(E) NAVFAC RFI form.pdf

PDF 125 KB Posted

Attached to
Buildign 159 Renovations Federal contract opportunity
Solicitation number
N4008520R3014
Issued by
Department of the Navy Naval Facilities Engineering Command

View the file

Other files for this federal contract opportunity

Other files attached to Buildign 159 Renovations, newest first.
File Type Posted
(G) General Req Revised -9 2018.pdf PDF
(D) Base Access Pass Request1.pdf PDF
(G) General Req Revised -NCACS 5-2-2013.pdf PDF
N4008520R3014RFP New London B159.pdf PDF
(A) B159 Design Build RFP.pdf PDF
(B) Price Proposal Form.pdf PDF
(F) 01 31 23.13 20 ECMS Spec.pdf PDF
(C) CT20190024.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT NUMBER:

N40085-16-R-1619

REQUEST FOR INFORMATION RFI NUMBER:

CONTRACT TITLE:

PRIME CONTRACTOR:

SUBCONTRACTOR/SUPPLIER:

SUBJECT/TITLE OF RFI:

DRAWING(S):

DETAIL(S):

SPECIFICATION:

CPM ACTIVITY NUMBER:

COST EFFECT: INCREASE: DECREASE: NONE:

INFORMATION REQUESTED & RECOMMENDED SOLUTION:

Date Response Required By: Date: Signature:

From:

To: Field Office Code

RECOMMENDATION:

Date: Signature:

From: Field Office To: Prime Contractor

REPLY:

Date: Signature:

This reply is given with the expressed understanding that it does not constitute basis for change in the amount or time of subject contract. If you do not concur, DO NOT PROCEED, and notify this office immediately.

Please assign PC # to this change. It is requested that a proposal be forwarded by . THIS DOES NOT

CONSTITUTE AUTHORIZATION TO PROCEED.

copy to: File 2L Supv Civil Engineer Construction Representative

The RFI system is intended to provide an efficient mechanism for responding to contractor’s request for information ONLY. This system DOES NOT authorize the contractor to proceed with work - to do so, the contractor proceeds at his own risk. If the contractor considers the RFI response a changed condition, written notice to the Contracting Officer is required within 20 calendar days.

DISTRIBUTION: Original to File via REICC PL/DM ET A/E PC # via AROICC/CONTRACT OFFICER

File details come from the government source that posted it. Updated .