0200000 F Auto Doors Management and Administration.pdf
PDF 202 KB Posted
- Attached to
- Automatic Door Maintenance and Repair Services, Naval Submarine Base New London, Groton, CT
- Solicitation number
- N4008520R3013
About this file
This document contains a federal contract opportunity and related file regarding automatic door maintenance and repair services. The Naval Facilities Engineering Command is soliciting proposals for a small business set-aside contract to provide all labor, management, supervision, tools, materials, and equipment for automatic door maintenance and repair services at Naval Submarine Base New London in Groton, Connecticut. The contract will have a base year and four option periods and utilize a combination of firm-fixed price for recurring work and indefinite quantity for non-recurring work. Offerors must be registered in the VETS-4212 system if they have a current federal contract or subcontract over $150,000. The related file outlines numerous deliverables and reporting requirements for the contract, including quality management and property management plans, safety certifications, hazardous material inventories, and sustainable procurement reporting.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
0200000 Management and Administration
SECTION F: DELIVERABLES OF PERFORMANCE
DELIVERABLES
Annex/
Spec Item
Form
Attachment
Number Deliverable Title
Date (s) of
Submission
Distribution
Frequency Original
Copies
(including original)
0200000/
2.2.1.2
N/A Request to Work
Outside
Government’s
Regular Working
Hours
At least seven calendar days prior to requested day.
KO and
COR
1 As required
0200000/
2.3.1
N/A Sign-In Sheets and
Minutes
Within two working days.
KO, COR
and all attendees
1 As required
0200000/
2.3.1
N/A Final Revision of
Minutes
Within two working days.
KO, COR
and all attendees
1 As required
0200000/
2.3.4
N/A Permits and
Licenses
Before work commences and as requested by the KO.
KO and
COR
1 As specified
0200000/
2.3.5
N/A Certificate of
Insurance
At least 30 calendar days prior to start of contract performance.
KO and
COR
1 As specified
0200000/
2.6.7.1
N/A Quality
Management Plan
At least 30 calendar days prior to start of contract performance and within 15 calendar days prior to any changes.
KO and
COR
1 As specified
0200000/
2.6.7.2
N/A QC Inspection File Within five calendar days of completion/ termination of the contract.
KO and
COR
1 As specified
0200000/
2.6.7.3
N/A Contractor Quality
Inspection and
Surveillance
Report
First work day of each month.
KO and
COR
1 Monthly
0200000/
2.6.8
N/A Property
Management Plan
At least 30 calendar days prior to start of contract performance.
KO and
COR
1 As specified
Spec Item
Form
Attachment
Number Deliverable Title
Date (s) of
Submission
Distribution
Frequency Original
Copies
(including original)
0200000/
2.7.1
N/A List of Key
Personnel and
Qualifications
At least 30 calendar days prior to start of contract performance.
KO and
COR
1 As specified
0200000/
2.7.1
N/A Organizational
Chart
At least 15 calendar days prior to start of contract performance.
KO and
COR
1 As specified
0200000/
2.7.2.6
N/A Proof of Legal
Residency
Prior to be admitted to site of work.
KO and
COR
1 As specified
0200000/
2.7.3
N/A Contractor Labor
Hours (eCMRA)
Report
No later than 31
October.
KO and
COR
1 Annually for labor executed during the period of performance during each
Government fiscal year
(FY)
0200000/
2.8.1
N/A Employee List Upon request. KO and
COR
1 As required
0200000/
2.8.8
N/A Personnel Security
Investigation (PSI), Fingerprint Card
(FD87), and OF-
306 Declaration for
Federal
Employment
Prior to employee access to sensitive unclassified information.
KO, COR,
and
Security
Manager
1 As required
0200000/
2.9.1
N/A Accident
Prevention Plan
At least 30 calendar days prior to start of contract performance and
15 calendar days prior to any changes.
KO and
COR
1 As specified
0200000/
2.9.2
N/A Activity Hazard
Analysis
Together with the
Accident
Prevention Plan and for changes.
KO and
COR
1 As specified
0200000/
2.9.3
N/A Compliance Plans, Programs, and
Procedures
Together with the
Accident
Prevention Plan and for changes.
KO and
1 As specified
Spec Item
Form
Attachment
Number Deliverable Title
Date (s) of
Submission
Distribution
Frequency Original
Copies
(including original)
0200000/
2.9.7
N/A Monthly On-Site
Labor Report
First work day of each month.
KO and
COR
1 Monthly
0200000/
2.9.8
N/A OSHA Citations and Violations
Corrective Action
Report
Within 48 hours after receiving a citation.
KO and
COR
1 As required
0200000/
2.9.10
N/A Safety
Certifications
At least 15 calendar days prior to start of contract performance and prior to expiration of certifications.
KO and
COR
1 As specified
0200000/
2.10.2.7
N/A Spill Report Within 48 hours of spill occurrence
KO and
COR
1 As required
0200000/
2.10.2.8
N/A Emergency
Planning and
Community Right-
To-Know Act
(EPCRA) Report
At least 15 calendar days prior to start of contract performance and not less than 10 working days prior to planned use of hazardous material.
KO and
COR
2 As specified
0200000/
2.10.2.8
J-0200000-05 Contractor
Hazardous
Material Inventory
Log
Within 15 calendar days after the end of each calendar year and at termination of the contract.
KO and
COR
2 Annually
0200000/
2.10.2.12
N/A Asbestos
Containing
Material (ACM)
Written notification within 24 hours of discovery
KO and
COR
2 As specified
0200000/
2.10.3
N/A Sustainable
Procurement and
Practices Plan
At least 15 calendar days prior to start of contract performance and within 15 calendar days after exercised option periods.
KO and
1 Annually
Spec Item
Form
Attachment
Number Deliverable Title
Date (s) of
Submission
Distribution
Frequency Original
Copies
(including original)
0200000/
2.10.3
N/A Sustainable
Delivery of
Services Report
Within five calendar days after each contract period.
KO and
COR
1 Annually
0200000/
2.10.3.2
N/A Recovered
Material
Certification
As specified KO and
COR
1 When a product containing recovered materials is equal to or better than the original and could be used.
0200000/
2.14.1
N/A Detailed Scope of
Work and Detailed
Estimate
Within two work days
KO and
COR
2 As required
0200000/
2.15.1.1
N/A Non-Recurring
Work Quantities
Ordered via
FedMall
First work day of each month.
KO and
COR
1 Monthly
0200000/
2.15.2.1
N/A Non-Recurring
Work Proposals
Within two working days following receipt of request
KO and
1 As required
File details come from the government source that posted it. Updated .