N4008519R9179.pdf
PDF 394 KB Posted
- Attached to
- DESIGN-BUILD (DB), P-1254 MOBILE AVIATION MAINTENANCE FACILITY POWER UPGRADES, MCAS BEAUFORT, SC
- Solicitation number
- N40085-19-R-9179
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 0005.pdf | ||
| Amendment 0004.pdf | ||
| Amendment 0003.pdf | ||
| Amendment 0003 Attachment.pdf | ||
| Attachment D - Price Proposal Form P-1254.pdf | ||
| 2020_1562038_P1254 Final Volume II.pdf | ||
| AMENDMENT 0002.pdf | ||
| 2020_1562038_P1254 Final Volume I.pdf | ||
| Amendment 0001.pdf | ||
| Attachment C - Past Performance Questionnaire.docx | DOCX document | |
| Attachment B - Construction Design Exp.docx | DOCX document | |
| Attachment A - PPI log.doc | DOC document |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ACQR5668396
SOLICITATION NO. N40085-19-R-9179, DESIGN-BUILD (DB), P-1254 MOBILE AVIATION MAINTENANCE FACILITY POWER UPGRADES, MARINE
CORPS AIR STATION (MCAS), BEAUFORT, SOUTH CAROLINA
THIS REQUEST FOR PROPOSAL (RFP) IS FOR PHASE ONE FACTORS 1-4 ONLY. OFFERORS WHO HAVE BEEN SELECTED FOR PHASE TWO
WILL BE NOTIFIED DIRECTLY TO SUBMIT FACTOR 5 AND PRICE PROPOSAL.
THIS ACQUISITION IS BEING SOLICITED AS A TOTAL SMALL BUSINESS SET-ASIDE.
PROPOSALS ARE DUE TUESDAY, 18 FEBRUARY 2020 AT 2:00 EST. REFER TO SECTION 00 21 19 FOR PROPOSAL DELIVERY INFORMATION.
PRE-PROPOSAL INQUIRIES (PPI) CUT-OFF DATE AND TIME IS TUESDAY, 04 FEBRUARY 2020 AT 2:00 PM EST. ALL PPI'S SHALL BE
SUBMITTED TO BRITTANY CRISTELLI VIA EMAIL AT BRITTANY.CRISTELLI@NAVY.MIL.
MAGNITUDE OF CONSTRUCTION FOR THIS PROJECT IS BETWEEN $5,000,000 AND $10,000,000 IN ACCORDANCE WITH FAR 36.204.
DESIGN-BUILD BUDGET FOR THIS PROCUREMENT IS $8,070,000.
NAICS CODE IS 237130 - POWER AND COMMUNICATION LINE AND RELATED STRUCTURES CONSTRUCTIONS, AND THE SMALL BUSINESS
SIZE STANDARD IS $39,500,000.
BRITTANY N. CRISTELLI 757-341-1978
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
16-Jan-2020
(RFP)
(IFB)
X
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
X
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______15 calendar days and complete it w ithin ________555 calendar days after receiving aw ard, notice to proceed. This performance period is X mandatory, negotiable. (See _________________________FAR 52.211-10
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________4 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________18 Feb 2020 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee X is, is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______180 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
NAVFAC MID ATLANTIC
ACQUISITION CORE
9324 VIRGINIA AVENUE
NORFOLK VA 23511-3095
N40085
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
02:00 PM (hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
FAX:TEL: TEL: FAX:
N4008519R9179 42
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
N4008519R9179
Section 00 10 00 - Solicitation
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
Section 00 21 16 - Instructions to Proposers
INSTRUCTIONS TO OFFERORS
TABLE OF CONTENTS
1. GENERAL
1.1 GENERAL OVERVIEW OF PROCUREMENT PROCESS
1.2 GENERAL OVERVIEW OF CONTRACT
2. BASIS FOR AWARD
3. EVALUATION FACTORS FOR AWARD
4. PROPOSAL REQUIREMENTS
4.1 PRE-PROPOSAL CONFERENCE AND SITE VISIT
4.2 PROPOSAL SUBMISSION INSTRUCTIONS
4.3 PRE-PROPOSAL INQUIRIES (PPIs)
4.4 CONTRACT OPPORTUNITIES
5. INCORPORATION OF TECHNICAL PROPOSAL
6. ATTACHMENTS: MAY BE LOCATED ON CONTRACT OPPORTUNITIES UNDER ATTACHMENTS
5.1 ATTACHMENT A - PRE-PROPOSAL INQUIRY LOG
5.2 ATTACHMENT B - CONSTRUCTION AND DESIGN EXPERIENCE AND PROJECT DATA SHEET
5.3 ATTACHMENT C - PAST PERFORMANCE QUESTIONAIRE
5.4 ATTACHMENT D – PRICE PROPOSAL FORM
1. GENERAL OVERVIEW OF PROCUREMENT PROCESS
1.1.1 This solicitation is being issued as a Total Small Business Set-Aside.
1.1.2 The NAICS code for this procurement is 237130 and the size standard is $39,500,000
1.1.3 This acquisition will be advertised utilizing FAR Part 36.3, Two Phase Design Build Selection Procedures and 15 – Contracting by Negotiations resulting in a Firm Fixed Price (FFP) contract for construction services.
1.1.4 Magnitude of Construction: Between $5,000,000 and $10,000,000
1.2 GENERAL OVERVIEW OF CONTRACT
Description of Work:
The project, located at Marine Corps Air Station (MCAS), Beaufort, South Carolina, will provide a 2 MW ground-mounted solar photovoltaic system, plus 1 MW/4MWh minimum of battery storage and standby backup generation to ensure uninterrupted power for the mobile aviation maintenance facility, Building 1254 (a.k.a. "van pad").
Ancillary equipment will include power conditioning and control equipment to allow the van pad to operate in island mode. Minor lighting upgrades will also be made at the site to improve lighting quality and reduce energy consumption. The project will enable the facility to continue operations and keep aircraft mission-ready through prolonged disruptions in the commercial grid.
Project benefits include:
- Energy resilience by allowing the Station to island the mission-critical aviation support facility.
- Cost avoidance by reducing lost productive labor hours associated with downtime caused by power outages at the van pad.
- Increase in aviation readiness by enabling 24/7 operations and reducing turnaround time for critical avionics and airframe maintenance, testing, calibration and repairs.
- Energy cost reduction via onsite generation and battery storage.
- Generation assets that can be leveraged to help black start the installation when the FY2019 ERCIP project
P-505 is constructed.
A. BASIS FOR AWARD
1. The Government reserves the right to eliminate from consideration for award any or all offers at any time prior to award of the contract; to negotiate with offerors in the competitive range; and to award the contract to the offeror submitting the proposal determined to represent the best value—the proposal most advantageous to the Government, price and other factors considered.
2. As stated in the solicitation, the Government intends to evaluate proposals and award a contract without discussions with offerors (except clarifications as described in FAR 15.306(a)). The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary. In addition, if the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals.
3. The tradeoff process is selected as appropriate for this acquisition. The Government considers it to be in its best interest to allow consideration of award to other than the lowest priced offeror or other than the highest technically rated offeror.
4. This procurement will utilize two-phase design-build selection procedures as prescribed in FAR Subpart 36.3, where non-price Factors 1-4 will be evaluated in Phase I, and non-price Factor 5 and price will be evaluated in Phase II. Factor 1 will only be rated Acceptable or Unacceptable. If an offeror is rated Unacceptable in Factor 1, then they will not be considered for Phase II, unless corrected through discussions (if held). In making the best value award decision after Phase II, the Government will consider non-price Factors 2-5 and price.
The relative order of importance of the non-price evaluation factors is the technical factors (Factors 2, 4, and 5) are of equal importance to each other and, when combined, are equal in importance to the past performance evaluation/performance confidence assessment factor (Factor 3). When the proposal is evaluated as a whole, the technical factors and past performance/performance confidence assessment factor combined (i.e., the non-price evaluation factors) are approximately equal to price.
5. Any proposal found to have a Deficiency in meeting the stated solicitation requirements or performance objectives will be considered ineligible for award, unless the Deficiency is corrected through discussions. Proposals may be found to have either a Significant Weakness or multiple Weaknesses that impact either the individual factor rating or the overall rating for the proposal. The evaluation report must document the evaluation board’s assessment of the identified Weakness(s) and Significant Weaknesses and the associated risk to successful contract performance. This assessment must provide the rationale for proceeding to award without discussions.
F. EVALUATION FACTORS FOR AWARD
1. The solicitation requires the evaluation of price and the following non-price factors:
Phase I:
Factor 1 – Technical Approach Factor 2 – Experience Factor 3 – Past Performance Factor 4 – Safety
Phase II:
Factor 5 – Technical Solution
The distinction between Experience and Past Performance is that Experience pertains to the volume of work completed by a contractor that are comparable to the types of work described under the definition of recent, relevant projects, in terms of size, scope, and complexity. Past Performance pertains to both the relevance of recent efforts and how well a contractor has performed on the contracts.
2. As stated in the solicitation for this two-phase design-build procurement, Factors 1-4 will be evaluated in Phase I and Factor 5 will be evaluated in Phase II. Factor 1 will only be rated Acceptable or Unacceptable. If an offeror is rated Unacceptable in Factor 1, then they will not be considered for Phase II, unless corrected through discussions (if held). In making the best value award decisions after Phase II, the Government will consider Factors 2-5 and price.
The relative order of importance of the non-price evaluation factors is the technical factors (Factors 2, 4, and 5) are of equal importance to each other and, when combined are equal in importance to the past performance evaluation/performance confidence assessment factor (Factor 3). When the proposal is evaluated as a whole, the technical factors and past performance/performance confidence assessment factor combined (i.e., the non-price evaluation factors) are approximately equal to price.
After evaluating Phase I proposals, the source selection authority shall select the most highly qualified offerors and request that only those offerors submit Phase II proposals. In accordance with FAR 36.303-1(a)(4), the solicitation shall state that a maximum of five (5) offerors will be selected to submit Phase II proposals unless the contracting officer determines that a number greater than five (5) is in the Government’s best interest.
The importance of price will increase if the Offerors’ non-price proposals are considered essentially equal in terms of overall quality, or if price is so high as to significantly diminish the value of a non-price proposal’s superiority to the Government. Award will be made to the responsible Offeror whose offer conforms to the solicitation and represents the best value to the Government, price and non-price factors considered.
3. Basis of Evaluation and Submittal Requirements for Each Factor.
(a) Price (PHASE II):
(1) Solicitation Submittal Requirements:
Electronic submissions of Price Proposal are authorized. The Price Proposal Form may be emailed to brittany.cristelli@navy.mil and must be received on or before the time set for receipt of proposals. If Offeror chooses to submit as hard copy, price shall be submitted on the Price Schedule included in the solicitation. Offeror shall submit one marked “Original”, one CD, each in a separate package with the following characteristics:
• Cover page with Solicitation Number, Solicitation Title, Prime Contractor Name, Address, Phone Number, Fax Number, DUNS, Cage Code, Point of Contact, Phone Number, and Email Address;
• Completed SF 1442 signed with all amendments acknowledged;
• Price Proposal Form;
• Copy of Representation and Certifications and proof of registration in System for Award Management
(SAM);
• Confirmation of filing of Veterans’ Employment and Training (VETS) VETS-4212 for the 2016 filing cycle; and
• Bid Guarantee in accordance with FAR Clause 52.228-1 -- Bid Guarantee (amount shall be at least 20 percent of the bid price, but shall not exceed $3 million).
• Responsibility Determination Information (see below)
The offeror is required to submit a complete Price Proposal Form that includes completion of all contract line item numbers (CLINs).
In the event of discrepancy between the original and copy, the original shall govern. Additionally, price information included in the non-price proposal will not be considered. Likewise, non-price information included in the price proposal will not be considered.
ADDITIONAL INFORMATION TO BE SUBMITTED WITH PRICE PROPOSAL PACKAGE (PHASE II):
RESPONSIBILITY DETERMINATION INFORMATION - In order to be eligible for award, the offeror must be determined responsible in accordance with FAR Part 9, specifically 9.104-1, General Standards. In a separate tab, the offeror shall provide the following information in the price proposal package:
1. One (1) signed bank reference demonstrating adequate financial resources. If offeror’s firm has a line of credit – provide information on how many figures offeror can borrow against the line of credit (i.e. medium 6 figures – exact line of credit is not required).
2. The offeror shall provide the latest three complete fiscal year financial statements for the prime contractor, certified by an independent accounting firm, if practicable, or signed by an authorized officer of the organization.
Submit evidence of availability of working/operating capital, which will be used for the performance of the resultant contract. For Joint Venture arrangements, submit the latest three complete fiscal year financial statements for each company in the Joint Venture and discuss the financial responsibilities among the companies. The Government may also utilize Dun & Bradstreet reports to evaluate the financial capacity of the offeror.
3. Description of offeror’s facilities and equipment.
4. Other offeror’s work presently under contract.
Although required to be submitted with offeror’s price proposal, this information will not be evaluated as part of the price proposal. This information forms the basis of your firm’s responsibility determination should your firm be considered for award. Proposal packages from unsuccessful offerors will not be returned to the offeror, but shall be destroyed by the Contracting Officer. No certificate of destruction will be issued.
(2) Basis of Evaluation:
The Government will evaluate price based on the total price. Total price consists of the basic requirements and all option items (see Section 00 10 00 – Solicitation of the solicitation). The Government intends to evaluate all options and has included the provision FAR 52.217-5, Evaluation of Options (JUL 1990) in the solicitation. In accordance with FAR 52.217-5, evaluation of options will not obligate the Government to exercise the option(s). Analysis will be performed by one or more of the following techniques to ensure a fair and reasonable price:
(i) Comparison of proposed prices received in response to the RFP.
(ii) Comparison of proposed prices with the IGCE.
(iii) Comparison of proposed prices with available historical information.
(iv) Comparison of market survey results.
(b) Non-price Factors:
Non-price binder: The offeror shall submit one (1) original, marked “Original”, one CD ROM, and four (4) copies, marked “Copy”, each in a separate three ring binder with the following:
• Cover page with Solicitation Number, Solicitation Title, Prime Contractor Name, Address, Phone Number, Fax Number, DUNS, CAGE Code, Point of Contact, Phone Number, and Email Address;
• 8 ½ x 11 paper, 12-point font;
• Refer to individual factors for page limitations. Pages that exceed indicated page limitations shall not be evaluated; and
• Additionally, include an electronic version of the non-price proposal on one CD-ROM.
As with the price proposal, in the event of a discrepancy between the original and copies (or CD-ROM), the original version of the proposal will govern. Furthermore, any price information within the technical proposal (non-price proposal) will not be considered. Likewise, any technical/non-price information within the price proposal will not be considered.
(1) Factor 1 – Technical Approach:
(i) Solicitation Submittal Requirements:
The composition and management of the firms proposed as the design-build (DB) team for this contract will be evaluated in this factor.
The offeror shall submit the following information:
(1) Provide a narrative clearly describing the proposed primary construction firm(s) and primary design firm(s) for this contract and the rationale for proposing this arrangement. Provide the role, responsibilities, and contractual relationships between the various firms (see FAR Subpart 9.6). The narrative shall also include a simple organizational chart that clearly identifies the lines of authority between the entities. If the experience of a significant design subcontractor is being claimed in Factor 2, Experience, the firm must be named in the above narrative and organizational chart.
The technical approach narrative shall be limited to one (1) double-sided page (or two (2) single-sided pages) including the organizational chart. Information provided beyond this page limit will not be considered. The information requested in item #2 below is not included in this page limitation.
(2) In addition to the narrative, the offeror shall submit a signed copy of a joint venture agreement, partnership agreement, teaming agreement, approved mentor protégé agreement (MPA), or letter of commitment for each member of the offeror’s team identified above (e.g., joint venture member, partner, team member, subcontractor, parent company, subsidiary, or other affiliated company, etc.).
(ii) Basis of Evaluation:
The assessment of the offeror’s technical approach will be used as a means of evaluating the capability of the offeror to successfully meet the requirements of the RFP. This factor will be rated on an Acceptable or Unacceptable basis.
Failure to provide any of the above required information may result in the offeror being rated Unacceptable.
Offerors that are rated Unacceptable in this factor will be ineligible to proceed to Phase II, unless corrected through discussions, if held.
(2) Factor 2 – Experience:
(i) Solicitation Submittal Requirements:
The offeror shall submit the following information:
(1) Construction Experience:
Submit a minimum of two (2) and up to a maximum of five (5) relevant construction projects that best demonstrate experience on projects that are similar in Size, Scope, and Complexity to the project described herein.
For purposes of this evaluation, a relevant project is further defined as:
Size: Projects with new construction of 0.50MW ground-mounted solar photovoltaic system or greater, and a final construction cost of $3,000,000 or greater.
Scope/Complexity: Projects with new construction of ground-mounted solar photovoltaic system. At least one relevant construction project shall demonstrate experience with the installation of a battery storage system.
Note: Renovations of or additions to existing systems will not be considered.
Ensure that the project description clearly identifies whether the project is new construction or repair/renovation, addresses how the project meets the Size, Scope, and Complexity requirements as delineated above, and provides the final construction cost, or the Board may find the project Not Relevant.
Projects submitted for the Offeror shall be completed within the past five (5) years of the date of issuance of this
RFP.
A project is defined as a construction project performed under a single task order or contract. For multiple award and indefinite delivery/indefinite quantity type contracts, the contract as a whole shall not be submitted as a project;
rather Offerors shall submit the work performed under a task order as a project.
The attached Construction & Design Experience Project Data Sheet is MANDATORY and SHALL be used to submit project information. If the same project is being used to demonstrate construction and design experience, submit separate Project Data Sheets for construction and design or the Government may not consider the project.
Except as specifically requested, the Government will not consider information submitted in addition to this form nor will the Government consider information submitted via any other medium. Individual blocks on this form may be expanded; however, total length for each project data sheet shall not exceed one (1) double-sided page (or two (2) single-sided pages). Information beyond this page limit will not be considered.
For all submitted projects, the description of the project shall clearly describe the scope of work performed and the relevancy to the project requirements of this RFP (i.e., unique features, area, construction methods). In addition, the description should also address any sustainable features for the project, including specific descriptions of those features. Provide applicable documentation on projects that were validated and/or certified through U.S. Green Building Council (USGBC) or the equivalent organization or process.
If the Offeror is a Joint Venture (JV), relevant project experience should be submitted for projects completed by the Joint Venture entity. If the Joint Venture does not have shared experience, projects may be submitted for the Joint Venture members. Offerors who fail to submit experience for all Joint Venture members may be rated lower.
Offerors are still limited to a total of five (5) projects combined.
If an Offeror is utilizing experience information of affiliates/subsidiaries/parent/LLC/LTD member companies (name is not exactly as stated on the SF1442), the proposal shall clearly demonstrate that the affiliate/subsidiary/parent firm will have meaningful involvement in the performance of the contract.
Experience of proposed subcontractors will not be considered for Construction Experience. Likewise, the Government will not consider the offeror’s experience as a subcontractor.
(2) Design Experience:
Submit a minimum of two (2) and up to a maximum of five (5) relevant design projects that best demonstrate experience on projects that are similar in Size, Scope, and Complexity to the project described herein.
For purposes of this evaluation, a relevant project is further defined as:
Size: Projects with design of new construction of 0.50MW ground-mounted solar photovoltaic system or greater, and a final construction cost of $3,000,000 or greater.
Scope/Complexity: Projects with design of new construction of ground-mounted solar photovoltaic system. At least one relevant design project shall demonstrate experience with the installation of a battery storage system.
Note: Renovations of or additions to existing systems will not be considered.
Ensure that the project description clearly identifies whether the project is new construction or repair/renovation, addresses how the project meets the Size, Scope, and Complexity requirements as delineated above, and provides the final construction cost, or the Board may find the project Not Relevant.
Projects submitted for the Offeror’s designer of record shall be completed within the past five (5) years of the date of issuance of this RFP. For design-build projects, the design portion of the contract shall have been completed within the past five (5) years of the date of issuance of the RFP. If the information provided does not clearly that when the contract or design portion was complete, the project may not be considered.
A project is defined as a complete design effort performed under a single task order or contract/subcontract. For multiple award and indefinite delivery/indefinite quantity type contracts, the contract as a whole shall not be submitted as a project; rather Offerors shall submit the work performed under a task order as a project.
The attached Construction & Design Experience Project Data Sheet is MANDATORY and SHALL be used to submit project information. If the same project is being used to demonstrate construction and design experience, submit separate Project Data Sheets for construction and design or the Government may not consider the project.
Except as specifically requested, the Government will not consider information submitted in addition to this form nor will the Government consider information submitted via any other medium. Individual blocks on this form may be expanded; however, total length for each project data sheet shall not exceed one (1) double-sided page (or two (2) single-sided pages). Information beyond this page limit will not be considered.
For all submitted projects, the description of the project shall clearly describe the scope of work performed and the relevancy to the project requirements of this RFP (i.e., unique features, area, construction methods). In addition, the description should also address any sustainable features for the project, including specific descriptions of those features. Provide applicable documentation on projects that were validated and/or certified through U.S. Green Building Council (USGBC) or the equivalent organization or process.
If an Offeror is utilizing experience information of affiliates/subsidiaries/parent/LLC/LTD member companies (name is not exactly as stated on the SF1442), the proposal shall clearly demonstrate that the affiliate/subsidiary/parent firm will have meaningful involvement in the performance of the contract.
The Offeror may utilize experience of a design subcontractor to demonstrate design experience under this evaluation factor. The Offeror must provide a supporting joint venture agreement, partnership agreement, teaming agreement, or letter of commitment and an explanation of the meaningful involvement for the design subcontractor. Offerors proposing multiple design firms should submit relevant project experience for all design firms. Failure to do so may result in a lower rating. Offerors are still limited to a total of five (5) projects combined.
(ii) Basis of Evaluation:
The basis of evaluation will include the Offeror’s demonstrated experience and depth of experience in performing relevant construction and design projects as defined in the solicitation submittal requirements. The assessment of the Offeror’s relevant experience will be used as a means of evaluating the capability of the Offeror to successfully meet the requirements of the RFP. The Government will only review the first five projects submitted for construction and the first five projects submitted for design. Any projects submitted in excess of the five (5) for Construction Experience and five (5) for Design Experience will not be considered.
Relevant projects where the Offeror and the proposed design firm(s) have previously worked together may be considered more favorably than those that have not worked together.
Relevant projects that demonstrate design-build experience may be considered more favorably than those that do not have design-build experience.
Relevant projects that demonstrate experience with sustainable features may be considered more favorably than those that do not demonstrate experience with sustainable features.
(3) Factor 3 – Past Performance:
If a completed Contractor Performance Assessment Reporting System (CPARS) evaluation is available, it shall be submitted with the proposal for each project included in Factor 2 for Construction Experience. If a completed AE Contractor Performance Assessment Reporting System (CPARS) evaluation is available, it shall be submitted with the proposal for each project included in Factor 2 for Design Experience. If there is not a completed CPARS evaluation, then the Offeror shall submit Past Performance Questionnaires (Attachment D) for each project included in Factor 2 for both Construction Experience and Design Experience. The Offeror should provide completed Past Performance Questionnaires (PPQ) in the proposal. Offerors shall not incorporate by reference into their proposal PPQs previously submitted for other RFPs. However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation. If the Offeror is unable to obtain a completed PPQ from a client for a project(s) before proposal closing date, the Offeror shall complete and submit with the proposal the first page of the PPQ, which will provide contract and client information for the respective project(s). The Government may make reasonable attempts to contact the client noted for that project(s) to obtain the PPQ information. However, Offerors should follow-up with clients/references to help ensure timely submittal of questionnaires. If the client requests, questionnaires may be submitted directly to the Government’s point of contact, Brittany Cristelli at brittany.cristelli@navy.mil.
Offerors are highly encouraged to provide any information on problems encountered and the corrective actions taken on projects submitted under Factor 2 – Experience. Likewise, Offerors are highly encouraged to address any adverse past performance issues. Explanations shall not exceed two (2) double-sided pages (or four (4) single-sided pages) in total. Information provided beyond this page limit will not be considered.
The Government reserves the right to contact references for verification or additional information. The Government’s inability to contact any of the Offeror’s references or the references unwillingness to provide the information requested may affect the Government’s evaluation of this factor.
Performance award or additional information submitted by the Offeror will not be considered.
This evaluation will consider how well the Offeror’s team performed on relevant projects submitted under Factor 2 – Experience and may also consider past performance on other projects currently documented in known sources.
The Government will consider the recency and relevance of the information, the source of the information, context of the data, and general trends in the Contractor’s performance. This evaluation is separate and distinct from the Contracting Officer’s responsibility determination. The assessment of the Offeror’s team’s past performance will be used as a means of evaluating the Offeror’s team’s probability to successfully meet the requirements of the RFP.
Offerors lacking relevant past performance history will receive a NEUTRAL Confidence rating.
(4) Factor 4 – Safety:
The Offeror shall submit the following information: (For a partnership or joint venture, the following submittal requirements are required for each contractor who is part of the partnership or joint venture; however, only one safety narrative is required. EMR, DART and TRC Rates shall not be submitted for subcontractors.)
(1) Experience Modification Rate (EMR): Include three previous complete calendar years’ worth of data (2016, 2017, and 2018). This rate compares company’s annual losses in insurance claims against its policy premiums. The offeror may submit an insurance company-provided equivalent rate if no EMR exists. If the offeror has no EMR or premium, for any year, the offeror must affirmatively state so and explain why. Any extenuating circumstances that affect the EMR and negative trends must be addressed as part of the factor submission.
(2) OSHA Days Away from Work, Restricted Duty, or Job Transfer (DART) Rate: Submit three previous complete calendar years’ worth of data (2016, 2017, and 2018). If an offeror cannot submit an OSHA DART rates, for any year, the offeror must affirmatively state so and an explanation must be provided. Any extenuating circumstances that affected the OSHA DART rate data negatively must be addressed as part of this factor submission.
(3) OSHA Total Recordable Case (TRC) Rate: Submit three previous complete calendar years’ worth of data (2016, 2017, and 2018). If an offeror cannot submit OSHA TRC rates, for any year, the offeror must affirmatively state so and an explanation must be provided. Any extenuating circumstances that affected the OSHA TRC rate data negatively must be addressed as part of this factor submission.
(4) Technical Approach for Safety: The technical approach to safety narrative shall be limited to one (1) double-sided page (or two (2) single-sided pages), and must address all items below. Information in excess of the page limitation will not be considered.
a. The offeror shall describe the plan for safety that will be implemented to evaluate safety performance of potential subcontractors as part of the selection process for all levels of subcontractors.
b. The offeror shall fully describe the safety management system that they will use to oversee the safety compliance and performance of self-performed and subcontractor performed work.
c. The offeror shall describe any innovative methods that will be employed to ensure and monitor safe work practices at self-performed and/or all subcontractor levels.
d. The offeror shall describe their methodology to execute an effective program that facilitates sound mishap prevention techniques and processes, employee reporting of unsafe conditions, unsafe activities, and near-miss mishaps.
The evaluation will collectively consider the following:
- Experience Modification Rate (EMR)
- OSHA Days Away from Work, Restricted Duty, or Job Transfer (DART)
- Total Recordable Case (TRC) Rates
- Offeror Technical Approach to Safety
- Other sources of information available to the Government
(a) Experience Modification Rate (EMR): For the three previous complete calendar years (2016, 2017, and 2018) the offeror will submit EMR. If no EMR exists, the offeror may submit an insurance company-provided equivalent rate explaining why not. If an insurance company-provided equivalent rate is provided, it will be treated the same as an EMR. Any extenuating circumstances that affected the EMR and negative trends should be addressed as part of this selection factor. The board will evaluate the EMR to determine if the Offeror has demonstrated a history of safe work practices taking into account any negative trends and extenuating circumstances that impact the rating.
(b) OSHA Days Away from Work, Restricted Duty, or Job Transfer (DART) Rates: For the three previous complete calendar years (2016, 2017, and 2018), the offeror will submit their OSHA DART, as defined by the U.S.
Department of Labor, Occupational Safety and Health Administration. If unable to submit OSHA DART rates, the offeror must affirmatively state so, and an explanation must be provided. Any extenuating circumstances that affected the OSHA DART data and negative trends should be addressed as part of this element. The board will evaluate the OSHA DART rates to determine if the Offeror has demonstrated a history of safe work practices taking into account any upward trends and extenuating circumstances that impact rates.
(c) Total Recordable Case (TRC) Rates: For the three previous complete calendar years (2016, 2017, and 2018), the offeror will submit their TRC, as defined by the U.S. Department of Labor, Occupational Safety and Health Administration. If unable to submit TRC rates, the offeror must affirmatively state so, and an explanation must be provided. Any extenuating circumstances that affected the TRC rate data and negative trends should be addressed as part of this element. The board will evaluate the TRC rates to determine if the Offeror has demonstrated a history of safe work practices taking into account any upward trends and extenuating circumstances that impact rates.
(d) Technical Approach to Safety: The offeror will describe their plan to evaluate their safety performance and that of potential subcontractors. Also, describe any innovative methods that the Offeror will employ to ensure and monitor safe work practices at all subcontractor levels. The Safety Narrative shall be limited to two pages. The board will evaluate the narrative to determine the degree to which subcontractor safety performance will be considered in the selection of all levels of subcontractors on the upcoming project. The board will evaluate the narrative to determine the degree to which innovations are being proposed that may enhance safety on this procurement and validate the contractor has addressed methodology to be used in the execution of an effective program that facilitates sound mishap prevention techniques/processes, employee reporting of unsafe conditions, unsafe activities, and near-miss mishaps. Those Offerors whose plan demonstrates a commitment to hire subcontractors with a culture of safety and who propose innovative methods to enhance a safe working environment may be given greater weight in the evaluation.
(e) Other Sources of Information Available to the Government: Other sources for safety may include but are not limited to OSHA data, NAVFAC’s Contractor Incident Reporting System (CIRS) in Enterprise Safety Applications Management System (ESAMS), Contractor Performance Assessment Reporting System (CPARS) and other related databases.
(5) Factor 5 – Technical Solution:
Provide a narrative describing your understanding and approach to executing the project that meets the requirements of the RFP. The narrative shall address the following, at a minimum:
• Site layout of the solar array, including orientation, site clearing, access, roadways, and connection to existing electrical grid;
• Description of the battery system, including housing and connection to existing electrical grid; and
• Cybersecurity adherence.
Narratives shall not exceed six (6) double-sided pages (or twelve (12) single-sided pages). Four (4) conceptual site drawings (site plans) must be provided to supplement the narrative, one for each site. The Government will not consider information beyond this page limit, but the page limit does not include the four conceptual site drawings.
The Government will evaluate the narrative considering the extent to which the offeror demonstrates a clear understanding of the architectural and engineering requirements of the project. The Government will evaluate the offeror's technical solution to determine whether it meets or exceeds the technical requirements of the RFP.
4. PROPOSAL REQUIREMENTS
1. PRE-PROPOSAL CONFERENCE AND SITE VISIT: Site Visit will be conducted during Phase II and will be announced via Amendment.
2. PROPOSAL SUBMISSION INSTRUCTIONS: In response to this request for proposal, the complete proposal shall include the Price Proposal and the Non-Price Factors Proposal, submitted in accordance with the above Basis of Evaluation and Submittal Requirements for Each Factor and as follows:
i. The Price Proposal (if submitted in hard copy) and the Non-Price Proposal shall be submitted in separate 3-ring binders. All pages shall be numbered and binders shall be appropriately tabbed, conforming to the proposal submittal requirements’ structure for each evaluation factor. Price and Non-Price Proposals must be submitted in sealed envelopes/boxes. Any pricing information included in the Non-Cost/Price Proposal will not be considered.
Similarly, any Non-Price information included in the Price Proposal will not be considered. Proposals shall be labeled
“PRICE PROPOSAL OR NON-COST/PRICE PROPOSAL FOR RFP N40085-19-R-9179,
ATTN: BRITTANY CRISTELLI; DO NOT OPEN IN MAIL ROOM”.
DUE TO INCREASED SECURITY CONCERNS, THIS SOLICITATION AUTHORIZES ELECTRONIC
SUBMISSION OF THE PRICE PROPOSAL FORM. THESE MAY BE EMAILED TO THE FOLLOWING
BRITTANY.CRISTELLI@NAVY.MIL AND SHALL BE RECEIVED ON OR BEFORE THE DUE DATE
FOR PROPOSALS OR THE PROPOSAL MAY BE REJECTED.
ii. The offeror’s proposal must include all data and information required and must be submitted in accordance with these instructions. The offeror shall be compliant with the requirements as stated herein, for non-conformance may result in an unfavorable proposal evaluation.
Proposals may be sent via express mail carriers to the following address:
NAVFAC MIDLANT
9324 Virginia Avenue, Bldg, Z140, Room 225 Norfolk, VA 23511 Attn: Brittany Cristelli, Contract Specialist - ACQ 21
(MAILED PROPOSALS ARE PREFERRED DUE TO RECENT SECURITY CHANGES REQUIRED TO
GAIN BASE ACCESS)
3. PRE-PROPOSAL INQUIRIES (PPIs): All inquiries must be submitted in writing and received by the Contract Specialist by the date specified herein in order to permit adequate time to reply to the inquiry. There is no guarantee that PPI’s submitted after the cut-off date will be answered before the solicitation closes. Submit all questions to brittany.cristelli@navy.mil. Use of the PPI Log template is required. The PPI Log Template (Attachment A) can be found on the Contract Opportunities website under the Attachments section.
4. Contract Opportunities: Amendments will be posted directly to Contract Opportunities/beta.SAM. The drawings and specifications will be posted on Contract Opportunities under the Attachments section of this RFP. Additionally, other postings will be made to Contract Opportunities, such as the pre-proposal inquires (PPI) log, revised drawings, etc., under the Attachments section of the RFP. It is recommended contractors check Contract Opportunities and Attachments section of the RFP periodically to see if additional postings have been made. It is the contractor’s responsibility to check Contract Opportunities for all postings.
Section 00 45 00 - Representations and Certifications
CLAUSES INCORPORATED BY REFERENCE
52.203-11 Certification And Disclosure Regarding Payments To
Influence Certain Federal Transactions
SEP 2007
52.204-7 System for Award Management OCT 2018 52.204-13 System for Award Management Maintenance OCT 2018 52.204-16 Commercial and Government Entity Code Reporting JUL 2016 52.204-17 Ownership or Control of Offeror JUL 2016 52.217-4 Evaluation Of Options Exercised At The Time Of Contract
Award
JUN 1988
52.217-5 Evaluation Of Options JUL 1990 52.222-25 Affirmative Action Compliance APR 1984 52.222-38 Compliance With Veterans' Employment Reporting
Requirements
FEB 2016
52.223-22 Public Disclosure of Greenhouse Gas Emissions and Reduction Goals -- Representation.
DEC 2016
52.225-12 Notice of Buy American Requirement - Construction Materials Under Trade Agreements
MAY 2014
52.225-18 Place of Manufacture AUG 2018 52.236-28 Preparation of Proposals--Construction OCT 1997 52.252-3 Alterations in Solicitation APR 1984 52.252-5 Authorized Deviations In Provisions APR 1984 252.204-7007 Alternate A, Annual Representations and Certifications JUN 2019 252.206-7000 Domestic Source Restriction DEC 1991 252.215-7008 Only One Offer JUL 2019 252.223-7001 Hazard Warning Labels DEC 1991 252.223-7004 Drug Free Work Force SEP 1988 252.223-7006 Prohibition On Storage, Treatment, and Disposal of Toxic or
Hazardous Materials
SEP 2014
252.225-7017 Photovoltaic Devices AUG 2019 252.225-7018 Photovoltaic Devices--Certificate DEC 2018 252.247-7022 Representation of Extent of Transportation by Sea. JUN 2019
CLAUSES INCORPORATED BY FULL TEXT
52.204-3 TAXPAYER IDENTIFICATION (OCT 1998)
(a) Definitions.
Common parent, as used in this provision, means that corporate entity that owns or controls an affiliated group of corporations that files its Federal income tax returns on a consolidated basis, and of which the offeror is a member.
Taxpayer Identification Number (TIN), as used in this provision, means the number required by the Internal Revenue Service (IRS) to be used by the offeror in reporting income tax and other returns. The TIN may be either a Social Security Number or an Employer Identification Number.
(b) All offerors must submit the information required in paragraphs (d) through (f) of this provision to comply with debt collection requirements of 31 U.S.C. 7701(c) and 3325(d), reporting requirements of 26 U.S.C. 6041, 6041A, and 6050M, and implementing regulations issued by the IRS. If the resulting contract is subject to the payment reporting requirements described in Federal Acquisition Regulation (FAR) 4.904, the failure or refusal by the offeror to furnish the information may result in a 31 percent reduction of payments otherwise due under the contract.
(c) The TIN may be used by the Government to collect and report on any delinquent amounts arising out of the offeror's relationship with the Government (31 U.S.C. 7701(c)(3)). If the resulting contract is subject to the payment reporting requirements described in FAR 4.904, the TIN provided hereunder may be matched with IRS records to verify the accuracy of the offeror's TIN.
(d) Taxpayer Identification Number (TIN).
___ TIN:.--------------------------------------------------------
___ TIN has been applied for.
___ TIN is not required because:
___ Offeror is a nonresident alien, foreign corporation, or foreign partnership that does not have income effectively connected with the conduct of a trade or business in the United States and does not have an office or place of business or a fiscal paying agent in the United States;
___ Offeror is an agency or instrumentality of a foreign government;
___ Offeror is an agency or instrumentality of the Federal Government.
(e) Type of organization.
___ Sole proprietorship;
___ Partnership;
___ Corporate entity (not tax-exempt);
___ Corporate entity (tax-exempt);
___ Government entity (Federal, State, or local);
___ Foreign government;
___ International organization per 26 CFR 1.6049-4;
___ Other--------------------------------------------------------
(f) Common parent.
___ Offeror is not owned or controlled by a common parent as defined in paragraph (a) of this provision.
___ Name and TIN of common parent:
Name-------------------------------------------------------------------
TIN--------------------------------------------------------------------
(End of provision)
52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2018)
(a)(1) The North American Industry Classification System (NAICS) code for this acquisition is 237130.
(2) The small business size standard is $39,500,000.
(3) The small business size standard for a concern which submits an offer in its own name, other than on a construction or service contract, but which proposes to furnish a product which it did not itself manufacture, is 500 employees.
(b)(1) If the provision at 52.204-7, System for Award Management, is included in this solicitation, paragraph (d) of this provision applies.
(2) If the provision at 52.204-7, System for Award Management, is not included in this solicitation, and the Offeror has an active registration in the System for Award Management (SAM), the Offeror may choose to use paragraph (d) of this provision instead of completing the corresponding individual representations and certifications in the solicitation. The Offeror shall indicate which option applies by checking one of the following boxes:
( ) Paragraph (d) applies.
( ) Paragraph (d) does not apply and the offeror has completed the individual representations…