J-0200000-15 ELINS.xlsx

XLSX spreadsheet 132 KB Posted

Attached to
Facility Investment Services for Preventative Maintenance Repair and Alteration Services
Solicitation number
N4008520R0057
Issued by

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RECURRING BASE YEAR

ATTACHMENT J-0200000-15
EXHIBIT LINE ITEM NUMBERS
CONTRACT# N40085-20-R-0057
EXHIBIT A

Line Item 001 Base Period - Recurring Work

PROVIDE UNIT PRICES FOR RECURRING WORK

IN ACCORDANCE WITH SECTION C. SPEC ITEM 3

ELINS A001 through A061

UNIT OFTOTAL
ELINDESCRIPTIONQTYISSUEUnit CostAMOUNT
CNIC
A001Emergency Service Order Work Estimated (Spec Item 3.1.3)70Each$$
A002Emergency Service Orders for Critical Cooling System Estimated (Spec Item 3.1.4)10Each$$
A003Routine Service Orders Estimated (Spec Item 3.1.5)355Each$$
A004Service Order Report (Spec Item 3.1.6)12Monthly$$
A005Daily Work Tracking (Spec Item 3.1.8)12Daily$$
A006Inventory Management (Spec Item 3.2)4Yearly$$
A007Develop And Implement Preventive Maintenance Program For HVAC Systems (Spec Item 3.3)2100Each$$
A008HVAC and Refrigeration Systems Spec Items 3.3.1)1Each$$
A009Direct Digital Controls (DDC) Requirements NAVSTA (Spec Items 3.4 / 3.4.1 / 3.4.2 / 3.4.3)49Each$$
A010Other Reccuring Services Program (Spec Items 3.5)12Monthly$$
A011HVAC Seasonal Start-up and Shut Down (Spec Item 3.5.1)2Each$$
A012Freeze Protection (In 55 Gal Drums) (Spec Items 3.5.220GAL$$
A013HVAC Water Testing and Treatment Services (Spec Items 3.5.31Monthly$$
A014Chemical Treatment For the Cooling Tower (Biocide) and Packaged Terminal Heat Pump Loop.(Rust Inhibitor) (Spec Item 3.5.3.1)10GAL$$
A015Trouble-shooting Testing and Replacement of Steam Traps. (Spec Items .3.5.4) 1"161Each$$
A016Trouble-shooting Testing and Replacement of Steam Traps. (Spec Items .3.5.4) 2"29Each$$
A017Restoration and Resetting Of HVAC Systems After Power Outages and Other Disruptions. Spec Item 3.5.5)2Each$$
A018Identification of Equipment in the Field (Tags Installed) (Spec Items 3.6.1)1Yearly$$
A019Filter and Belt Database (No Historical Data) (Spec Items 3.6.2)4Yearly$$
A020Ozone Depleting Substances (ODS) List (Spec Item 3.6.3)4Yearly$$
A021On-going Equipment and System Deviation Status Report (Spec Item 3.6.4)1Monthly$$
$
NHCNE
A022Emergency Service Order Work Estimated (Spec Item 3.1.3)9Each$$
A023Emergency Service Orders for Critical Cooling System Estimated (Spec Item 3.1.4)2Each$$
A024Routine Service Orders Estimated (Spec Item 3.1.5)20Each$$
A025Service Order Report (Spec Item 3.1.6)12Monthly$$
A026Daily Work Tracking (Spec Item 3.1.8)12Daily$$
A027Inventory Management (Spec Item 3.2)4Yearly$$
A028Develop And Implement Preventive Maintenance Program For HVAC Systems (Spec Item 3.3)690Each$$
A029HVAC and Refrigeration Systems Spec Items 3.3.1)1Each$$
A030Direct Digital Controls (DDC) Requirements NAVSTA (Spec Items 3.4 / 3.4.1 / 3.4.2 / 3.4.3)2Each$$
A031Other Reccuring Services Program (Spec Items 3.5)12Monthly$$
A032HVAC Seasonal Start-up and Shut Down (Spec Item 3.5.1)2Each$$
A033Chemical Treatment For the Cooling Tower (Biocide) and Packaged Terminal Heat Pump Loop.(Rust Inhibitor) (Spec Item 3.5.3.1)10GAL$$
A034Freeze Protection (In 55 Gal Drums) (Spec Items 3.5.25GAL$$
A035HVAC Water Testing and Treatment Services (Spec Items 3.5.31Monthly$$
A036Trouble-shooting Testing and Replacement of Steam Traps. (Spec Items .3.5.4) 1"8Each$$
A037Trouble-shooting Testing and Replacement of Steam Traps. (Spec Items .3.5.4) 2"4Each$$
A038Restoration and Resetting Of HVAC Systems After Power Outages and Other Disruptions. Spec Item 3.5.5)2Each$$
A039Identification of Equipment in the Field (Tags Installed) (Spec Items 3.6.1)1Yearly$$
A040Filter and Belt Database (No Historical Data) (Spec Items 3.6.2)4Yearly$$
A041Ozone Depleting Substances (ODS) List (Spec Item 3.6.3)4Yearly$$
A042On-going Equipment and System Deviation Status Report (Spec Item 3.6.4)1Monthly$$
$
NGIS
A043Emergency Service Order Work Estimated (Spec Item 3.1.3)10Each$$
A044Emergency Service Orders for Critical Cooling System Estimated (Spec Item 3.1.4)2Each$$
A045Routine Service Orders Estimated (Spec Item 3.1.5)30Each$$
A046Service Order Report (Spec Item 3.1.6)12Monthly$$
A047Daily Work Tracking (Spec Item 3.1.8)12Daily$$
A048Inventory Management (Spec Item 3.2)4Yearly$$
A049Develop And Implement Preventive Maintenance Program For HVAC Systems (Spec Item 3.3)329Each$$
A050HVAC and Refrigeration Systems Spec Items 3.3.1)1Each$$
A051Direct Digital Controls (DDC) Requirements NAVSTA (Spec Items 3.4 / 3.4.1 / 3.4.2 / 3.4.3)2Each$$
A052Other Reccuring Services Program (Spec Items 3.5)12Monthly$$
A053Heat Trace for Cooling Tower1Each$$
A054Chemical Treatment For the Cooling Tower (Biocide) and Packaged Terminal Heat Pump Loop.(Rust Inhibitor) (Spec Item 3.5.3.1)10GAL$$
A055HVAC Water Testing and Treatment Services (Spec Items 3.5.31Monthly$$
A056Restoration and Resetting Of HVAC Systems After Power Outages and Other Disruptions. Spec Item 3.5.5)2Each$$
A057Identification of Equipment in the Field (Tags Installed) (Spec Items 3.6.1)1Yearly$$
A058Filter and Belt Database (No Historical Data) (Spec Items 3.6.2)4Yearly$$
A060Ozone Depleting Substances (ODS) List (Spec Item 3.6.3)4Yearly$$
A061On-going Equipment and System Deviation Status Report (Spec Item 3.6.4)1Monthly$$

TOTAL $

NON-RECURRING BASE YEAR

ATTACHMENT J-0200000-15
EXHIBIT LINE ITEM NUMBERS
CONTRACT# N40085-20-R-0057
EXHIBIT A

Line Item 002 Base Period - Non-Recurring Work

PROVIDE UNIT PRICES FOR NON-RECURRING WORK

IN ACCORDANCE WITH SECTION C. SPEC ITEM 4

ELINS A700 through A704

ELINProduct NameDescription ExtendedEstimatedUnit ofUnitExtended
QuantityIssuePricePrice

Indefinite Quantity Work for use at all MIDLANT Bases within the Sewell's Point and Annexes

A700Unit Priced Labor Work (Davis Bacon) - MUST BE NEGOTIATED BY KOPerformance of specific maintenance, repair, and alteration work that exceeds the labor limitations of a service order or PM repair. Task order completion times will be specified on each order.950MH$$
A701Unit Priced Labor Work (Service Contract Act) - MUST BE NEGOTIATED BY KOPerformance of specific maintenance, repair, and alteration work that exceeds the labor limitations of a service order or PM repair. Task order completion will be specified on each order.950MH$$
A702Material Costs - MUST BE NEGOTIATED BY KOProvide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order.120,000EA$ 1.00$ 120,000.00
A703Condenser Catch PanProvide an aluminum pan under the outdoor unit to contain all runoff caused by condenser cleaning. The pan will be 1/8" thick, 2" - 4" tall, wide and deep enough to contain all the effluent from condenser coil washing.1,000SF$$
The pan will have two 3/4" pipe connections for draining. The caps / plugs will be wired to the lip of the pan to prevent loss.
The pan will be large enough to contain 100% of the effluent. The SF quantity is based on the total sf of 1/8" aluminum in place. The pan will be in place within 5 working days of issuance of the Task Order.
A704Duct Fire Damper TestingProvide Duct Fire Damper Testing for NAVSTA and NHCNE.1,000EA$$
In NFPA 80, section 19.3 Operational Test, fire damper testing is detailed. The essential test is that the damper will open and close and no obstructions are present. NFPA 729 is referenced when any smoke detection is present. The operation must be under the airflow conditions that the system will encounter. Fusible links must comply with NFPA 90A and UL33.10 Documentation must be maintained and any deficiencies reported and corrective action noted. It also states that “repairs shall begin without delay” and following repair shall be operational tested again. Both standards state the requirement for testing one year after installation and then every 4 years (hospitals 6 years).

TOTAL NON-RECURRING BASE YEAR $

RECURRING OPTION ONE

ATTACHMENT J-0200000-15
EXHIBIT LINE ITEM NUMBERS
CONTRACT# N40085-20-R-0057
EXHIBIT B

Line Item 003 First Option Period - Recurring Work

PROVIDE UNIT PRICES FOR RECURRING WORK

ELINS B001 through B061

UNIT OFTOTAL
ELINDESCRIPTIONQTYISSUEUnit CostAMOUNT
CNIC
B001Emergency Service Order Work Estimated (Spec Item 3.1.3)70Each$$
B002Emergency Service Orders for Critical Cooling System Estimated (Spec Item 3.1.4)10Each$$
B003Routine Service Orders Estimated (Spec Item 3.1.5)355Each$$
B004Service Order Report (Spec Item 3.1.6)12Monthly$$
B005Daily Work Tracking (Spec Item 3.1.8)12Daily$$
B006Inventory Management (Spec Item 3.2)4Yearly$$
B007Develop And Implement Preventive Maintenance Program For HVAC Systems (Spec Item 3.3)2100Each$$
B008HVAC and Refrigeration Systems Spec Items 3.3.1)1Each$$
B009Direct Digital Controls (DDC) Requirements NAVSTA (Spec Items 3.4 / 3.4.1 / 3.4.2 / 3.4.3)49Each$$
B010Other Reccuring Services Program (Spec Items 3.5)12Monthly$$
B011HVAC Seasonal Start-up and Shut Down (Spec Item 3.5.1)2Each$$
B012Freeze Protection (In 55 Gal Drums) (Spec Items 3.5.220GAL$$
B013HVAC Water Testing and Treatment Services (Spec Items 3.5.31Monthly$$
B014Chemical Treatment For the Cooling Tower (Biocide) and Packaged Terminal Heat Pump Loop.(Rust Inhibitor) (Spec Item 3.5.3.1)10GAL$$
B015Trouble-shooting Testing and Replacement of Steam Traps. (Spec Items .3.5.4) 1"161Each$$
B016Trouble-shooting Testing and Replacement of Steam Traps. (Spec Items .3.5.4) 2"29Each$$
B017Restoration and Resetting Of HVAC Systems After Power Outages and Other Disruptions. Spec Item 3.5.5)2Each$$
B018Identification of Equipment in the Field (Tags Installed) (Spec Items 3.6.1)1Yearly$$
B019Filter and Belt Database (No Historical Data) (Spec Items 3.6.2)4Yearly$$
B020Ozone Depleting Substances (ODS) List (Spec Item 3.6.3)4Yearly$$
B021On-going Equipment and System Deviation Status Report (Spec Item 3.6.4)1Monthly$$
$
NHCNENHCNE
B022Emergency Service Order Work Estimated (Spec Item 3.1.3)9Each$$
B023Emergency Service Orders for Critical Cooling System Estimated (Spec Item 3.1.4)2Each$$
B024Routine Service Orders Estimated (Spec Item 3.1.5)20Each$$
B025Service Order Report (Spec Item 3.1.6)12Monthly$$
B026Daily Work Tracking (Spec Item 3.1.8)12Daily$$
B027Inventory Management (Spec Item 3.2)4Yearly$$
B028Develop And Implement Preventive Maintenance Program For HVAC Systems (Spec Item 3.3)690Each$$
B029HVAC and Refrigeration Systems Spec Items 3.3.1)1Each$$
B030Direct Digital Controls (DDC) Requirements NAVSTA (Spec Items 3.4 / 3.4.1 / 3.4.2 / 3.4.3)2Each$$
B031Other Reccuring Services Program (Spec Items 3.5)12Monthly$$
B032HVAC Seasonal Start-up and Shut Down (Spec Item 3.5.1)2Each$$
B033Chemical Treatment For the Cooling Tower (Biocide) and Packaged Terminal Heat Pump Loop.(Rust Inhibitor) (Spec Item 3.5.3.1)10GAL$$
B034Freeze Protection (In 55 Gal Drums) (Spec Items 3.5.25GAL$$
B035HVAC Water Testing and Treatment Services (Spec Items 3.5.31Monthly$$
B036Trouble-shooting Testing and Replacement of Steam Traps. (Spec Items .3.5.4) 1"8Each$$
B037Trouble-shooting Testing and Replacement of Steam Traps. (Spec Items .3.5.4) 2"4Each$$
B038Restoration and Resetting Of HVAC Systems After Power Outages and Other Disruptions. Spec Item 3.5.5)2Each$$
B039Identification of Equipment in the Field (Tags Installed) (Spec Items 3.6.1)1Yearly$$
B040Filter and Belt Database (No Historical Data) (Spec Items 3.6.2)4Yearly$$
B041Ozone Depleting Substances (ODS) List (Spec Item 3.6.3)4Yearly$$
B042On-going Equipment and System Deviation Status Report (Spec Item 3.6.4)1Monthly$$
$
NGISNGIS
B043Emergency Service Order Work Estimated (Spec Item 3.1.3)10Each$$
B044Emergency Service Orders for Critical Cooling System Estimated (Spec Item 3.1.4)2Each$$
B045Routine Service Orders Estimated (Spec Item 3.1.5)30Each$$
B046Service Order Report (Spec Item 3.1.6)12Monthly$$
B047Daily Work Tracking (Spec Item 3.1.8)12Daily$$
B048Inventory Management (Spec Item 3.2)4Yearly$$
B049Develop And Implement Preventive Maintenance Program For HVAC Systems (Spec Item 3.3)329Each$$
B050HVAC and Refrigeration Systems Spec Items 3.3.1)1Each$$
B051Direct Digital Controls (DDC) Requirements NAVSTA (Spec Items 3.4 / 3.4.1 / 3.4.2 / 3.4.3)2Each$$
B052Other Reccuring Services Program (Spec Items 3.5)12Monthly$$
B053Heat Trace for Cooling Tower1Each$$
B054Chemical Treatment For the Cooling Tower (Biocide) and Packaged Terminal Heat Pump Loop.(Rust Inhibitor) (Spec Item 3.5.3.1)10GAL$$
B055HVAC Water Testing and Treatment Services (Spec Items 3.5.31Monthly$$
B056Restoration and Resetting Of HVAC Systems After Power Outages and Other Disruptions. Spec Item 3.5.5)2Each$$
B057Identification of Equipment in the Field (Tags Installed) (Spec Items 3.6.1)1Yearly$$
B058Filter and Belt Database (No Historical Data) (Spec Items 3.6.2)4Yearly$$
B060Ozone Depleting Substances (ODS) List (Spec Item 3.6.3)4Yearly$$
B061On-going Equipment and System Deviation Status Report (Spec Item 3.6.4)1Monthly$$

TOTAL $

NON-RECURRING OPTION ONE

ATTACHMENT J-0200000-15
EXHIBIT LINE ITEM NUMBERS
CONTRACT# N40085-20-R-0057
EXHIBIT B

Line Item 004 Option 1 Period - Non-Recurring Work

PROVIDE UNIT PRICES FOR NON-RECURRING WORK

ELINS B700 through B704

ELINProduct NameDescription ExtendedEstimatedUnit ofUnitExtended
QuantityIssuePricePrice

Indefinite Quantity Work for use at all MIDLANT Bases within the Sewell's Point and Annexes

B700Unit Priced Labor Work (Davis Bacon) - MUST BE NEGOTIATED BY KOPerformance of specific maintenance, repair, and alteration work that exceeds the labor limitations of a service order or PM repair. Task order completion times will be specified on each order.950MH$$
B701Unit Priced Labor Work (Service Contract Act) - MUST BE NEGOTIATED BY KOPerformance of specific maintenance, repair, and alteration work that exceeds the labor limitations of a service order or PM repair. Task order completion will be specified on each order.950MH$$
B702Material Costs - MUST BE NEGOTIATED BY KOProvide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order.120,000EA$1.00$ 120,000.00
B703Condenser Catch PanProvide an aluminum pan under the outdoor unit to contain all runoff caused by condenser cleaning. The pan will be 1/8" thick, 2" - 4" tall, wide and deep enough to contain all the effluent from condenser coil washing.1,000SF$$
The pan will have two 3/4" pipe connections for draining. The caps / plugs will be wired to the lip of the pan to prevent loss.
The pan will be large enough to contain 100% of the effluent. The SF quantity is based on the total sf of 1/8" aluminum in place. The pan will be in place within 5 working days of issuance of the Task Order.
B704Duct Fire Damper TestingProvide Duct Fire Damper Testing for NAVSTA and NHCNE.1,000EA$$
In NFPA 80, section 19.3 Operational Test, fire damper testing is detailed. The essential test is that the damper will open and close and no obstructions are present. NFPA 729 is referenced when any smoke detection is present. The operation must be under the airflow conditions that the system will encounter. Fusible links must comply with NFPA 90A and UL33.10 Documentation must be maintained and any deficiencies reported and corrective action noted. It also states that “repairs shall begin without delay” and following repair shall be operational tested again. Both standards state the requirement for testing one year after installation and then every 4 years (hospitals 6 years).

TOTAL NON-RECURRING PRICE OPTION ONE $

RECURRING OPTION TWO

ATTACHMENT J-0200000-15
EXHIBIT LINE ITEM NUMBERS
CONTRACT# N40085-20-R-0057
EXHIBIT C

Line Item 007 Second Option Period - Recurring Work

PROVIDE UNIT PRICES FOR RECURRING WORK

ELINS C001 through C061

UNIT OFTOTAL
ELINDESCRIPTIONQTYISSUEUnit CostAMOUNT
CNIC
C001Emergency Service Order Work Estimated (Spec Item 3.1.3)70Each$$
C002Emergency Service Orders for Critical Cooling System Estimated (Spec Item 3.1.4)10Each$$
C003Routine Service Orders Estimated (Spec Item 3.1.5)355Each$$
C004Service Order Report (Spec Item 3.1.6)12Monthly$$
C005Daily Work Tracking (Spec Item 3.1.8)12Daily$$
C006Inventory Management (Spec Item 3.2)4Yearly$$
C007Develop And Implement Preventive Maintenance Program For HVAC Systems (Spec Item 3.3)2100Each$$
C008HVAC and Refrigeration Systems Spec Items 3.3.1)1Each$$
C009Direct Digital Controls (DDC) Requirements NAVSTA (Spec Items 3.4 / 3.4.1 / 3.4.2 / 3.4.3)49Each$$
C010Other Reccuring Services Program (Spec Items 3.5)12Monthly$$
C011HVAC Seasonal Start-up and Shut Down (Spec Item 3.5.1)2Each$$
C012Freeze Protection (In 55 Gal Drums) (Spec Items 3.5.220GAL$$
C013HVAC Water Testing and Treatment Services (Spec Items 3.5.31Monthly$$
C014Chemical Treatment For the Cooling Tower (Biocide) and Packaged Terminal Heat Pump Loop.(Rust Inhibitor) (Spec Item 3.5.3.1)10GAL$$
C015Trouble-shooting Testing and Replacement of Steam Traps. (Spec Items .3.5.4) 1"161Each$$
C016Trouble-shooting Testing and Replacement of Steam Traps. (Spec Items .3.5.4) 2"29Each$$
C017Restoration and Resetting Of HVAC Systems After Power Outages and Other Disruptions. Spec Item 3.5.5)2Each$$
C018Identification of Equipment in the Field (Tags Installed) (Spec Items 3.6.1)1Yearly$$
C019Filter and Belt Database (No Historical Data) (Spec Items 3.6.2)4Yearly$$
C020Ozone Depleting Substances (ODS) List (Spec Item 3.6.3)4Yearly$$
C021On-going Equipment and System Deviation Status Report (Spec Item 3.6.4)1Monthly$$
$
NHCNE
C022Emergency Service Order Work Estimated (Spec Item 3.1.3)9Each$$
C023Emergency Service Orders for Critical Cooling System Estimated (Spec Item 3.1.4)2Each$$
C024Routine Service Orders Estimated (Spec Item 3.1.5)20Each$$
C025Service Order Report (Spec Item 3.1.6)12Monthly$$
C026Daily Work Tracking (Spec Item 3.1.8)12Daily$$
C027Inventory Management (Spec Item 3.2)4Yearly$$
C028Develop And Implement Preventive Maintenance Program For HVAC Systems (Spec Item 3.3)690Each$$
C029HVAC and Refrigeration Systems Spec Items 3.3.1)1Each$$
C030Direct Digital Controls (DDC) Requirements NAVSTA (Spec Items 3.4 / 3.4.1 / 3.4.2 / 3.4.3)2Each$$
C031Other Reccuring Services Program (Spec Items 3.5)12Monthly$$
C032HVAC Seasonal Start-up and Shut Down (Spec Item 3.5.1)2Each$$
C033Chemical Treatment For the Cooling Tower (Biocide) and Packaged Terminal Heat Pump Loop.(Rust Inhibitor) (Spec Item 3.5.3.1)10GAL$$
C034Freeze Protection (In 55 Gal Drums) (Spec Items 3.5.25GAL$$
C035HVAC Water Testing and Treatment Services (Spec Items 3.5.31Monthly$$
C036Trouble-shooting Testing and Replacement of Steam Traps. (Spec Items .3.5.4) 1"8Each$$
C037Trouble-shooting Testing and Replacement of Steam Traps. (Spec Items .3.5.4) 2"4Each$$
C038Restoration and Resetting Of HVAC Systems After Power Outages and Other Disruptions. Spec Item 3.5.5)2Each$$
C039Identification of Equipment in the Field (Tags Installed) (Spec Items 3.6.1)1Yearly$$
C040Filter and Belt Database (No Historical Data) (Spec Items 3.6.2)4Yearly$$
C041Ozone Depleting Substances (ODS) List (Spec Item 3.6.3)4Yearly$$
C042On-going Equipment and System Deviation Status Report (Spec Item 3.6.4)1Monthly$$
$
NGIS
C043Emergency Service Order Work Estimated (Spec Item 3.1.3)10Each$$
C044Emergency Service Orders for Critical Cooling System Estimated (Spec Item 3.1.4)2Each$$
C045Routine Service Orders Estimated (Spec Item 3.1.5)30Each$$
C046Service Order Report (Spec Item 3.1.6)12Monthly$$
C047Daily Work Tracking (Spec Item 3.1.8)12Daily$$
C048Inventory Management (Spec Item 3.2)4Yearly$$
C049Develop And Implement Preventive Maintenance Program For HVAC Systems (Spec Item 3.3)329Each$$
C050HVAC and Refrigeration Systems Spec Items 3.3.1)1Each$$
C051Direct Digital Controls (DDC) Requirements NAVSTA (Spec Items 3.4 / 3.4.1 / 3.4.2 / 3.4.3)2Each$$
C052Other Reccuring Services Program (Spec Items 3.5)12Monthly$$
C053Heat Trace for Cooling Tower1Each$$
C054Chemical Treatment For the Cooling Tower (Biocide) and Packaged Terminal Heat Pump Loop.(Rust Inhibitor) (Spec Item 3.5.3.1)10GAL$$
C055HVAC Water Testing and Treatment Services (Spec Items 3.5.31Monthly$$
C056Restoration and Resetting Of HVAC Systems After Power Outages and Other Disruptions. Spec Item 3.5.5)2Each$$
C057Identification of Equipment in the Field (Tags Installed) (Spec Items 3.6.1)1Yearly$$
C058Filter and Belt Database (No Historical Data) (Spec Items 3.6.2)4Yearly$$
C060Ozone Depleting Substances (ODS) List (Spec Item 3.6.3)4Yearly$$
C061On-going Equipment and System Deviation Status Report (Spec Item 3.6.4)1Monthly$$

TOTAL $

NON-RECURRING OPTION TWO

ATTACHMENT J-0200000-15
EXHIBIT LINE ITEM NUMBERS
CONTRACT# N40085-20-R-0057
EXHIBIT C

Line Item 006 Option 2 Period - Non-Recurring Work

PROVIDE UNIT PRICES FOR NON-RECURRING WORK

ELINS C700 through C704

ELINProduct NameDescription ExtendedEstimatedUnit ofUnitExtended
QuantityIssuePricePrice

Indefinite Quantity Work for use at all MIDLANT Bases within the Sewell's Point and Annexes

C700Unit Priced Labor Work (Davis Bacon) - MUST BE NEGOTIATED BY KOPerformance of specific maintenance, repair, and alteration work that exceeds the labor limitations of a service order or PM repair. Task order completion times will be specified on each order.1,000MH$$
C701Unit Priced Labor Work (Service Contract Act) - MUST BE NEGOTIATED BY KOPerformance of specific maintenance, repair, and alteration work that exceeds the labor limitations of a service order or PM repair. Task order completion will be specified on each order.1,000MH$$
C702Material Costs - MUST BE NEGOTIATED BY KOProvide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order.120,000EA$ 1.00$ 120,000.00
C703Condenser Catch PanProvide an aluminum pan under the outdoor unit to contain all runoff caused by condenser cleaning. The pan will be 1/8" thick, 2" - 4" tall, wide and deep enough to contain all the effluent from condenser coil washing.1,000SF$$
The pan will have two 3/4" pipe connections for draining. The caps / plugs will be wired to the lip of the pan to prevent loss.
The pan will be large enough to contain 100% of the effluent. The SF quantity is based on the total sf of 1/8" aluminum in place. The pan will be in place within 5 working days of issuance of the Task Order.
C704Duct Fire Damper TestingProvide Duct Fire Damper Testing for NAVSTA and NHCNE.1,000EA$$
In NFPA 80, section 19.3 Operational Test, fire damper testing is detailed. The essential test is that the damper will open and close and no obstructions are present. NFPA 729 is referenced when any smoke detection is present. The operation must be under the airflow conditions that the system will encounter. Fusible links must comply with NFPA 90A and UL33.10 Documentation must be maintained and any deficiencies reported and corrective action noted. It also states that “repairs shall begin without delay” and following repair shall be operational tested again. Both standards state the requirement for testing one year after installation and then every 4 years (hospitals 6 years).

TOTAL NON-RECURRING PRICE OPTION TWO $

RECURRING OPTION THREE

ATTACHMENT J-0200000-15
EXHIBIT LINE ITEM NUMBERS
CONTRACT# N40085-20-R-0057
EXHIBIT D

Line Item 007 Second Option Period - Recurring Work

PROVIDE UNIT PRICES FOR RECURRING WORK

ELINS D001 through D061

UNIT OFTOTAL
ELINDESCRIPTIONQTYISSUEUnit CostAMOUNT
CNIC
D001Emergency Service Order Work Estimated (Spec Item 3.1.3)70Each$$
D002Emergency Service Orders for Critical Cooling System Estimated (Spec Item 3.1.4)10Each$$
D003Routine Service Orders Estimated (Spec Item 3.1.5)355Each$$
D004Service Order Report (Spec Item 3.1.6)12Monthly$$
D005Daily Work Tracking (Spec Item 3.1.8)12Daily$$
D006Inventory Management (Spec Item 3.2)4Yearly$$
D007Develop And Implement Preventive Maintenance Program For HVAC Systems (Spec Item 3.3)2100Each$$
D008HVAC and Refrigeration Systems Spec Items 3.3.1)1Each$$
D009Direct Digital Controls (DDC) Requirements NAVSTA (Spec Items 3.4 / 3.4.1 / 3.4.2 / 3.4.3)49Each$$
D010Other Reccuring Services Program (Spec Items 3.5)12Monthly$$
D011HVAC Seasonal Start-up and Shut Down (Spec Item 3.5.1)2Each$$
D012Freeze Protection (In 55 Gal Drums) (Spec Items 3.5.220GAL$$
D013HVAC Water Testing and Treatment Services (Spec Items 3.5.31Monthly$$
D014Chemical Treatment For the Cooling Tower (Biocide) and Packaged Terminal Heat Pump Loop.(Rust Inhibitor) (Spec Item 3.5.3.1)10GAL$$
D015Trouble-shooting Testing and Replacement of Steam Traps. (Spec Items .3.5.4) 1"161Each$$
D016Trouble-shooting Testing and Replacement of Steam Traps. (Spec Items .3.5.4) 2"29Each$$
D017Restoration and Resetting Of HVAC Systems After Power Outages and Other Disruptions. Spec Item 3.5.5)2Each$$
D018Identification of Equipment in the Field (Tags Installed) (Spec Items 3.6.1)1Yearly$$
D019Filter and Belt Database (No Historical Data) (Spec Items 3.6.2)4Yearly$$
D020Ozone Depleting Substances (ODS) List (Spec Item 3.6.3)4Yearly$$
D021On-going Equipment and System Deviation Status Report (Spec Item 3.6.4)1Monthly$$
$
NHCNE
D022Emergency Service Order Work Estimated (Spec Item 3.1.3)9Each$$
D023Emergency Service Orders for Critical Cooling System Estimated (Spec Item 3.1.4)2Each$$
D024Routine Service Orders Estimated (Spec Item 3.1.5)20Each$$
D025Service Order Report (Spec Item 3.1.6)12Monthly$$
D026Daily Work Tracking (Spec Item 3.1.8)12Daily$$
D027Inventory Management (Spec Item 3.2)4Yearly$$
D028Develop And Implement Preventive Maintenance Program For HVAC Systems (Spec Item 3.3)690Each$$
D029HVAC and Refrigeration Systems Spec Items 3.3.1)1Each$$
D030Direct Digital Controls (DDC) Requirements NAVSTA (Spec Items 3.4 / 3.4.1 / 3.4.2 / 3.4.3)2Each$$
D031Other Reccuring Services Program (Spec Items 3.5)12Monthly$$
D032HVAC Seasonal Start-up and Shut Down (Spec Item 3.5.1)2Each$$
D033Chemical Treatment For the Cooling Tower (Biocide) and Packaged Terminal Heat Pump Loop.(Rust Inhibitor) (Spec Item 3.5.3.1)10GAL$$
D034Freeze Protection (In 55 Gal Drums) (Spec Items 3.5.25GAL$$
D035HVAC Water Testing and Treatment Services (Spec Items 3.5.31Monthly$$
D036Trouble-shooting Testing and Replacement of Steam Traps. (Spec Items .3.5.4) 1"8Each$$
D037Trouble-shooting Testing and Replacement of Steam Traps. (Spec Items .3.5.4) 2"4Each$$
D038Restoration and Resetting Of HVAC Systems After Power Outages and Other Disruptions. Spec Item 3.5.5)2Each$$
D039Identification of Equipment in the Field (Tags Installed) (Spec Items 3.6.1)1Yearly$$
D040Filter and Belt Database (No Historical Data) (Spec Items 3.6.2)4Yearly$$
D041Ozone Depleting Substances (ODS) List (Spec Item 3.6.3)4Yearly$$
D042On-going Equipment and System Deviation Status Report (Spec Item 3.6.4)1Monthly$
$
NGIS
D043Emergency Service Order Work Estimated (Spec Item 3.1.3)10Each$$
D044Emergency Service Orders for Critical Cooling System Estimated (Spec Item 3.1.4)2Each$$
D045Routine Service Orders Estimated (Spec Item 3.1.5)30Each$$
D046Service Order Report (Spec Item 3.1.6)12Monthly$$
D047Daily Work Tracking (Spec Item 3.1.8)12Daily$$
D048Inventory Management (Spec Item 3.2)4Yearly$$
D049Develop And Implement Preventive Maintenance Program For HVAC Systems (Spec Item 3.3)329Each$$
D050HVAC and Refrigeration Systems Spec Items 3.3.1)1Each$$
D051Direct Digital Controls (DDC) Requirements NAVSTA (Spec Items 3.4 / 3.4.1 / 3.4.2 / 3.4.3)2Each$$
D052Other Reccuring Services Program (Spec Items 3.5)12Monthly$$
D053Heat Trace for Cooling Tower1Each$$
D054Chemical Treatment For the Cooling Tower (Biocide) and Packaged Terminal Heat Pump Loop.(Rust Inhibitor) (Spec Item 3.5.3.1)10GAL$$
D055HVAC Water Testing and Treatment Services (Spec Items 3.5.31Monthly$$
D056Restoration and Resetting Of HVAC Systems After Power Outages and Other Disruptions. Spec Item 3.5.5)2Each$$
D057Identification of Equipment in the Field (Tags Installed) (Spec Items 3.6.1)1Yearly$$
D058Filter and Belt Database (No Historical Data) (Spec Items 3.6.2)4Yearly$$
D060Ozone Depleting Substances (ODS) List (Spec Item 3.6.3)4Yearly
D061On-going Equipment and System Deviation Status Report (Spec Item 3.6.4)1Monthly

TOTAL $

NON-RECURRING OPTION THREE

ATTACHMENT J-0200000-15
EXHIBIT LINE ITEM NUMBERS
CONTRACT# N40085-20-R-0057
EXHIBIT D

Line Item 008 Option 3 Period - Non-Recurring Work

PROVIDE UNIT PRICES FOR NON-RECURRING WORK

ELINS D700 through D704

ELINProduct NameDescription ExtendedEstimatedUnit ofUnitExtended
QuantityIssuePricePrice

Indefinite Quantity Work for use at all MIDLANT Bases within the Sewell's Point and Annexes

D700Unit Priced Labor Work (Davis Bacon) - MUST BE NEGOTIATED BY KOPerformance of specific maintenance, repair, and alteration work that exceeds the labor limitations of a service order or PM repair. Task order completion times will be specified on each order.950MH$$
D701Unit Priced Labor Work (Service Contract Act) - MUST BE NEGOTIATED BY KOPerformance of specific maintenance, repair, and alteration work that exceeds the labor limitations of a service order or PM repair. Task order completion will be specified on each order.950MH$$
D702Material Costs - MUST BE NEGOTIATED BY KOProvide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order.120,000EA$ 1.00$ 120,000.00
D703Condenser Catch PanProvide an aluminum pan under the outdoor unit to contain all runoff caused by condenser cleaning. The pan will be 1/8" thick, 2" - 4" tall, wide and deep enough to contain all the effluent from condenser coil washing.1,000SF$$
The pan will have two 3/4" pipe connections for draining. The caps / plugs will be wired to the lip of the pan to prevent loss.
The pan will be large enough to contain 100% of the effluent. The SF quantity is based on the total sf of 1/8" aluminum in place. The pan will be in place within 5 working days of issuance of the Task Order.
D704Duct Fire Damper TestingProvide Duct Fire Damper Testing for NAVSTA and NHCNE.1,000EA$$
In NFPA 80, section 19.3 Operational Test, fire damper testing is detailed. The essential test is that the damper will open and close and no obstructions are present. NFPA 729 is referenced when any smoke detection is present. The operation must be under the airflow conditions that the system will encounter. Fusible links must comply with NFPA 90A and UL33.10 Documentation must be maintained and any deficiencies reported and corrective action noted. It also states that “repairs shall begin without delay” and following repair shall be operational tested again. Both standards state the requirement for testing one year after installation and then every 4 years (hospitals 6 years).

TOTAL NON-RECURRING PRICE OPTION THREE $

RECURRING OPTION FOUR

ATTACHMENT J-0200000-15
EXHIBIT LINE ITEM NUMBERS
CONTRACT# N40085-20-R-0057
EXHIBIT E

Line Item 009 Second Option Period - Recurring Work

PROVIDE UNIT PRICES FOR RECURRING WORK

ELINS E001 through E061

UNIT OFTOTAL
ELINDESCRIPTIONQTYISSUEUnit CostAMOUNT
CNIC
E001Emergency Service Order Work Estimated (Spec Item 3.1.3)70Each$$
E002Emergency Service Orders for Critical Cooling System Estimated (Spec Item 3.1.4)10Each$$
E003Routine Service Orders Estimated (Spec Item 3.1.5)355Each$$
E004Service Order Report (Spec Item 3.1.6)12Monthly$$
E005Daily Work Tracking (Spec Item 3.1.8)12Daily$$
E006Inventory Management (Spec Item 3.2)4Yearly$$
E007Develop And Implement Preventive Maintenance Program For HVAC Systems (Spec Item 3.3)2100Each$$
E008HVAC and Refrigeration Systems Spec Items 3.3.1)1Each$$
E009Direct Digital Controls (DDC) Requirements NAVSTA (Spec Items 3.4 / 3.4.1 / 3.4.2 / 3.4.3)49Each$$
E010Other Reccuring Services Program (Spec Items 3.5)12Monthly$$
E011HVAC Seasonal Start-up and Shut Down (Spec Item 3.5.1)2Each$$
E012Freeze Protection (In 55 Gal Drums) (Spec Items 3.5.220GAL$$
E013HVAC Water Testing and Treatment Services (Spec Items 3.5.31Monthly$$
E014Chemical Treatment For the Cooling Tower (Biocide) and Packaged Terminal Heat Pump Loop.(Rust Inhibitor) (Spec Item 3.5.3.1)10GAL$$
E015Trouble-shooting Testing and Replacement of Steam Traps. (Spec Items .3.5.4) 1"161Each$$
E016Trouble-shooting Testing and Replacement of Steam Traps. (Spec Items .3.5.4) 2"29Each$$
E017Restoration and Resetting Of HVAC Systems After Power Outages and Other Disruptions. Spec Item 3.5.5)2Each$$
E018Identification of Equipment in the Field (Tags Installed) (Spec Items 3.6.1)1Yearly$$
E019Filter and Belt Database (No Historical Data) (Spec Items 3.6.2)4Yearly$$
E020Ozone Depleting Substances (ODS) List (Spec Item 3.6.3)4Yearly$$
E021On-going Equipment and System Deviation Status Report (Spec Item 3.6.4)1Monthly$$
$
NHCNE
E022Emergency Service Order Work Estimated (Spec Item 3.1.3)9Each$$
E023Emergency Service Orders for Critical Cooling System Estimated (Spec Item 3.1.4)2Each$$
E024Routine Service Orders Estimated (Spec Item 3.1.5)20Each$$
E025Service Order Report (Spec Item 3.1.6)12Monthly$$
E026Daily Work Tracking (Spec Item 3.1.8)12Daily$$
E027Inventory Management (Spec Item 3.2)4Yearly$$
E028Develop And Implement Preventive Maintenance Program For HVAC Systems (Spec Item 3.3)690Each$$
E029HVAC and Refrigeration Systems Spec Items 3.3.1)1Each$$
E030Direct Digital Controls (DDC) Requirements NAVSTA (Spec Items 3.4 / 3.4.1 / 3.4.2 / 3.4.3)2Each$$
E031Other Reccuring Services Program (Spec Items 3.5)12Monthly$$
E032HVAC Seasonal Start-up and Shut Down (Spec Item 3.5.1)2Each$$
E033Chemical Treatment For the Cooling Tower (Biocide) and Packaged Terminal Heat Pump Loop.(Rust Inhibitor) (Spec Item 3.5.3.1)10GAL$$
E034Freeze Protection (In 55 Gal Drums) (Spec Items 3.5.25GAL$$
E035HVAC Water Testing and Treatment Services (Spec Items 3.5.31Monthly$$
E036Trouble-shooting Testing and Replacement of Steam Traps. (Spec Items .3.5.4) 1"8Each$$
E037Trouble-shooting Testing and Replacement of Steam Traps. (Spec Items .3.5.4) 2"4Each$$
E038Restoration and Resetting Of HVAC Systems After Power Outages and Other Disruptions. Spec Item 3.5.5)2Each$$
E039Identification of Equipment in the Field (Tags Installed) (Spec Items 3.6.1)1Yearly$$
E040Filter and Belt Database (No Historical Data) (Spec Items 3.6.2)4Yearly$$
E041Ozone Depleting Substances (ODS) List (Spec Item 3.6.3)4Yearly$$
E042On-going Equipment and System Deviation Status Report (Spec Item 3.6.4)1Monthly$$
$
NGIS$$
E043Emergency Service Order Work Estimated (Spec Item 3.1.3)10Each$$
E044Emergency Service Orders for Critical Cooling System Estimated (Spec Item 3.1.4)2Each$$
E045Routine Service Orders Estimated (Spec Item 3.1.5)30Each$$
E046Service Order Report (Spec Item 3.1.6)12Monthly$$
E047Daily Work Tracking (Spec Item 3.1.8)12Daily$$
E048Inventory Management (Spec Item 3.2)4Yearly$$
E049Develop And Implement Preventive Maintenance Program For HVAC Systems (Spec Item 3.3)329Each$$
E050HVAC and Refrigeration Systems Spec Items 3.3.1)1Each$$
E051Direct Digital Controls (DDC) Requirements NAVSTA (Spec Items 3.4 / 3.4.1 / 3.4.2 / 3.4.3)2Each$$
E052Other Reccuring Services Program (Spec Items 3.5)12Monthly$$
E053Heat Trace for Cooling Tower1Each$$
E054Chemical Treatment For the Cooling Tower (Biocide) and Packaged Terminal Heat Pump Loop.(Rust Inhibitor) (Spec Item 3.5.3.1)10GAL$$
E055HVAC Water Testing and Treatment Services (Spec Items 3.5.31Monthly$$
E056Restoration and Resetting Of HVAC Systems After Power Outages and Other Disruptions. Spec Item 3.5.5)2Each$$
E057Identification of Equipment in the Field (Tags Installed) (Spec Items 3.6.1)1Yearly$$
E058Filter and Belt Database (No Historical Data) (Spec Items 3.6.2)4Yearly$$
E060Ozone Depleting Substances (ODS) List (Spec Item 3.6.3)4Yearly$$
E061On-going Equipment and System Deviation Status Report (Spec Item 3.6.4)1Monthly$$

NON-RECURRING OPTION FOUR

ATTACHMENT J-0200000-15
EXHIBIT LINE ITEM NUMBERS
CONTRACT# N40085-20-R-0057
EXHIBIT E

Line Item 010 Option 4 Period - Non-Recurring Work

PROVIDE UNIT PRICES FOR NON-RECURRING WORK

ELINS E700 through E704

ELINProduct NameDescription ExtendedEstimatedUnit ofUnitExtended
QuantityIssuePricePrice

Indefinite Quantity Work for use at all MIDLANT Bases within the Sewell's Point and Annexes

E700Unit Priced Labor Work (Davis Bacon) - MUST BE NEGOTIATED BY KOPerformance of specific maintenance, repair, and alteration work that exceeds the labor limitations of a service order or PM repair. Task order completion times will be specified on each order.950MH$$
E701Unit Priced Labor Work (Service Contract Act) - MUST BE NEGOTIATED BY KOPerformance of specific maintenance, repair, and alteration work that exceeds the labor limitations of a service order or PM repair. Task order completion will be specified on each order.950MH$$
E702Material Costs - MUST BE NEGOTIATED BY KOProvide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order.120,000EA$ 1.00$ 120,000.00
E703Condenser Catch PanProvide an aluminum pan under the outdoor unit to contain all runoff caused by condenser cleaning. The pan will be 1/8" thick, 2" - 4" tall, wide and deep enough to contain all the effluent from condenser coil washing.1,000SF$$
The pan will have two 3/4" pipe connections for draining. The caps / plugs will be wired to the lip of the pan to prevent loss.
The pan will be large enough to contain 100% of the effluent. The SF quantity is based on the total sf of 1/8" aluminum in place. The pan will be in place within 5 working days of issuance of the Task Order.
E704Duct Fire Damper TestingProvide Duct Fire Damper Testing for NAVSTA and NHCNE.1,000EA$$
In NFPA 80, section 19.3 Operational Test, fire damper testing is detailed. The essential test is that the damper will open and close and no obstructions are present. NFPA 729 is referenced when any smoke detection is present. The operation must be under the airflow conditions that the system will encounter. Fusible links must comply with NFPA 90A and UL33.10 Documentation must be maintained and any deficiencies reported and corrective action noted. It also states that “repairs shall begin without delay” and following repair shall be operational tested again. Both standards state the requirement for testing one year after installation and then every 4 years (hospitals 6 years).

TOTAL NON-RECURRING PRICE OPTION FOUR $

SUMMARY

Recurring WorkNon- Recurring Work
Base Year
$$
Option 1
$
Option 2
$$
Option 3
$$
Option 4
$$
Total 5 Year RecurringTotal 5 Year Non-Recurring
$$

File details come from the government source that posted it. Updated .