Amendment_0003.pdf
PDF 59 KB Posted
- Solicitation number
- N40085-17-R-5020
About this file
Amendment 0003
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_0002.pdf | ||
| Amendment_0001.pdf | ||
| Attachment_A_-_Price_Proposal_Form.docx | DOCX document | |
| Attachment_B_-_Wage_Determination.pdf | ||
| d3_2008_Tetra_Tech_SAP-QAPP.zip | ZIP file | |
| Attachment_C_-_Pre-Proposal_Inquiry_Form.xls | XLS spreadsheet | |
| d2_2016_Watermark-Mechanicsburg_Site_3_QAPP_Rev_2016.pdf | ||
| b_NSA_Mechanicsburg_Site_Map.pdf | ||
| 17R5020_General_Requirements.docx | DOCX document | |
| d1_2016_Watermark-Draft_Final_2016_AMR.pdf | ||
| c_Site_3_Location_Map.pdf | ||
| PWS.docx | DOCX document |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
PAGE OF PAGES
1 2
2. AMENDMENT/MODIFICATION NO.
3. EFFECTIVE DATE
24-Feb-2017
4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
6. ISSUED BY CODE N40085 7. ADMINISTERED BY (If other than Item 6) CODE
NAVFAC MID ATLANTIC
IPT NORTH
9324 VIRGINIA AVENUE
BLDG Z-144
NORFOLK VA 23511
See Item 6
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) X 9A. AMENDMENT OF SOLICITATION
NO.
N40085-17-R-5020
X
9B. DATED (SEE ITEM 11)
27 January 2017
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, X is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning __1__ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.
IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
SOLICITATION NO. N40085-17-R-5020 ANNUAL GROUNDWATER SAMPLING AND REPORTING, NAVAL SUPPORT ACTIVITY, MECHANICSBURG, PENNSYLVANIA
The purpose of this Amendment is to:
1. Provide responses to Pre-Proposal Inquiries (see Section SF 30 Block 14 Continuation Page)
Proposal due date remains Monday, 27 February 2017, by no later than 2:00 pm EST.
Alanna Whybrew, alanna.whybrew@navy.mil, (757) 341-0081
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
24-Feb-2017
NSN 7540-01-152-8070
Previous edition unusable
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
AMENDMENT 0003
RESPONSES TO PRE-PROPOSAL INQUIRIES (PPIs)
QUESTION GOVERNMENT RESPONSE Response Number
Per Section 4.3.1, the contractor is required to clear obstructions from the wells.
To ensure that contractors are providing the same level of effort, can the Navy provide a scope of work on the level of effort required to clear the obstructions from the wells, including duration and method of removal.
Clarification to PWS Section 4.3.1: The Contractor will identify the nature of the obstruction in each well using a downhole camera. Following the video survey and in consultation with the NAVFAC RPM, a determination will be made based on the video evidence as to whether the obstruction can be removed from each well. If the obstruction is removable, the Contractor will attempt removal for a period up to 8 hours at each well. In the event the obstruction is not removable, the Contractor’s efforts will be considered complete. The Contractor should assume the services of a drill rig are not needed for the obstruction removal;
however, other means of forced extraction should be attempted. 14
Should the contractor include costs for redrilling of these wells? No. 15
(End of Summary of Changes)
| 11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS |
| 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. |
File details come from the government source that posted it. Updated .