18-0043 Lead Base Paint Inspection Report.pdf

PDF 1 MB Posted

Attached to
Repair BEQ HP504
Solicitation number
N40085-21-R-2505
Issued by

View the file

Other files

File Type Posted
NEW RFP 180043.pdf PDF
N4008518B0043 Dwgs.pdf PDF
N4008518B0043 Specs 1of2.pdf PDF
18-0043 Pb and ACM fr CL combined.pdf PDF
18-0043 APPD.pdf PDF
N4008518B0043 Specs 2of2.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Client:

Mr. Randy Alvar Project Manager CEMS Engineering 320-C Midland Parkway Summerville, SC 29485

Submitted Electronically: ralvar@CEMS-ae.com

Project:

Lead Base Paint Inspection

BEQ HP504

Camp Lejeune, North Carolina

Dear Mr. Alvar:

Crystal Coast Environmental, Inc. (CCEI) was retained to conduct a lead base paint (LBP) inspection at the project identified above. The inspection consisted of visible and accessible interior and exterior surfaces coated with paint.

Background information on the Site and a summary of the inspection are provided below. CCEI’s services are subject to the Terms and Conditions to the Limitations and Service Constraints in Attachment A. The results of the inspection are presented in the attachments to this report.

LEAD SURVEY

CCEI conducted a LBP inspection to identify building components that may be impacted during scheduled renovations and may have lead-containing surface coatings.

The LBP inspection was performed on May 7, 2018, by Mr. Robert Elbertson of CCEI. The inspection was conducted by visually assessing areas of concern that may have surface coatings that are suspected to contain lead. Suspected materials coated with LBP were analyzed for total lead content (reported in total percent by weight) by Flame Atomic Adsorption Spectrometry (AAS) in accordance with U.S.

EPA Method 7420, SW 846-3050B/7000B. Strict Quality Control/Quality Assurance provisions were adhered to for analysis of all lead samples. from a wall, door frame, window sill, and baseboard. The results of the LBP inspection are presented in the attachments to this report as follows.

Crystal Coast Environmental, Inc.

10302 Bristow Center Dr.

Suite 115

Bristow, VA 20136

Tel: 910.938.7998

Fax: 910.938.3441 www.cceinc.biz

ENVIRONMENTAL

Date:

May 18, 2018

Contact:

Robert Elbertson

Phone:

910.330.7410

Email:

relbertson@cceinc.biz

Our ref:

18-5161

May 18, 2018

• Attachment A – CCEI Limitations and Service Constraints

• Attachment B – Laboratory Results

• Attachment C – Sampling Locations

• Attachment D – Photographic Log

FINDINGS

Based on the results of the investigation, the material identified does not contain LBP.

If analysis was conducted by a laboratory: 0.5% by weight or 5,000 parts per million (ppm).

The Occupational Safety and Health Administration (OSHA) Lead in Construction standard does not define lead paint based on content. Any detectable lead in paint makes it lead paint for purposes of complying with OSHA regulations to determine worker exposure.

CONCLUSIONS

Based upon the results of the inspection, the samples are reported as to containing detectable quantities of lead. The scope of this lead screening survey was limited to only assessing building components located areas or rooms identified by the client. If areas outside the scope of assessment for this survey may be disturbed, additional assessment may be required

The remaining samples are reported as not containing detectable quantities of lead.

The scope of this lead screening survey was limited to only assessing building components located areas or rooms identified by the client. If areas outside the scope of assessment for this survey may be disturbed, additional assessment may be required.

CLOSING

Should you have any questions regarding this report, or if CCEI can be of further assistance, please feel free to contact CCEI at (910) 938-7998.

Sincerely, Crystal Coast Environmental, Inc.

May 18, 2018

Robert Elbertson Operations Manager

Attachments A. CCEI Limitations and Service Constraints B. Laboratory Results C. Sampling Locations D. Photographic Log

Limitations and Service Constraints

The opinions, conclusions and recommendations presented in this report are limited to the information obtained during the performance of the specific scope of service identified in the report. To the extent that Crystal Coast Environmental, Inc. (CCEI) relied upon any information prepared by other parties not under direct contract to CCEI, no representation as to the accuracy or completeness of such information is made. This report is an instrument of professional service and the services described in the report were performed in accordance with generally accepted standards and level of skill and care ordinarily exercised by members of the profession working under similar conditions including comparable budgetary and schedule constraints. No warranty, guarantee or certification express or implied, is intended or given with respect to CCIE’s services, opinions, conclusions or recommendations. This statement is in lieu of any other statement either expressed or implied.

CCEI’s observations, the results of testing and CCEI’s opinions, conclusions and recommendations apply solely to conditions existing at the specific times when and specific locations where CCEI’s investigative work was performed. Observation and testing activities such as those conducted by CCEI are inherently limited and do not represent a conclusive or complete characterization. Conditions in other parts of the project site, building or area may vary from conditions at the specific locations where observations were made and where testing was performed by CCEI. Additionally, other building material hazards which were not identified by CCEI, may also be present in the indoor air, un-accessed areas and in walls, ceilings, cavities and floors. Therefore, the extent of CCEI’s opinions, conclusions and recommendations are limited and 100% confidence in these opinions, conclusions and recommendations cannot reasonably be achieved. Nothing contained in this report shall relieve any other party of its responsibility to abide by contract documents and applicable laws, codes, regulations, or standards nor shall it be considered medical advice or consultation.

This report may document whether work conducted by CCEI or under CCEI’s observation was done so in accordance with applicable regulatory standards. In the absence of standards such as is often the case for microbial assessment and abatement, this report may not be construed as providing clearance, approval, or authorization for use or re-occupancy of a given structure. Actual site conditions and quantities should be field verified and unless expressly stated.

This report is expressly for the sole and exclusive use of the party for whom this report was originally prepared for and for the particular purpose outlined in the report. Only the party for whom this report was originally prepared and/or other specifically named parties have the right to make use of and rely upon this report. Reuse of this report or any portion thereof for other than its intended purpose, or if modified, or if used by third parties, shall be at the user’s sole risk.

Weight

Attn:

Address: 10302 Bristow Center Dr Order #: 259775 #115

Project: HP504 CLNC

Bristow, VA 20136

Crystal Coast Environmental (3425)Customer:

18-5161Number: PO Number:

Received 05/09/18 Matrix Paint

% / Wt. RL*Total µg

Cust. Sample ID

Parameter

Sample ID Location

Schneider Laboratories Global, Inc 2512 W. Cary Street • Richmond, Virginia • 23220-5117 804-353-6778 • 800-785-LABS (5227) • Fax 804-359-1475

05/10/18

Location: Camp Lejeune

Analyzed

05/10/18Reported

Sample Date

Conc.Method

Analysis Report

Door/Door Frame 05/04/18405-Pb-01259775-001 320 mg

0.0146 % 31.3 mg/kg46.8 µgEPA 7000B / 3050B 146 mg/kgLead

Interior Walls 05/04/18405-Pb-02259775-002 346 mg

0.00338 % 28.9 mg/kg11.7 µgEPA 7000B / 3050B 33.8 mg/kgLead

Analyst: RW

259775-05/10/18 06:34 PM

Analyst Reviewed By: Eric Broaddus

Federal Lead Paint Statute

Location UnitClearance

Lead in paint by weight < 0.50 %

Lead in paint as PPM < 5000 mg/kg

Minimum reporting limit: 10.0 µg. Concentration and *Reporting Limit (RL) based on weights provided by client. All internal QC parameters were met. Unusual sample conditions, if any, are described. Values are reported to three significant figures. PPM = mg/kg | PPB = µg/kg. The test results reported relate only to the samples submitted. AIHA-LAP, LLC accredited for Lead.

SHEET NO.

JOB NO.

ISSUE DATE

APPROVED

CHECKED

DESIGNED

DRAWN

SHEET TITLE

JOB TITLE

B

REVISIONS

C

A

17-0022

INTERIOR & EXTERIOR

REPAIRS TO BEQ HP504

AS101

05/14/18

Approver

Checker

Designer

Author

HAZARDOUS

MATERIALS

ABATEMENT FIRST

FLOOR PLAN

NO. DATE DESCRIPTION

SCALE: 1" = 30'-0"1

FIRST FLOOR PLAN

PLAN NORTH

Robert Callout 405-Pb-01

ISSUE DATE

APPROVED

CHECKED

DESIGNED

DRAWN

SHEET TITLE

JOB TITLE

B

REVISIONS

C

A

17-0022

INTERIOR & EXTERIOR

REPAIRS TO BEQ HP504

AS102

05/14/18

Approver

Checker

Designer

Author

HAZARDOUS

MATERIALS

ABATEMENT SECOND

FLOOR PLAN

NO. DATE DESCRIPTION

SCALE: 1" = 30'-0"1

SECOND FLOOR PLAN

PLAN NORTH

Robert Callout 405-Pb-02

ISSUE DATE

APPROVED

CHECKED

DESIGNED

DRAWN

SHEET TITLE

JOB TITLE

B

REVISIONS

C

A

17-0022

INTERIOR & EXTERIOR

REPAIRS TO BEQ HP504

AS103

05/14/18

Approver

Checker

Designer

Author

HAZARDOUS

MATERIALS

ABATEMENT THIRD

FLOOR PLAN

NO. DATE DESCRIPTION

SCALE: 1" = 30'-0"1

THIRD FLOOR PLAN

PLAN NORTH

ISSUE DATE

APPROVED

CHECKED

DESIGNED

DRAWN

SHEET TITLE

JOB TITLE

B

REVISIONS

C

A

17-0022

INTERIOR & EXTERIOR

REPAIRS TO BEQ HP504

AS104

05/14/18

Approver

Checker

Designer

Author

HAZARDOUS

MATERIALS

ABATEMENT ROOF

PLAN

NO. DATE DESCRIPTION

PLAN NORTH

SCALE: 1" = 30'-0"1

ROOF PLAN

FC515 (FC516) Camp Lejeune, NC

18-5161 Page 1 of 1

View of the Front of the Building Pb-01: Door/Door Frame

Pb-02: Interior Walls

Pb Sampling Locations.pdf
Sheets
AS101 - HAZARDOUS MATERIALS ABATEMENT FIRST FLOOR PLAN
AS102 - HAZARDOUS MATERIALS ABATEMENT SECOND FLOOR PLAN
AS103 - HAZARDOUS MATERIALS ABATEMENT THIRD FLOOR PLAN
AS104 - HAZARDOUS MATERIALS ABATEMENT ROOF PLAN