periodic background screenings are conducted to verify continued DBIDS participation and installation access privileges. DBIDS access privileges will be immediately suspended or revoked if at any time a Contractor employee becomes ineligible. An adjudication process may be initiated when a background screen failure results in disqualification from participation in the
DBIDS, and Contractor employee does not agree with the reason for disqualification. The Government is the final authority. DBIDS Notification Requirements: Immediately report instances of lost or stolen badges to the Contracting Officer. Immediately collect DBIDS credentials and notify the Contracting Officer in writing under the following circumstances:
(1) An employee has departed the company without having properly returned or surrendered their DBIDS credentials. (2) There is a reasonable basis to conclude that an employee, or former employee, might pose a risk, compromise, or threat to the safety or security of the Installation or anyone therein.
c. Contractor Vehicles: All vehicles must display a valid state license plate and safety inspection sticker, if applicable, and must be maintained in good repair. The company name must be displayed in a clearly visible manner and size on each Contractor vehicle used in the course of work. Registration, proof of insurance and driver's licenses are required to obtain a station vehicle pass.
d. Work Hours: Unless otherwise indicated, work will be located on a Government compound, military installation, or station. Contractor work hours are between 0700 and 1530 Monday through Friday. Obtain advance approval from the Contracting Officer for Contractor personnel to remain on site beyond normal working hours. Notify the Contracting Officer at least 48 hours in advance to obtain approval for access to the jobsite or work outside of normal working hours or on Saturday, Sunday, and Federal Holidays.
SMALL PROJECT TEMPLATE - PART 2 GENERAL REQUIREMENTS - Page 6
e. Contractor Personnel: Provide the Contracting Officer the name(s) of the supervisory person(s) authorized to act for the Contractor. Provide, and update as required, a list of the key personnel for the Contractor and subcontractors including addresses and telephone numbers for use in the event of an emergency.
f. Contractor employees must conduct themselves in a proper, efficient, courteous and businesslike manner. Remove from the site any individual whose continued employment is deemed by the Contracting Officer to be contrary to the public interest or inconsistent with the best interests of National Security.
1.3 Security Requirements
All security requirements apply to all subcontractors and suppliers associated with this contract.
Comply with the following:
a. Do not publicly disclose any information concerning any aspect of the materials or services relating to this contract, without prior written approval of the Contracting Officer.
b. Do not disclose or cause to be disseminated any information concerning the operations of the activity's security or interrupt the continuity of its operations.
c. Do not disclose any information to any person not entitled to receive it. Failure to safeguard any classified information that may come to the Contractor or any person under his control, may subject the Contractor, his agents or employees to criminal liability under 18 U.S.C., Sections 793 and 798.
d. Direct to the Contracting Officer and or Installation Security Officer for resolution all inquiries, comments or complaints arising from any matter observed, experienced, or learned as a result of or in connection with the performance of this contract, the resolution of which may require the dissemination of official information.
e. Coordinate photography requirements with the Contracting Officer. Some areas restrict or prohibit photographing Government property.
Deviations from or violations of any of the provisions of this paragraph, will, in addition to all other criminal and civil remedies provided by law, subject the Contractor to immediate termination for default and withdrawal of the Government's acceptance and approval of employment of the individuals involved.
01 20 00.05 20 PRICE AND PAYMENT PROCEDURES
1.1 Schedule of Prices
Submit a schedule of prices for approval on forms furnished by the Government. The initial schedule of prices may be preliminary for construction activities until the design is developed.
Include a detailed breakdown of the contract price with quantities and unit prices for each work activity or definable feature of work. Include general conditions, profit, and overhead costs within
SMALL PROJECT TEMPLATE - PART 2 GENERAL REQUIREMENTS - Page 7 the unit prices. Break down into design and construction is required. The Contractor may invoice for bonds once the Government has approved the bonds, however, no other requests for payment will be processed without an approved schedule of prices and baseline schedule.
1.2 Contractor Invoices
Contractor requests for payment must conform and will be processed in accordance with the requirements of FAR 52.232-5 and FAR 52.232-27.
a. Content of Invoice: Requests for payment in accordance with the terms of the contract must consist of the following: (If NFAS Clause 5252.232-9301 is present in the contract, documents must be provided as attachments in Wide Area Workflow (WAWF). The maximum size limit per attachment is less than 2 megabytes, but there are no limits on the number of attachments. If a document cannot be attached to WAWF due to system or size restrictions it must be provided as instructed by the contracting officer). If NFAS Clause 5252.232.9301 is not present in the contract, follow the invoicing instructions provided in the contract.
1. Contractor's Invoice on NAVFAC Form 7300/30, must show, in summary form, the basis for arriving at the amount of the invoice.
2. Contractor's Estimate for Voucher/ Contract Performance Statement on NAVFAC
Form 7300/31 furnished by the Government, showing in detail: the estimated cost, percentage of completion, and value of completed performance for each of the construction categories stated in this contract. Use NAVFAC LANT Form 4-330/110 (New 7/84) on NAVFAC Atlantic contracts when a Monthly Estimate for Voucher is required.
3. Affidavit to accompany invoice (LANTDIV NORVA Form 4-4235/4 (Rev. 5/81)).
4. Updated copy of submittal register.
5. Updated copy of progress schedule. Furnish as specified in "FAR 52.236-15, Schedules for Construction Contracts."
6. Contractor Safety Self Evaluation Checklist (original)
7. Final release (for final payment only). Final invoice must be accompanied by the certification required by DFARS 252.247.7023 TRANSPORTATION OF SUPPLIES BY SEA, and the Contractor's Final Release.
b. Payment:
1. Payment will be made on Contractor's submission of itemized requests and will be subject to reduction for overpayments or increased for underpayments from previous payments. The Government may withhold payment or reduce payments for the following:
a. Defects in material or workmanship.
b. Claims the Government may have against the Contractor under or in connection with this contract.
c. Contractor's failure to submit an updated schedule.
d. Payroll violations.
e. Unless otherwise adjusted, repayment to the Government upon demand for overpayments made to the Contractor.
2. Payments may be made for materials, stored off construction sites, under the following conditions:
a. Materials to be considered for progress payment prior to installation must be located and stored within 20 miles by streets and roads of the construction site.
b. Materials adequately insured and protected from theft and exposure.
Payment requests for offsite materials must include the consent of surety.
SMALL PROJECT TEMPLATE - PART 2 GENERAL REQUIREMENTS - Page 8
c. Materials not susceptible to deterioration or physical damage in storage or in transit to the job site are acceptable for progress payments. Items such as steel, machinery, pipe and fittings and electrical cable are acceptable, but items such as gypsum board; glass, insulation and wall covering are not.
d. Materials in transit to the job or storage site are not acceptable for payment.
e. Conditions specified in FAR 52.232-5(b) Payments Under Fixed Price Construction Contracts.
1.3 Budget Management
The Contractor must be responsible for budget management throughout the entire project. It is the intent of the Government to partner with the Contractor to maximize project value while strictly controlling contract modifications and maintaining overall fiscal control. When required, develop a Budget Management System for each phase of the design.
This project requires a Budget Management System be developed and maintained. The Budget Management System must represent major portions of the work such as HVAC, site work, and exterior skin. The purpose of budget management is to balance scope and value during critical project design decisions. Update the budget management status at regular intervals during design, at a minimum with design submittals, for review by and discussion with the COR.
01 30 00.05 20 ADMINISTRATIVE REQUIREMENTS
1.1 Supervision
The Contractor must have a superintendent fluent in English on the job site during working hours.
The Superintendent must have a minimum of 5 years of experience as a Superintendent on previous projects of similar size and complexity. The Superintendent may serve as the Site Safety and Health Officer. Provide a Superintendent Resume for the proposed on-site Project Superintendent describing experience with references and qualifications to the Contracting Officer for approval. The Contracting Officer reserves the right to interview the proposed on-site Project Superintendent at any time in order to verify the submitted qualifications.
1.2 Required Insurance
Within 15 calendar days after award, furnish the Contracting Officer a Certificate of Insurance as evidence of the following insurance coverage amounts not less than the amount specified below in accordance with FAR Clause 52.228-5, Insurance Work On A Government Installation:
a. Comprehensive General Liability: $500,000 per occurrence.
b. Automobile Liability: $200,000 per person, $500,000 per occurrence for bodily injury;
$20,000 per occurrence for property damage.
c. Worker's Compensation: As required by Federal and State Worker's compensation and occupational disease and other laws.
SMALL PROJECT TEMPLATE - PART 2 GENERAL REQUIREMENTS - Page 9
d. Employer's Liability Coverage: $100,000, except in states where worker's compensation may not be written by private carriers.
e. Others as required by state law.
f. Above insurance coverages are to extend to Contractor personnel operating Government owned equipment and vehicles.
g. The Certificate of Insurance must provide for 30 calendar days written notice to the
Contracting Officer by the insurance company prior to cancellation or material change in policy coverage.
For projects which require removal of asbestos containing materials the Asbestos Contractor or Subcontractor, as the case may be is required to provide occurrence-based liability insurance with asbestos coverages in an amount not less than $1,000,000 and must name the Government and PQP as additional insureds.
01 31 19.05 20 POST AWARD MEETINGS
1.1 Post Award Kick-off Meeting (PAK)
Prior to commencement of design, and within 21 calendar days of award, meet with representatives of the Contracting Officer, installation and client to present the concept design for discussion and acceptance. The project team will develop a mutual understanding relative to the approved proposal, safety program, environmental permits and requirements, quality control procedures, and design and construction schedule. During the meeting, Contractor must propose and gain acceptance for any critical path work activities requiring advance submittal and approval.
If the contract includes work on any fire protection system, including fire alarm and mass notification systems, the Contractor and the appropriate DOR must meet with the NAVFAC Fire Protection Engineer (FPE) to establish clear expectations of fire protection requirements of the project.
The Contractor's key personnel must attend including the Project Manager, Superintendent, Site Safety and Health officer, CQ Manager, DQC Manager, DOR, and major subcontractors.
1.2 Partnering
The Contracting Officer will organize initial and follow-up informal partnering sessions with key personnel of the project team, including Contractor's personnel and Government personnel. The initial session may be a part of the PAK Meeting. The initial partnering session will be conducted and facilitated using electronic media provided by the Contracting Officer. Follow-on partnering sessions will be conducted every 6 months or less frequent as determined by the Contracting Officer.
1.3 Pre-Construction Conference
Prior to construction or demolition, meet with representatives of the Contracting Officer to discuss and develop mutual understanding relative to administration of the safety programs, environmental issues, safety of building occupants and surrounding area, hazardous materials, waste disposal, construction QC procedures, construction schedule, labor provisions and other construction phase contract procedures.
SMALL PROJECT TEMPLATE - PART 2 GENERAL REQUIREMENTS - Page 10
1.4 NAVFAC Red Zone Meeting (NRZ)
Participate in NAVFAC Red Zone (NRZ) meetings with the Contracting Officer to identify strategies to ensure the project is carried to expeditious closure and turnover to the client. The Contracting Officer will provide a template to the Contractor to use to develop a NRZ Checklist.
Revise the template to include critical work activities and their planned completion dates based on the project scope of work and schedule. Discuss any progress changes with items listed on the NRZ Checklist during regularly scheduled NRZ Meetings beginning approximately at 75% stage of construction prior to project completion.
01 31 23.13 20 ELECTRONIC CONSTRUCTION AND FACILITY
SUPPORT CONTRACT MANAGEMENT SYSTEM
See UFGS Section 01 31 23.13 20 Electronic Construction and Facility Support Contract Management System in Part 5 of this RFP for requirements for the use of eCMS.
01 32 16.05 20 SMALL PROJECT DESIGN AND CONSTRUCTION
SCHEDULES
Develop and implement a design and construction schedule in accordance with attached UFGS 01 32
16.05 20.
01 33 00.05 20 CONSTRUCTION SUBMITTAL PROCEDURES
1.1 Construction submittals are to be Contractor-approved, except those listed below:
a. DOR Approval required for:
1. Fire Protection related submittals
b. Government Approval required for:
1. Government approved submittals as required by UFGS specification sections edited by the DOR.
1.2 Submit the following construction submittals, approved by the DOR, to the Government for surveillance:
a. Submit fire protection related submittals pertaining to spray-applied fire proofing and fire stopping, exterior fire alarm reporting systems, interior fire alarm & detection systems, and fire suppression systems including fire pumps and standpipe systems.
b. Submit geotechnical related submittals pertaining to the soils investigations (reports and soils analysis), foundations (shallow and deep), pavements structure design, test pile and production pile testing and installation.
c. Submit roofing submittals pertaining to materials and systems used to make up the roof system.
SMALL PROJECT TEMPLATE - PART 2 GENERAL REQUIREMENTS - Page 11
d. Submit HVAC Testing, Adjusting, and Balancing required submittals.
e. Submit telecommunications shop drawings for coordination with the NMCI Contractor.
Note: For the purpose of this document, the term "NMCI" is used to reference the network provided for use by the Navy and Marine Corps; the terms Continuation of Service Contract (COSC) and Next Generation Enterprise Network (NGEN) will be used to reference the contract between the government and the Contractor providing the NMCI network service.
f. Submit Performance Verification and Acceptance Testing required by IBC or this RFP.
g. Submit all Interim Special Inspection Reports on a bi-weekly basis until work requiring special inspections is complete. Submit all Structural Observation Reports and the Final Report of IBC Special Inspections.
h. For any pre-engineered buildings, submit shop drawings showing engineering data and complete building drawings, signed and sealed by a registered professional engineer.
i. Comply with sustainability submittals per UFGS section 01 33 29.05 20 Sustainability
Reporting for Design-Build.
j. Submit Structural Shop Drawings and structural product data.
1.3 Construction Submittal Process
Provide to the Government submittals as listed. See Section 01 33 10.05 20 "Design Procedures" for specific design and construction submittal format and approval and surveillance requirements.
Design drawings may be prepared more like shop drawings to minimize construction submittals after final designs are approved. Therefore, the Contractor is encouraged to prepare and submit with the design drawings, appropriate connection, fabrication, layout, and product specific drawings.
a. QC Plan, prior to Design/Construction .
b. Construction submittals, prior to construction, approved in accordance with QC Plan, the
DOR or QC Specialist is the approving authority for submittals unless otherwise indicated.
c. Sustainability Action Plan (and Sustainability Notebook when required) in accordance with 01 33 29.05 20 Sustainability Reporting for Design-Build.
d. DOR-approved construction submittals identifiedfor Government surveillance (typically
Fire Protection system and Life Safety submittals). Stamp the submittals "FOR SURVEILLANCE ONLY." Submit Surveillance submittals to the Governmentprior to starting work for that item. Submittals required for surveillance will be returned only if corrective actions are required.
SMALL PROJECT TEMPLATE - PART 2 GENERAL REQUIREMENTS - Page 12
e. Safety Data Sheets (SDS) as applicable.
f. Baseline Schedule: due prior to PAK.
g. Environmental Protection Plan, prior to start of the work.
h. Contractor Safety Self-Evaluation Checklist.
i. Accident Reports - submit if incidence occurs.
j. Accident Prevention Plan and Activity Hazard Analysis: Submit prior to construction.
k. Schedule of Prices, initial due 21 calendar days after award and a detailed due prior to
l. Record Drawings, due at Beneficial Occupancy
m. Operation and Maintenance Information: Due prior to testing as applicable, no later than
30 calendar days before Beneficial Occupancy.
n. Licenses and Permits: Per this section and Part 4.
o. Completed High Performance and Sustainable Building (HPSB) compliance checklists in accordance with UFC 1-200-02, High Performance and Sustainable Building Requirements and UFGS Section 01 33 29.05 20 Sustainability Reporting for Design-Build. Attach completed HPSB Checklist to Interim DD 1354.
p. DD Form 1354: Prepare a Draft and Interim DD Form 1354, TRANSFER AND
ACCEPTANCE OF MILITARY REAL PROPERTY, in accordance with UFC 1-300-08.
Coordinate the identification of appropriate asset construction categories with the Contracting Officer and the Real Property Accounting Officer.
1) Draft DD Form 1354. DOR must determine applicable real property assets broken out by construction categories and submit a "Draft DD Form 1354" for Government approval as a part of the Design Analysis included with the Prefinal Design submittal. "Draft DD Form 1354" must include all quantities and units of measure, but does not require cost breakdown. The Real Property Accountable Officer (RPAO)will provide the first draft of the DD1354 to the contractor with RPUIDs and CCNS on it.
2) Interim DD Form 1354. Contractor must coordinate with the DOR and update the Draft DD Form 1354 submission to include any additional assets, improvements, or alterations that occurred during construction. Use the Draft DD Form 1354 and the UFGS Section 01 20 00.05 20, Price and Payment Procedures to identify costs. The costs and quantities must align with the RPUID and unit of measures listed on the RPAO's draft 1354. Submit the final draft Interim DD Form 1354 to the Government for approval 30 days prior to the Beneficial Occupancy Date (BOD). If modifications to the Interim DD Form 1354 are required by the Government, the corrected version must be submitted prior to the BOD.
3) When documenting demolition work, the DD Form 1354 must list the quantitative data
SMALL PROJECT TEMPLATE - PART 2 GENERAL REQUIREMENTS - Page 13 associated with this work as a negative value to show the cost should be deleted from the Navy asset data store. Coordinate with the Installation Real Property POC to assist in determining the negative value for demolition work. There are two ways to account for the demolition portion of the project and to document the reduction of real property: (1) attach an Authorization for Demolition form 18 (Service-specific) to the DD Form 1354 to document category codes and quantities of demolished real property. These should be listed separately from constructed/transferred item numbers; or, (2) indicate, as additional DD Form 1354 item numbers, all demolished real property facility numbers and category codes using negative numbers (shown in parenthesis) for units of measure, and in block 18 indicate N/A for costs. Disposal cost within the footprint of the project is added into total construction cost of new facility prompting the demolition.
q. Construction Submittals:
1) In addition to the design submittals noted in Section 01 33 10.05 20, construction submittals will be required. The list of required submittals will be generated from the Contractor-prepared specifications and indicated in the submittal register.
2) Shop drawing submissions will be governed by UFGS 01 33 00.05 20 Construction Submittal Procedures, available on the Whole Building Design website (www.wbdg.org ).
Contractor must assume a 15 day review period, and provide 3 hard copies of all submittals (in addition to electronic submittals) to be submitted to FEAD.
1.4 Operations and Maintenance Information (OMSI)
Deliverable FEAD/ ROICC IPT PWO USER
1 Quality Control Plan X
2 Material Safety Data Sheets X
3 Design/Construction Schedule X
4 Waste Management Plan X
5 Safety and Health Plan X
6 Schedule of Prices X
7 Budget Management Summary X
8 Record Drawings X
9 Operation and Maintenance Information X
10 Licenses and Permits X
11 Badge Requests X
12 Statement of Acknowledgement SF 1413 X
13 Demolition and Work Plan X
14 Design Development Docs X
15 Final Design Docs X
16 Submittal Register X
17 N/A 18 Performance/Payment Bonds X
19 Environmental Protection Plan X
SMALL PROJECT TEMPLATE - PART 2 GENERAL REQUIREMENTS - Page 14
20 Certificates of Insurance X
21 DD Form 1354 X
22 Sustainability Action Plan X
23 Sustainability Notebook X
24 NAVFAC Sustainability & Energy Data Record Card X
1.5 Licenses and Permits
Obtain all appointments, licenses, and permits required to perform work under this contract at no additional expense to the Government. See "Permits Record of Decision" (PROD) form for list of permits. Comply with all applicable federal, state, and local laws, and base regulations and procedures. Provide evidence of such permits and licenses to the Contracting Officer before work commences and at other times as requested by the Contracting Officer (see FAR 52.236-7, Permits and Responsibilities). Coordinate permit applications with Navy or local environmental office.
The contractor must submit a complete PROD form with the first design submittal package. A blank PROD form can be obtained from the NAVFAC Design-Build website at the following link http://www.wbdg.org/FFC/NAVFAC/NDBM/ST/PROD_Form.doc . Contractor must determine correct permit fees and pay said fees. Copies of all permits, permit applications, and the completed PROD form must be forwarded to the Government's Civil Reviewer and Environmental Reviewer.
Contractor is exclusively responsible for his full compliance with patent laws and must affirm that the company is licensed to use equipment and processes the company employs in this project.
1.6 Record Drawings
The as-built modifications must be accomplished by electronic drafting methods on the Contractor-originated DWG design drawings to create a complete set of record drawings. For each record drawing, provide CAD drawing identical to signed Contractor-originated PDF drawing that incorporate modifications to the as-built conditions. After all as-built conditions are recorded on the DWG files, produce a PDF file of each individual record drawing in conformance with FC 1-300-09N. Electronic signatures are not required on record drawings.
01 33 10.05 20 DESIGN SUBMITTAL PROCEDURES
1.1 Summary
This section includes requirements for contractor-originated design documents and design submittals.
1.2 Reference Standards
This RFP references published standards, the titles of which can be found in the Unified Master Reference List (UMRL)on the Whole Building Design Guide at the Unified Facilities Guide Specification (UFGS) Website. The publications referenced form a part of this specification to the extent referenced.
The advisory provisions of all codes, requirements, and standards are mandatory; substitute
SMALL PROJECT TEMPLATE - PART 2 GENERAL REQUIREMENTS - Page 15 words such as "must" or "required" for words such as "shall", "should", "may", or "recommended," wherever they appear. The results of these wording substitutions incorporate these code and standard statements as requirements. Reference to the "authority having jurisdiction" is interpreted to mean Contracting Officer or Contracting Officer Representative. Comply with the required and advisory portions of the current edition of the standard at the time of contract solicitation.
Provide work in compliance with the following design standards and codes, as a minimum.
Government standards listed in this RFP take precedence over industry standards. The following list of codes and standards is not comprehensive and is augmented by other codes and standards referenced and cross-referenced in the RFP. Refer to Parts 3 and 4 for specific requirements within other UFC's.
a. U.S. Department of Defense (DoD) Unified Facilities Criteria (UFC)
UFC 1-200-01
DoD Building Code (General Building
Requirements)
UFC 1-200-02
High Performance and Sustainable
Building Requirements
UFC 1-300-08
Criteria for Transfer and Acceptance of
DoD Real Property
FC 1-300-09N
Navy and Marine Corps Design
Procedures
UFC 3-560-01
Electrical Safety, O&M
UFC 3-600-01
Fire Protection Engineering
UFC 3-810-01N
Navy and Marine Corps Environmental
Engineering for Facility Construction
b. UFC 1-200-01
UFC 1-200-01, DoD Building Code is a hub document that provides general building requirements and references other critical UFCs. A reference to UFC 1-200-01 in the RFP document requires compliance with the Tri-Service Core UFCs. Refer to the UFC 1-200-01 for a complete list of all applicable Tri-Service Core UFCs at website location http://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc . Contractor-originated design documents must provide a project design that complies with the Request For Proposal (RFP), FC 1-300-09N, UFC 1-200-01, UFC 3-810-01N, the Core UFCs, and other UFC's listed above.
1.3 Design Requirements
a. Provide design documents that include basis of design, design drawings and design specifications, reports and submittal register in accordance with FC 1-300-09N Navy and
SMALL PROJECT TEMPLATE - PART 2 GENERAL REQUIREMENTS - Page 16
Marine Corps Design Procedures.
b. Design is the work necessary to ensure functionality, quality, and safety for critical facets of the project. Special coordination requirements such as for phone, LAN and cable, are included herein.
c. Part 3 contains the project description, functional and performance requirements, scope items, and expected quality levels that exceed Part 4. Part 4 identifies design criteria, verification requirements, and performance and quality requirements of products.
d. Provide professional registration and design signing and stamping requirements per requirements of FC 1-300-09N, Design Procedures. Interior Designers must be NCIDQ certified per UFC 3-120-10 Interior Design. The design effort must be overseen by a Design Quality Control (DQC) Manager who will ensure that the design meets the requirements of this RFP. The DQC Manager will prepare a DQC Plan describing how the design process will ensure conformance to the RFP.
e. Provide a Contractor-originated design specification that in conjunction with the drawings, demonstrates compliance with requirements of the RFP. The specified products, materials, systems, and equipment that are approved by the DOR; submitted to the Government by the Contractor; and reviewed by the Contracting Officer must be used to construct…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .