1502000 Auto Doors FAP.pdf

PDF 305 KB Posted

Attached to
Automatic Door Maintenance and Repair Services, Naval Submarine Base New London, Groton, CT
Solicitation number
N4008520R3013
Issued by

About this file

This document contains a functional assessment plan (FAP) and monthly performance assessment summary for automatic door maintenance and repair services, as well as a related federal contract opportunity notice. The FAP outlines performance objectives, standards, and assessment levels for services such as responding to emergency, urgent, and routine service orders; completing preventative maintenance; and performing non-recurring work. It requires responding to emergency orders within two hours, arresting emergent conditions within 24 hours, completing urgent orders within five days, and routine orders within 30 days. Preventative maintenance is to be done in accordance with manufacturers' procedures. The related opportunity notice is a combined synopsis/solicitation seeking proposals for automatic door maintenance and repair services at Naval Submarine Base New London in Groton, Connecticut. It is a small business set-aside requiring recurring fixed-price work and non-recurring indefinite quantity work over a base year and four option periods.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FUNCTIONAL ASSESSMENT PLAN (FAP)

FACILITY INVESTMENT

1502000

FACILITY INVESTMENT FAP

Assessment Levels (AL) Assessment Frequency (Freq)

A – Annually

Q – Quarterly

M – Once per month

BW – Once every 13-16 days

W – Once per week

R – As required

Method of Assessment (MOA)

PS – Periodic Sampling

VCC – Validated Customer Complaints

UV – Unscheduled Visits

CE – Customer’s Evaluation

AL1

Start assessment at this Level

AL2

Add this Level if Contractor performance for AL1 is

Unsatisfactory

AL3

Add this Level if Contractor performance at AL1 or AL2 is

Unsatisfactory

Note: Return to appropriate Assessment

Level when performance improves.

Note: The first method listed in the MOA column below is the primary assessment method.

Spec

Item Performance Objective Performance Standard MOA

Assessment Level Sample Size

Freq

AL1 AL2 AL3

UOM

(total) Normal Reduced

3.1 Service Orders

The Contractor shall perform service call work in a timely manner and ensure Automatic Door systems and equipment are restored to a safe, operable condition and function properly.

Service call work is responded to and completed within the specified time.

Automatic Door systems and equipment are restored to operable condition and function properly in accordance with OEM specifications.

Work is accomplished per Spec Item 2.4, Workmanship and Material Standards.

When repair is complete the facility, system, or equipment does not present any hazard or danger to personnel.

PS

VCC

N/A

10%

5%

M

Item Performance Objective Performance Standard MOA

Assessment Level Sample Size

Freq

AL1 AL2 AL3

UOM

(total) Normal Reduced

3.1.1 Emergency Service Orders

The Contractor shall respond to emergency service calls and arrest emergent conditions to minimize and mitigate damage to facilities, systems, and equipment, and danger to personnel.

Associated repairs are completed to ensure Automatic Door systems and equipment are restored to a safe, operable condition and function properly.

Emergency service orders responded to within two (2) hours of receipt of call.

Emergency service orders are arrested within 24 hours of receipt of call.

Work is continued without interruption until emergent condition is arrested.

3.1.2 Urgent Service Orders

The Contractor shall complete urgent service orders in a timely manner and ensure equipment is restored to a safe, normal working condition and function properly.

Urgent service orders are completed within five (5) working days.

3.1.3 Routine Service Orders

The Contractor shall complete routine service calls in a timely manner and ensure Automatic Door systems and equipment are restored to a safe, operable condition and function properly.

Routine service orders are completed within

30 calendar days.

3.2 Preventive Maintenance (PM)

Program

The Contractor shall develop and implement a PM program for

Automatic Door systems and equipment to ensure proper operation, to minimize breakdowns, and to maximize useful life.

Maintenance is accomplished in accordance with the Contractor’s PM program and work schedule.

PM is performed in accordance with manufacturers’ recommended procedures and OEM standards.

5%

Item Performance Objective Performance Standard MOA

Assessment Level Sample Size

Freq

AL1 AL2 AL3

UOM

(total) Normal Reduced

4 Non-recurring Work

Non-recurring work may be ordered utilizing DoD EMALL in accordance with Section H or on a task order in accordance with the PROCEDURES

FOR ISSUING ORDERS clause in

Section G. The order will specify the exact locations and types of work to be accomplished. The period of performance will be specified in each order.

As

Required

R

MONTHLY PERFORMANCE ASSESSMENT SUMMARY

Contract #: N40085-xx-x-XXXX Installation/Site:

Annex/sub-annex: 1502000 Facility Investment Month/Year:

Title

AL1 Rating AL2/AL3 Rating VCC Safety

Item E VG S M U # Samples A U # Samples P/N Issues # Samples

3.1 Service Orders

3.1.1 Emergency Service Orders

3.1.2 Urgent Service Orders

3.1.3 Routine Service Orders

3.2 Preventive Maintenance (PM)

Program

4 Non-recurring Work (IDIQ)

Comments:

Recommended Actions:

Technical Ratings (mark using "X")

E VG S M U

Overall Technical Rating for Recurring Work

Overall Technical Rating for Non-recurring Work

SPAR/COR Signature: Date: