Attachment E - Price Proposal Form (Seed Project).docx
DOCX document 22 KB Posted
- Solicitation number
- N4008520R0041
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 0002.pdf | ||
| Amendment 0001.pdf | ||
| Attachment C - Construction and Design Experience Project Data Sheet.docx | DOCX document | |
| NSGL Roofing MACC RFP Bldgs 328 and 7260.pdf | ||
| Attachment D - Past Performance Questionnaire.docx | DOCX document | |
| Attachment B - SECNAV_5512_1_11787.pdf | ||
| Attachment A - Pre-Proposal Inquiry Form.xlsx | XLSX spreadsheet | |
| N4008520R0041 Solicitation.pdf | ||
| NSGL Roofing MACC Specifications Bldgs 328 and 7260.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DB/DBB IDIQ MACC for Roof Repairs and Replacement N40085-20-R-0041
| NAVFAC MIDLANT Great Lakes AOR |
| Solicitation |
ATTACHMENT E - PRICE PROPOSAL FORM
PART 1 GENERAL
1.1 CONTRACT LINE ITEMS
The terms Offeror and Bidder and versions thereof (offer/bid) have the same definition as used within this contract.
Provide the Contract Line Item (CLIN) lump sum price for the following items:
CLIN 0001 ‐ BASE PRICE. Price includes the following:
CLIN 0001AA. Price for the entire work for Repair Roof Building 7260 complete to the 5-foot line outside of the building, complete in accordance with the drawings and specifications, but excluding work described in Contract Line Item CLIN 0001AB, 0001AC, and 0001AD.
| CLIN |
| ITEM |
| TOTAL PRICE FOR CLIN 0001AA |
| 0001AA |
| Repair Roof Building 7260 |
| $______________ |
CLIN 0001AB. Price for the entire for Replace Roof Building 328 complete to the 5-foot line, outside of the building, complete in accordance with the drawings and specifications but excluding work described in CLIN 0001AA, 0001AC, and 0001AD.
| CLIN |
| ITEM |
| TOTAL PRICE FOR CLIN 0001AB |
| 0001AB |
| Replace Roof Building 328 |
| $_____________ |
CLIN 0001AC. Price for removal and disposal of asbestos containing roofing materials complete in accordance with the drawings and specifications for Building 7260 but excluding work in CLIN 0001AA, 0001AB, and 0001AD. Unused quantities will be de-obligated.
| CLIN |
| Item |
| Unit |
| Unit Price |
| No. Units |
| TOTAL PRICE FOR CLIN 0001AC (UNIT PRICE X NO. UNITS) |
| 0001AC |
| Remove asbestos containing roofing material from Building 7260 |
| Square Feet |
| $________ |
| 1,000 |
| $______________ |
CLIN 0001AD. Price for removal and disposal of asbestos containing roofing materials complete in accordance with the drawings and specifications for Building 328 but excluding work in CLIN 0001AA, 0001AB, and 0001AC. Unused quantities will be de-obligated.
| CLIN |
| Item |
| Unit |
| Unit Price |
| No. Units |
| TOTAL PRICE FOR CLIN 0001AD (UNIT PRICE X NO. UNITS) |
| 0001AD |
| Remove asbestos containing roofing material from Building 328 |
| Square Feet |
| $________ |
| 1,000 |
| $______________ |
CLIN 0001. Base Price – Price includes the following:
Total Base Price in accordance with the drawings and specifications includes CLINs 0001AA, 0001AB, 0001AC, and 0001AD.
| CLIN |
| ITEM |
| TOTAL PRICE FOR CLIN 0001 |
| 0001 |
| Total Price for CLIN 0001 includes CLIN 001AA through CLIN 0001AD |
| $______________ |
1.2 GENERAL NOTES
a. Award will be made on the total sum of Contract Line Items 0001AA, 0001AB, 0001AC, and 0001AD. For CLINs 0001AC and 0001AD, enter unit prices and extended totals in spaces provided. If there is a difference between a unit price and the extended total, the unit price will be held to be the intended bid and the total recomputed accordingly. If an Offeror provides a total but fails to enter a unit price, the total divided by the specified quantity will be held to be the intended unit price.
b. The Government reserves the unilateral right to award a firm fixed proposed price as required for CLIN 0001. No provision is made for economic price adjustment.
c. The Government may reject an offer as nonresponsive if it is materially unbalanced as to prices for the basic requirement and the option quantities. An offer is unbalanced when it is based on prices significantly less than cost for some work and prices that are significantly overstated for other work.
d. The Performance Bond must reflect 100 percent of the aggregate amount of all Items.
-- End of Document --