N4008518B0043 Specs 2of2.pdf

PDF 6 MB Posted

Attached to
Repair BEQ HP504
Solicitation number
N40085-21-R-2505
Issued by

View the file

Other files

File Type Posted
NEW RFP 180043.pdf PDF
N4008518B0043 Dwgs.pdf PDF
N4008518B0043 Specs 1of2.pdf PDF
18-0043 Pb and ACM fr CL combined.pdf PDF
18-0043 APPD.pdf PDF
18-0043 Lead Base Paint Inspection Report.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CEMS Engineering

Comprehensive Interior/Exterior Asbestos Survey Report

HP504 - BEQ

Marine Corps Base Camp Lejeune, North Carolina

May 18, 2018

Comprehensive Interior/Exterior Asbestos Survey Report

HP504 – BEQ

Marine Corps Base Camp Lejeune, NC

Robert Elbertson NC AHERA Inspector relbertson@cceinc.biz

Prepared for:

Mr. Randy Alvar

Prepared by:

Crystal Coast Environmental, Inc.

10302 Bristow Center Dr.

Suite: 115

Bristow, VA 20136

Tel: 910.938.7998

Fax: 910.938.3441 www.cceinc.biz

Our Ref.:

18-5161

Date:

This document is intended only for the use of the individual or entity for which it was prepared and may contain information that is privileged, confidential and exempt from disclosure under applicable law.

Table of Contents

1. Introduction 1

2. Methodology 1

3. Analytical Methods 2

4. Findings 2

5. Conclusions and Recommendations 2

6. Additional Survey Limitations 4

APPENDICES

A Limitations and Service Constraints B Inspector Accreditations C Homogeneous Applications D Asbestos Sample Locations E Laboratory Report (NVLAP) – Asbestos Bulk Sample Results F Photograph Logs

Survey Report

Mr. Randy Alvar May 18, 2018

1. Introduction

As requested by Mr. Randy Alvar, Crystal Coast Environmental, Inc. (CCEI) conducted a Comprehensive Interior/Exterior Asbestos Survey (CIES) of the above-referenced building/project. The survey consisted of visually observing the interior and exterior, then collecting a representative number of samples for subsequent laboratory analyses as described below. The objective of the survey was to identify and quantify asbestos-containing building materials (ACBMs) for future planned renovations or demolition activity. The sampling shall be consistent with areas that have historically tested positive for ACBMs in previous BEQ surveys.

As directed by the client, destructive testing was performed on flooring material to identify materials which may be hidden or obstructed by layers of wood substrate.

Unless noted herein, no other destructive testing was conducted to expose other potentially hidden or obstructed material. Examples of other areas include, but are not limited to: interior wall cavities, pipe chases, spaces above fixed ceilings, grout/adhesive beneath ceramic tiles/marble tiles/granite, and adhesives behind wall mounted mirrors, etc.

The survey was conducted on May 7, 2018 by Mr. Robert Elbertson. A copy of inspector’s accreditation is provided in Appendix B.

2. Methodology

CCEI conducted the CIES in general accordance with ASTM E2356-09 Standard Practice for Comprehensive Building Asbestos Surveys. ASTM E2356-09 meets the applicable requirements of current Environmental Protection Agency (EPA) National Emission Standards for Hazardous Air Pollutants (NESHAP) Standard 40 CFR 61, Subpart M (Asbestos); EPA Asbestos Hazard Emergency Response Act (AHERA) Standard 40 CFR 763, Subpart E; and Occupational Safety and Health Administration (OSHA) asbestos survey and/or sampling regulations.

CCEI visually observed readily accessible areas for suspect ACBMs. Identified suspect materials were divided into "Homogeneous Applications" (HAs) - i.e., building materials which were determined by the inspector to be homogeneous based on their color, texture, and assumed date of installation.

Representative samples were then collected from selected HAs. The numbers of samples collected was based on CCEI’s in-house sampling protocol, which is based in part on the U.S. Environmental Protection Agency (U.S. EPA) Asbestos Hazard Emergency Response Act (AHERA) regulations. Each sample was assigned its own

Survey Report

Mr. Randy Alvar May 18, 2018 unique identification number, placed in 4 mil sealable plastic bags, and tightly sealed for subsequent shipment under a chain of custody protocol to EMSL located in Morrisville, North Carolina.

3. Analytical Methods

Material identification was performed by EMSL using Polarized Light Microscopy with Dispersion Staining (PLM/DS) method in accordance with the U.S. EPA Method 600/R-93/116. Asbestos content in each sample was evaluated based on a visual examination of each sample using a stereoscope.

EMSL is a member of the American Industrial Hygiene Association (AIHA) and accredited through the National Voluntary Laboratory Accreditation Program (NVLAP) administered by the National Institute of Standards and Technology (NIST).

The laboratory analytical report is provided in Appendix E.

4. Findings

A total of 19 HAs were identified throughout the Site, and a total of 12 suspect ACBM bulk samples were collected and submitted for laboratory analysis. A listing of HAs identified along with each HA material description, location, condition, asbestos content and estimated quantity are presented in Appendix C. Approximate sampling locations are shown in the Appendix D.

A total of 2 HA materials were confirmed or presumed asbestos containing material (PACM) at concentration above 1% (ACBM is defined as a material containing more than 1% of asbestos by weight).

A listing of HAs that were confirmed or presumed to contain asbestos at concentration above 1% is presented in Table 1.

5. Conclusions and Recommendations

As presented in Appendix C and the laboratory data provided in Appendix E, the results of the asbestos survey identified confirmed ACBMs at the Site.

In accordance with current EPA National Emission Standards for Hazardous Pollutants (NESHAP) regulations, certain types of ACM must be removed prior to being disturbed by demolition or renovation activities. Current EPA NESHAP and Health Hazards Control Unit (HHC) of North Carolina Department of Health and Human Service

Survey Report

Mr. Randy Alvar May 18, 2018

(DHHS) regulations require that all Regulated ACMs (RACM) be removed prior to being disturbed. RACMs are defined as:

• Friable ACM.

• Non-Friable Category 1 ACM that has become friable.

• Non-Friable Category 1 ACM that has been or will be subjected to sanding, abrading, grinding, or cutting.

• Non-Friable Category 2 ACM that has a high probability of becoming friable or crumbled, pulverized, or otherwise reduced to powder by the demolition or renovation activities.

In some cases, materials which may be ACBMs were identified as “Suspect ACM, Not Sampled” in the HAT. These include materials that could not safely be accessed during the survey, were labeled as PACM based on the inspector’s field determination. Until determined otherwise, suspect and not sampled materials have been assumed to be ACBMs and should be managed as asbestos-containing in accordance with the local, state, and federal regulations.

If other suspect materials that are not referenced in this report are identified during demolition and/or renovation activities, CCEI recommends that these materials be considered as ACBM until they are inspected by an appropriately licensed asbestos inspector and proven otherwise.

Prior to demolition activities and when it is safe to do so, CCEI recommends sampling the PACM identified in this survey. Should these materials prove to be non-ACMs this could result in significant cost savings.

Due to the inability to effectively separate some types of multi-layered ACBMs (i.e., floor tile/mastic, mastic/wood subflooring, gypsum board/joint compound, etc.) from non-ACMs these materials are considered “asbestos-contaminated” for the purposes of removal, and should be managed as ACBM.

ACBMs identified at the Site that may be disturbed during demolition activities, must be removed by a licensed asbestos abatement contractor utilizing industry standard work procedures in accordance with all federal, state and local regulations governing asbestos.

Asbestos waste must be disposed at an asbestos waste receiving facility that is duly permitted by the state and/or local municipality in which it resides. The asbestos waste

Survey Report

Mr. Randy Alvar May 18, 2018 should be disposed in a landfill with a NESHAP condition in the facility’s air permit that allows acceptance of RACM.

6. Additional Survey Limitations

CCEI’s asbestos survey is subject to the following limitations in addition to those presented in Appendix A:

• Utilities/services, including electric were assumed to be active in the areas surveyed. Materials associated with electrical components and energized equipment, were not safely accessible and were not sampled.

• Subsurface investigations, including access to below grade structures, underground piping, conduits, building footings and extent of subsurface soil asbestos contamination if any was not accessible at the time of the survey.

Should you decide to remove/demolish below grade structures, an additional investigation may be warranted to determine if the below grade structures contain or are coated with ACMs.

Limitations and Service Constraints

The opinions, conclusions and recommendations presented in this report are limited to the information obtained during the performance of the specific scope of service identified in the report. To the extent that Crystal Coast Environmental, Inc. (CCEI) relied upon any information prepared by other parties not under direct contract to CCEI, no representation as to the accuracy or completeness of such information is made. This report is an instrument of professional service and the services described in the report were performed in accordance with generally accepted standards and level of skill and care ordinarily exercised by members of the profession working under similar conditions including comparable budgetary and schedule constraints. No warranty, guarantee or certification express or implied, is intended or given with respect to CCIE’s services, opinions, conclusions or recommendations. This statement is in lieu of any other statement either expressed or implied.

CCEI’s observations, the results of testing and CCEI’s opinions, conclusions and recommendations apply solely to conditions existing at the specific times when and specific locations where CCEI’s investigative work was performed. Observation and testing activities such as those conducted by CCEI are inherently limited and do not represent a conclusive or complete characterization. Conditions in other parts of the project site, building or area may vary from conditions at the specific locations where observations were made and where testing was performed by CCEI. Additionally, other building material hazards which were not identified by CCEI, may also be present in the indoor air, un-accessed areas and in walls, ceilings, cavities and floors. Therefore, the extent of CCEI’s opinions, conclusions and recommendations are limited and 100% confidence in these opinions, conclusions and recommendations cannot reasonably be achieved. Nothing contained in this report shall relieve any other party of its responsibility to abide by contract documents and applicable laws, codes, regulations, or standards nor shall it be considered medical advice or consultation.

This report may document whether work conducted by CCEI or under CCEI’s observation was done so in accordance with applicable regulatory standards. In the absence of standards such as is often the case for microbial assessment and abatement, this report may not be construed as providing clearance, approval, or authorization for use or re-occupancy of a given structure. Actual site conditions and quantities should be field verified and unless expressly stated.

This report is expressly for the sole and exclusive use of the party for whom this report was originally prepared for and for the particular purpose outlined in the report. Only the party for whom this report was originally prepared and/or other specifically named parties have the right to make use of and rely upon this report. Reuse of this report or any portion thereof for other than its intended purpose, or if modified, or if used by third parties, shall be at the user’s sole risk.

Homogeneous Application Table BEQ HP504, Camp Lejeune, NC

Project No.: 18-5161

HA No. Material Type Primary Color Texture Description NESHAP Cat. Friable Rooms Locatio n Condition Amt. Unit s Remarks

1 M - Ceiling Texture White Rough Spray-on Ceiling Texture Non-ACM, Sampled Yes Throughout Ceiling Good Non-ACM are not quantified 2 M - Ceiling Tile - 2' x 2' Gray Smooth 2' x 2' Cellulose Ceiling Tile Non-ACM, Sampled Yes Lounges Ceiling Good Non-ACM are not quantified

3 M - Gypsum Board (walls and ceilings) Gray Smooth Gypsum Board Non-ACM, Sampled No Dorm Rooms Wall Good Non-ACM are not quantified

4 M - Joint Compound (associated with wall/ceiling board/panels) White Rough Joint Compound Non-ACM, Sampled Yes Dorm Rooms Wall Good Non-ACM are not quantified

5 M - Cove Base Mastic Yellow Rough Mastic Associated with Brown Cove Base Non-ACM, Sampled No Central Walkways Wall Good Non-ACM are not quantified 6 M - Cove Base Mastic Brown Rough Mastic Associated with Black Cove Base Non-ACM, Sampled No Dorm Rooms Wall Good Non-ACM are not quantified

7 M - Floor Tile - 12" x 12" Gray Smooth 1' x 1' Vinyl Floor Tile Non-ACM, Sampled No Dorm Rooms and Common Areas Floor Good Non-ACM are not quantified

8 M - Floor Tile - Mastic/Adhesive Brown Rough Mastic Associated with HA-7 Non-ACM, Sampled No Dorm Rooms and Common Areas Floor Good Non-ACM are not quantified

9 M - Floor Tile - 12" x 12" Beige Smooth 1' x 1' Vinyl Floor Tile Non-ACM, Sampled No Central Walkways, and Laundry Rooms Floor Good Previously Identified in Government Report

10 M - Floor Tile - Mastic/Adhesive Yellow Rough Mastic Associated with HA-9 Non-ACM, Sampled No Central Walkways, and Laundry Rooms Floor Good Previously Identified in Government Report

11 M - Caulking/Putties Gray Smooth Pipe Chases, Wall Penetrations Non-ACM, Sampled No Mechanical Rooms and Chases Other Good Previously Identified in Government Report

12 M - Exterior - Window Caulk Gray Smooth Exterior Window Caulk Non-ACM, Sampled No Exterior Wall Good Previously Identified in Government Report

M - Mastic/Skimcoat/Taping

Compounds on Duct Insulation Seams

Gray Rough HVAC Duct Mastic/Tape Non-ACM, Sampled No Mechanical Rooms and Chases Other Good Previously Identified in Government Report

14 M - Roof - Built-up Roof Gray Rough Built-up Roof Non-ACM, Sampled No Roof Roof Good Previously Identified in Government Report 15 M - Roof - Pitch Pocket Tar Black Smooth Pitch Pocket Mastic Non-ACM, Sampled No Roof Roof Good Previously Identified in Government Report 16 M - Roof - Caulking/Mastic Black Smooth Roofing Caulk CAT 2 Non-friable ACM No Roof Roof Good 60 SF Quantities are an approximation

17 NSM - Duct Insulation - Fiberglass Yellow Rough Fiberglass Duct Insulation Non-ACM, Sampled No Mechanical Rooms and Chases Other Good Previously Identified in Government Report

18 NSM - Pipe Insulation - Fiberglass Yellow Rough Fiber Glass Pipe Insulation Non-ACM, Sampled No Mechanical Rooms and Chases Other Good Previously Identified in Government Report

19 M - Construction Mastics - Describe Not Visible Not Visible Mastic Associated with Shower Pans Presumed ACM, Not Sampled No Dorm Rooms Other Good 96 EA Inaccessible at time of survey

T = Thermal System Insulation (TSI) Material S - Surface Material M - Miscellaneous Material

Results of Sample Analyses

Project No.: 18-5161

HA No. Material Type ID Location Content Type Sample Date Consultant Method Lab

1 M - Ceiling Texture 504-1-01 1st floor hallway ND 5/7/2018 CCEI PLM EMSL 1 M - Ceiling Texture 504-1-02 2nd floor hallway ND 5/7/2018 CCEI PLM EMSL 2 M - Ceiling Tile - 2' x 2' 504-2-03 3rd floor lounge ND 5/7/2018 CCEI PLM EMSL 3 M - Gypsum Board (walls and ceilings) 504-3-04 122 ND 5/7/2018 CCEI PLM EMSL 4 M - Joint Compound (associated with wall/ceiling board/panels) 504-4-05 122 ND 5/7/2018 CCEI PLM EMSL 5 M - Cove Base Mastic 504-5-06 2nd floor hallway ND 5/7/2018 CCEI PLM EMSL 5 M - Cove Base Mastic 504-5-07 3rd floor hallway ND 5/7/2018 CCEI PLM EMSL 6 M - Cove Base Mastic 504-6-08 224 ND 5/7/2018 CCEI PLM EMSL 6 M - Cove Base Mastic 504-6-09 224 ND 5/7/2018 CCEI PLM EMSL 7 M - Floor Tile - 12" x 12" 504-7-10 122 ND 5/7/2018 CCEI PLM EMSL 8 M - Floor Tile - Mastic/Adhesive 504-8-11 224 ND 5/7/2018 CCEI PLM EMSL

T = Thermal System Insulation (TSI) Material S = Surfacing Material M - Miscellaneous Material

SHEET NO.

JOB NO.

ISSUE DATE

APPROVED

CHECKED

DESIGNED

DRAWN

SHEET TITLE

JOB TITLE

B

REVISIONS

C

A

17-0022

INTERIOR & EXTERIOR

REPAIRS TO BEQ HP504

AS101

05/14/18

Approver

Checker

Designer

Author

HAZARDOUS

MATERIALS

ABATEMENT FIRST

FLOOR PLAN

NO. DATE DESCRIPTION

SCALE: 1" = 30'-0"1

FIRST FLOOR PLAN

PLAN NORTH

Robert Callout 504-1-01(-)

Robert Callout 504-3-04(-) 504-4-05(-) 504-7-10(-)

ISSUE DATE

APPROVED

CHECKED

DESIGNED

DRAWN

SHEET TITLE

JOB TITLE

B

REVISIONS

C

A

17-0022

INTERIOR & EXTERIOR

REPAIRS TO BEQ HP504

AS102

05/14/18

Approver

Checker

Designer

Author

HAZARDOUS

MATERIALS

ABATEMENT SECOND

FLOOR PLAN

NO. DATE DESCRIPTION

SCALE: 1" = 30'-0"1

SECOND FLOOR PLAN

PLAN NORTH

Robert Callout 501-1-02(-)

Robert Callout 504-6-08(-) 504-6-08(-) 504-8-11(-)

Robert Callout 504-5-06(-)

ISSUE DATE

APPROVED

CHECKED

DESIGNED

DRAWN

SHEET TITLE

JOB TITLE

B

REVISIONS

C

A

17-0022

INTERIOR & EXTERIOR

REPAIRS TO BEQ HP504

AS103

05/14/18

Approver

Checker

Designer

Author

HAZARDOUS

MATERIALS

ABATEMENT THIRD

FLOOR PLAN

NO. DATE DESCRIPTION

SCALE: 1" = 30'-0"1

THIRD FLOOR PLAN

PLAN NORTH

Robert Callout 504-2-03(-)

Robert

504-5-07(-)

ISSUE DATE

APPROVED

CHECKED

DESIGNED

DRAWN

SHEET TITLE

JOB TITLE

B

REVISIONS

C

A

17-0022

INTERIOR & EXTERIOR

REPAIRS TO BEQ HP504

AS104

05/14/18

Approver

Checker

Designer

Author

HAZARDOUS

MATERIALS

ABATEMENT ROOF

PLAN

NO. DATE DESCRIPTION

PLAN NORTH

SCALE: 1" = 30'-0"1

ROOF PLAN

EMSL Analytical, Inc.

2500 Gateway Centre Blvd., Suite 600 Morrisville, NC 27560

Tel/Fax: (919) 465-3900 / (919) 465-3950 http://www.EMSL.com / raleighlab@emsl.com

291803841EMSL Order:

Customer ID: BUFF52

Customer PO:

Project ID:

Attention: Phone:Robert Elbertson (910) 330-7410

Fax:Crystal Coast Environmental, Inc. (910) 938-3441

Received Date:10302 Bristow Center Drive 05/08/2018 10:15 AM

Analysis Date:#115 05/14/2018 - 05/15/2018

Collected Date:Bristow, VA 20136 05/07/2018

Project: 18-5161 HP504 Camp Lejeune, NC

Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized

Light Microscopy

Sample Description Appearance % Fibrous % Non-Fibrous

Non-Asbestos Asbestos

% Type

504-1-01

291803841-0001

None DetectedNon-fibrous (Other)98%Cellulose

Wollastonite

<1%

2%

White

Fibrous

Homogeneous

Ceiling Texture

504-1-02

291803841-0002

None DetectedNon-fibrous (Other)100%White

Non-Fibrous

Homogeneous

Ceiling Texture

504-2-03

291803841-0003

None DetectedPerlite

Non-fibrous (Other)

15%

20%

Cellulose

Min. Wool

5%

60%

Gray

Fibrous

Homogeneous

Ceiling Tile

504-3-04

291803841-0004

None DetectedNon-fibrous (Other)80%Cellulose

Glass

15%

5%

Gray

Fibrous

Homogeneous

Gypsum Board

504-4-05

291803841-0005

None DetectedNon-fibrous (Other)98%Wollastonite2%White

Fibrous

Homogeneous

Joint Compound

504-5-06

291803841-0006A

None DetectedNon-fibrous (Other)98%Cellulose2%Tan

Fibrous

Homogeneous

Cove Base Mastic

504-5-07

291803841-0007

None DetectedNon-fibrous (Other)98%Cellulose2%Tan

Fibrous

Homogeneous

Cove Base Mastic

504-6-08

291803841-0008A

None DetectedNon-fibrous (Other)100%Brown

Non-Fibrous

Homogeneous

Cove Base Mastic

504-6-09

291803841-0009

None DetectedNon-fibrous (Other)98%Cellulose2%Brown

Fibrous

Homogeneous

Cove Base Mastic

504-7-10

291803841-0010

None DetectedNon-fibrous (Other)98%Cellulose2%Gray/Beige

Fibrous

Homogeneous

1x1 Vinyl Floor Tile

(Gray)

504-7-11

291803841-0011

None DetectedNon-fibrous (Other)97%Cellulose3%Black

Fibrous

Homogeneous

Floor Tile Mastic

Analyst(s)

Olivia Bradley (8)

Roxsee Stover (3)

Billy Barnes, Asbestos Lab Manager or Other Approved Signatory

EMSL maintains liability limited to cost of analysis . This report relates only to the samples reported and may not be reproduced, except in full, without written approval by EMSL. EMSL bears no responsibility for sample collection activities or analytical method limitations. Interpretation and use of test results are the responsibility of the client. This report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST or any agency of the federal government . Non-friable organically bound materials present a problem matrix and therefore EMSL recommends gravimetric reduction prior to analysis. Samples received in good condition unless otherwise noted. Estimated accuracy, precision and uncertainty data available upon request. Unless requested by the client, building materials manufactured with multiple layers (i.e. linoleum, wallboard, etc.) are reported as a single sample. Reporting limit is 1%

Samples analyzed by EMSL Analytical, Inc. Morrisville, NC NVLAP Lab Code 200671-0, VA 3333 000278, WVA LT000296

Initial report from: 05/15/2018 09:43:53

Page 1 of 1ASB_PLM_0008_0001 - 1.78 Printed: 5/15/2018 9:43 AM

18-5161 Page 1 of 4

View of the Front of the Building HA-1: Spray-on Ceiling Texture

HA-2: 2’ x 2’ Cellulose Ceiling Tile HA-3: Gypsum Board

HA-4: Joint Compound HA-5: Cove Base Mastic

18-5161 Page 2 of 4

HA-6: Cove Base Mastic HA-7: 1’ x 1’ Vinyl Floor Tile

HA-8: Mastic Associated with HA-7 HA-9: 1’ x 1’ Beige Vinyl Floor Tile

HA-10: Mastic Associated with HA-9 HA-11: Wall Penetration Mastic

18-5161 Page 3 of 4

HA-12: Exterior Window Caulk HA-13: HVAC Duct Mastic

HA-14: Built-up Roof HA-15: Pitch Pocket Mastic

HA-16: Roofing Caulk/Mastic HA-17: (NSM) Fiberglass Duct Insulation

18-5161 Page 4 of 4

HA-18: (NSM) Fiberglass Pipe Insulation

Client:

Project Manager CEMS Engineering 320-C Midland Parkway Summerville, SC 29485

Submitted Electronically: ralvar@CEMS-ae.com

Project:

Lead Base Paint Inspection

BEQ HP504

Camp Lejeune, North Carolina

Dear Mr. Alvar:

Crystal Coast Environmental, Inc. (CCEI) was retained to conduct a lead base paint (LBP) inspection at the project identified above. The inspection consisted of visible and accessible interior and exterior surfaces coated with paint.

Background information on the Site and a summary of the inspection are provided below. CCEI’s services are subject to the Terms and Conditions to the Limitations and Service Constraints in Attachment A. The results of the inspection are presented in the attachments to this report.

LEAD SURVEY

CCEI conducted a LBP inspection to identify building components that may be impacted during scheduled renovations and may have lead-containing surface coatings.

The LBP inspection was performed on May 7, 2018, by Mr. Robert Elbertson of CCEI. The inspection was conducted by visually assessing areas of concern that may have surface coatings that are suspected to contain lead. Suspected materials coated with LBP were analyzed for total lead content (reported in total percent by weight) by Flame Atomic Adsorption Spectrometry (AAS) in accordance with U.S.

EPA Method 7420, SW 846-3050B/7000B. Strict Quality Control/Quality Assurance provisions were adhered to for analysis of all lead samples. from a wall, door frame, window sill, and baseboard. The results of the LBP inspection are presented in the attachments to this report as follows.

Crystal Coast Environmental, Inc.

10302 Bristow Center Dr.

Suite 115

Bristow, VA 20136

Tel: 910.938.7998

Fax: 910.938.3441 www.cceinc.biz

ENVIRONMENTAL

Date:

May 18, 2018

Contact:

Robert Elbertson

Phone:

910.330.7410

Email:

relbertson@cceinc.biz

Our ref:

18-5161

• Attachment A – CCEI Limitations and Service Constraints

• Attachment B – Laboratory Results

• Attachment C – Sampling Locations

• Attachment D – Photographic Log

FINDINGS

Based on the results of the investigation, the material identified does not contain LBP.

If analysis was conducted by a laboratory: 0.5% by weight or 5,000 parts per million (ppm).

The Occupational Safety and Health Administration (OSHA) Lead in Construction standard does not define lead paint based on content. Any detectable lead in paint makes it lead paint for purposes of complying with OSHA regulations to determine worker exposure.

CONCLUSIONS

Based upon the results of the inspection, the samples are reported as to containing detectable quantities of lead. The scope of this lead screening survey was limited to only assessing building components located areas or rooms identified by the client. If areas outside the scope of assessment for this survey may be disturbed, additional assessment may be required

The remaining samples are reported as not containing detectable quantities of lead.

The scope of this lead screening survey was limited to only assessing building components located areas or rooms identified by the client. If areas outside the scope of assessment for this survey may be disturbed, additional assessment may be required.

CLOSING

Should you have any questions regarding this report, or if CCEI can be of further assistance, please feel free to contact CCEI at (910) 938-7998.

Sincerely, Crystal Coast Environmental, Inc.

Robert Elbertson Operations Manager

Attachments A. CCEI Limitations and Service Constraints B. Laboratory Results C. Sampling Locations D. Photographic Log

Limitations and Service Constraints

The opinions, conclusions and recommendations presented in this report are limited to the information obtained during the performance of the specific scope of service identified in the report. To the extent that Crystal Coast Environmental, Inc. (CCEI) relied upon any information prepared by other parties not under direct contract to CCEI, no representation as to the accuracy or completeness of such information is made. This report is an instrument of professional service and the services described in the report were performed in accordance with generally accepted standards and level of skill and care ordinarily exercised by members of the profession working under similar conditions including comparable budgetary and schedule constraints. No warranty, guarantee or certification express or implied, is intended or given with respect to CCIE’s services, opinions, conclusions or recommendations. This statement is in lieu of any other statement either expressed or implied.

CCEI’s observations, the results of testing and CCEI’s opinions, conclusions and recommendations apply solely to conditions existing at the specific times when and specific locations where CCEI’s investigative work was performed. Observation and testing activities such as those conducted by CCEI are inherently limited and do not represent a conclusive or complete characterization. Conditions in other parts of the project site, building or area may vary from conditions at the specific locations where observations were made and where testing was performed by CCEI. Additionally, other building material hazards which were not identified by CCEI, may also be present in the indoor air, un-accessed areas and in walls, ceilings, cavities and floors. Therefore, the extent of CCEI’s opinions, conclusions and recommendations are limited and 100% confidence in these opinions, conclusions and recommendations cannot reasonably be achieved. Nothing contained in this report shall relieve any other party of its responsibility to abide by contract documents and applicable laws, codes, regulations, or standards nor shall it be considered medical advice or consultation.

This report may document whether work conducted by CCEI or under CCEI’s observation was done so in accordance with applicable regulatory standards. In the absence of standards such as is often the case for microbial assessment and abatement, this report may not be construed as providing clearance, approval, or authorization for use or re-occupancy of a given structure. Actual site conditions and quantities should be field verified and unless expressly stated.

This report is expressly for the sole and exclusive use of the party for whom this report was originally prepared for and for the particular purpose outlined in the report. Only the party for whom this report was originally prepared and/or other specifically named parties have the right to make use of and rely upon this report. Reuse of this report or any portion thereof for other than its intended purpose, or if modified, or if used by third parties, shall be at the user’s sole risk.

Weight

Attn:

Address: 10302 Bristow Center Dr Order #: 259775 #115

Project: HP504 CLNC

Bristow, VA 20136

Crystal Coast Environmental (3425)Customer:

18-5161Number: PO Number:

Received 05/09/18 Matrix Paint

% / Wt. RL*Total µg

Cust. Sample ID

Parameter

Sample ID Location

Schneider Laboratories Global, Inc 2512 W. Cary Street • Richmond, Virginia • 23220-5117 804-353-6778 • 800-785-LABS (5227) • Fax 804-359-1475

05/10/18

Location: Camp Lejeune

Analyzed

05/10/18Reported

Sample Date

Conc.Method

Analysis Report

Door/Door Frame 05/04/18405-Pb-01259775-001 320 mg

0.0146 % 31.3 mg/kg46.8 µgEPA 7000B / 3050B 146 mg/kgLead

Interior Walls 05/04/18405-Pb-02259775-002 346 mg

0.00338 % 28.9 mg/kg11.7 µgEPA 7000B / 3050B 33.8 mg/kgLead

Analyst: RW

259775-05/10/18 06:34 PM

Analyst Reviewed By: Eric Broaddus

Federal Lead Paint Statute

Location UnitClearance

Lead in paint by weight < 0.50 %

Lead in paint as PPM < 5000 mg/kg

Minimum reporting limit: 10.0 µg. Concentration and *Reporting Limit (RL) based on weights provided by client. All internal QC parameters were met. Unusual sample conditions, if any, are described. Values are reported to three significant figures. PPM = mg/kg | PPB = µg/kg. The test results reported relate only to the samples submitted. AIHA-LAP, LLC accredited for Lead.

ISSUE DATE

APPROVED

CHECKED

DESIGNED

DRAWN

SHEET TITLE

JOB TITLE

B

REVISIONS

C

A

17-0022

INTERIOR & EXTERIOR

REPAIRS TO BEQ HP504

AS101

05/14/18

Approver

Checker

Designer

Author

HAZARDOUS

MATERIALS

ABATEMENT FIRST

FLOOR PLAN

NO. DATE DESCRIPTION

SCALE: 1" = 30'-0"1

FIRST FLOOR PLAN

PLAN NORTH

Robert

405-Pb-01

ISSUE DATE

APPROVED

CHECKED

DESIGNED

DRAWN

SHEET TITLE

JOB TITLE

B

REVISIONS

C

A

17-0022

INTERIOR & EXTERIOR

REPAIRS TO BEQ HP504

AS102

05/14/18

Approver

Checker

Designer

Author

HAZARDOUS

MATERIALS

ABATEMENT SECOND

FLOOR PLAN

NO. DATE DESCRIPTION

SCALE: 1" = 30'-0"1

SECOND FLOOR PLAN

PLAN NORTH

Robert

405-Pb-02

ISSUE DATE

APPROVED

CHECKED

DESIGNED

DRAWN

SHEET TITLE

JOB TITLE

B

REVISIONS

C

A

17-0022

INTERIOR & EXTERIOR

REPAIRS TO BEQ HP504

AS103

05/14/18

Approver

Checker

Designer

Author

HAZARDOUS

MATERIALS

ABATEMENT THIRD

FLOOR PLAN

NO. DATE DESCRIPTION

SCALE: 1" = 30'-0"1

THIRD FLOOR PLAN

PLAN NORTH

ISSUE DATE

APPROVED

CHECKED

DESIGNED

DRAWN

SHEET TITLE

JOB TITLE

B

REVISIONS

C

A

17-0022

INTERIOR & EXTERIOR

REPAIRS TO BEQ HP504

AS104

05/14/18

Approver

Checker

Designer

Author

HAZARDOUS

MATERIALS

ABATEMENT ROOF

PLAN

NO. DATE DESCRIPTION

PLAN NORTH

SCALE: 1" = 30'-0"1

ROOF PLAN

FC515 (FC516) Camp Lejeune, NC

18-5161 Page 1 of 1

View of the Front of the Building Pb-01: Door/Door Frame

Pb-02: Interior Walls

SURVEY FINDINGS Building: HP504

Friable ACM identified

Non-friable ACM identified

Tested Non ACM or REMOVED Materials DESCRIPTION LOCATION Date Quantity

DESCRIPTION LOCATION Date Quantity

DESCRIPTION LOCATION Date Quantity

No friable ACM records found in database

ROOFING SEALANT, BLACK 650 SFROOF CENTERLINE VENTS AND

PARAPET WALL FLASHING

3/28/2006

ROOFING SEALANT, BLACK 60 SFROOF CENTERLINE VENTS ONLY;

PARAPET WALL FLASHING TESTED

NON ACM (SEE ALSO HM40)

9/22/2014

ROOFING SEALANT, BLACK 650 SFROOF CENTERLINE VENTS AND

PARAPET WALL FLASHING

7/16/2009

ROOFING SEALANT, BLACK 650 SFROOF CENTERLINE VENTS AND

PARAPET WALL FLASHING

9/5/2012

2'x2' CEILING TILE, CENTRAL LOUNGES 3/28/2006

12" BEIGE FLOOR TILE AND ADHESIVE CENTER HALLS, LAUNDRY 3/28/2006

12" GRAY FLOOR TILE AND ADHESIVE DORM ROOMS AND COMMON AREAS

THROUGHOUT

3/28/2006

DUCT SEALANT, WHITE CENTRAL PIPE CHASE DUCTS

BETWEEN FLOOR PENETRATIONS

7/16/2009

INTERIOR CAULKING, PIPE CHASE CMU/ BLOCK EXPANSION

JOINTS

7/16/2009

ADHESIVE CENTER HALLS, LAUNDRY 3/28/2006

DUCT SEALANT, GRAY PIPE CHASES, MECHANICAL ROOMS,

AND STUB DUCT INTO DORM ROOMS

3/28/2006

DRYWALL AND JOINT MATERIAL DORM ROOMS AND COMMON AREAS

THROUGHOUT

3/28/2006

MISCELLANEOUS SEALANT CEMENTITIOUS PACKING AT WASTE

DRAIN PIPING IN PIPE CHASES

3/28/2006

TEXTURED CEILING MATERIAL DORM ROOMS AND COMMON AREAS

THROUGHOUT

3/28/2006

Tuesday, April 10, 2018 Page 1 of 2

MISCELLANEOUS SEALANT PIPE CHASES AT SEWER AND VENT

LINE WALL PENETRATION

7/16/2009

MISCELLANEOUS SEALANT PIPE CHASES, MECHANICAL ROOMS

WALL CABLE/CONDUIT PENETRATIONS

3/28/2006

EXTERIOR CAULKING, WINDOWS 3/28/2006

CLOTH EXPANSION JOINT MATERIAL, THIN MECHANICAL ROOM HVAC UNITS 7/16/2009

FOIL BACKED TAPE MECHANICAL ROOM HVAC UNITS AND

DUCTS

7/16/2009

HVAC DUCT INSULATION MECHANICAL ROOM HVAC UNITS AND

DUCTS

7/16/2009

INTERIOR CAULKING, VANITY SINKS AND DORM ROOM

DOORS

7/16/2009

PIPE INSULATION MECHANICAL ROOMS AND PIPE

CHASES THROUGHOUT

7/16/2009

FIBERGLASS INSULATION SEALANT MECHANICAL ROOMS AND PIPE

CHASES ON FIBERGLASS INSULATION

THROUGHOUT

7/16/2009

FIBERGLASS INSULATION SEALANT PIPE CHASES, FIBERGLASS PIPING END

CAPS

7/16/2009

INTERIOR CAULKING, RESIDUAL MATERIAL, SECOND FLOOR

HALL (WATER SCUTTLEBUTT

REMOVED)

7/16/2009

VINYL THRESHOLD MATERIAL CENTER HALL DOORWAYS (TILE TO

CONCRETE TRANSITIONS)

7/16/2009

EXTERIOR CAULKING, BRICK FACING EXPANSION JOINTS 7/16/2009

ROOFING SEALANT, GRAY ROOFING SYSTEM PERIMETER

FLASHING AT SEAMS (SEE ALSO HM07)

9/22/2014

PITCH POCKET TAR ROOFING SYSTEM CABLE/ CONDUIT

PENETRATIONS

7/16/2009

BUILT-UP ROOFING MAIN ROOFING SYSTEM MEMBRANE

(NOT A CORE SAMPLE)

7/16/2009

ROOFING MATERIAL, MAIN ROOFING SYSTEM MEMBRANE

(NOT A CORE SAMPLE)

7/16/2009

ADHESIVE CENTER HALLS, LAUNDRY, DORM

ROOMS

7/16/2009

DUCT SEALANT, GRAY PIPE CHASES, MECHANICAL ROOMS,

AND STUB DUCT INTO DORM ROOMS

7/16/2009

12" GRAY FLOOR TILE AND ADHESIVE DORM ROOMS AND COMMON AREAS

THROUGHOUT

7/16/2009

DRYWALL AND JOINT MATERIAL DORM ROOMS AND COMMON AREAS

THROUGHOUT

7/16/2009

TEXTURED CEILING MATERIAL DORM ROOMS AND COMMON AREAS

THROUGHOUT

7/16/2009

EXTERIOR CAULKING, WINDOWS AND DOORS 7/16/2009

Tuesday, April 10, 2018 Page 2 of 2

C H

E C

K E

D

B

Y

D R

A W

N

B

S

A L

E

G

A

P H

I C

S H

E

T

O

F

A

T

DESCRIPTION

REVISIONS

AH Environmental Consultants

SYM.APPROVED DATE

MCB CAMP LEJEUNE, NC

S A

M P

L

I

E N

T I F

I C

A T

I O

N

H O

M O

G E

N O

U

M

T

E R

I A

L

P O

S I T

I V

E

N

E G

A T

I V

E

O

R

T

R A

C E

T

R

F

P

E

S E

N C

E

O

F

A

S B

E S

T O

S

S A

M P

G E

N

B U

I L D

I N

G

H

P

F I R

O

O R

CY2014 ASBESTOS INSPECTION

HP504-01

MCB CAMP LEJEUENE, NC

D D

A R

D

S E

P T

E M

B E

R

E N

T I F

I E

D

M R

M E

C H

A N

I C

O

M

E L

E C

T R

I C

N

E L

I N

F O

R M

A T

I O

N

P

A C

K E

T

A S

B E

S T

T

I F

I C

A T

I O

N A

N

E C

K E

D

B

A W

N

B

A L

A

P H

I C

S H

E

T

AH Environmental Consultants

SYM.APPROVED DATE

MCB CAMP LEJEUNE, NC

S A

M P

E N

T I F

I C

A T

I O

N

H O

M O

G E

N O

T

E R

I A

L

P O

S I T

I V

E

N

E G

A T

I V

E

O

R

T

R A

C E

T

R

F

E

S E

N C

E

O

F

A

S B

E S

T O

S

S A

M P

G E

B U

I L D

I N

G

H

P

S E

C O

O

O R

CY2014 ASBESTOS INSPECTION

HP504-02

MCB CAMP LEJEUENE, NC

D D

A R

D

S E

P T

E M

B E

R

E N

T I F

I E

D

M R

M E

C H

A N

I C

E C

K E

D

B

A W

N

B

A L

A

P H

I C

S H

E

T

AH Environmental Consultants

SYM.APPROVED DATE

MCB CAMP LEJEUNE, NC

S A

M P

E N

T I F

I C

A T

I O

N

H O

M O

G E

N O

T

E R

I A

L

P O

S I T

I V

E

N

E G

A T

I V

E

O

R

T

R A

C E

T

R

F

E

S E

N C

E

O

F

A

S B

E S

T O

S

S A

M P

G E

B U

I L D

I N

G

H

P

T H

I R

D

F

L O

O R

CY2014 ASBESTOS INSPECTION

HP504-03

MCB CAMP LEJEUENE, NC

D D

A R

D

S E

P T

E M

B E

R

E N

T I F

I E

D

M R

M E

C H

A N

I C

E C

K E

D

B

A W

N

B

A L

A

P H

I C

S H

E

T

AH Environmental Consultants

SYM.APPROVED DATE

MCB CAMP LEJEUNE, NC

S A

M P

E N

T I F

I C

A T

I O

N

H O

M O

G E

N O

T

E R

I A

L

P O

S I T

I V

E

N

E G

A T

I V

E

O

R

T

R A

C E

T

R

F

E

S E

N C

E

O

F

A

S B

E S

T O

S

S A

M P

G E

B U

I L D

I N

G

H

P

R O

O F

CY2014 ASBESTOS INSPECTION

HP504-R

MCB CAMP LEJEUENE, NC

D D

A R

D

S E

P T

E M

B E

R

A A

T T

C

E S

S

A C

M

L E

G E

N D

R O

T

E R

I A

L

T

M

March 2016

Version Number 3

CAMP LEJEUNE CONTRACTOR ENVIRONMENTAL GUIDE

FINAL

PAGE INTENTIONALLY BLANK

i

TABLE OF CONTENTS

Table of Contents .......................................................................... i

Record of Changes ...................................................................... ix

Certification Page........................................................................ xi

List of Acronyms and Abbreviations ........................................ xiii

Contractor’s Phone Directory ................................................... xix

1.0 Contractor Environmental Guide Overview ................... 1-1

1.1. Key Definitions and Concepts ..................................... 1-3

1.1.1. Key Definitions ................................................. 1-3

1.1.2. Key Concepts .................................................... 1-4

1.2. Installation Background .............................................. 1-5

1.2.1. Environmental Management Division and

Environmental Affairs Department................... 1-6

1.2.2. Expectations ...................................................... 1-7

1.3. Overview of Requirements .......................................... 1-8

1.3.1. Contractor Environmental Guide ...................... 1-9

1.3.2. Environmental and EMS Training .................. 1-10

1.4. Points of Contact ....................................................... 1-12

1.5. Overview Map ........................................................... 1-13

2.0 Environmental Management System .............................. 2-1

2.1. Key Definition and Concepts ...................................... 2-2

2.1.1. Key Definitions ................................................. 2-2

2.1.2. Key Concepts .................................................... 2-3

2.2. Overview of Requirements .......................................... 2-5

2.3. Environmental Management System ........................... 2-6

2.4. EMS Responsibilities .................................................. 2-8

2.5. Contractor Environmental Guide and EMS ................ 2-9 ii

3.0 Training .......................................................................... 3-1

3.1. Key Definitions and Concepts ..................................... 3-2

3.1.1. Key Definitions ................................................. 3-2

3.1.2. Key Concepts .................................................... 3-3

3.1.3. Environmental Management System ................ 3-4

3.2. Overview of Requirements .......................................... 3-4

3.3. Training Requirements ................................................ 3-4

3.3.1. General Environmental Awareness ................... 3-4

3.3.2. Environmental Management System ................ 3-5

3.3.3. Recordkeeping .................................................. 3-5

4.0 Air Quality ...................................................................... 4-1

4.1. Key Definitions and Concepts ..................................... 4-1

4.1.1. Key Definitions ................................................. 4-1

4.1.2. Key Concepts .................................................... 4-2

4.1.3. Environmental Management System ................ 4-3

4.2. Overview of Requirements .......................................... 4-4

4.3. Permit Requirements ................................................... 4-5

4.4. Additional Activities of Concern ................................ 4-6

5.0 Environmental Emergency Planning and Response ....... 5-1

5.1. Key Definitions and Concepts ..................................... 5-1

5.1.1. Key Definitions ................................................. 5-2

5.1.2. Key Concepts .................................................... 5-3

5.1.3. Environmental Management System ................ 5-4

5.2. Overview of Requirements .......................................... 5-4

5.3. Spill Notification ......................................................... 5-6

5.3.1. POL/Hazardous Materials Spill Notification

Procedures ......................................................... 5-6

5.3.2. Wastewater Spill and Water Line Break

Notification ....................................................... 5-8

5.4. Follow-Up ................................................................... 5-9

6.0 Cultural Resources ......................................................... 6-1

6.1. Key Definitions and Concepts ..................................... 6-1 iii

6.1.1. Key Definitions ................................................. 6-1

6.1.2. Key Concepts .................................................... 6-3

6.1.3. Environmental Management System ................ 6-3

6.2. Overview of Requirements .......................................... 6-4

6.3. Procedures ................................................................... 6-7

7.0 Hazardous Materials/Hazardous Waste Management .... 7-1

7.1. Key Definitions and Concepts ..................................... 7-1

7.1.1. Key Definitions ................................................. 7-2

7.1.2 Key Concepts .................................................... 7-5

7.1.3 Environmental Management System ................ 7-8

7.2. Overview of Requirements ........................................ 7-11

7.3. Hazardous Materials Requirements ........................... 7-14

7.4. Universal Waste Requirements ................................. 7-16

7.5. Hazardous Waste Requirements ................................ 7-18

7.5.1. Storage ............................................................ 7-19

7.5.2. Manifesting and Disposal ............................... 7-21

7.6. Non–RCRA-Regulated Waste Requirements ........... 7-22

7.6.1. Used Oil and Oil Filters .................................. 7-22

7.6.2. Used Antifreeze .............................................. 7-24

7.6.3. Petroleum-Contaminated Wipes and Oily Rags . 7-

7.6.4. Used Electronic Equipment ............................ 7-25

7.6.5. New and Used Batteries (Not Regulated as

Universal Waste) ............................................. 7-25

8.0 Asbestos .......................................................................... 8-1

8.1. Key Definitions and Concepts ..................................... 8-1

8.1.1. Key Definitions ................................................. 8-1

8.1.2. Key Concepts .................................................... 8-3

8.1.3. Environmental Management System ................ 8-4

8.2. Overview of Requirements .......................................... 8-5

8.3. Responsibilities Before a Demolition or Renovation

Project .......................................................................... 8-6

8.3.1. Identification of ACM and PACM ................... 8-7 iv

8.3.2. Notification ....................................................... 8-8

8.3.3. Removal ............................................................ 8-8

8.3.4. Training ............................................................. 8-9

8.4. Responsibilities During a Demolition or Renovation

Project .......................................................................... 8-9

8.5. Disposal of ACM Waste ............................................ 8-10

9.0 Lead-Based Paint ............................................................ 9-1

9.1. Key Definitions and Concepts ..................................... 9-1

9.1.1. Key Definitions ................................................. 9-1

9.1.2. Key Concepts .................................................... 9-3

9.1.3. Environmental Management System ................ 9-3

9.2. Overview of Requirements .......................................... 9-4

9.3. Responsibilities Before Renovation or Demolition ..... 9-6

9.4. Permits ......................................................................... 9-8

9.5. Disposal ....................................................................... 9-8

9.6. Training ....................................................................... 9-9

10.0 Natural Resources ......................................................... 10-1

10.1. Key Definitions and Concepts ................................... 10-1

10.1.1. Key Definitions ............................................... 10-2

10.1.2. Key Concepts .................................................. 10-3

10.1.3. Environmental Management System .............. 10-5

10.2. Overview of Requirements ........................................ 10-6

10.3. National Environmental Policy Act ........................ 10-10

10.4. Timber ..................................................................... 10-11

10.5. Threatened and Endangered Species ....................... 10-13

10.6. Wetlands .................................................................. 10-14

10.6.1. Avoidance ..................................................... 10-14

10.6.2. Permits .......................................................... 10-15

10.6.3. Impacts .......................................................... 10-18

10.6.4. Mitigation ...................................................... 10-19

10.7. Temporary Construction .......................................... 10-20 v

11.0 Stormwater ................................................................... 11-1

11.1. Key Definitions and Concepts ................................... 11-1

11.1.1. Key Definitions ............................................... 11-2

11.1.2. Key Concepts .................................................. 11-5

11.1.3. Environmental Management System .............. 11-8

11.2. Overview of Requirements ........................................ 11-9

11.3. Prior to Site Work .................................................... 11-11

11.3.1. Construction Notifications ............................ 11-12

11.3.2. Familiarity with the Stormwater Phase I Industrial

Permit ............................................................ 11-12

11.3.3. Familiarity with the Stormwater Phase II

Municipal Permit .......................................... 11-13

11.3.4. Project-Specific Construction Permits .......... 11-13

11.4. Responsibilities During Site Work .......................... 11-16

12.0 Solid Waste, Recycling, and Pollution Prevention (P2) . 12-

12.1. Key Definitions and Concepts ................................... 12-1

12.1.1. Key Definitions ............................................... 12-2

12.1.2. Key Concepts .................................................. 12-3

12.1.3. Environmental Management System .............. 12-4

12.2. Overview of Requirements ........................................ 12-5

12.3. Solid Waste Requirements ........................................ 12-7

12.3.1. MCB Camp Lejeune Landfill Acceptable Waste

Streams ............................................................ 12-9

12.4. Recycling Requirements .......................................... 12-14

12.4.1. Recycling Center ........................................... 12-15

12.4.2. Other Recyclables ......................................... 12-16

12.5. Pollution Prevention and Green Procurment ........... 12-17

13.0 Potential Discovery of Undocumented Contaminated

Sites .............................................................................. 13-1

13.1. Key Definitions and Concepts ................................... 13-2

13.1.1. Key Definitions ............................................... 13-2

13.1.2. Key Concepts .................................................. 13-3 vi

13.1.3. Environmental Management System .............. 13-3

13.2. Overview of Requirements ........................................ 13-3

13.3. Unforeseen Site Condition Procedures ...................... 13-4

13.3.1. Petroleum, Oil, and Lubricants ....................... 13-5

13.3.2. Munitions and Ordnance ................................. 13-6

14.0 Permitting ..................................................................... 14-1

14.1. Key Definitions and Concepts ................................... 14-1

14.1.1. Key Definitions ............................................... 14-1

14.1.2. Key Concepts .................................................. 14-2

14.1.3. Environmental Management System .............. 14-3

14.2. Overview of Requirements ........................................ 14-3

14.3. Project Permits and Approvals .................................. 14-3

14.3.1. Stormwater (Section 11.0) .............................. 14-4

14.3.2. Asbestos (Section 8.0) .................................... 14-5

14.3.3. Lead-Based Paint (Section 9.0)....................... 14-5

14.3.4. Air Quality (Section 4.0) ................................. 14-6

14.3.5. Wetlands (Section 10.6) .................................. 14-7

14.3.6. Drinking Water/Wastewater ........................... 14-8 vii

List of Tables

Table 1-1. Contacts in Case of a Spill ..................................... 1-13

Table 2-1. Practices Identified Under MCB Camp Lejeune’s

EMS ..................................................................... 2-10

Table 5-1. Environmental Emergency Response Contacts ....... 5-3

Table 12-1. Base Landfill Requirements .............................. 12-11

List of Figures

Figure 1-1. Environmental Management Division (MCB Camp

Lejeune) Organization Chart ................................. 1-7

Figure 1-2. Environmental Affairs Department (MCAS New

River) Organization Chart .................................... 1-7

Figure 1-3. Overview Map ...................................................... 1-14

Figure 2-1. Plan, Do, Check, Act Cycle ................................... 2-4

Figure 2-2. Potential Interactions of Construction and Demolition

Activities with the Environment ............................ 2-7

Figure 6-1. Possible Cultural Resource Discovery Flow Chart 6-8

Figure 7-1. Diamond Hazard Label .......................................... 7-7

Attachments and Appendix

Attachment 2-1 MCB Camp Lejeune’s Environmental Policy

Statement

Attachment 3-1 Spill Reporting Form

Attachment 4-1 Weekly Hazardous Waste (HW) Site

Inspection Form MCB Camp Lejeune

Attachment 4-2 Weekly Hazardous Waste (HW) Site

Inspection Form MCAS New River

Appendix General EMS & Environmental Awareness

Training for Contractors & Vendors viii ix

RECORD OF CHANGES

Date Description of

Changes Page # Name/Initials x xi

CERTIFICATION PAGE

I certify that I have read, understood, and accept this document and all attachments, and that all those within my party working on a job site within Marine Corps Base Camp Lejeune and/or

Marine Corps Air Station New River will comply with the environmental policies and regulations herein. I am aware that there are penalties for not complying with this Guide.

Signature

Date xii xiii

LIST OF ACRONYMS AND

ABBREVIATIONS

ACM Asbestos-Containing Material

AHERA Asbestos Hazard and Emergency Response

Act

AHPA Archaeological and Historic Preservation

Act

ARPA Archeological Resource Protection Act

ASHARA Asbestos School Hazard Abatement

Reauthorization Act

ASD Accumulation Start Date

ASO Air Station Order

BMP Best Management Practice

BO Base Order

C&D Construction and Demolition

CAA Clean Air Act

CAMA Coastal Area Management Act

CERCLA Comprehensive Environmental Response, Compensation, and Liability

CETEP Comprehensive Environmental Training and

Education Program

CFC Chlorofluorocarbon

CFR Code of Federal Regulations

CG Commanding General

CWA Clean Water Act

CZMA Coastal Zone Management Act

DHHS Department of Health and Human Services

DLADS…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .