ACQR5554166
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
DRY DOCK 4 RENOVATION, NORFOLK NAVAL SHIPYARD, PORTSMOUTH, VIRGINIA
See Continuation Page
1. CONTRACT ID CODE PAGE OF PAGES
J 1 22
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 12-Jul-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008519R9014
X 9B. DATED (SEE ITEM 11)
12-Mar-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
12-Jul-2019
CODE
NAVFAC MID ATLANTIC
ACQUISITION CORE
9324 VIRGINIA AVENUE
NORFOLK VA 23511-3095
N40085 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N4008519R9014
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0010
The purpose of this amendment is to provide the following information:
I. Provide Pre-Proposal Inquiry (PPI) Responses II. Provide revised drawings contained in files N4008519R901400061369059-DWG-DP2A-07of23
[contains sheets SD107 and SD114], N4008519R901400061369059-DWG-DP2A-09of23 [contains sheet S-507] and N4008519R901400061369059-DWG-DP2A-11of23 [contains sheets M-001, MS113, MS114, MS209, MS210 and MS503]. (Revisions are in red)
III. Provide additional referenced drawings IV. Provide additional documents (Appendix J) V. Provide information for specifications VI. Provide revised Price Proposal Form (Attachment F). (Revisions are in red) VII. Provide Wage Determinations
I. PROVIDE PRE-PROPOSAL INQUIRY (PPI) RESPONSES
PPI#
Reference Question
Government Response
Page/Dwg Section Paragraph
27 4 31 52 00 1.4.4.1.b
Please provide more details on the system test. What is the purpose of the test? What constitutes a successful test?
See Amendment 0010
28 4 31 52 00 1.4.4.1.b
In situations where there is concern about settlement in the surrounding area, it is customary for the Owner to provide maximum drawdown values at points of interest on the site rather than a blanket limit on settlement. Will the Navy consider this approach?
Bid per RFP
29 5 31 52 00 1.4.4.3.a
The specification requires the contractor to draw the groundwater down to Elev. 49 inside the dock and pumpwell and "within a minimum of 20 feet behind the dry dock wall, or pumpwell wall". The goal is likely incompatible with the desire to limit drawdown and resulting settlement beneath surrounding buildings. Even with the addition of recharge wells, it may not be physcially
See Amendment 0010 possible.
Design Pack.
2A
DO YOU HAVE THE
ELEVATIONS OF THE
EXISTING DUCTBANKS
THAT PENTRATE THE
EXISTING MANHOLE
See Amendment 0010
EP103/EP1
04/ED103
DP2B
More information is needed on drawings EP104 and EP103.
The contractor needs to know cable/conduit details in order to size and price the duct bank.
On drawing ED103 the contractor is instructed to remove conductors for later use.
The contractor suggests to replace the conductor in its entirety.
To your knowledge, is there asbestos within the manholes?
Bid Per RFP
60 ED103 DP2B
More information is needed on drawing ED103 in order to properly estimate the demolition of the flood lights and associated appurtences.
Routing and size is requested by the contractor.
61 ED103 DP2B
What is the size of the manhole in note 11.
Where is the final destination for the CHP circuit?
DP2A
Please provide a box and device schedule for package 2A.
64 ED103 DP2B
Note 2 from ED103, instructs the contractor to "REMOVE
CONNECTION TO CAPSTAN
TO INCLUDE PULLBOX,
DISCONNECT SWITCH,
STARTER, TRANSFORMER,
RECEPTACLE, SUMP PUMP,
FLOATS, AND DISCHARGE
PIPING." The contractor needs mechanical/electrical details of the capstan and appurtenances.
65 EP103 DP2B
Drawing EP103 does not specifically note to install a new duct bank. Please confirm the contractor is supposed to install a new duct bank where the proposed sections are shown.
DP2B
Design package 2B does not have a fixture schedule. The general electrical nots show a fixture symbol with minimal detail. Can we assume it is going to be the same 4' LED strip light from the schedule in package 1?
67 ED102 DP2B
Design package 2B sheet ED102 - All notes that require the removal of an electrical device/panel/gear/etc. also require the removal of conduit and conductors back to its source. It is unclear what and where the source of each of these items is. Please clarify.
(this same issue arises on multiple pages following this one.
Will NAVFAC setup another site visit for the benefit of subcontractors and vendors to inspect the facility? Many small businesses did not have the opportunity to inspect the site at the initial vist.
Bid Per RFP
2A- Dwg
SD401
Demolition Section A1 show removal of previously installed 78” diameter pipe pile to the tip elevation of -50 FT.In removing the 78” diameter pipe pile to this elevation, significant undermining of adjacent structures will occur. We suggest removing the subject pipe pile to the bottom of tremie which is +/-10 FT below mud line.
Bid Per RFP
73 9 3/1/2000 2.2.1.2 c state 8000 ft-lb max demolition hammer this is to small of a hammer to economically demolish the drydock will a large hammer be acceptable
Bid Per RFP
74 5 31-23-00.00-
1.5 g what level of contamination for excess soil are we to figure for disposal cost
See Amendment 0010
75 34 3 31 29 3.4.8 tell us to clean and roughen surfaces there is no access into the dewatering tunnels in the drydock floor is it your intent for the contrector to demolish the floor to create access
Bid Per RFP
77 27 03 31 29 2.9.1 b will steel face forms be acceptable
79 G-006 Asbestos 1 & 2 Verify which electrical manholes have cables wrapped with asbestos fire wrap.
Bid Per RFP
80 G-007 Asbestos 2 & 2
Verify which electrical ductbanks that are called out to be demolished have asbestos fiber conduits.
Bid Per RFP
82 8 01 14 00.00
1.5.6
Working hours are indicated as 8 1/2 hour period between 7 a.m. and 3:30 p.m, Monday through Friday, and 7 a.m. to 11 p.m. Saturday, excluding government holidays. Past experience indicates that vehicles with personnel and materials that must go through truck inspection can spend 3 hours waiting for inspections to access the facility and CIA. Are special provisions going to be put in place at truck inspection to ensure contractors are able to access the work area in a timely manner to be able to work for 8 1/2 hours?
Attachment F - Price Proposal
Form
No unit price line items are included in the Price Proposal Form for contaminated and hazardous soil or water. Please confirm that should contaminated or hazardous soil or water be encountered, additional costs will be handled as unforeseen conditions and paid for by contract modification.
See Amendment 0010
SD107,
Pack. 2A
There are call outs for detail D1 SD510 and D3 SD510. These details do not exist. Please provide.
See Amendment 0010
85 G-006 Pack. 2A Asbestos
Note 2. states that "fiber conduits…assumed to have asbestos…within the conduit itself. What is the shipyards procedure in dealing with the demolition of concrete ductbanks that have asbestos in the fiber conduits?
Bid Per RFP
86 G-006 Pack. 2A Asbestos
Notes 1 and 2 reference specification 02 82 12.00 22 for demolishing and handling asbestos containming material.
This section has not been included in the specifications.
Please provide.
N4008519 R9014N40 08519R90
14_SF1442
-1
The wage determination General Decision Number:
VA190055 02/01/2019 VA55
does not list rates for sheet metal workers. What is the correct rate to use for sheet metal workers on heavy construction projects?
33.11.00.01.
2.1.1.3 Please advise if the stainless fittings need to be true s80 or will XH be acceptable
89 M001
Drawing M001 Note 14 references detail A5/CU501 for restraining rod detail, Detail A5 on CU501 is a detail referencing a tapping sleeve. Can the detail be provided for the retaining rods.
See Amendment 0010
90 1965 33.11.00 1.3.3
Drawing MS113 Note 1 states to provide 10" stainless EMP piping in the dry dock, the specification calls for fiberglass pipe and fittings. Please clarify if the piping is to be fiberglass or 316 stainless steel.
91 MS209
Drawing MS209 EMP horizontal piping does not indicate a detail for the pipe supports. Please clarify if detail C4/MS504 shall be utilized with the EMP piping in the dry dock
There is no support details provided for the ASW, DDF, CHT, SFF, OWWO, FW installed horizontally within the trench, please provide detail for supports for these systems within the trench
93 S507
Detail B1 references note 3 in regards to the ball valve, there is no Note 3 on this drawing.
Please provide this information in regards to the ball valve.
See Amendment 0010
14 and 15 of 16
4.2 and 4.3 Amendment 9
Amendment 9 extended Bid due date to August 14, 2019.
Original Solicitaion outlines all Pre-Proposal Inquiries to be submitted at least 10 days prior to solicitation closing date. We request extended due date for Pre-Proposal Inquiries to be extended from July 22nd to August 5th.
See Amendment 0009
II. PROVIDE REVISED DRAWINGS
The following NAVFAC Drawings contained in files N4008519R901400061369059-DWG-DP2A-07of23, N4008519R901400061369059-DWG-DP2A-09of23 and N4008519R901400061369059-DWG-DP2A-11of23 are hereby removed:
NAVFAC DWG NO. DESIGN PACKAGE TITLE
12778637 Design Package 2A SD107 – Structural Demolition Plan – Area 107 12778642 Design Package 2A SD114 – Structural Demolition Plan – Area 114 12778735 Design Package 2A S-507 – Dry Dock Floor Details – 2 of 2 12778783 Design Package 2A M-001 – Mechanical Utilities Legend, Notes, and
Abbreviations 12778792 Design Package 2A MS113 – Mechanical Demolition Plan – Area 113 12778793 Design Package 2A MS114 – Mechanical Demolition Plan – Area 114 12778812 Design Package 2A MS209 – Mechanical Utilities Elevation – DD4 South
Wall Area 113 12778813 Design Package 2A MS210 – Mechanical Utilities Elevation – DD4 South
Wall Area 114 12778834 Design Package 2A MS503 – Details – 3 of 4 12778835 Design Package 2A MS504 – Details – 4 of 4
The following NAVFAC Drawing contained in file N4008519R9014Amendment_0010_Dwgs are hereby replaced with:
12778637 Design Package 2A SD107 – Structural Demolition Plan – Area 107* 12778642 Design Package 2A SD114 – Structural Demolition Plan – Area 114* 12778735 Design Package 2A S-507 – Dry Dock Floor Details – 2 of 2* 12778783 Design Package 2A M-001 – Mechanical Utilities Legend, Notes, and
Abbreviations* 12778792 Design Package 2A MS113 – Mechanical Demolition Plan – Area 113* 12778793 Design Package 2A MS114 – Mechanical Demolition Plan – Area 114* 12778812 Design Package 2A MS209 – Mechanical Utilities Elevation – DD4 South
Wall Area 113* 12778813 Design Package 2A MS210 – Mechanical Utilities Elevation – DD4 South
Wall Area 114* 12778834 Design Package 2A MS503 – Details – 3 of 4* 12778835 Design Package 2A MS504 – Details – 4 of 4*
*the drawings contain revisions dated 7/10/2019** **See additional documents for the revised drawings**
III. PROVIDE ADDITIONAL REFERENCED DRAWINGS
The following additional reference drawings contained in file N4008519R90140010Amendment_00101369059- SPC-App A12 is hereby incorporated:
• 1984 New Capstans At Dry Docks 3,4, and 7 (NAVFAC DWG Nos. 4113076 through 4113095)
• 2002 Dry Dock No.4 Replace Dock Lighting (NAVFAC DWG Nos. 4473725 through 4473735)
• 2002 Pumpwell 2,3,4, And 8 Power One Line Diagrams (NAVFAC DWG Nos. 4473764 through 4473772)
***See additional documents for the additional reference drawings***
IV. PROVIDE ADDITIONAL DOCUMENTS (APPENDIX J)
The following additional reference document contained in files N4008519R90140010Amendment_00101369059-SPC-App J1 and N4008519R90140010Amendment_00101369059-SPC-App J2 are hereby incorporated.
***See additional documents for the additional reference documents***
V. PROVIDE INFORMATION FOR SPECIFICATIONS
The following information is hereby added to the following Spec Sections:
SECTION 03 31 29 MARINE CONCRETE
2.9.1 Form Ties and Form Facing Material
Replace 2.9.1.b in its entirety with the following:
“b. When plywood forms are used for a smooth form finish, maximum reuse is three times.”
After paragraph 2.9.1.b, add the following:
“c. Provide forms with a form treatment that prevents bond of the concrete to the forms.”
SECTION 31 52 00 TEMPORARY COFFERDAM AND DEWATERING
1.4.4.1 Description
Add the following to the end of Paragraph 1.4.4.1.b:
“The intent of the test well program is to:
1. Collect test well data during Design Package 1 construction, in advance of production well installation during Design Package 2A/B construction.
2. Provide the Contractor the opportunity to collect test well performance data that will enable the design of an efficient production dewatering and recharge system.
3. Evaluate the potential impact of drawdown on the settlement of adjacent structures.”
1.4.4.3 Performance Requirements
Delete the second sentence of Paragraph 1.4.4.3 in its entirety and replace with the following:
“The installed system shall be capable of lowering and maintaining the groundwater to EL 49 (or to an elevation which mitigates seepage into the dock and pumpwell during reconstruction work) behind the dry dock and pumpwell walls until the wall and floor reconstruction work is completed.”
VIII. PROVIDE REVISED PRICE PROPOSAL FORM (ATTACHMENT F)
Attachment F- Price Proposal Form is hereby removed (File: N4008519R90140007Attachment F-Price Proposal Form_rev-Amendment_0007.pdf)
Attachment F- Price Proposal Form is hereby revised and replaced with (File: N4008519R90140010Attachment F-Price Proposal Form_rev-Amendment_0010.pdf
***See additional documents for the revised Price Proposal Form (Attachment F)***
VI. Provide Wage Determination
The following wage determinations are hereby incorporated (Davis-Bacon Act WD #: VA20190055 and Davis-Bacon Act WD #: VA20190161):
"General Decision Number: VA20190055 02/01/2019
Superseded General Decision Number: VA20180055
State: Virginia
Construction Types: Heavy (Heavy and Sewer and Water Line)
County: Portsmouth* County in Virginia.
*INDEPENDENT CITY
HEAVY CONSTRUCTION PROJECTS (Including Sewer and Water Lines)
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.60 for calendar year 2019 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.60 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2019. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/04/2019 1 02/01/2019
ELEC0080-006 06/01/2018
Rates Fringes
ELECTRICIAN......................$ 27.94 12.56%+6.95+a
a. Workmen shall take off 1 hour with pay, at the discretion of the employer, on State and National Election days;
Tuesday following the first Monday in November, provided they are qualified and vote.
IRON0079-007 05/01/2017
Rates Fringes
IRONWORKER, STRUCTURAL...........$ 25.50 14.80
* PLUM0110-002 11/01/2018
Rates Fringes
PLUMBER/PIPEFITTER...............$ 28.57 16.73
SUVA2010-056 09/03/2010
Rates Fringes
CARPENTER........................$ 21.57 3.74
CEMENT MASON/CONCRETE FINISHER...$ 19.00 3.83
FORM WORKER......................$ 17.00
IRONWORKER, REINFORCING..........$ 22.45 11.85
LABORERS
Common or General...........$ 15.00 0.69 Flagger.....................$ 7.39 0.20 Landscape...................$ 10.00 Pipelayer...................$ 13.88 1.32
POWER EQUIPMENT OPERATOR:
Backhoe.....................$ 17.61 2.57 Bobcat/Skid Loader..........$ 11.40 Bulldozer...................$ 42.50 1.47 Crane, All Types............$ 23.38 Excavator...................$ 19.27 7.28 Loader......................$ 15.00 1.75 Mechanic....................$ 26.78 6.32 Trackhoe....................$ 12.75 1.24 Tugboat.....................$ 19.00
TRUCK DRIVER, Includes All Dump Trucks......................$ 14.33 3.58
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or
""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator
U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION"
"General Decision Number: VA20190161 04/05/2019
Superseded General Decision Number: VA20180172
State: Virginia
Construction Type: Building
County: Portsmouth* County in Virginia.
* INDEPENDENT CITY OF PORTSMOUTH
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.60 for calendar year 2019 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.60 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2019. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/04/2019 1 01/11/2019 2 04/05/2019
* ASBE0024-006 10/01/2017
Rates Fringes
ASBESTOS WORKER/HEAT & FROST
INSULATOR - MECHANICAL (Duct, Pipe & Mechanical System Insulation)......................$ 35.13 16.22+a
a. PAID HOLIDAYS: New Year's Day, Martin Luther King Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day,the day after Thanksgiving and Christmas Day provided the employee works the regular work day before and after the paid holiday.
BOIL0045-003 01/01/2017
Rates Fringes
BOILERMAKER......................$ 32.72 25.26
BRVA0008-001 02/01/2018
Rates Fringes
BRICKLAYER.......................$ 20.59 8.13
ELEC0080-010 06/01/2018
Rates Fringes
ELECTRICIAN (Includes Low Voltage Wiring and Alarm Installation)....................$ 27.94 12.56%+6.95+a
a. Workmen shall take off 1 hour with pay, at the discretion of the employer, on State and National Election days;
Tuesday following the first Monday in November, provided they are qualified and vote.
ELEV0052-005 01/01/2019
Rates Fringes
ELEVATOR MECHANIC................$ 41.34 33.705+a+b
a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day, the Friday after Thanksgiving Day and Christmas Day.
b. VACATIONS: 6% men under 5 years based on regular hourly rate and 8% men over 5 years based on regular hourly rate for all hours worked.
ENGI0147-019 11/01/2013
Rates Fringes
POWER EQUIPMENT OPERATOR
Cranes 90 tons & over capacity; Tower & Climbing Cranes with Controls 100
ft. above ground............$ 28.30 8.69%+8.15 Cranes under 90 tons........$ 27.38 8.69%+8.15
IRON0079-012 05/01/2017
Rates Fringes
IRONWORKER, STRUCTURAL AND
ORNAMENTAL.......................$ 25.50 14.80
IRON0079-013 05/01/2017
Rates Fringes
IRONWORKER, RIGGER...............$ 25.50 14.80
PLUM0110-008 11/01/2018
Rates Fringes
PIPEFITTER (Includes HVAC Pipe, Unit and Temperature Controls Installations)..........$ 28.57 16.73
PLUMBER..........................$ 28.57 16.73
SUVA2013-045 01/11/2016
Rates Fringes
CARPENTER, Includes Acoustical Ceiling Installation, Drywall Hanging, and Form Work...........$ 17.00 0.00
CAULKER..........................$ 18.49 1.33
CEMENT MASON/CONCRETE FINISHER...$ 17.48 0.00
GLAZIER..........................$ 19.36 4.68
IRONWORKER, REINFORCING..........$ 27.18 4.13
LABORER: Mason Tender - Brick...$ 13.48 3.27
LABORER: Mason Tender - Cement/Concrete..................$ 12.96 3.12
LABORER: Common or General, Including Demolition and Pipelaying.......................$ 12.06 2.49
OPERATOR:
Backhoe/Excavator/Trackhoe.......$ 20.69 1.35
OPERATOR: Bobcat/Skid Steer/Skid Loader................$ 18.95 4.03
OPERATOR: Bulldozer.............$ 18.07 3.50
OPERATOR: Forklift..............$ 19.40 7.00
OPERATOR: Loader................$ 21.28 3.17
OPERATOR: Roller................$ 16.25 4.88
PAINTER (Brush and Roller).......$ 16.87 0.00
PAINTER: Spray..................$ 18.10 5.43
ROOFER...........................$ 18.40 2.31
SHEET METAL WORKER, Includes HVAC Duct Installation...........$ 19.24 2.80
SPRINKLER FITTER (Fire Sprinklers)......................$ 18.91 4.67
TILE FINISHER....................$ 23.40 0.00
TILE SETTER......................$ 27.80 10.25
TRUCK DRIVER: Dump Truck........$ 15.50 0.75
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.