AMENDMENT 0003.pdf
PDF 48 KB Posted
- Attached to
- Caissons, DryDock#1 at Portsmouth Naval Shipyard
- Solicitation number
- N4008520R0158
About this file
This amendment modifies a solicitation for the construction of two graving dock caissons for Dry Dock #1 at the Portsmouth Naval Shipyard in Kittery, Maine. The amendment provides responses to 27 pre-proposal inquiries, extends the proposal due date to February 16, 2021, and removes two NAVSEA drawing references from the specifications. Key details include constructing the caissons primarily offsite with delivery to the shipyard for final testing at the dry docks, responses to questions regarding subcontractor experience, performance bonds for each caisson, material specifications for check valves, and clarification that hot work permits apply only to work at the Portsmouth Naval Shipyard.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AMENDMENT 0007.pdf | ||
| AMENDMENT 0006.pdf | ||
| AMENDMENT 0005.pdf | ||
| AMENDMENT 0004.pdf | ||
| AMENDMENT 0002.pdf | ||
| AMENDMENT 0001.pdf | ||
| P-381 Caisson Drawings Part 2 - M E.pdf | ||
| P-381 Caisson Specifications App. A.pdf | ||
| P-381 Caisson Drawings Part 1 - G S.pdf | ||
| P-381 Caisson Specifications.pdf | ||
| Attachment D - Small Business Subcontracting Plan Template.doc | DOC document | |
| Attachment E - Price Proposal Form.pdf | ||
| Attachment B - Construction Experience Data Sheet.docx | DOCX document | |
| Attachment C - Past Performance Questionnaire.docx | DOCX document | |
| N4008520R0158.pdf | ||
| Attachment A - PPI Inquiry Log.doc | DOC document |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
SOLICITATION NO. N40085-20-R-0158, DESIGN-BID-BUILD (DBB), P-381, MULTI MISSION DRY DOCK #1, CAISSONS, PORTSMOUTH NAVAL
SHIPYARD, KITTERY, ME
The purpose of this amendment is to provide responses to Pre-Proposal Inquiries (PPI's) and extend the proposal due date to 16 February
2021 NLT 2:00 PM EST.
See Continuation Page(s).
1. CONTRACT ID CODE PAGE OF PAGES
J 1 10
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 04-Feb-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008520R0158
X 9B. DATED (SEE ITEM 11)
20-Nov-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
04-Feb-2021
CODE
NAVFACSYSCOM MID-ATLANTIC
ACQUISITION CORE
9324 VIRGINIA AVENUE
NORFOLK VA 23511-3095
N40085 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N4008520R0158
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0003
CONTINUATION SHEET
SECTION 624 – HATCHES, DOORWAYS, AND MANHOLES
Section 624a. GENERAL
In Parts A and B, remove both NAVSEA references.
Contractor
PPI#
Section of RFP or Page Number
Paragraph Reference
Drawing Number
Question RESPONSE
9 Spec pp.
10 - 11
(1) Factor 1, Corporate Experience
Factor 1 states:
“submit a minimum of two (2) to a maximum of five (5) relevant construction projects that best demonstrates your experience on projects that aresimilar in size, scope and complexity as detailed below”.
Factor 1 then continues:
“Subcontractor experience will not be considered.
Additionally, experience of the offeror while performing as a subcontractor will not be considered”.
****** has performed as subcontractor for **** on (3) Caissons, and for **** on (1) Caisson.
Would you reconsider your position on not
PENDING RESPONSE
considering the experience of the offeror while performing as a subcontractor?
11 RFP p.
53; Spec.
section 01 78
00.00 22
p. 9
52.228-15;
1.5.2
Could the contract be structured in such a way that the Performance and Payment Bond requirement will be a separate bond for each Caisson, rather than a single bond that would run from award to completion (approx.
April 2025)?
No.
Spec p.
505c.3:
Check Valves
Please advise/confirm NIALBR is acceptable for the seat insert for the Check Valves?
Ni-Al-Br material for check valve seat material is acceptable
19 RFP p.
4.3 Pre-
Proposal Inquiries
N/A On page 8 of the solicitation, paragraph
(a) Price, (1) Solicitation Submittal Requirements states:
“Due to COVID-19 restrictions, proposal packages shall be sent via email and through DOD Safe file in accordance with instructions below.
Hand carried or courier packages are not being accepted at this time”. However, page 15 states that in
Hard copy will be due 24 February 2021.
addition to the electronic copy due Wednesday, 06 January 2021 2:00 p.m. Eastern Time, a hard copy is also due on Wednesday, 13 January 2021 12:00 p.m. Eastern Time and further instructions for hard copy submission are provided on page
16. Please clarify if a hard copy is due on 13 January 2021.
20 Docume nt 00 41 00, Bid
Schedule s-P381
Caissons
CLIN 001d Inspection, Testing and Acceptance Caisson 1
N/A Please clarify if this item is to include cost for all testing or cost of testing just at facility site at Portsmouth Naval Shipyard in Kittery, ME?
CLIN 001d is intended to include the costs for all testing.
21 Page 18 of RFP
52.222-5
CONSTRU
CTION
WAGE
RATE
REQUIRE
MENTS –
SECONDA
RY SITE
OF WORK
(MAY
2014)
N/A P-381 Multi-Mission Dry Dock No. 1 Caissons Specifications, Section 011100 Page 1, Section 1.1.2 (Location) identifies the site of work as follows: “The work is located at the Portsmouth Naval Shipyard, Kittery, Maine, within the Controlled Industrial Area (CIA) at Dry Dock No. 1, approximately as indicated on the drawings. The exact location will be shown by the Contracting Officer.” At Page 18 of RFP, Clause 52.222-5, paragraph
(2) provides that “If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.”
FAR 52.222-6 (a) provides:
(a) Definition.—"Site of the work"—
(1) Means—
(i) The primary site of the work. The physical place or places where the construction called for in the contract will remain when work on it is completed; and
(ii) The secondary site of the work, if any. Any other site where a significant portion of the building or work is constructed, provided that such site is- (A)
Confirmed.
Located in the United States; and (B) Established specifically for the performance of the contract or project;
(2) Except as provided in paragraph
(3) of this definition, includes any fabrication plants, mobile factories, batch plants, borrow pits, job headquarters, tool yards, etc., provided-
(i) They are dedicated exclusively, or nearly so, to performance of the contract or project;
and
(ii) They are adjacent or virtually adjacent to the "primary site of the work" as defined in paragraph (a)(1)(i), or the "secondary site of the work" as defined in paragraph (a)(1)(ii) of this definition;
(3) Does not include permanent home offices, branch plant establishments, fabrication plants, or tool yards of a Contractor or subcontractor whose locations and continuance in operation are determined wholly without regard to a particular Federal contract or project. In addition, fabrication plants, batch plants, borrow pits, job headquarters, yards, etc., of a commercial or material supplier which are established by a supplier of materials for the project before opening of bids and not on the Project site, are not included in the "site of the work." Such permanent, previously established facilities are not a part of the "site of the work" even if the operations for a period of time may be dedicated exclusively or nearly so, to the performance of a contract.
Please confirm that an already existing shipyard where the Caisson will be manufactured is not a secondary site of work for the P-381 Multi-Mission Dry Dock #1, Caissons project.
22 RFP p.53 52.228-15
PERFORM
ANCE AND
PAYMENT
BONDS –
CONSTRU
CTION
(JUN 2020)
N/A The government is going to incur additional cost based on wanting to hold full bonding during the storage period. This will also put the contractor is an unfavorable situation with outstanding large bonds on work that is completed. Will the government be willing to release the performance bond on Caissons if the storage option is executed?
Released bonds is requested since most
Propose to RFP.
of the work will be complete and therefore minimal risk whilst in storage. At a minimum, reducing the bonded amount to the contract value for delivery and final testing would allow this to happen as well. This will also free the bonding capacity to support new work for the contractor.
23 P-381 Caisson
Specifica tions
Section
Section 624a.
GENERAL
N/A Please provide
NAVSEA DWG 805-
1645097 and
NAVSEA DWG 805-
1400074 as we are unable to locate these specific drawing numbers.
The NAVSEA references were removed from the Specification Section 624a.
24 Page 8 of
RFP
Section 3.a.1 N/A Section 3.a.1 states “Due to COVID-19 restrictions, proposal packages shall be sent via email and through DOD Safe file in accordance with instructions below.
Hand carried or courier packages are not being accepted at this time.”, however RFP pg. 10 under “Basis of Evaluation” states “Non-price binder: The offeror shall submit one (1) original electronically, marked “Original” in accordance with the directions and submission requirements detailed in the solicitation or subsequent amendments.
Additionally, the offeror shall submit one (1) hard copy Original, marked “Original”; one (1) CD-ROM; and one (1)
Electronic copies are due via DOD Safe on 16 February 2021 and the hardcopies are due by mail on 24 February 2021 per RFP guidance.
copy, marked “Copy”, in accordance with the directions and submission requirements detailed in the solicitation or subsequent amendments.” Please confirm that the entire proposal shall be submitted via DOD Safe and no other copies are required. If not, please provide specific instructions for submittal requirements as it is unclear.
25 Page 20 of RFP
52.228-1
BID
GUARANT
EE
N/A 52.228-1 BID
GUARANTEE (SEP
1996) states “(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.” Please confirm that a scanned copy of the SF 28 submitted with contractor’s proposal via the DOD Safe site is sufficient and no other copies are required. If additional copies are required, please provide instructions for submission.
SF 28 will be accepted electronically on the proposal due date of 16 February 2021 but a hardcopy should also be included with the mailed proposal due 24 Februrary.
26 Page 20 of RFP
Attachm ent E
52.228-1
BID
GUARANT
EE
N/A 52.228-1 BID
GUARANTEE (SEP
1996) states “(c) The amount of the bid guarantee shall be 20 percent of the bid price or $3,000,000, whichever is less.-”, however Attachment E states “The minimum bid guarantee shall be 100 percent of the amount of CLIN 001a through 001L Base Amount.” Which
FAR 52.228-1 BID
GUARANTEE is correct.
requirement is correct and is the bid guarantee applicable to all CLINs as Attachment E indicates that is not the case?
27 Page 18 of P-
381+Cais son+
Specifica tions, SECTIO
N 01 35
26.00 22
1.13.1 N/A Section 1.13.1 states
“Submit and obtain a written permit prior to performing "Hot Work" (i.e. welding or cutting) or operating other flame-producing/spark producing devices, from the Portsmouth Naval Shipyard Fire Department.” Please confirm this requirement is not intended for shipyard bidders who will be constructing the Caisson at a different location than Portsmouth Naval Shipyard.
Correct, this permit applies to work at the Portsmouth Naval Shipyard, Kittery, ME and does not apply to work outside of the Portsmouth Naval Shipyard.
---END OF AMENDMENT---
SECTION 00 10 00 - SOLICITATION
The required response date/time has changed from 15-Feb-2021 02:00 PM to 16-Feb-2021 02:00 PM.
(End of Summary of Changes)