J-1502000-06 Chemical Treatment

Bldg # Area Description # of

Systems Capacity per System Glycol Notes

370 CP Condenser Water 1 Automated System; Note 4 370 CP Chilled Water 1 370 CP Hot Water 1 X 440 CP Chilled Water 1 1,000 gal.

440 CP Hot Water 1 900 gal. X 446 CHI Hot Water 1 120 gal.

1109 CHI Hot Water 1 1109 CHI Chilled Water 1 1112 CP Chilled Water 1 1268 CHI Hot Water 1 1277 MID Hot Water 1 230 gal 1284 CHI Hot Water 1 150 gal.

1288 CP Dual Temp 1 450 gal.

1288 CP Dual Temp 1 X 1356 CP Hot Water 1 1356 CP Chilled Water 1 1356 CP Glycol Loop Solar 2 X 1362 CHI Chilled Water 1 250 gal. X 1362 CHI Hot Water 1 500 gal.

1372 CP Chilled Water 1 1500 gal.

1372 CP Hot Water 1 1500 gal.

1373 CC Hot Water 1 300 gal.

1376 CC Chilled Water 1 250 gal.

1376 CC Hot Water 1 700 gal. X 1378 CHI Chilled Water 1

1284 CHI

Dry Cooler Loop for Winter Cooling 1 X Automated System; Note 4

1284A CHI

Chiller Plant Chilled Water System 1

Closed System

This is a large underground distribution system with between 6 and 20-inch pipe serving 10 buildings. See Note 3.

1284A CHI

Chiller Plant Condenser Water System 1 Open System

Includes automated chemical treatment system. See Note 3 and Note 4.

W-36 CC Hot Water 1 200 gal.

23A Chiller 1 23A Chiller 1

43 Chiller 1 80 Ton Carrier Model 30RBA08069- 0171L Ser# 4907Q85109

1 Chiller 1 York Model#

YCWL0074SE46XABSDT

outside Tower 1 Evapco Model # LPT516F

1A Chiller 1

York Model#

YCAL0052EE46XEBSDTXHX

XRL

3 Chller 1 Carrer Model #

3ORAPO5O6FA00110

13 Chiller 1 Carrier Model#

30RAP0105FA08100

Note: All Condenser Water systems require cooling tower cleaning and seasonal layup and flushing.

Note 2: Glycol shall be propylene type for all systems.

Note 3: For bldg. 1284A Central Chilled Water Plant, the contractor is NOT responsible for maintenance on the chemical treatment systems for condenser water and chilled water, nor is the contractor responsible provision of chemicals for the condenser water and chilled water; however, Contractor shall respond to all calls and perform all repairs on the chemical treatment systems in bldg. 1284A Central Chilled Water Plan Note 4: Responsible for maintenance and repair of automated system (control panel, pumps, etc.)

Note 5: This spreadsheet contains multiple Tabs.

# of

Systems Capacity per System Glycol Notes

1 CHI Hot Water 1 500 gal.

1A CHI Hot Water 1 100 gal.

1A CHI Chilled Water 2 500 gal.

3 CHI Hot Water 1 500 gal.

3 CHI Chilled Water 1 10 CHI Hot Water 1 250 gal.

13 CC Chilled Water 1 X 27 CHI Chilled Water 1 250 gal. X 27 CHI Hot Water 2 1000 gal.

29 CHI Hot Water 1 75 gal.

29 CHI Chilled Water 1 X Automated System; Note 4 52 CHI Hot Water 1 170 gal.

683 CHI Hot Water 1 500 gal.

686 CHI Dual Temp 1 1000 gal.

686 CHI Condenser Water 1 991 CHI Dual Temp 1 1000 gal.

991 CHI Condenser Water 1 X Dry Cooler/ Automated- Note 4 1269 CP Hot Water 1 200 gal.

1269 CP Chilled Water 1 1284 CHI Hot Water 1 150 gal.

1284 CHI

Dry Cooler Loop for Winter Cooling 1 X Automated System; Note 4

Note: All Condenser Water systems require cooling tower cleaning and seasonal layup and flushing.

Note 2: Glycol shall be propylene type for all systems.

Note 3: Not used.

Note 4: Responsible for maintenance and repair of automated system (control panel, pumps, etc.)

# of

Systems Capacity per System Glycol Notes

NHCNE

43 NHCNE Hot Water 1 43 NHCNE Chilled Water 1 X 44 NHCNE Hot Water 1

23A NHCNE Condenser Water 1 23A NHCNE Chilled Water 1 23A NHCNE Hot Water 1

1173 CP Chilled Water 1 X

York Model# YCAL0064EC46XBA Ser#

SLLM810020

Note: All Condenser Water systems require cooling tower cleaning and seasonal layup and flushing.

Note 2: Glycol shall be propylene type for all systems.

Note 3: Not used.

Note 4: Not used.

# of

Systems Capacity per System Glycol Notes

1688 CHI Cooling Tower Water 1 Automated System; Note 4 1688 CHI Condenser Water 1 Main building heat pump loop

Note: All Condenser Water systems require cooling tower cleaning and seasonal layup and flushing.

Note 2: Glycol shall be propylene type for all systems.

Note 3: Not used.

Note 4: Responsible for maintenance and repair of automated system (control panel, pumps, etc.)