J-0200000-15 ELINS.xlsx
XLSX spreadsheet 132 KB Posted
- Attached to
- Facility Investment Services for Preventative Maintenance Repair and Alteration Services
- Solicitation number
- N4008520R0057
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RECURRING BASE YEAR
| ATTACHMENT J-0200000-15 |
| EXHIBIT LINE ITEM NUMBERS |
| CONTRACT# N40085-20-R-0057 |
| EXHIBIT A |
Line Item 001 Base Period - Recurring Work
PROVIDE UNIT PRICES FOR RECURRING WORK
IN ACCORDANCE WITH SECTION C. SPEC ITEM 3
ELINS A001 through A061
| UNIT OF | TOTAL | ||||
| ELIN | DESCRIPTION | QTY | ISSUE | Unit Cost | AMOUNT |
| CNIC | |||||
| A001 | Emergency Service Order Work Estimated (Spec Item 3.1.3) | 70 | Each | $ | $ |
| A002 | Emergency Service Orders for Critical Cooling System Estimated (Spec Item 3.1.4) | 10 | Each | $ | $ |
| A003 | Routine Service Orders Estimated (Spec Item 3.1.5) | 355 | Each | $ | $ |
| A004 | Service Order Report (Spec Item 3.1.6) | 12 | Monthly | $ | $ |
| A005 | Daily Work Tracking (Spec Item 3.1.8) | 12 | Daily | $ | $ |
| A006 | Inventory Management (Spec Item 3.2) | 4 | Yearly | $ | $ |
| A007 | Develop And Implement Preventive Maintenance Program For HVAC Systems (Spec Item 3.3) | 2100 | Each | $ | $ |
| A008 | HVAC and Refrigeration Systems Spec Items 3.3.1) | 1 | Each | $ | $ |
| A009 | Direct Digital Controls (DDC) Requirements NAVSTA (Spec Items 3.4 / 3.4.1 / 3.4.2 / 3.4.3) | 49 | Each | $ | $ |
| A010 | Other Reccuring Services Program (Spec Items 3.5) | 12 | Monthly | $ | $ |
| A011 | HVAC Seasonal Start-up and Shut Down (Spec Item 3.5.1) | 2 | Each | $ | $ |
| A012 | Freeze Protection (In 55 Gal Drums) (Spec Items 3.5.2 | 20 | GAL | $ | $ |
| A013 | HVAC Water Testing and Treatment Services (Spec Items 3.5.3 | 1 | Monthly | $ | $ |
| A014 | Chemical Treatment For the Cooling Tower (Biocide) and Packaged Terminal Heat Pump Loop.(Rust Inhibitor) (Spec Item 3.5.3.1) | 10 | GAL | $ | $ |
| A015 | Trouble-shooting Testing and Replacement of Steam Traps. (Spec Items .3.5.4) 1" | 161 | Each | $ | $ |
| A016 | Trouble-shooting Testing and Replacement of Steam Traps. (Spec Items .3.5.4) 2" | 29 | Each | $ | $ |
| A017 | Restoration and Resetting Of HVAC Systems After Power Outages and Other Disruptions. Spec Item 3.5.5) | 2 | Each | $ | $ |
| A018 | Identification of Equipment in the Field (Tags Installed) (Spec Items 3.6.1) | 1 | Yearly | $ | $ |
| A019 | Filter and Belt Database (No Historical Data) (Spec Items 3.6.2) | 4 | Yearly | $ | $ |
| A020 | Ozone Depleting Substances (ODS) List (Spec Item 3.6.3) | 4 | Yearly | $ | $ |
| A021 | On-going Equipment and System Deviation Status Report (Spec Item 3.6.4) | 1 | Monthly | $ | $ |
| $ |
| NHCNE | |||||
| A022 | Emergency Service Order Work Estimated (Spec Item 3.1.3) | 9 | Each | $ | $ |
| A023 | Emergency Service Orders for Critical Cooling System Estimated (Spec Item 3.1.4) | 2 | Each | $ | $ |
| A024 | Routine Service Orders Estimated (Spec Item 3.1.5) | 20 | Each | $ | $ |
| A025 | Service Order Report (Spec Item 3.1.6) | 12 | Monthly | $ | $ |
| A026 | Daily Work Tracking (Spec Item 3.1.8) | 12 | Daily | $ | $ |
| A027 | Inventory Management (Spec Item 3.2) | 4 | Yearly | $ | $ |
| A028 | Develop And Implement Preventive Maintenance Program For HVAC Systems (Spec Item 3.3) | 690 | Each | $ | $ |
| A029 | HVAC and Refrigeration Systems Spec Items 3.3.1) | 1 | Each | $ | $ |
| A030 | Direct Digital Controls (DDC) Requirements NAVSTA (Spec Items 3.4 / 3.4.1 / 3.4.2 / 3.4.3) | 2 | Each | $ | $ |
| A031 | Other Reccuring Services Program (Spec Items 3.5) | 12 | Monthly | $ | $ |
| A032 | HVAC Seasonal Start-up and Shut Down (Spec Item 3.5.1) | 2 | Each | $ | $ |
| A033 | Chemical Treatment For the Cooling Tower (Biocide) and Packaged Terminal Heat Pump Loop.(Rust Inhibitor) (Spec Item 3.5.3.1) | 10 | GAL | $ | $ |
| A034 | Freeze Protection (In 55 Gal Drums) (Spec Items 3.5.2 | 5 | GAL | $ | $ |
| A035 | HVAC Water Testing and Treatment Services (Spec Items 3.5.3 | 1 | Monthly | $ | $ |
| A036 | Trouble-shooting Testing and Replacement of Steam Traps. (Spec Items .3.5.4) 1" | 8 | Each | $ | $ |
| A037 | Trouble-shooting Testing and Replacement of Steam Traps. (Spec Items .3.5.4) 2" | 4 | Each | $ | $ |
| A038 | Restoration and Resetting Of HVAC Systems After Power Outages and Other Disruptions. Spec Item 3.5.5) | 2 | Each | $ | $ |
| A039 | Identification of Equipment in the Field (Tags Installed) (Spec Items 3.6.1) | 1 | Yearly | $ | $ |
| A040 | Filter and Belt Database (No Historical Data) (Spec Items 3.6.2) | 4 | Yearly | $ | $ |
| A041 | Ozone Depleting Substances (ODS) List (Spec Item 3.6.3) | 4 | Yearly | $ | $ |
| A042 | On-going Equipment and System Deviation Status Report (Spec Item 3.6.4) | 1 | Monthly | $ | $ |
| $ |
| NGIS | |||||
| A043 | Emergency Service Order Work Estimated (Spec Item 3.1.3) | 10 | Each | $ | $ |
| A044 | Emergency Service Orders for Critical Cooling System Estimated (Spec Item 3.1.4) | 2 | Each | $ | $ |
| A045 | Routine Service Orders Estimated (Spec Item 3.1.5) | 30 | Each | $ | $ |
| A046 | Service Order Report (Spec Item 3.1.6) | 12 | Monthly | $ | $ |
| A047 | Daily Work Tracking (Spec Item 3.1.8) | 12 | Daily | $ | $ |
| A048 | Inventory Management (Spec Item 3.2) | 4 | Yearly | $ | $ |
| A049 | Develop And Implement Preventive Maintenance Program For HVAC Systems (Spec Item 3.3) | 329 | Each | $ | $ |
| A050 | HVAC and Refrigeration Systems Spec Items 3.3.1) | 1 | Each | $ | $ |
| A051 | Direct Digital Controls (DDC) Requirements NAVSTA (Spec Items 3.4 / 3.4.1 / 3.4.2 / 3.4.3) | 2 | Each | $ | $ |
| A052 | Other Reccuring Services Program (Spec Items 3.5) | 12 | Monthly | $ | $ |
| A053 | Heat Trace for Cooling Tower | 1 | Each | $ | $ |
| A054 | Chemical Treatment For the Cooling Tower (Biocide) and Packaged Terminal Heat Pump Loop.(Rust Inhibitor) (Spec Item 3.5.3.1) | 10 | GAL | $ | $ |
| A055 | HVAC Water Testing and Treatment Services (Spec Items 3.5.3 | 1 | Monthly | $ | $ |
| A056 | Restoration and Resetting Of HVAC Systems After Power Outages and Other Disruptions. Spec Item 3.5.5) | 2 | Each | $ | $ |
| A057 | Identification of Equipment in the Field (Tags Installed) (Spec Items 3.6.1) | 1 | Yearly | $ | $ |
| A058 | Filter and Belt Database (No Historical Data) (Spec Items 3.6.2) | 4 | Yearly | $ | $ |
| A060 | Ozone Depleting Substances (ODS) List (Spec Item 3.6.3) | 4 | Yearly | $ | $ |
| A061 | On-going Equipment and System Deviation Status Report (Spec Item 3.6.4) | 1 | Monthly | $ | $ |
TOTAL $
NON-RECURRING BASE YEAR
| ATTACHMENT J-0200000-15 |
| EXHIBIT LINE ITEM NUMBERS |
| CONTRACT# N40085-20-R-0057 |
| EXHIBIT A |
Line Item 002 Base Period - Non-Recurring Work
PROVIDE UNIT PRICES FOR NON-RECURRING WORK
IN ACCORDANCE WITH SECTION C. SPEC ITEM 4
ELINS A700 through A704
| ELIN | Product Name | Description Extended | Estimated | Unit of | Unit | Extended |
| Quantity | Issue | Price | Price |
Indefinite Quantity Work for use at all MIDLANT Bases within the Sewell's Point and Annexes
| A700 | Unit Priced Labor Work (Davis Bacon) - MUST BE NEGOTIATED BY KO | Performance of specific maintenance, repair, and alteration work that exceeds the labor limitations of a service order or PM repair. Task order completion times will be specified on each order. | 950 | MH | $ | $ |
| A701 | Unit Priced Labor Work (Service Contract Act) - MUST BE NEGOTIATED BY KO | Performance of specific maintenance, repair, and alteration work that exceeds the labor limitations of a service order or PM repair. Task order completion will be specified on each order. | 950 | MH | $ | $ |
| A702 | Material Costs - MUST BE NEGOTIATED BY KO | Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. | 120,000 | EA | $ 1.00 | $ 120,000.00 |
| A703 | Condenser Catch Pan | Provide an aluminum pan under the outdoor unit to contain all runoff caused by condenser cleaning. The pan will be 1/8" thick, 2" - 4" tall, wide and deep enough to contain all the effluent from condenser coil washing. | 1,000 | SF | $ | $ |
| The pan will have two 3/4" pipe connections for draining. The caps / plugs will be wired to the lip of the pan to prevent loss. | ||||||
| The pan will be large enough to contain 100% of the effluent. The SF quantity is based on the total sf of 1/8" aluminum in place. The pan will be in place within 5 working days of issuance of the Task Order. | ||||||
| A704 | Duct Fire Damper Testing | Provide Duct Fire Damper Testing for NAVSTA and NHCNE. | 1,000 | EA | $ | $ |
| In NFPA 80, section 19.3 Operational Test, fire damper testing is detailed. The essential test is that the damper will open and close and no obstructions are present. NFPA 729 is referenced when any smoke detection is present. The operation must be under the airflow conditions that the system will encounter. Fusible links must comply with NFPA 90A and UL33.10 Documentation must be maintained and any deficiencies reported and corrective action noted. It also states that “repairs shall begin without delay” and following repair shall be operational tested again. Both standards state the requirement for testing one year after installation and then every 4 years (hospitals 6 years). |
TOTAL NON-RECURRING BASE YEAR $
RECURRING OPTION ONE
| ATTACHMENT J-0200000-15 |
| EXHIBIT LINE ITEM NUMBERS |
| CONTRACT# N40085-20-R-0057 |
| EXHIBIT B |
Line Item 003 First Option Period - Recurring Work
PROVIDE UNIT PRICES FOR RECURRING WORK
ELINS B001 through B061
| UNIT OF | TOTAL | ||||
| ELIN | DESCRIPTION | QTY | ISSUE | Unit Cost | AMOUNT |
| CNIC | |||||
| B001 | Emergency Service Order Work Estimated (Spec Item 3.1.3) | 70 | Each | $ | $ |
| B002 | Emergency Service Orders for Critical Cooling System Estimated (Spec Item 3.1.4) | 10 | Each | $ | $ |
| B003 | Routine Service Orders Estimated (Spec Item 3.1.5) | 355 | Each | $ | $ |
| B004 | Service Order Report (Spec Item 3.1.6) | 12 | Monthly | $ | $ |
| B005 | Daily Work Tracking (Spec Item 3.1.8) | 12 | Daily | $ | $ |
| B006 | Inventory Management (Spec Item 3.2) | 4 | Yearly | $ | $ |
| B007 | Develop And Implement Preventive Maintenance Program For HVAC Systems (Spec Item 3.3) | 2100 | Each | $ | $ |
| B008 | HVAC and Refrigeration Systems Spec Items 3.3.1) | 1 | Each | $ | $ |
| B009 | Direct Digital Controls (DDC) Requirements NAVSTA (Spec Items 3.4 / 3.4.1 / 3.4.2 / 3.4.3) | 49 | Each | $ | $ |
| B010 | Other Reccuring Services Program (Spec Items 3.5) | 12 | Monthly | $ | $ |
| B011 | HVAC Seasonal Start-up and Shut Down (Spec Item 3.5.1) | 2 | Each | $ | $ |
| B012 | Freeze Protection (In 55 Gal Drums) (Spec Items 3.5.2 | 20 | GAL | $ | $ |
| B013 | HVAC Water Testing and Treatment Services (Spec Items 3.5.3 | 1 | Monthly | $ | $ |
| B014 | Chemical Treatment For the Cooling Tower (Biocide) and Packaged Terminal Heat Pump Loop.(Rust Inhibitor) (Spec Item 3.5.3.1) | 10 | GAL | $ | $ |
| B015 | Trouble-shooting Testing and Replacement of Steam Traps. (Spec Items .3.5.4) 1" | 161 | Each | $ | $ |
| B016 | Trouble-shooting Testing and Replacement of Steam Traps. (Spec Items .3.5.4) 2" | 29 | Each | $ | $ |
| B017 | Restoration and Resetting Of HVAC Systems After Power Outages and Other Disruptions. Spec Item 3.5.5) | 2 | Each | $ | $ |
| B018 | Identification of Equipment in the Field (Tags Installed) (Spec Items 3.6.1) | 1 | Yearly | $ | $ |
| B019 | Filter and Belt Database (No Historical Data) (Spec Items 3.6.2) | 4 | Yearly | $ | $ |
| B020 | Ozone Depleting Substances (ODS) List (Spec Item 3.6.3) | 4 | Yearly | $ | $ |
| B021 | On-going Equipment and System Deviation Status Report (Spec Item 3.6.4) | 1 | Monthly | $ | $ |
| $ |
| NHCNE | NHCNE | ||||
| B022 | Emergency Service Order Work Estimated (Spec Item 3.1.3) | 9 | Each | $ | $ |
| B023 | Emergency Service Orders for Critical Cooling System Estimated (Spec Item 3.1.4) | 2 | Each | $ | $ |
| B024 | Routine Service Orders Estimated (Spec Item 3.1.5) | 20 | Each | $ | $ |
| B025 | Service Order Report (Spec Item 3.1.6) | 12 | Monthly | $ | $ |
| B026 | Daily Work Tracking (Spec Item 3.1.8) | 12 | Daily | $ | $ |
| B027 | Inventory Management (Spec Item 3.2) | 4 | Yearly | $ | $ |
| B028 | Develop And Implement Preventive Maintenance Program For HVAC Systems (Spec Item 3.3) | 690 | Each | $ | $ |
| B029 | HVAC and Refrigeration Systems Spec Items 3.3.1) | 1 | Each | $ | $ |
| B030 | Direct Digital Controls (DDC) Requirements NAVSTA (Spec Items 3.4 / 3.4.1 / 3.4.2 / 3.4.3) | 2 | Each | $ | $ |
| B031 | Other Reccuring Services Program (Spec Items 3.5) | 12 | Monthly | $ | $ |
| B032 | HVAC Seasonal Start-up and Shut Down (Spec Item 3.5.1) | 2 | Each | $ | $ |
| B033 | Chemical Treatment For the Cooling Tower (Biocide) and Packaged Terminal Heat Pump Loop.(Rust Inhibitor) (Spec Item 3.5.3.1) | 10 | GAL | $ | $ |
| B034 | Freeze Protection (In 55 Gal Drums) (Spec Items 3.5.2 | 5 | GAL | $ | $ |
| B035 | HVAC Water Testing and Treatment Services (Spec Items 3.5.3 | 1 | Monthly | $ | $ |
| B036 | Trouble-shooting Testing and Replacement of Steam Traps. (Spec Items .3.5.4) 1" | 8 | Each | $ | $ |
| B037 | Trouble-shooting Testing and Replacement of Steam Traps. (Spec Items .3.5.4) 2" | 4 | Each | $ | $ |
| B038 | Restoration and Resetting Of HVAC Systems After Power Outages and Other Disruptions. Spec Item 3.5.5) | 2 | Each | $ | $ |
| B039 | Identification of Equipment in the Field (Tags Installed) (Spec Items 3.6.1) | 1 | Yearly | $ | $ |
| B040 | Filter and Belt Database (No Historical Data) (Spec Items 3.6.2) | 4 | Yearly | $ | $ |
| B041 | Ozone Depleting Substances (ODS) List (Spec Item 3.6.3) | 4 | Yearly | $ | $ |
| B042 | On-going Equipment and System Deviation Status Report (Spec Item 3.6.4) | 1 | Monthly | $ | $ |
| $ |
| NGIS | NGIS | ||||
| B043 | Emergency Service Order Work Estimated (Spec Item 3.1.3) | 10 | Each | $ | $ |
| B044 | Emergency Service Orders for Critical Cooling System Estimated (Spec Item 3.1.4) | 2 | Each | $ | $ |
| B045 | Routine Service Orders Estimated (Spec Item 3.1.5) | 30 | Each | $ | $ |
| B046 | Service Order Report (Spec Item 3.1.6) | 12 | Monthly | $ | $ |
| B047 | Daily Work Tracking (Spec Item 3.1.8) | 12 | Daily | $ | $ |
| B048 | Inventory Management (Spec Item 3.2) | 4 | Yearly | $ | $ |
| B049 | Develop And Implement Preventive Maintenance Program For HVAC Systems (Spec Item 3.3) | 329 | Each | $ | $ |
| B050 | HVAC and Refrigeration Systems Spec Items 3.3.1) | 1 | Each | $ | $ |
| B051 | Direct Digital Controls (DDC) Requirements NAVSTA (Spec Items 3.4 / 3.4.1 / 3.4.2 / 3.4.3) | 2 | Each | $ | $ |
| B052 | Other Reccuring Services Program (Spec Items 3.5) | 12 | Monthly | $ | $ |
| B053 | Heat Trace for Cooling Tower | 1 | Each | $ | $ |
| B054 | Chemical Treatment For the Cooling Tower (Biocide) and Packaged Terminal Heat Pump Loop.(Rust Inhibitor) (Spec Item 3.5.3.1) | 10 | GAL | $ | $ |
| B055 | HVAC Water Testing and Treatment Services (Spec Items 3.5.3 | 1 | Monthly | $ | $ |
| B056 | Restoration and Resetting Of HVAC Systems After Power Outages and Other Disruptions. Spec Item 3.5.5) | 2 | Each | $ | $ |
| B057 | Identification of Equipment in the Field (Tags Installed) (Spec Items 3.6.1) | 1 | Yearly | $ | $ |
| B058 | Filter and Belt Database (No Historical Data) (Spec Items 3.6.2) | 4 | Yearly | $ | $ |
| B060 | Ozone Depleting Substances (ODS) List (Spec Item 3.6.3) | 4 | Yearly | $ | $ |
| B061 | On-going Equipment and System Deviation Status Report (Spec Item 3.6.4) | 1 | Monthly | $ | $ |
TOTAL $
NON-RECURRING OPTION ONE
| ATTACHMENT J-0200000-15 |
| EXHIBIT LINE ITEM NUMBERS |
| CONTRACT# N40085-20-R-0057 |
| EXHIBIT B |
Line Item 004 Option 1 Period - Non-Recurring Work
PROVIDE UNIT PRICES FOR NON-RECURRING WORK
ELINS B700 through B704
| ELIN | Product Name | Description Extended | Estimated | Unit of | Unit | Extended |
| Quantity | Issue | Price | Price |
Indefinite Quantity Work for use at all MIDLANT Bases within the Sewell's Point and Annexes
| B700 | Unit Priced Labor Work (Davis Bacon) - MUST BE NEGOTIATED BY KO | Performance of specific maintenance, repair, and alteration work that exceeds the labor limitations of a service order or PM repair. Task order completion times will be specified on each order. | 950 | MH | $ | $ |
| B701 | Unit Priced Labor Work (Service Contract Act) - MUST BE NEGOTIATED BY KO | Performance of specific maintenance, repair, and alteration work that exceeds the labor limitations of a service order or PM repair. Task order completion will be specified on each order. | 950 | MH | $ | $ |
| B702 | Material Costs - MUST BE NEGOTIATED BY KO | Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. | 120,000 | EA | $1.00 | $ 120,000.00 |
| B703 | Condenser Catch Pan | Provide an aluminum pan under the outdoor unit to contain all runoff caused by condenser cleaning. The pan will be 1/8" thick, 2" - 4" tall, wide and deep enough to contain all the effluent from condenser coil washing. | 1,000 | SF | $ | $ |
| The pan will have two 3/4" pipe connections for draining. The caps / plugs will be wired to the lip of the pan to prevent loss. | ||||||
| The pan will be large enough to contain 100% of the effluent. The SF quantity is based on the total sf of 1/8" aluminum in place. The pan will be in place within 5 working days of issuance of the Task Order. | ||||||
| B704 | Duct Fire Damper Testing | Provide Duct Fire Damper Testing for NAVSTA and NHCNE. | 1,000 | EA | $ | $ |
| In NFPA 80, section 19.3 Operational Test, fire damper testing is detailed. The essential test is that the damper will open and close and no obstructions are present. NFPA 729 is referenced when any smoke detection is present. The operation must be under the airflow conditions that the system will encounter. Fusible links must comply with NFPA 90A and UL33.10 Documentation must be maintained and any deficiencies reported and corrective action noted. It also states that “repairs shall begin without delay” and following repair shall be operational tested again. Both standards state the requirement for testing one year after installation and then every 4 years (hospitals 6 years). |
TOTAL NON-RECURRING PRICE OPTION ONE $
RECURRING OPTION TWO
| ATTACHMENT J-0200000-15 |
| EXHIBIT LINE ITEM NUMBERS |
| CONTRACT# N40085-20-R-0057 |
| EXHIBIT C |
Line Item 007 Second Option Period - Recurring Work
PROVIDE UNIT PRICES FOR RECURRING WORK
ELINS C001 through C061
| UNIT OF | TOTAL | ||||
| ELIN | DESCRIPTION | QTY | ISSUE | Unit Cost | AMOUNT |
| CNIC | |||||
| C001 | Emergency Service Order Work Estimated (Spec Item 3.1.3) | 70 | Each | $ | $ |
| C002 | Emergency Service Orders for Critical Cooling System Estimated (Spec Item 3.1.4) | 10 | Each | $ | $ |
| C003 | Routine Service Orders Estimated (Spec Item 3.1.5) | 355 | Each | $ | $ |
| C004 | Service Order Report (Spec Item 3.1.6) | 12 | Monthly | $ | $ |
| C005 | Daily Work Tracking (Spec Item 3.1.8) | 12 | Daily | $ | $ |
| C006 | Inventory Management (Spec Item 3.2) | 4 | Yearly | $ | $ |
| C007 | Develop And Implement Preventive Maintenance Program For HVAC Systems (Spec Item 3.3) | 2100 | Each | $ | $ |
| C008 | HVAC and Refrigeration Systems Spec Items 3.3.1) | 1 | Each | $ | $ |
| C009 | Direct Digital Controls (DDC) Requirements NAVSTA (Spec Items 3.4 / 3.4.1 / 3.4.2 / 3.4.3) | 49 | Each | $ | $ |
| C010 | Other Reccuring Services Program (Spec Items 3.5) | 12 | Monthly | $ | $ |
| C011 | HVAC Seasonal Start-up and Shut Down (Spec Item 3.5.1) | 2 | Each | $ | $ |
| C012 | Freeze Protection (In 55 Gal Drums) (Spec Items 3.5.2 | 20 | GAL | $ | $ |
| C013 | HVAC Water Testing and Treatment Services (Spec Items 3.5.3 | 1 | Monthly | $ | $ |
| C014 | Chemical Treatment For the Cooling Tower (Biocide) and Packaged Terminal Heat Pump Loop.(Rust Inhibitor) (Spec Item 3.5.3.1) | 10 | GAL | $ | $ |
| C015 | Trouble-shooting Testing and Replacement of Steam Traps. (Spec Items .3.5.4) 1" | 161 | Each | $ | $ |
| C016 | Trouble-shooting Testing and Replacement of Steam Traps. (Spec Items .3.5.4) 2" | 29 | Each | $ | $ |
| C017 | Restoration and Resetting Of HVAC Systems After Power Outages and Other Disruptions. Spec Item 3.5.5) | 2 | Each | $ | $ |
| C018 | Identification of Equipment in the Field (Tags Installed) (Spec Items 3.6.1) | 1 | Yearly | $ | $ |
| C019 | Filter and Belt Database (No Historical Data) (Spec Items 3.6.2) | 4 | Yearly | $ | $ |
| C020 | Ozone Depleting Substances (ODS) List (Spec Item 3.6.3) | 4 | Yearly | $ | $ |
| C021 | On-going Equipment and System Deviation Status Report (Spec Item 3.6.4) | 1 | Monthly | $ | $ |
| $ |
| NHCNE | |||||
| C022 | Emergency Service Order Work Estimated (Spec Item 3.1.3) | 9 | Each | $ | $ |
| C023 | Emergency Service Orders for Critical Cooling System Estimated (Spec Item 3.1.4) | 2 | Each | $ | $ |
| C024 | Routine Service Orders Estimated (Spec Item 3.1.5) | 20 | Each | $ | $ |
| C025 | Service Order Report (Spec Item 3.1.6) | 12 | Monthly | $ | $ |
| C026 | Daily Work Tracking (Spec Item 3.1.8) | 12 | Daily | $ | $ |
| C027 | Inventory Management (Spec Item 3.2) | 4 | Yearly | $ | $ |
| C028 | Develop And Implement Preventive Maintenance Program For HVAC Systems (Spec Item 3.3) | 690 | Each | $ | $ |
| C029 | HVAC and Refrigeration Systems Spec Items 3.3.1) | 1 | Each | $ | $ |
| C030 | Direct Digital Controls (DDC) Requirements NAVSTA (Spec Items 3.4 / 3.4.1 / 3.4.2 / 3.4.3) | 2 | Each | $ | $ |
| C031 | Other Reccuring Services Program (Spec Items 3.5) | 12 | Monthly | $ | $ |
| C032 | HVAC Seasonal Start-up and Shut Down (Spec Item 3.5.1) | 2 | Each | $ | $ |
| C033 | Chemical Treatment For the Cooling Tower (Biocide) and Packaged Terminal Heat Pump Loop.(Rust Inhibitor) (Spec Item 3.5.3.1) | 10 | GAL | $ | $ |
| C034 | Freeze Protection (In 55 Gal Drums) (Spec Items 3.5.2 | 5 | GAL | $ | $ |
| C035 | HVAC Water Testing and Treatment Services (Spec Items 3.5.3 | 1 | Monthly | $ | $ |
| C036 | Trouble-shooting Testing and Replacement of Steam Traps. (Spec Items .3.5.4) 1" | 8 | Each | $ | $ |
| C037 | Trouble-shooting Testing and Replacement of Steam Traps. (Spec Items .3.5.4) 2" | 4 | Each | $ | $ |
| C038 | Restoration and Resetting Of HVAC Systems After Power Outages and Other Disruptions. Spec Item 3.5.5) | 2 | Each | $ | $ |
| C039 | Identification of Equipment in the Field (Tags Installed) (Spec Items 3.6.1) | 1 | Yearly | $ | $ |
| C040 | Filter and Belt Database (No Historical Data) (Spec Items 3.6.2) | 4 | Yearly | $ | $ |
| C041 | Ozone Depleting Substances (ODS) List (Spec Item 3.6.3) | 4 | Yearly | $ | $ |
| C042 | On-going Equipment and System Deviation Status Report (Spec Item 3.6.4) | 1 | Monthly | $ | $ |
| $ |
| NGIS | |||||
| C043 | Emergency Service Order Work Estimated (Spec Item 3.1.3) | 10 | Each | $ | $ |
| C044 | Emergency Service Orders for Critical Cooling System Estimated (Spec Item 3.1.4) | 2 | Each | $ | $ |
| C045 | Routine Service Orders Estimated (Spec Item 3.1.5) | 30 | Each | $ | $ |
| C046 | Service Order Report (Spec Item 3.1.6) | 12 | Monthly | $ | $ |
| C047 | Daily Work Tracking (Spec Item 3.1.8) | 12 | Daily | $ | $ |
| C048 | Inventory Management (Spec Item 3.2) | 4 | Yearly | $ | $ |
| C049 | Develop And Implement Preventive Maintenance Program For HVAC Systems (Spec Item 3.3) | 329 | Each | $ | $ |
| C050 | HVAC and Refrigeration Systems Spec Items 3.3.1) | 1 | Each | $ | $ |
| C051 | Direct Digital Controls (DDC) Requirements NAVSTA (Spec Items 3.4 / 3.4.1 / 3.4.2 / 3.4.3) | 2 | Each | $ | $ |
| C052 | Other Reccuring Services Program (Spec Items 3.5) | 12 | Monthly | $ | $ |
| C053 | Heat Trace for Cooling Tower | 1 | Each | $ | $ |
| C054 | Chemical Treatment For the Cooling Tower (Biocide) and Packaged Terminal Heat Pump Loop.(Rust Inhibitor) (Spec Item 3.5.3.1) | 10 | GAL | $ | $ |
| C055 | HVAC Water Testing and Treatment Services (Spec Items 3.5.3 | 1 | Monthly | $ | $ |
| C056 | Restoration and Resetting Of HVAC Systems After Power Outages and Other Disruptions. Spec Item 3.5.5) | 2 | Each | $ | $ |
| C057 | Identification of Equipment in the Field (Tags Installed) (Spec Items 3.6.1) | 1 | Yearly | $ | $ |
| C058 | Filter and Belt Database (No Historical Data) (Spec Items 3.6.2) | 4 | Yearly | $ | $ |
| C060 | Ozone Depleting Substances (ODS) List (Spec Item 3.6.3) | 4 | Yearly | $ | $ |
| C061 | On-going Equipment and System Deviation Status Report (Spec Item 3.6.4) | 1 | Monthly | $ | $ |
TOTAL $
NON-RECURRING OPTION TWO
| ATTACHMENT J-0200000-15 |
| EXHIBIT LINE ITEM NUMBERS |
| CONTRACT# N40085-20-R-0057 |
| EXHIBIT C |
Line Item 006 Option 2 Period - Non-Recurring Work
PROVIDE UNIT PRICES FOR NON-RECURRING WORK
ELINS C700 through C704
| ELIN | Product Name | Description Extended | Estimated | Unit of | Unit | Extended |
| Quantity | Issue | Price | Price |
Indefinite Quantity Work for use at all MIDLANT Bases within the Sewell's Point and Annexes
| C700 | Unit Priced Labor Work (Davis Bacon) - MUST BE NEGOTIATED BY KO | Performance of specific maintenance, repair, and alteration work that exceeds the labor limitations of a service order or PM repair. Task order completion times will be specified on each order. | 1,000 | MH | $ | $ |
| C701 | Unit Priced Labor Work (Service Contract Act) - MUST BE NEGOTIATED BY KO | Performance of specific maintenance, repair, and alteration work that exceeds the labor limitations of a service order or PM repair. Task order completion will be specified on each order. | 1,000 | MH | $ | $ |
| C702 | Material Costs - MUST BE NEGOTIATED BY KO | Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. | 120,000 | EA | $ 1.00 | $ 120,000.00 |
| C703 | Condenser Catch Pan | Provide an aluminum pan under the outdoor unit to contain all runoff caused by condenser cleaning. The pan will be 1/8" thick, 2" - 4" tall, wide and deep enough to contain all the effluent from condenser coil washing. | 1,000 | SF | $ | $ |
| The pan will have two 3/4" pipe connections for draining. The caps / plugs will be wired to the lip of the pan to prevent loss. | ||||||
| The pan will be large enough to contain 100% of the effluent. The SF quantity is based on the total sf of 1/8" aluminum in place. The pan will be in place within 5 working days of issuance of the Task Order. | ||||||
| C704 | Duct Fire Damper Testing | Provide Duct Fire Damper Testing for NAVSTA and NHCNE. | 1,000 | EA | $ | $ |
| In NFPA 80, section 19.3 Operational Test, fire damper testing is detailed. The essential test is that the damper will open and close and no obstructions are present. NFPA 729 is referenced when any smoke detection is present. The operation must be under the airflow conditions that the system will encounter. Fusible links must comply with NFPA 90A and UL33.10 Documentation must be maintained and any deficiencies reported and corrective action noted. It also states that “repairs shall begin without delay” and following repair shall be operational tested again. Both standards state the requirement for testing one year after installation and then every 4 years (hospitals 6 years). |
TOTAL NON-RECURRING PRICE OPTION TWO $
RECURRING OPTION THREE
| ATTACHMENT J-0200000-15 |
| EXHIBIT LINE ITEM NUMBERS |
| CONTRACT# N40085-20-R-0057 |
| EXHIBIT D |
Line Item 007 Second Option Period - Recurring Work
PROVIDE UNIT PRICES FOR RECURRING WORK
ELINS D001 through D061
| UNIT OF | TOTAL | ||||
| ELIN | DESCRIPTION | QTY | ISSUE | Unit Cost | AMOUNT |
| CNIC | |||||
| D001 | Emergency Service Order Work Estimated (Spec Item 3.1.3) | 70 | Each | $ | $ |
| D002 | Emergency Service Orders for Critical Cooling System Estimated (Spec Item 3.1.4) | 10 | Each | $ | $ |
| D003 | Routine Service Orders Estimated (Spec Item 3.1.5) | 355 | Each | $ | $ |
| D004 | Service Order Report (Spec Item 3.1.6) | 12 | Monthly | $ | $ |
| D005 | Daily Work Tracking (Spec Item 3.1.8) | 12 | Daily | $ | $ |
| D006 | Inventory Management (Spec Item 3.2) | 4 | Yearly | $ | $ |
| D007 | Develop And Implement Preventive Maintenance Program For HVAC Systems (Spec Item 3.3) | 2100 | Each | $ | $ |
| D008 | HVAC and Refrigeration Systems Spec Items 3.3.1) | 1 | Each | $ | $ |
| D009 | Direct Digital Controls (DDC) Requirements NAVSTA (Spec Items 3.4 / 3.4.1 / 3.4.2 / 3.4.3) | 49 | Each | $ | $ |
| D010 | Other Reccuring Services Program (Spec Items 3.5) | 12 | Monthly | $ | $ |
| D011 | HVAC Seasonal Start-up and Shut Down (Spec Item 3.5.1) | 2 | Each | $ | $ |
| D012 | Freeze Protection (In 55 Gal Drums) (Spec Items 3.5.2 | 20 | GAL | $ | $ |
| D013 | HVAC Water Testing and Treatment Services (Spec Items 3.5.3 | 1 | Monthly | $ | $ |
| D014 | Chemical Treatment For the Cooling Tower (Biocide) and Packaged Terminal Heat Pump Loop.(Rust Inhibitor) (Spec Item 3.5.3.1) | 10 | GAL | $ | $ |
| D015 | Trouble-shooting Testing and Replacement of Steam Traps. (Spec Items .3.5.4) 1" | 161 | Each | $ | $ |
| D016 | Trouble-shooting Testing and Replacement of Steam Traps. (Spec Items .3.5.4) 2" | 29 | Each | $ | $ |
| D017 | Restoration and Resetting Of HVAC Systems After Power Outages and Other Disruptions. Spec Item 3.5.5) | 2 | Each | $ | $ |
| D018 | Identification of Equipment in the Field (Tags Installed) (Spec Items 3.6.1) | 1 | Yearly | $ | $ |
| D019 | Filter and Belt Database (No Historical Data) (Spec Items 3.6.2) | 4 | Yearly | $ | $ |
| D020 | Ozone Depleting Substances (ODS) List (Spec Item 3.6.3) | 4 | Yearly | $ | $ |
| D021 | On-going Equipment and System Deviation Status Report (Spec Item 3.6.4) | 1 | Monthly | $ | $ |
| $ |
| NHCNE | |||||
| D022 | Emergency Service Order Work Estimated (Spec Item 3.1.3) | 9 | Each | $ | $ |
| D023 | Emergency Service Orders for Critical Cooling System Estimated (Spec Item 3.1.4) | 2 | Each | $ | $ |
| D024 | Routine Service Orders Estimated (Spec Item 3.1.5) | 20 | Each | $ | $ |
| D025 | Service Order Report (Spec Item 3.1.6) | 12 | Monthly | $ | $ |
| D026 | Daily Work Tracking (Spec Item 3.1.8) | 12 | Daily | $ | $ |
| D027 | Inventory Management (Spec Item 3.2) | 4 | Yearly | $ | $ |
| D028 | Develop And Implement Preventive Maintenance Program For HVAC Systems (Spec Item 3.3) | 690 | Each | $ | $ |
| D029 | HVAC and Refrigeration Systems Spec Items 3.3.1) | 1 | Each | $ | $ |
| D030 | Direct Digital Controls (DDC) Requirements NAVSTA (Spec Items 3.4 / 3.4.1 / 3.4.2 / 3.4.3) | 2 | Each | $ | $ |
| D031 | Other Reccuring Services Program (Spec Items 3.5) | 12 | Monthly | $ | $ |
| D032 | HVAC Seasonal Start-up and Shut Down (Spec Item 3.5.1) | 2 | Each | $ | $ |
| D033 | Chemical Treatment For the Cooling Tower (Biocide) and Packaged Terminal Heat Pump Loop.(Rust Inhibitor) (Spec Item 3.5.3.1) | 10 | GAL | $ | $ |
| D034 | Freeze Protection (In 55 Gal Drums) (Spec Items 3.5.2 | 5 | GAL | $ | $ |
| D035 | HVAC Water Testing and Treatment Services (Spec Items 3.5.3 | 1 | Monthly | $ | $ |
| D036 | Trouble-shooting Testing and Replacement of Steam Traps. (Spec Items .3.5.4) 1" | 8 | Each | $ | $ |
| D037 | Trouble-shooting Testing and Replacement of Steam Traps. (Spec Items .3.5.4) 2" | 4 | Each | $ | $ |
| D038 | Restoration and Resetting Of HVAC Systems After Power Outages and Other Disruptions. Spec Item 3.5.5) | 2 | Each | $ | $ |
| D039 | Identification of Equipment in the Field (Tags Installed) (Spec Items 3.6.1) | 1 | Yearly | $ | $ |
| D040 | Filter and Belt Database (No Historical Data) (Spec Items 3.6.2) | 4 | Yearly | $ | $ |
| D041 | Ozone Depleting Substances (ODS) List (Spec Item 3.6.3) | 4 | Yearly | $ | $ |
| D042 | On-going Equipment and System Deviation Status Report (Spec Item 3.6.4) | 1 | Monthly | $ | |
| $ |
| NGIS | |||||
| D043 | Emergency Service Order Work Estimated (Spec Item 3.1.3) | 10 | Each | $ | $ |
| D044 | Emergency Service Orders for Critical Cooling System Estimated (Spec Item 3.1.4) | 2 | Each | $ | $ |
| D045 | Routine Service Orders Estimated (Spec Item 3.1.5) | 30 | Each | $ | $ |
| D046 | Service Order Report (Spec Item 3.1.6) | 12 | Monthly | $ | $ |
| D047 | Daily Work Tracking (Spec Item 3.1.8) | 12 | Daily | $ | $ |
| D048 | Inventory Management (Spec Item 3.2) | 4 | Yearly | $ | $ |
| D049 | Develop And Implement Preventive Maintenance Program For HVAC Systems (Spec Item 3.3) | 329 | Each | $ | $ |
| D050 | HVAC and Refrigeration Systems Spec Items 3.3.1) | 1 | Each | $ | $ |
| D051 | Direct Digital Controls (DDC) Requirements NAVSTA (Spec Items 3.4 / 3.4.1 / 3.4.2 / 3.4.3) | 2 | Each | $ | $ |
| D052 | Other Reccuring Services Program (Spec Items 3.5) | 12 | Monthly | $ | $ |
| D053 | Heat Trace for Cooling Tower | 1 | Each | $ | $ |
| D054 | Chemical Treatment For the Cooling Tower (Biocide) and Packaged Terminal Heat Pump Loop.(Rust Inhibitor) (Spec Item 3.5.3.1) | 10 | GAL | $ | $ |
| D055 | HVAC Water Testing and Treatment Services (Spec Items 3.5.3 | 1 | Monthly | $ | $ |
| D056 | Restoration and Resetting Of HVAC Systems After Power Outages and Other Disruptions. Spec Item 3.5.5) | 2 | Each | $ | $ |
| D057 | Identification of Equipment in the Field (Tags Installed) (Spec Items 3.6.1) | 1 | Yearly | $ | $ |
| D058 | Filter and Belt Database (No Historical Data) (Spec Items 3.6.2) | 4 | Yearly | $ | $ |
| D060 | Ozone Depleting Substances (ODS) List (Spec Item 3.6.3) | 4 | Yearly | ||
| D061 | On-going Equipment and System Deviation Status Report (Spec Item 3.6.4) | 1 | Monthly |
TOTAL $
NON-RECURRING OPTION THREE
| ATTACHMENT J-0200000-15 |
| EXHIBIT LINE ITEM NUMBERS |
| CONTRACT# N40085-20-R-0057 |
| EXHIBIT D |
Line Item 008 Option 3 Period - Non-Recurring Work
PROVIDE UNIT PRICES FOR NON-RECURRING WORK
ELINS D700 through D704
| ELIN | Product Name | Description Extended | Estimated | Unit of | Unit | Extended |
| Quantity | Issue | Price | Price |
Indefinite Quantity Work for use at all MIDLANT Bases within the Sewell's Point and Annexes
| D700 | Unit Priced Labor Work (Davis Bacon) - MUST BE NEGOTIATED BY KO | Performance of specific maintenance, repair, and alteration work that exceeds the labor limitations of a service order or PM repair. Task order completion times will be specified on each order. | 950 | MH | $ | $ |
| D701 | Unit Priced Labor Work (Service Contract Act) - MUST BE NEGOTIATED BY KO | Performance of specific maintenance, repair, and alteration work that exceeds the labor limitations of a service order or PM repair. Task order completion will be specified on each order. | 950 | MH | $ | $ |
| D702 | Material Costs - MUST BE NEGOTIATED BY KO | Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. | 120,000 | EA | $ 1.00 | $ 120,000.00 |
| D703 | Condenser Catch Pan | Provide an aluminum pan under the outdoor unit to contain all runoff caused by condenser cleaning. The pan will be 1/8" thick, 2" - 4" tall, wide and deep enough to contain all the effluent from condenser coil washing. | 1,000 | SF | $ | $ |
| The pan will have two 3/4" pipe connections for draining. The caps / plugs will be wired to the lip of the pan to prevent loss. | ||||||
| The pan will be large enough to contain 100% of the effluent. The SF quantity is based on the total sf of 1/8" aluminum in place. The pan will be in place within 5 working days of issuance of the Task Order. | ||||||
| D704 | Duct Fire Damper Testing | Provide Duct Fire Damper Testing for NAVSTA and NHCNE. | 1,000 | EA | $ | $ |
| In NFPA 80, section 19.3 Operational Test, fire damper testing is detailed. The essential test is that the damper will open and close and no obstructions are present. NFPA 729 is referenced when any smoke detection is present. The operation must be under the airflow conditions that the system will encounter. Fusible links must comply with NFPA 90A and UL33.10 Documentation must be maintained and any deficiencies reported and corrective action noted. It also states that “repairs shall begin without delay” and following repair shall be operational tested again. Both standards state the requirement for testing one year after installation and then every 4 years (hospitals 6 years). |
TOTAL NON-RECURRING PRICE OPTION THREE $
RECURRING OPTION FOUR
| ATTACHMENT J-0200000-15 |
| EXHIBIT LINE ITEM NUMBERS |
| CONTRACT# N40085-20-R-0057 |
| EXHIBIT E |
Line Item 009 Second Option Period - Recurring Work
PROVIDE UNIT PRICES FOR RECURRING WORK
ELINS E001 through E061
| UNIT OF | TOTAL | ||||
| ELIN | DESCRIPTION | QTY | ISSUE | Unit Cost | AMOUNT |
| CNIC | |||||
| E001 | Emergency Service Order Work Estimated (Spec Item 3.1.3) | 70 | Each | $ | $ |
| E002 | Emergency Service Orders for Critical Cooling System Estimated (Spec Item 3.1.4) | 10 | Each | $ | $ |
| E003 | Routine Service Orders Estimated (Spec Item 3.1.5) | 355 | Each | $ | $ |
| E004 | Service Order Report (Spec Item 3.1.6) | 12 | Monthly | $ | $ |
| E005 | Daily Work Tracking (Spec Item 3.1.8) | 12 | Daily | $ | $ |
| E006 | Inventory Management (Spec Item 3.2) | 4 | Yearly | $ | $ |
| E007 | Develop And Implement Preventive Maintenance Program For HVAC Systems (Spec Item 3.3) | 2100 | Each | $ | $ |
| E008 | HVAC and Refrigeration Systems Spec Items 3.3.1) | 1 | Each | $ | $ |
| E009 | Direct Digital Controls (DDC) Requirements NAVSTA (Spec Items 3.4 / 3.4.1 / 3.4.2 / 3.4.3) | 49 | Each | $ | $ |
| E010 | Other Reccuring Services Program (Spec Items 3.5) | 12 | Monthly | $ | $ |
| E011 | HVAC Seasonal Start-up and Shut Down (Spec Item 3.5.1) | 2 | Each | $ | $ |
| E012 | Freeze Protection (In 55 Gal Drums) (Spec Items 3.5.2 | 20 | GAL | $ | $ |
| E013 | HVAC Water Testing and Treatment Services (Spec Items 3.5.3 | 1 | Monthly | $ | $ |
| E014 | Chemical Treatment For the Cooling Tower (Biocide) and Packaged Terminal Heat Pump Loop.(Rust Inhibitor) (Spec Item 3.5.3.1) | 10 | GAL | $ | $ |
| E015 | Trouble-shooting Testing and Replacement of Steam Traps. (Spec Items .3.5.4) 1" | 161 | Each | $ | $ |
| E016 | Trouble-shooting Testing and Replacement of Steam Traps. (Spec Items .3.5.4) 2" | 29 | Each | $ | $ |
| E017 | Restoration and Resetting Of HVAC Systems After Power Outages and Other Disruptions. Spec Item 3.5.5) | 2 | Each | $ | $ |
| E018 | Identification of Equipment in the Field (Tags Installed) (Spec Items 3.6.1) | 1 | Yearly | $ | $ |
| E019 | Filter and Belt Database (No Historical Data) (Spec Items 3.6.2) | 4 | Yearly | $ | $ |
| E020 | Ozone Depleting Substances (ODS) List (Spec Item 3.6.3) | 4 | Yearly | $ | $ |
| E021 | On-going Equipment and System Deviation Status Report (Spec Item 3.6.4) | 1 | Monthly | $ | $ |
| $ |
| NHCNE | |||||
| E022 | Emergency Service Order Work Estimated (Spec Item 3.1.3) | 9 | Each | $ | $ |
| E023 | Emergency Service Orders for Critical Cooling System Estimated (Spec Item 3.1.4) | 2 | Each | $ | $ |
| E024 | Routine Service Orders Estimated (Spec Item 3.1.5) | 20 | Each | $ | $ |
| E025 | Service Order Report (Spec Item 3.1.6) | 12 | Monthly | $ | $ |
| E026 | Daily Work Tracking (Spec Item 3.1.8) | 12 | Daily | $ | $ |
| E027 | Inventory Management (Spec Item 3.2) | 4 | Yearly | $ | $ |
| E028 | Develop And Implement Preventive Maintenance Program For HVAC Systems (Spec Item 3.3) | 690 | Each | $ | $ |
| E029 | HVAC and Refrigeration Systems Spec Items 3.3.1) | 1 | Each | $ | $ |
| E030 | Direct Digital Controls (DDC) Requirements NAVSTA (Spec Items 3.4 / 3.4.1 / 3.4.2 / 3.4.3) | 2 | Each | $ | $ |
| E031 | Other Reccuring Services Program (Spec Items 3.5) | 12 | Monthly | $ | $ |
| E032 | HVAC Seasonal Start-up and Shut Down (Spec Item 3.5.1) | 2 | Each | $ | $ |
| E033 | Chemical Treatment For the Cooling Tower (Biocide) and Packaged Terminal Heat Pump Loop.(Rust Inhibitor) (Spec Item 3.5.3.1) | 10 | GAL | $ | $ |
| E034 | Freeze Protection (In 55 Gal Drums) (Spec Items 3.5.2 | 5 | GAL | $ | $ |
| E035 | HVAC Water Testing and Treatment Services (Spec Items 3.5.3 | 1 | Monthly | $ | $ |
| E036 | Trouble-shooting Testing and Replacement of Steam Traps. (Spec Items .3.5.4) 1" | 8 | Each | $ | $ |
| E037 | Trouble-shooting Testing and Replacement of Steam Traps. (Spec Items .3.5.4) 2" | 4 | Each | $ | $ |
| E038 | Restoration and Resetting Of HVAC Systems After Power Outages and Other Disruptions. Spec Item 3.5.5) | 2 | Each | $ | $ |
| E039 | Identification of Equipment in the Field (Tags Installed) (Spec Items 3.6.1) | 1 | Yearly | $ | $ |
| E040 | Filter and Belt Database (No Historical Data) (Spec Items 3.6.2) | 4 | Yearly | $ | $ |
| E041 | Ozone Depleting Substances (ODS) List (Spec Item 3.6.3) | 4 | Yearly | $ | $ |
| E042 | On-going Equipment and System Deviation Status Report (Spec Item 3.6.4) | 1 | Monthly | $ | $ |
| $ |
| NGIS | $ | $ | |||
| E043 | Emergency Service Order Work Estimated (Spec Item 3.1.3) | 10 | Each | $ | $ |
| E044 | Emergency Service Orders for Critical Cooling System Estimated (Spec Item 3.1.4) | 2 | Each | $ | $ |
| E045 | Routine Service Orders Estimated (Spec Item 3.1.5) | 30 | Each | $ | $ |
| E046 | Service Order Report (Spec Item 3.1.6) | 12 | Monthly | $ | $ |
| E047 | Daily Work Tracking (Spec Item 3.1.8) | 12 | Daily | $ | $ |
| E048 | Inventory Management (Spec Item 3.2) | 4 | Yearly | $ | $ |
| E049 | Develop And Implement Preventive Maintenance Program For HVAC Systems (Spec Item 3.3) | 329 | Each | $ | $ |
| E050 | HVAC and Refrigeration Systems Spec Items 3.3.1) | 1 | Each | $ | $ |
| E051 | Direct Digital Controls (DDC) Requirements NAVSTA (Spec Items 3.4 / 3.4.1 / 3.4.2 / 3.4.3) | 2 | Each | $ | $ |
| E052 | Other Reccuring Services Program (Spec Items 3.5) | 12 | Monthly | $ | $ |
| E053 | Heat Trace for Cooling Tower | 1 | Each | $ | $ |
| E054 | Chemical Treatment For the Cooling Tower (Biocide) and Packaged Terminal Heat Pump Loop.(Rust Inhibitor) (Spec Item 3.5.3.1) | 10 | GAL | $ | $ |
| E055 | HVAC Water Testing and Treatment Services (Spec Items 3.5.3 | 1 | Monthly | $ | $ |
| E056 | Restoration and Resetting Of HVAC Systems After Power Outages and Other Disruptions. Spec Item 3.5.5) | 2 | Each | $ | $ |
| E057 | Identification of Equipment in the Field (Tags Installed) (Spec Items 3.6.1) | 1 | Yearly | $ | $ |
| E058 | Filter and Belt Database (No Historical Data) (Spec Items 3.6.2) | 4 | Yearly | $ | $ |
| E060 | Ozone Depleting Substances (ODS) List (Spec Item 3.6.3) | 4 | Yearly | $ | $ |
| E061 | On-going Equipment and System Deviation Status Report (Spec Item 3.6.4) | 1 | Monthly | $ | $ |
NON-RECURRING OPTION FOUR
| ATTACHMENT J-0200000-15 |
| EXHIBIT LINE ITEM NUMBERS |
| CONTRACT# N40085-20-R-0057 |
| EXHIBIT E |
Line Item 010 Option 4 Period - Non-Recurring Work
PROVIDE UNIT PRICES FOR NON-RECURRING WORK
ELINS E700 through E704
| ELIN | Product Name | Description Extended | Estimated | Unit of | Unit | Extended |
| Quantity | Issue | Price | Price |
Indefinite Quantity Work for use at all MIDLANT Bases within the Sewell's Point and Annexes
| E700 | Unit Priced Labor Work (Davis Bacon) - MUST BE NEGOTIATED BY KO | Performance of specific maintenance, repair, and alteration work that exceeds the labor limitations of a service order or PM repair. Task order completion times will be specified on each order. | 950 | MH | $ | $ |
| E701 | Unit Priced Labor Work (Service Contract Act) - MUST BE NEGOTIATED BY KO | Performance of specific maintenance, repair, and alteration work that exceeds the labor limitations of a service order or PM repair. Task order completion will be specified on each order. | 950 | MH | $ | $ |
| E702 | Material Costs - MUST BE NEGOTIATED BY KO | Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. | 120,000 | EA | $ 1.00 | $ 120,000.00 |
| E703 | Condenser Catch Pan | Provide an aluminum pan under the outdoor unit to contain all runoff caused by condenser cleaning. The pan will be 1/8" thick, 2" - 4" tall, wide and deep enough to contain all the effluent from condenser coil washing. | 1,000 | SF | $ | $ |
| The pan will have two 3/4" pipe connections for draining. The caps / plugs will be wired to the lip of the pan to prevent loss. | ||||||
| The pan will be large enough to contain 100% of the effluent. The SF quantity is based on the total sf of 1/8" aluminum in place. The pan will be in place within 5 working days of issuance of the Task Order. | ||||||
| E704 | Duct Fire Damper Testing | Provide Duct Fire Damper Testing for NAVSTA and NHCNE. | 1,000 | EA | $ | $ |
| In NFPA 80, section 19.3 Operational Test, fire damper testing is detailed. The essential test is that the damper will open and close and no obstructions are present. NFPA 729 is referenced when any smoke detection is present. The operation must be under the airflow conditions that the system will encounter. Fusible links must comply with NFPA 90A and UL33.10 Documentation must be maintained and any deficiencies reported and corrective action noted. It also states that “repairs shall begin without delay” and following repair shall be operational tested again. Both standards state the requirement for testing one year after installation and then every 4 years (hospitals 6 years). |
TOTAL NON-RECURRING PRICE OPTION FOUR $
SUMMARY
| Recurring Work | Non- Recurring Work |
| Base Year | |
| $ | $ |
| Option 1 | |
| $ | |
| Option 2 | |
| $ | $ |
| Option 3 | |
| $ | $ |
| Option 4 | |
| $ | $ |
| Total 5 Year Recurring | Total 5 Year Non-Recurring |
| $ | $ |
File details come from the government source that posted it. Updated .