This document provides an amendment to a solicitation for two graving dock caissons for the Portsmouth Naval Shipyard. The amendment extends the proposal due date to February 15, 2021, provides responses to 18 pre-proposal inquiries, and clarifies several specification requirements. Key details include: the scope of work involves fabrication and delivery of two steel caissons with mechanical and electrical systems for integration with a new dry dock; responses address questions on fire alarm wiring, access hatch drawings, engineering seal requirements, submittal needs, concrete installation, pump details, and check valve specifications; and the proposal due date is extended to allow additional time for responses.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

SOLICITATION NO. N40085-20-R-0158, DESIGN-BID-BUILD (DBB), P-381, MULTI MISSION DRY DOCK #1, CAISSONS, PORTSMOUTH NAVAL

SHIPYARD, KITTERY, ME

The purpose of this amendment is to provide responses to Pre-Proposal Inquiries and extend the proposal due date to 15 February 2021 NLT

2:00 P.M. EST.

See Continuation Page(s).

1. CONTRACT ID CODE PAGE OF PAGES

J 1 9

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 22-Dec-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008520R0158

X 9B. DATED (SEE ITEM 11)

20-Nov-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

22-Dec-2020

CODE

NAVFACSYSCOM MID-ATLANTIC

ACQUISITION CORE

9324 VIRGINIA AVENUE

NORFOLK VA 23511-3095

N40085 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N4008520R0158

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 0002

Contractor

PPI#

Section of RFP or Page Number

Paragraph Reference

Drawing Number

Question RESPONSE

1 Section 436b

Fire and flooding Alarm System

Please indicate the quantity and type of King Fisher transmitter zones

The operations deck of the caisson is considered one zone.

2 OE606 Fire and Flood Alarm Wiring Diagram

OE606 Wiring for the heat detectors, manual pull stations and duct smoke detectors is shown as LS2SWU-3 (18-6(3-Shielded Twisted Pairs)). This type of wiring is not compatible with the King-Fisher provider's equipment. We propose installing LSTSGU-4 (14-3). Is this acceptable?

Yes, LSTSGU-4 is acceptable in place of LS2SWU-3 for wiring to fire alarm devices.

3 OA101 Weather Deck, Hatches

OA101 What Navsea Drawing is required for the Watertight Access Hatch? 1) What size is required?

Hatch size is provided in Note 1 on OS103.

4 OA101,

OS103

Operations Deck, Hatches

OA101,

OS103

What Navsea Drawing is required for the Ballast Tank Watertight Utility Hatch? 1) What size is required?

Hatch size is provided in Note 1 on OS103.

5 100a Engineering SWBS section 100a requires that the fabrication drawings be signed and sealed by a professional engineer registered in the state where the project is located. BSR’s PE’s

Current Professional Engineering License from any state will be accepted.

are registered in California, not VA or ME. Please confirm that California PE registration will again be acceptable. Note that our California PEs have extensive caisson design experience, including Charlestown-Boston and Kittery’s previous ones and were previously approved for those projects.

6 100 Engineering Please confirm that only one set of design and engineering deliverables will be required (not a set for each of 2 caissons). This includes production drawings, as-built drawings, launch plan, inclining plan, Transport/Towing Plan (assuming caissons are delivered separately, barge tie-downs/bracing/shoring and off-load lifting rig (again assuming caissons are delivered separately., Heavy weather-fire-flooding Protection Plan, hinged blind flange deflection calcs, reach rod calcs, and foundation calcs. We assume the weight reports, inclines, deadweight survey & incline reports will be produced for each caisson.

Confirmed, each caisson is required to have individualized testing reports, weight calculations, etc. Any submittal that is identical for both caisson does not need to be duplicated.

7 p. 16 of

RFP

4.3 Pre-

Proposal Inquiries n/a On page 16 of the solicitation, paragraph

4.3. PRE-PROPOSAL

INQUIRIES (PPIs) states, “all inquiries must be submitted in writing and received by the Contract

All Pre- proposal inquires must be submitted by January 25, 2021.

Specialist by the date specified herein in order to permit adequate time to reply to the inquiry”. We do not see a date specified for the close of inquiries. Please advise by which date all inquiries must be received.

8 Spec pp.

49 – 50

096b Weight Control, General;

097a Inclining Experiment, Execution

OA502:

Note 3, Note 5

096b states: Conduct a Deadweight Survey, after installation of the concrete and with the caisson afloat, and based on drafts (or freeboards) determine the actual displacement of the caisson. 097a states:

Ensure, at the time of the inclining experiment, the Caisson is substantially completed, and that all weight to complete, including all permanent ballast is properly documented in the in the Weight Control Report.

OA502, Note 3 states:

Install heavy weight concrete throughout the caisson hull to 7’- 6” above the baseline…Density should be varied to reach the target launch condition described in Item 4. OA502, Note 5 states: After launch, concrete shall be installed to a level of 9’-0” above the baseline forward of FR 3-1 and aft of FR 3-2.

Concrete density in these forward and aft bays shall be determined after a lightship incline survey is conducted to

The 7'-6" layer can be installed prior to launch, as noted in OA502. The 'finishing' layer to 9'-0" ABL, in specified areas, can be added after launch, as specified in OA502. The 9'-0" height may be adjusted slightly to correct for list/trim.

determine the actual as-built weight and center of gravity of the caisson structure.

Please clarify when all concrete is to be added.

9 Spec pp.

10 - 11

(1) Factor 1, Corporate Experience

Factor 1 states:

“submit a minimum of two (2) to a maximum of five (5) relevant construction projects that best demonstrates your experience on projects that aresimilar in size, scope and complexity as detailed below”.

Factor 1 then continues:

“Subcontractor experience will not be considered.

Additionally, experience of the offeror while performing as a subcontractor will not be considered”.

Steel America has performed as subcontractor for W.F.

Magann on (3) Caissons, and for Cianbro on (1) Caisson.

Would you reconsider your position on not considering the experience of the offeror while performing as a subcontractor?

PENDING RESPONSE

10 Spec p.68

503 - Pumps OP301 –

OP304

Please provide reference elevations for the Superflood pumps and the Ballast pumps to determine overall lengths, suction, and discharge elevations. Please see below for more information: Please also provide sole plate elevations on the operating deck, the suction flange elevation on the superflood pumps, centerline discharge flange elevation for superflood pumps, and the suction screen elevation in the sump and centerline discharge flange elevations for the ballast pumps.

Details on Sheet OS516 show dimensions of Super Flood and Dewatering Pump foundations relative to the Operations Deck level. Sump dimensions for dewatering pumps are shown on Sheets OA502 and OP302. Contractor to confirm clearance dimension between sump floor and pump intake with pump manufacturer.

Centerline pipe elevations for pump discharge are shown on Sheet OP302.

Super Flood pump intake is connected to the 36"x30" tee connected to a 36" flood through pipe - pipe centerline elevation is shown on Sheet OP302.

11 RFP p.

53; Spec.

section 01 78

00.00 22

p. 9

52.228-15;

1.5.2

Could the contract be structured in such a way that the Performance and Payment Bond requirement will be a separate bond for each Caisson, rather than a single bond that would run from award to completion (approx.

April 2025)?

PENDING RESPONSE

12 When/where will final acceptance happen if we are to store the first Caisson for 18 months?

Final acceptance and testing will occur at the Portsmouth Naval Shipyard.

13 If final acceptance is to happen upon delivery and seating of the Caisson, does the government understand that most of the hardware in the Caisson has a warranty of a year after installation? This would mean that upon delivery much of the hardware will be out of the warranty period.

The one year warranty period does not start until acceptance of the caisson regardless of storage timeframe awarded. '

14 RFP P.

4.

PROPSAL

REQUIRE

MENTS:

Proposal Due Date

Would it be possible to get an extension on this bid?

The proposal due date is extended to February 15, 2021.

15 Spec p.

505c.3:

Check Valves

Section 505c.3 states:

“Check valves shall be single disc wafer type check valves designed to allow flow forward and downstream of the pump but disallow flow reversal. Check valves shall be metal-to-metal seated, double flanged valves conforming to API 594 and ASME B16.34 standards.”

The above references 2 different types of check valves: Wafer and Double Flanged.

Please clarify which type of valve is correct.

All pipe to valve end connections shall be bolted. The wafer style check valves shall be provided with the double flange pattern, as specified (wafer double flanged pattern). Flange ends shall conform with ASME B16.5, Class 150.

16 Page 15 7 N/A In order to submit a comprehensive, and well thought out bid for this solicitation, is it possible to have the bid deadline extended to 3 February 2021 2:00 p.m. Eastern Time, with a hard copy submitted 10 February 2020 12:00 P.M Eastern Time?

The proposal due date is extended to February 15, 2021.

Spec p.

505c.3:

Check Valves

Please advise/confirm NIALBR is acceptable for the seat insert for the Check Valves?

PENDING RESPONSE

SF 1442,

pg. 1

Section 13, Part A

N/A

The contractor requests a proposal deadline extension from January 6th, 2021 to at least February 15th 2021 in order to provide a proposal in response to Solicitation No.

N40085-20-R-0158.

Our proposal team and supply base will require this additional time to adequately review and respond to solicitation requirements. We appreciate being considered for this program and fully intend to provide a proposal if granted this extension.

The proposal due date is extended to February 15, 2021.

SECTION 00 10 00 - SOLICITATION

The required response date/time has changed from 06-Jan-2021 02:00 PM to 15-Feb-2021 02:00 PM.