Amendment 0003.pdf
PDF 160 KB Posted
- Solicitation number
- N4008520R0069a
View the file
Other files
Show all 39
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ACQR5764267
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The reason for this Amendment is:
1. Provide responses to PPIs.
The due date proposals remains 17 April 2020.
1. CONTRACT ID CODE PAGE OF PAGES
1 9
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 31-Mar-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008520R0069
X 9B. DATED (SEE ITEM 11)
03-Mar-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
31-Mar-2020
CODE
NAVFAC MID ATLANTIC
MARINE CORPS IPT
9324 VIRGINIA AVE
NORFOLK VA 23511
N40085 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N4008520R0069
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
PPI RESPONSES
RESPONSES TO PPIs 15 – 38
15 3/19/2020 Tunnel Drawings
Note #2 SD-101 (Tunnel)
Note number two on plan sheet SD-101 directs the contractor to adequately support the north wall of the existing tunnel throughout construction.
Will the Navy allow complete removal of the existing wall in lieu of temporary support?
As shown on CD101 There is a concrete deadman and tieback that is placed against the existing tunnel wall, this wall is to remain such that the tieback is not compromisd.
16 3/19/2020 Tunnel Drawings
N/A SD101 Is any additional as-built information available for the deadman anchor adjacent to the existing tunnel?
Only information found is provided in 1990 Dry Dock No.2 Modernization reference drawings
17 3/19/2020 Crane Rail Drawings
N/A CD101 Please provide as built information for Building 344 foundations.
Building foundations are 1'-6" or 2' diam.
Reinforced concrete piers that extend approximately 5 FT below grade. Spacing of piers is approximately 11+ ft apart. Contractor to field verify.
18 3/23/2020 Tunnel Drawings
N/A S-506 detail A3
Detail A3 shows a different style rail clip than detail A1. Can we use A1 detail or do you have any
The details in A3 are for a narrower clip. The clip should be coordinated with the manufacturer to fit on the plate, whereas the maximum distance from the outer edge of clips on each side does not exceed 10" further specification available for A3?
19 3/23/2020 Tunnel Drawings
N/A S-503 Detail A1
This shows a ¾” base plate on top of the crane rail base plate but lacks any other dimensions.
Are dimensions available?
Both plates are 3/4" wt. The upper base plate is shown on detail A3 /506 across the tunnel. The lower plate extends 1/2" past the web of the beam to allow for welding. The flange is 11.25" +2* (1/2")= 12.25"
20 3/23/2020 Crane Rail Drawings
N/A S-505 Detail C1
In regards to the rail clip depicted in the detail would a welded full thread stud and no.62 clip be acceptable in lieu of the item depicted?
No
21 3/23/2020 Crane Rail Drawings
N/A S-505 Detail A1 crane rail base plate
Would a shorter length plate be acceptable for the curve areas? The 9’ 11.5” plate shown may be too long to incorporate in to the curve areas. If so would a detail be provided?
Base plates can be reduced to 5'-11 1/2". In doing this the overall number of anchor bolts will be reduced to eight and six clips. The contractor shall consult the rail supplier for more details.
22 3/24/2020 Crane Rail Drawings
N/A SD501
Detail B3
In reference to detail B3 on plan sheet SD501 can you confirm the dimensions of the existing concrete Crane Rail foundation?
This detail shows a 7 foot 6 inch deep foundation.
Borings indicate that rock in this
See question #2.
section of rail is 5 feet below finished grade.
23 3/24/2020 Crane Rail Drawings
N/A S-502 Detail B1
In reference to detail B1 on plan sheet S502 can you confirm the dimensions of the proposed concrete Crane Rail foundation?
This detail shows a 6 foot 8 inch minimum depth foundation with mud slab.
Borings indicate that rock in this section of rail is 5 feet below finished grade.
See question #2.
24 3/24/2020 Crane Rail Drawings
N/A S-104 Will the Navy consider adding a unit price pay item for rock removal to allow for potential removals needed to accommodate the new crane rail foundations?
See question #2, the intent of the sections is to minimize rock removal.
25 3/24/2020 Crane Rail Drawings
N/A V-101 Will the Navy provide additional information regarding existing Underground Utilities?
There is limited elevation information available to
Existing invert elevations have been identified.
Additionally, the notes from the manhole investigation with field notes on dimensions have been provided. Contractor will need to provide their own field verifications.
determine if a utility will require temporary support during construction.
26 3/24/2020 Crane Rail Drawings
N/A V-101- V-104
Is a profile for the existing electrical duct bank available to help determine appropriate temporary support?
No existing duct bank profile has been identified.
The locations of the manholes are shown on the drawings and the existing field notes of the manholes have been provided with measurements of where the ducts come into the manhole.
Profiles in select locations can be found in the provided reference drawings. Contractor must provide their own field verifications.
27 3/24/2020 Crane Rail Drawings
N/A V-101- V-104
Will the Navy consider adding pay items for removal and replacement of existing Underground Electrical, Steam, Water, Sewer and other Utilities in conflict with Crane Rail Demolition and Replacement?
If not please further define the scope of removal and replacement.
All utilities not required to be demolished in the CD drawings, should be protected during demolition and remain in service. The cost of protection should be covered in the existing pay items, no additional pay items will be added.
28 3/24/2020 Crane Rail Drawings
N/A V-101- V-104
Does the Navy anticipate temporary shoring will be required for the existing underground electrical utilities located between the water and landside crane rails throughout the entire rail alignment from station 5+39.8 to station
The contractor must make their own determination based upon means and methods of demolition whether shoring is required.
16+00?
29 3/24/2020 Tunnel Drawings
N/A S-101 Will Dry Dock 2 be dewatered during tunnel construction to a level that does not contribute to groundwater infiltration?
As a typical condition, the dry dock will be in a dewatered state. Regardless of the current state of the dry dock, the expected groundwater conditions are identified in specification 31 23 00
00.22 paragraph 1.5.b
30 3/24/2020 Tunnel Drawings
N/A Ref S-
Is it acceptable to allow freshly placed concrete for the tunnel (eg, the base slab) to become submerged due to tidal groundwater infiltration?
The contractor may submit a concrete mix designed to be durable to seawater inundation and provide an appropriate placement plan which is considerate to all noted design and building codes to be reviewed and approved.
Additionally any proposed plan must meet waterproofing materials manufacturers installation requirements. If no dewatering is provided when working in areas with tidally influenced ground water use practices such as placing concrete in the dry on a falling tide to allow for maximum time for placement of concrete and also rinse all areas with fresh water prior to placement of concrete.
31 3/24/2020 Tunnel Drawings
N/A B-601 Is the date and time for the 3 borings from 1988 available to determine tide elevation and the level of water in Dry Dock 2 when samples were taken?
The time and date of the borings is not available.
32 3/24/2020 Tunnel Drawings
N/A MD-101 Note 2 on plan sheet MD-101 indicates removal of 6 inch diameter air line. Note 2 on plan sheet M-101 indicates new air line to be 8 inch. Please confirm the diameter of existing and new air lines.
Both drawing MD-101 showing a 6" diameter air line and M101 showing an 8" air line are correct
33 3/24/2020 Crane Rail Drawings
N/A CD101 On drawing CD101 of the Crane Rail drawings, notes 15 and 19 both state to adjust existing
DC-2908A
manhole cover.
Please confirm this is correct.
Note 15 is correct. For note 19, the callout should be DC-2906 not DC-2908A. Adjusted elevation callout is correct.
34 3/24/2020 Tunnel Drawings
N/A C-102, S-506, S-502
Drawing C- 102 Note Number 3 of the Tunnel Replacement drawings calls out 8 inch Trench Drain, however Drawing S-506 of the same set and S-502 of the Crane Rail Drawings both call out 12 inch Grate. Please Clarify.
The trench width is approximately 8" with the opening on the grate at 12" dependent upon product selected. The minimum width of the trench should be 8". The grating width may vary based upon manufacturer.
35 3/24/2020 Crane Rail Drawings
N/A C-102 Are the Frames and Grates for the trench drain system to be Hot-Dipped Galvanized, Ductile Iron or Stainless Steel? Are the grates required to be bolt down style, or are locking clips acceptable? If bolt down, is
NAVFAC
requiring Anti- Tamper bolts or will manufacturer recommended hex bolts be sufficient?
Trench drains must meet loading requirement of 49,000 lb wheel load grates must be suitable for this loading. Clips or manufacturer provided hex bolts are sufficient. Anti-tamper bolts should not be used.
36 3/24/2020 Crane Rail Drawings
N/A Due to lack of trench drain information will NAVFAC allow proposals to include polymer or composite pre-manufactured drain systems encased in concrete to be used on this project or is drain system required to be shaped entirely from cast-in-place concrete with embedded grate frames?
Polymer or Composite pre-manufactured trench drains are acceptable, as long as the load rating of 49,000lb wheel load is met
37 43914 Due to the ongoing
COVID19
pandemic and the increasingly difficult logistics of communicating with our subs and vendors who are transitioning to working remotely, we would like to respectfully request a minimum of a 2 week proposal and PPI submittal date extension.
Proposal due date has been revised to 17 April 2017.
38 43914 RFP -
2 N/A In lieu of the unpredictable travel capabilities and safety, can the proposals be submitted via email and then followed up with a hard
Please see response to PPI #14 issued in Amendment 0002. However, due to rapidly changing circumstances surrounding COVID 19, this is subject to change.
copy delivery?
CONTINUATION SHEET (Amendment 0003)
DRY DOCK 2 PORTAL CRANE RAIL REPAIRS – DRAWINGS
On NAVFAC Dwg. No. 12807324
SD104 DD2 EAST – DEMOLITION PLAN 4 Revise demolition keynote #5 to “Remove Cannon Bollard and Foundation, Salvage Intact Cannon Bollard and Provide to Government.”
On NAVFAC Dwg. No. 12807325
SD105 DD2 EAST – DEMOLITION PLAN 5 Revise demolition keynote #5 to “Remove Cannon Bollard and Foundation, Salvage Intact Cannon Bollard and Provide to Government.”
On NAVFAC Dwg. No. 12807326
SD106 DD2 EAST – DEMOLITION PLAN 6 Revise on amended drawing demolition keynote #5 to “Remove Cannon Bollard and Foundation, Salvage Intact Cannon Bollard and Provide to Government.”
On NAVFAC Dwg. No. 12807327
SD107 DD2 /Berth 6 TRANSITION – DEMOLITION PLAN 7 revise demolition keynote #5 to “Remove Cannon Bollard and Foundation, Salvage Intact Cannon Bollard and Provide to Government.”
On NAVFAC Dwg. No. 12807344
S-502 CRANE RAIL SECTIONS AND DETAILS 1 Revise amended drawing S-502 detail C2 Note for trench grate which reads “12” Grate, U-Trench” Change to “8” Wide U-Trench with grate rated for 49,000lb wheel load.”