ACQR5554166

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

DRY DOCK 4 RENOVATION, NORFOLK NAVAL SHIPYARD, PORTSMOUTH, VIRGINIA

1. CONTRACT ID CODE PAGE OF PAGES

J 1 5

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 02-Jul-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008519R9014

X 9B. DATED (SEE ITEM 11)

12-Mar-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

02-Jul-2019

CODE

NAVFAC MID ATLANTIC

ACQUISITION CORE

9324 VIRGINIA AVENUE

NORFOLK VA 23511-3095

N40085 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N4008519R9014

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0008

The purpose of this amendment is to provide the following information:

I. Provide Pre-Proposal Inquiry(PPI) Responses II. Provide revised drawings contained in files N4008519R9014_1369059-DWG-DP2A-10of23 [contains

S-513] and N4008519R90141369059-DWG-DP2A-19of23 [contains EP511 & EP512] III. Provide information for specifications and drawings IV. The proposal due date remains unchanged.

I. PROVIDE PRE-PROPOSAL INQUIRY(PPI) RESPONSES

PPI#

Reference Question

Government Response

Page/Dwg Section Paragraph

What is the existing inflitation rate of water for the dry dock and the pumpwell?

See Amendment

27 4 31 52 00 1.4.4.1.b Please provide more details on the system test.

What is the purpose of the test? What constitutes a successful test?

30 5 31 52 00 1.4.4.4

The specification requires that a responsible person continuously monitor the system. Does this require a physical presence 24/7 or will automated alarms be sufficient during off hours?

See Amendment

32 21-Oct 26 20 00 2.5.1.1

In section 26 20 00, page 10, subsection 2.5.1.1 of the specs, it clarify the minimum allowed conductor size for different systems. in addition, on page 21 of this section, subsection 3.1.3, the specs specify the minim conduit size is 1/2". Is up to the contractor to decide what size conduit and cable is necessary for each run? please clarify

Bid per RFP

Requesting more information on the battery operated portable hand lantern

03 31 29 1.8.2.2 (2)

Section 03 31 29 subsection 1.8.2.2 (2) requires that the required average strength is design per AC 301. ACI 301 requires the average compressive strength to 1200 psi greater that specified design strength. This results in a average compressive strength that is about 30% greater than there 4000 psi required. Subsection 1.8.2.2

(3) limits the average compressive strength to 20% more than the required concrete strength.

Please clarify.

03 31 29 3.4.8

Section 03 31 29 Subsection 3.4.8, requires the existing surfaces to be roughened to 1/4 in. full surface amplitude. Can this requirement be waived in confined spaces where the SCC is used to fill voids in existing structure?

DP2B

Cross Sections of Dry Dock 4 showing concrete thicknesses and the horizontal locations of the flumes for Sluice Gate 6 and Sluice gates 1 & 2.

This information is needed to determine the work for sealing active leaks and to determine the best solution to place the SSC in the flumes. Cross Section at approximately 50 foot spacing would be very jhelpful.

38 S003 DP2B

Design Package 2B Sheet S-003 Crack Repair Note 2 states " For bidding purposed , the contractor shall assume all cracks are 1/16" wide by 12"deep." . Note 11 limits crack repairs to 1/8" and wider. Please clarify.

Bid per RFP- Amendment

39 S003 DP2B

Design Package 2B Sheet S-003 Crack Repair Note 2 states " For bidding purposed , the contractor shall assume all cracks are 1/16" wide by 12"deep." A similar note was not found in Design Package 2A, can this note be included in Design Package 2A?

Bid per RFP- Amendment what is the existing inflration of the dock and pumpwell

See Amendment

43 G-006 note 6 what permits or licenses are required for this project what is the resteel size and pattern in the existing floor top and bottom mats was the existing caisson gate built in 1978 Bid per RFP

47 EP 511 EP 512 EP 512

The reinforcing steel quantity called out in these DWGs do not match the drawing section. Which should the contractor use ? Please clarify.

See Amendment

48 CS 504

Design

Pack. 2A

This page shows details of fencing, including security fencing and sliding gates details. Where is this fence located in plan? Is this temporary construction barrior fence?

See Amendment

49 G-101 Design

Pack. 2A Note 2

Note calls for a construction barrier fence around limits of work, minimum 4' above grade. CS 504, Detail C1 shows a chain link fence detail. Is this what the contractor is expected to install? Do the posts need to be embedded in 3.5' in a concrete footing or can a movable base be used?

Bid per RFP

50 S-513 Design

Pack. 2A

SECTION A-2 SAW CUT WHAT IS YOUT

INTENT THE WALL VARIES IN DEPTH UP

TO 3'10"

See Amendment

Design Pack. 2B

DESIGN PACKAGE 2B HAS US FILLING

FLUMES,TUNNELS, MISC OTHER

LOCATIONS WITH SCC CONCRETE THERE

IS NOT ENOUGH DETAILS FOR US TO

DETERMINE THE QUANITIES CAN YOU

ESTABLISH A QUANITY FOR BIDDING

Bid per RFP

54 B-101 Design

Pack. 2A

The majority of the boring locations listed on this page fall outside the limits of construction within the project. These borings show concrete beneath the asphalt pavement. Is the contractor to assume that the same condition can be found inside the limits of construction?

Bid per RFP

55 C-002 Design

Pack, 2A Note 10

Demo Note #10 says that "asphalt pavement has concrete base beaneath it that must be demolished". Can the Navy provide an area of concrete pavement demolition beneath the asphalt for the contractor to bid?

Bid per RFP

56 C-002 Design

Pack, 2A Note 10

Demo Note #10 says to "refer to boring logs for…thickness information" pertaining to concrete and asphalt demolition. These logs are outside the limits of construction. Should the contractor use these boring log thicknesses to determine the thickness of pavement to be demolished?

Due to the importance of this project, during the Industry Day discussion held for this project, it was discussed that a 14 calendar day government (& A/E) submittal review period should be feasible to help facilitate the schedule for this project. 28 calendar days for the review of all government (USG) approved submittals was deemed excessive for this project and 14 days should be plenty of time for the Navy to complete the submittals that required Government approval.

The 14 day review period will help the overall team (contractor, government, designer (A/E), and customer) ensure the overall success of the project in the timeline provided in NNSY's dry dock schedule. In a partnering effort, as discussed, will the government (USG) change the review period to 14 days in lieu of the standard 28 days?

II. PROVIDE REVISED DRAWINGS

The following NAVFAC Drawings contained in files N4008519R9014_1369059-DWG-DP2A-10of23 and N4008519R90141369059-DWG-DP2A-19of23 are hereby removed:

NAVFAC DWG NO. DESIGN PACKAGE TITLE

12778741 Design Package 2A S-513 – Pre-Cast Wall Panel Details 12778933 Design Package 2A EP511 – Typical Ductbank Details 12778934 Design Package 2A EP512 – Typical Ductbank Details

The following NAVFAC Drawings contained in file N4008519R9014Amendment_0008_Dwgs are hereby replaced with:

NAVFAC DWG NO. DESIGN PACKAGE TITLE

12778741 Design Package 2A S-513 – Pre-Cast Wall Panel Details (R1) – 2 of 2 12778933 Design Package 2A EP511 – Typical Ductbank Details ((R1) – 1 of 4

12778934 Design Package 2A EP512 – Typical Ductbank Details (R1) – 2 of 4

**the drawings contain revisions dated 7/02/2019** ***See additional documents for the revised drawings***

III. PROVIDE INFORMATION FOR SPECIFICATIONS AND DRAWINGS

The following information is hereby deleted on the following drawing:

NAVFAC Dwg. No. 12778598 (CS504)

Delete Details A4 and B1.

The following information is hereby added to the following Spec Sections:

SECTION 01 50 00.00 22 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

Add the following paragraph:

“3.6 GOVERNMENT FIELD OFFICE

Provide the Government Contracting Officer’s Representative and Engineering Technician with an office, approximately 200 square feet in floor area, located where directed and providing space heat and air conditioning, electric light and power, and toilet facilities consisting of one lavatory and one water closet complete with connections to water and sewer mains. Provide a mail slot in the door or a lockable mail box mounted on the surface of the door. Include a 4 by 8 foot plan table, two computer work spaces, two standard size office desks and chairs, and telephone. At completion of the project, the office will remain the property of the Contractor and be removed from the site. Utilities will be connected and disconnected in accordance with local codes and to the satisfaction of the Contracting Officer. Compliance with safety and appearance requirements for temporary facilities stated in previous paragraphs is required.”

SECTION 31 52 00 TEMPORARY COFFERDAM AND DEWATERING

1.4.4.4 Maintenance

Add the following to the end of Paragraph 1.4.4.4:

“Outside of normal working hours, the dewatering system may be remotely monitored using an approved remote monitoring system. The onsite response time to remote alarm notifications must be less than two hours.”

3.5.2 Dewatering During Dry Dock/Pumpwell Renovations

Add the following to the end of Paragraph 3.5.2.d:

“The existing typical combined infiltration rate for Dry Dock 4 and the Dry Dock 4 pumpwell is estimated to be 1,500,000 gallons per day based on existing drainage/sump pump capacities and run times. This rate is not representative of additional infiltration that may occur during large precipitation or extreme tidal events.

(End of Summary of Changes)