J-0200000-11_BOS_ELIN.pdf
PDF 491 KB Posted
- Solicitation number
- N4008517R1140
About this file
J-0200000-11_BOS_ELIN.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N40085-17-R-1140-0003.pdf | ||
| Copy_of_J-0200000-11_BOS_ELIN__(2).zip | ZIP file | |
| Sectio_J_-_1502000.pdf | ||
| Section_J_-_J-1602000.pdf | ||
| N40085-17-R-1140-0002.pdf | ||
| Attachment_J-0200000-13.pdf | ||
| Section_J_-_Part_1.zip | ZIP file | |
| J-0200000-11_BOS_ELIN.pdf | ||
| Section_J_-_Part_2.zip | ZIP file | |
| N40085-17-R-1140_-_Solicitation.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TOTAL CONTRACT COST
Exhibit Summary
Description NON-RECURRING WORK
OPTION THREE
OPTION FOUR
OPTION FIVE
OPTION ONE
BASE PERIOD
RECURRING WORK
OPTION TWO
OPTION SEVEN
OPTION SIX
ELIN /Sub
ELIN
Description Quantity Unit of Issue Unit Price Total
Annex 1502000 A001 3.1 Service Orders A001AA 3.1.1 Emergency Service Orders 500 EA 12 MO A001AB 3.1.2 Urgent Service Orders 900 EA 12 MO A001AC 3.1.3 Routine Service Orders 3,600 EA 12 MO
3.2 PREVENTATIVE MAINTENANCE
A002 Spec Item 3.2.1 HVAC Water treatment and 3.2.3 Boiler Water treatment A002AA Design and Implement HVAC Water treatment PM Program, Spec Item 3.2
Closed (9)and DTW loops (5) total 14
12 MO
A002AB
Design and Implement Boiler Water treatment PM Program, Spec Item 3.2 Closed loops(26)
12 MO
A002AC Glycol (7) 12 MO A002AD Open Loops (2) 12 MO A002AE Geothermal (31) 12 MO
Subtotal A003 Spec Item 3.2.2 DDC A003AA Design and Implement DDC PM Program (3,805 points) 12 MO
Subtotal
A004 Spec Item 3.2.4 Security Systems and Equipment Design and Implement PM Programs for the following
A004AA Fence Line (39,667 LF) 5 times a year 12 MO A004AB Mechanical Gates (13 EA) 12 MO A004AC Vehicle Gates (19 EA) 12 MO A004AD Turnstiles (17 EA) 12 MO A004AE Handicap Gates (13 EA) 12 MO A004AF Light Poles and Bulbs (104 EA) inspect 4 times a year 12 MO A004AG Camera Poles (36 EA) inspect 4 times a year 12 MO A004AH Generators (5 EA) 12 MO A004AJ Popup Barriers (6 Sets of 5) 12 MO
Subtotal
A005 Spec Item 3.2.5 Compressed Air Systems Design and Implement PM Programs for the following
A005AA Air Compressors (69 EA) 12 MO Subtotal
A006 Spec Item 3.2.6 Cathodic Protection Systems Design and Implement PM Programs for the following
A006AA Cathodic Protection Pipe Lines (44 EA) 12 MO A006AB Cathodic Protection Tanks (7 EA) 12 MO
Subtotal
A007 Spec Item 3.2.7 Weight Handling Equipment Design and Implement PM Programs for the following
A007AA Cranes (35 EA) 12 MO A007AB Mobile cranes (2) 12 MO A007AC Boat Lifts (3 EA) 12 MO A007AE Stacker lifts (5 EA) 12 MO A007AF WHE Inspection, Testing, Certifications 3.4.2 12 MO
Subtotal
A008 Spec Item 3.2.8 Lightning Arrestors and Grounding Devices Design and Implement PM Programs for the following
A008AA 1123 testing points 12 MO Subtotal
A009 Spec Item 3.2.9 Jet Refueling System Design and Implement PM Programs for the following
A009AA 5,000 Barrel Tanks (4 EA) 12 MO A009AB 13,500 Barrel Tanks (2 EA) 12 MO
ATTACHMENT J-0200000-11
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT N40085-17-R-1140
EXHIBIT A
Line Item 0001 Recurring Work Price - Base Period ELINs A001-A034
MCAS BOS
ELIN
Description Quantity Unit of Issue Unit Price Total
A009AC Valves (54 EA) 12 MO A009AD Pumps (26 EA) 12 MO A009AE Motor Control Panels (13 EA) 12 MO A009AF Filtration Systems (13 EA) 12 MO
Subtotal
A010 Spec Item 3.2.10 Swimming Pools Design and Implement PM Programs for the following
A010AA Pools (3 EA) 12 MO Subtotal
A011 Spec Item 3.2.11 Arresting Gear Design and Implement PM Programs for the following
A011AA Arresting E-28 Gear (8 EA) 12 MO Subtotal
A012 Spec Item 3.2.12 Auxiliary Generators Design and Implement PM Programs for the following
A012AA 15 KW Generator (1 EA) 12 MO A012AB 25 KW Generator (3 EA) 12 MO A012AC 30 KW Generator (3 EA) 12 MO A012AD 35 KW Generator (2 EA) 12 MO A012AE 40 KW Generator (3 EA) 12 MO A012AF 50 KW Generator (1 EA) 12 MO A012AG 60 KW Generator (7 EA) 12 MO A012AH 65 KW Generator (8 EA) 12 MO A012AJ 80 KW Generator (1 EA) 12 MO A012AK 100 KW Generator (8 EA) 12 MO A012AL 125 KW Generator (2 EA) 12 MO A012AM 135 KW Generator (1 EA) 12 MO A012AN 150 KW Generator (6 EA) 12 MO A012AP 200 KW Generator(10 EA) 12 MO A012AQ 230 KW Generator (3 EA) 12 MO A012AR 250 KW Generator (5 EA) 12 MO A012AS 400 KW Generator (1 EA) 12 MO A012AT 450 KW Generator (2 EA) 12 MO A012AU 1250 KW Generator (1 EA) 12 MO
Subtotal
A013 Spec. Item 3.2.13 Vertical Transportation Equipment Design and Implement PM Programs for the following
A013AA Auto Lifts (24 EA) 12 MO Subtotal Spec.Item 3.3 IMP
A014 Spec Item 3.3.1 HVAC Design and Implement IMP Programs for the following
A014AA Mixing Valve (1 EA) 12 MO A014AB Barometric Damper (1 EA) 12 MO A014AC Fume Hood (1 EA) 12 MO A014AD Gas Packs (3 EA) 12 MO A014AE Heat Exchangers (3 EA) 12 MO A014AF Motorized Louvers (3 EA) 12 MO A014AG Refrigerators (3 EA) 12 MO A014AH Cooling Tower (3 EA) 12 MO A014AJ Air Curtains (4 EA) 12 MO A014AK Condensate tank (8 EA) 12 MO A014AL Fan Coil Unit (188 EA) 12 MO A014AM Air Dryer (16 EA) 12 MO A014AN Freezers (16 EA) 12 MO A014AP Dehumidifiers (16 EA) 12 MO A014AQ Dry Fluid Cooler (10 EA) 12 MO A014AR Expansion Tanks (18 EA) 12 MO A014AS Computer Room Air Conditioner (CRAC) (28 EA) 12 MO A014AT Energy Recovery Units (ERU) (7 EA) 12 MO A014AU Energy Recovery Ventilation (ERV) (17 EA) 12 MO A014AV Ice Machine (27 EA) 12 MO A014AW Air Cooled Chiller (28 EA) 12 MO A014AX Motors (38 EA) 12 MO A014AY Frequency Drives (88 EA) 12 MO
ELIN
Description Quantity Unit of Issue Unit Price Total
A014AZ Water Heaters (127 EA) 12 MO A014BA Packaged Air Conditioning Unit (234EA) 12 MO A014BB Exhaust Fans (276 EA) 12 MO A014BC Pumps (279 EA) 12 MO A014BD Space Heater (332 EA) 12 MO A014BE Air Handlers (325 EA) 12 MO A014BF Heat Pumps (574 EA) 12 MO A014BG Variable Air Volume (VAV) (844 EA) 12 MO A014BH Water Fountain (2) 12 MO
Subtotal
A015 Spec Item 3.3.2 Boilers and Unfired Pressure Vessels Design and Implement IPM Programs for the following
A015AA Boilers (35 EA) maintenance and Inspection, Testing and Certification 12 MO Subtotal
A016 Spec. Item 3.3.3 Fire Protection
3.3.3.1 Fire Suppression Design
and Implement IMP Programs for the following
A016AA
Wet Sprinkler (192 EA) Maintenance and Inspection , Testing, and Certification 12
MO
A016AB Dry Sprinkler (32) Maintenance and Inspection , Testing, and Certification 12 MO A016AC Deluge (26) Maintenance and Inspection , Testing, and Certification 12 MO A016AD Foam (8) Maintenance and Inspection , Testing, and Certification 12 MO
A016AE Air Compressor (9 EA) Maintenance and Inspection , Testing, and Certification 12
MO
A016AF Fire Pump (7 EA) Maintenance and Inspection , Testing, and Certification 12 MO A016AH 3.3.3.1.1 Fire Extinguishers (8) Inspection 12 MO
3.3.3.2 Fire Alarm System Design
and Implement IMP Programs for the following
A016AJ Fire alarm Maintenance and Inspection , Testing, and Certification (143 EA) 12
MO
Subtotal
A017 Spec. Item 3.3.4 Vertical Transportation Equipment Design and Implement IPM Programs for the following
A017AA Passenger Elevator Hydraulic (7 EA) 12 MO A017AB Limited Use limited application (1 EA) 12 MO A017AC Wheel Chair Lift (1 EA) 12 MO
Subtotal Spec Item 3.4 Inspection Testing, and Certification Program
A018 Spec. Item 3.4.3 Backflow Prevention Devices/Inspection, Testing, Certification
A018AA Back Flow Preventers < 4 inches (128 EA) 12 MO A018AB Back Flow Preventers > 4 inches (42 EA) 12 MO A018AC Vacuum Breaker (53) 12 MO
Subtotal Spec. Item 3.5 Other Recurring Services Program
A019 Spec. Item 3.5.1 Exterior Lighting Systems A019AA Develop and Implement Exterior Lighting System PM Program 12 MO
Subtotal A020 Spec. Item 3.5.2 Grease Traps A020AA Develop and Implement Grease Trap PM Program (5 EA) 12 MO
Subtotal A021 Spec. Item 3.5.3 Airfield Lighting A021AA Develop and Implement Airfield Lighting System PM Program 12 MO
Subtotal A022 Spec. Item 3.5.4 400 Hz converters A022AA Develop and Implement 400 Hz Converter System PM Program (66 EA) 12 MO
Subtotal A023 Spec. Item 3.5.5 Storm Drainage Systems A023AA Develop and Implement Storm Drainage System PM Program 12 MO
Subtotal A024 Spec. Item 3.5.6 Fuel Storage Tanks/Facilities A024AA Develop and Implement Storage Tank/Facilities System PM Program (95) 12 MO
Subtotal A025 Spec. Item 3.5.7 Bachelor Quarters
ELIN
Description Quantity Unit of Issue Unit Price Total
A025AA Develop and implement a Program to support the Bachelor Quarters services (13 buildings)
12 MO
Subtotal A026 Spec. Item 3.5.8 Aircraft Hanger and Squadron Administration Spaces A026AA Develop and Implement a Program to support Aircraft Hanger Services (5 admin, 9 Hangers, 1 Corrosion Control Facility)
12 MO
A026AB Hanger Doors (35) 12 MO Subtotal
A027 Spec. Item 3.5.9 Off Peak Ice Storage Systems A027AA Develop and Implement Off Peak Ice Storage PM Program (8 EA) 12 MO
Subtotal A028 Spec. Item 3.5.10 Oil/Water Separator A028AA Develop and Implement Oil/Water Separator System PM Program (30 EA) 12 MO
Subtotal A029 Spec. Item 3.5.11 Solar Panels Hot Water A029AA Develop and Implement Solar Panel System Hot Water PM Program (182 EA) 12 MO
Subtotal A030 Spec. Item 3.5.12 Galley Hood Cleaning A030AA Develop and Implement Galley Hood Cleaning PM Program (3) 12 MO
Subtotal A031 Spec. Item 3.5.13 Propane Air Blender A031AA Develop and Implement Propane Air Blender System PM Program 12 MO
Subtotal A032 Spec. Item 3.5.14 UPS Battery Systems A032AA Develop and Implement UPS Battery Systems PM Program 12 MO
Subtotal A033 1503020 Pest Control A033AA COL4 Base Measures (Reduced Levels)
Services for Region facilities/spaces listed in the Frequencies for Scheduled Work provided in J-1503020-08 decrease in services from COL3 Base Measures to COL 4 Base Measures per the Common Output Level Standards listed in J-1503020-06. 12 MO Subtotal
A033AB Spec Item 3 COL3 Base Measures (Starting COL)
A033AB
For Region facilities/spaces listed in the Frequencies for Scheduled Work provided in J-1503020-08, to perform COL3 Base Measures as specified per the Common Output Level Standards listed in J-1503020-06. (477,051 sq. feet)
12 MO
Subtotal
A034 1602000 Electrical A034AA 3.1 Preventative Maintenance Electrical Distribution Systems 12 MO A034AB 3.1.1 Preventative Maintenance Solar Panels Photo Voltaic (1580 EA) 12 MO A034AC 3.2 Integrated Maintenance Plan (IMP) Jenbacher 12 MO A034AD 3.3.2 Meter Reading (Electrical and Water meters) 12 MO
Subtotal
A035 1700000 BSVE
A035AA WHE/MHE/ CESE Services (Operation of) 12 MO A035AB Dispatching Service 12 MO A035AC Non-Government Owned Leased Vehicles 12 MO A035AD Maintenance (Government-Owned) 12 MO
RECURRING WORK PRICE BASE YEAR TOTAL
ELIN Product Name (120 Characters)
Description Extended Estimated Quantity
Unit of Issue
Unit Price Extended Price
A700 Service Orders 1,000 EA
A701 Septic Tank 5 year inspection
Provide labor and material to perform 5 year inspection of septic tanks.
22 EA
A702 Power line clearing Provide labor and material to perform removal of tree limbs encroaching near Electrical lines.
4 EA
A703-A705 reserved
Subtotal Non-Recurring Work PRICE BASE
YEAR
A706 High Reach Work The Contractor shall provide labor, material, and equipment to perform high reach functions that include, but are not limited to, installation and removal of seasonal decorations, signs, fund drive or safety banners, roof inspection, maintenance of decorative or ornamental fixtures.
180 LH
A707 Generator Overhaul Base Year
The Contractor shall provide labor, material, and equipment to perform 10,000 hour generator overhaul maintenance on GE Jenbaucher generator located in building 1338.
1 EA
A708-A710 reserved
Subtotal Non-Recurring Work PRICE BASE
YEAR
A711 Wrecker Tow Truck Service
Supply Labor and material necessary to perform tow truck services for government vehicles. All tow truck services shall be classified as emergencies.
10 EA
A712 Bus Service Supply labor and material to provide bus drivers with buses for Command programs. Buses shall be free of dirt, graffiti, and litter. Buses shall be operated in accordance with local safety standards.
10 EA
ATTACHMENT J-0200000-11
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT N40085-17-R-1140
EXHIBIT A
Line Item 0002 Non-Recurring Work Price - Base Period ELINs A700-A720
A713 Truck Operation Services
Supply labor and material to provide operators for the operation of truck-tractors and semitrailers, truck-tractors and full trailers, trucks with dolly converters and full trailers and straight trucks; transporting of heavy construction equipment; transporting and setting up the portable stage when needed.
10 EA
A714 Composite Skilled UPL Rate Work - Subject to the Applicable Service Contract Act (SCA) and any Applicable
CBA. MUST BE
NEGOTIATED BY
KO
Provide one composite skilled labor hour of work-in-place performed by substantially and highly trained, certified, and/or licensed craftsmen and technicians, such as carpenters, painters, electricians, plumbers, equipment mechanics, electronics technicians, and pest controllers, per the scope and delivery schedule specified in the task order.
2,500 LH
A715 Composite Unskilled UPL Rate Work - Subject to the Applicable Service Contract Act (SCA) and any Applicable
CBA. MUST BE
NEGOTIATED BY
KO
Provide one composite unskilled labor hour of work-in-place performed by minimally trained or untrained workers, including custodial and grounds maintenance workers, and common laborers per the scope and delivery schedule specified in the order.
2,500 LH
A716 Composite UPL Rate Work - Subject to the applicable Wage Rate Requirement ( Construction).
MUST BE
NEGOTIATED BY
KO
Provide one composite skilled labor hour of work-in-place performed by substantially and highly trained, certified, and/or licensed craftsmen and technicians, such as carpenters, painters, electricians, plumbers, equipment mechanics, electronics technicians, and pest controllers, per the scope and delivery schedule specified in the order.
2,500 LH
A717 Material Costs-
MUST BE
NEGOTIATED BY
KO
Provide all materials and equipment not previously identified under the Recurring Work portion necessary to accomplish UPL Work.
N/A LS
A718-A720 reserved
SUB TOTAL Non-Recurring Work PRICE BASE
YEAR
TOTAL Non-Recurring Work PRICE BASE
YEAR
ELIN
Description Quantity Unit of Issue Unit Price Total
Annex 1502000 B001 3.1 Service Orders B001AA 3.1.1 Emergency Service Orders 500 EA 12 MO B001AB 3.1.2 Urgent Service Orders 900 EA 12 MO B001AC 3.1.3 Routine Service Orders 3,600 EA 12 MO
3.2 PREVENTATIVE MAINTENANCE
B002 Spec Item 3.2.1 HVAC Water treatment and 3.2.3 Boiler Water treatment
B002AA Design and Implement HVAC Water treatment PM Program, Spec Item 3.2 Closed (9)and DTW loops (5) total 14
12 MO
B002AB
Design and Implement Boiler Water treatment PM Program, Spec Item 3.2 Closed loops(26)
12 MO
B002AC Glycol (7) 12 MO B002AD Open Loops (2) 12 MO B002AE Geothermal (31) 12 MO
Subtotal B003 Spec Item 3.2.2 DDC B003AA Design and Implement DDC PM Program (3,805 points) 12 MO
Subtotal
B004 Spec Item 3.2.4 Security Systems and Equipment Design and Implement PM Programs for the following
B004AA Fence Line (39,667 LF) 5 times a year 12 MO B004AB Mechanical Gates (13 EA) 12 MO B004AC Vehicle Gates (19 EA) 12 MO B004AD Turnstiles (17 EA) 12 MO B004AE Handicap Gates (13 EA) 12 MO B004AF Light Poles and Bulbs (104 EA) inspect 4 times a year 12 MO B004AG Camera Poles (36 EA) inspect 4 times a year 12 MO B004AH Generators (5 EA) 12 MO B004AJ Popup Barriers (6 Sets of 5) 12 MO
Subtotal
B005 Spec Item 3.2.5 Compressed Air Systems Design and Implement PM Programs for the following
B005AA Air Compressors (69 EA) 12 MO Subtotal
B006 Spec Item 3.2.6 Cathodic Protection Systems Design and Implement PM Programs for the following
B006AA Cathodic Protection Pipe Lines (44 EA) 12 MO B006AB Cathodic Protection Tanks (7 EA) 12 MO
Subtotal
B007 Spec Item 3.2.7 Weight Handling Equipment Design and Implement PM Programs for the following
B007AA Cranes (35 EA) 12 MO B007AB Mobile cranes (2) 12 MO B007AC Boat Lifts (3 EA) 12 MO B007AD Stacker lifts (5 EA) 12 MO B007AE WHE Inspection, Testing, Certifications 3.4.2 12 MO
Subtotal
B008 Spec Item 3.2.8 Lightning Arrestors and Grounding Devices Design and Implement PM Programs for the following
B008AA 1123 testing points 12 MO Subtotal
B009 Spec Item 3.2.9 Jet Refueling System Design and Implement PM Programs for the following
B009AA 5,000 Barrel Tanks (4 EA) 12 MO B009AB 13,500 Barrel Tanks (2 EA) 12 MO
ATTACHMENT J-0200000-11
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT N40085-17-R-1140
EXHIBIT B
Line Item 0003 Recurring Work Price - 1st Option Period ELINs B001-B034
Description Quantity Unit of Issue Unit Price Total
B009AC Valves (54 EA) 12 MO B009AD Pumps (26 EA) 12 MO B009AE Motor Control Panels (13 EA) 12 MO B009AF Filtration Systems (13 EA) 12 MO
Subtotal
B010 Spec Item 3.2.10 Swimming Pools Design and Implement PM Programs for the following
B010AA Pools (3 EA) 12 MO Subtotal
B011 Spec Item 3.2.11 Arresting Gear Design and Implement PM Programs for the following
B011AA Arresting E-28 Gear (8 EA) 12 MO Subtotal
B012 Spec Item 3.2.12 Auxiliary Generators Design and Implement PM Programs for the following
B012AA 15 KW Generator (1 EA) 12 MO B012AB 25 KW Generator (3 EA) 12 MO B012AC 30 KW Generator (3 EA) 12 MO B012AD 35 KW Generator (2 EA) 12 MO B012AE 40 KW Generator (3 EA) 12 MO B012AF 50 KW Generator (1 EA) 12 MO B012AG 60 KW Generator (7 EA) 12 MO B012AH 65 KW Generator (8 EA) 12 MO B012AJ 80 KW Generator (1 EA) 12 MO B012AK 100 KW Generator (8 EA) 12 MO B012AL 125 KW Generator (2 EA) 12 MO B012AM 135 KW Generator (1 EA) 12 MO B012AN 150 KW Generator (6 EA) 12 MO B012AP 200 KW Generator(10 EA) 12 MO B012AQ 230 KW Generator (3 EA) 12 MO B012AR 250 KW Generator (5 EA) 12 MO B012AS 400 KW Generator (1 EA) 12 MO B012AT 450 KW Generator (2 EA) 12 MO B012AU 1250 KW Generator (1 EA) 12 MO
Subtotal
B013 Spec. Item 3.2.13 Vertical Transportation Equipment Design and Implement PM Programs for the following
B013AA Auto Lifts (24 EA) 12 MO Subtotal Spec.Item 3.3 IMP
B014 Spec Item 3.3.1 HVAC Design and Implement IMP Programs for the following
B014AA Mixing Valve (1 EA) 12 MO B014AB Barometric Damper (1 EA) 12 MO B014AC Fume Hood (1 EA) 12 MO B014AD Gas Packs (3 EA) 12 MO B014AE Heat Exchangers (3 EA) 12 MO B014AF Motorized Louvers (3 EA) 12 MO B014AG Refrigerators (3 EA) 12 MO B014AH Cooling Tower (3 EA) 12 MO B014AJ Air Curtains (4 EA) 12 MO B014AK Condensate tank (8 EA) 12 MO B014AL Fan Coil Unit (188 EA) 12 MO B014AM Air Dryer (16 EA) 12 MO B014AN Freezers (16 EA) 12 MO B014AP Dehumidifiers (16 EA) 12 MO B014AQ Dry Fluid Cooler (10 EA) 12 MO B014AR Expansion Tanks (18 EA) 12 MO B014AS Computer Room Air Conditioner (CRAC) (28 EA) 12 MO B014AT Energy Recovery Units (ERU) (7 EA) 12 MO B014AU Energy Recovery Ventilation (ERV) (17 EA) 12 MO B014AV Ice Machine (27 EA) 12 MO B014AW Air Cooled Chiller (28 EA) 12 MO B014AX Motors (38 EA) 12 MO B014AY Frequency Drives (88 EA) 12 MO
Description Quantity Unit of Issue Unit Price Total
B014AZ Water Heaters (127 EA) 12 MO B014BA Packaged Air Conditioning Unit (234EA) 12 MO B014BB Exhaust Fans (276 EA) 12 MO B014BC Pumps (279 EA) 12 MO B014BD Space Heater (332 EA) 12 MO B014BE Air Handlers (325 EA) 12 MO B014BF Heat Pumps (574 EA) 12 MO B014BG Variable Air Volume (VAV) (844 EA) 12 MO B014BH Water Fountain (2) 12 MO
Subtotal
B015 Spec Item 3.3.2 Boilers and Unfired Pressure Vessels Design and Implement IPM Programs for the following
B015AA Boilers (35 EA) maintenance and Inspection, Testing and Certification 12 MO Subtotal
B016 Spec. Item 3.3.3 Fire Protection
3.3.3.1 Fire Suppression
Design and Implement IMP Programs for the following
B016AA
Wet Sprinkler (192 EA) Maintenance and Inspection , Testing, and Certification 12
MO
B016AB Dry Sprinkler (32) Maintenance and Inspection , Testing, and Certification 12
MO
B016AC Deluge (26) Maintenance and Inspection , Testing, and Certification 12 MO B016AD Foam (8) Maintenance and Inspection , Testing, and Certification 12 MO
B016AE
Air Compressor (9 EA) Maintenance and Inspection , Testing, and Certification 12
MO
B016AF Fire Pump (7 EA) Maintenance and Inspection , Testing, and Certification 12
MO
B016AH 3.3.3.1.1 Fire Extinguishers (8) Inspection 12 MO
3.3.3.2 Fire Alarm System
Design and Implement IMP Programs for the following
B016AJ Fire alarm Maintenance and Inspection , Testing, and Certification (143 EA) 12
MO
Subtotal
B017 Spec. Item 3.3.4 Vertical Transportation Equipment Design and Implement IPM Programs for the following
B017AA Passenger Elevator Hydraulic (7 EA) 12 MO B017AB Limited Use limited application (1 EA) 12 MO B017AC Wheel Chair Lift (1 EA) 12 MO
Subtotal Spec Item 3.4 Inspection Testing, and Certification Program
B018 Spec. Item 3.4.3 Backflow Prevention Devices/Inspection, Testing, Certification
B018AA Back Flow Preventers < 4 inches (128 EA) 12 MO B018AB Back Flow Preventers > 4 inches (42 EA) 12 MO B018AC Vacuum Breaker (53) 12 MO
Subtotal Spec. Item 3.5 Other Recurring Services Program
B019 Spec. Item 3.5.1 Exterior Lighting Systems B019AA Develop and Implement Exterior Lighting System PM Program 12 MO
Subtotal B020 Spec. Item 3.5.2 Grease Traps B020AA Develop and Implement Grease Trap PM Program (5 EA) 12 MO
Subtotal B021 Spec. Item 3.5.3 Airfield Lighting B021AA Develop and Implement Airfield Lighting System PM Program 12 MO
Subtotal B022 Spec. Item 3.5.4 400 Hz converters B022AA Develop and Implement 400 Hz Converter System PM Program (66 EA) 12 MO
Subtotal B023 Spec. Item 3.5.5 Storm Drainage Systems B023AA Develop and Implement Storm Drainage System PM Program 12 MO
Subtotal B024 Spec. Item 3.5.6 Fuel Storage Tanks/Facilities B024AA Develop and Implement Storage Tank/Facilities System PM Program (95) 12 MO
Description Quantity Unit of Issue Unit Price Total
Subtotal B025 Spec. Item 3.5.7 Bachelor Quarters B025AA Develop and implement a Program to support the Bachelor Quarters services
(13 buildings)
12 MO
Subtotal
B026 Spec. Item 3.5.8 Aircraft Hanger and Squadron Administration Spaces
B026AA Develop and Implement a Program to support Aircraft Hanger Services (5 admin, 9 Hangers, 1 Corrosion Control Facility)
12 MO
B026AB Hanger Doors (35) 12 MO Subtotal
B027 Spec. Item 3.5.9 Off Peak Ice Storage Systems B027AA Develop and Implement Off Peak Ice Storage PM Program (8 EA) 12 MO
Subtotal B028 Spec. Item 3.5.10 Oil/Water Separator
B028AA Develop and Implement Oil/Water Separator System PM Program (30 EA)
12 MO
Subtotal B029 Spec. Item 3.5.11 Solar Panels Hot Water B029AA Develop and Implement Solar Panel System Hot Water PM Program (182EA 12 MO
Subtotal B030 Spec. Item 3.5.12 Galley Hood Cleaning B030AA Develop and Implement Galley Hood Cleaning PM Program (3) 12 MO
Subtotal B031 Spec. Item 3.5.13 Propane Air Blender B031AA Develop and Implement Propane Air Blender System PM Program 12 MO
Subtotal B032 Spec. Item 3.5.14 UPS Battery Systems B032AA Develop and Implement UPS Battery Systems PM Program 12 MO
Subtotal B033 1503020 Pest Control B033AA COL4 Base Measures (Reduced Levels)
Services for Region facilities/spaces listed in the Frequencies for Scheduled Work provided in J-1503020-08 decrease in services from COL3 Base Measures to COL 4 Base Measures per the Common Output Level Standards listed in J-1503020-06. 0 MO Subtotal
B033AB Spec Item 3 COL3 Base Measures (Starting COL)
B033AB
For Region facilities/spaces listed in the Frequencies for Scheduled Work provided in J-1503020-08, to perform COL3 Base Measures as specified per the Common Output Level Standards listed in J-1503020-06. (477,051 sq.
feet) 12 MO Subtotal
B034 1602000 Electrical B034AA 3.1 Preventative Maintenance Electrical Distribution Systems 12 MO B034AB 3.1.1 Preventative Maintenance Solar Panels Photo Voltaic (1580 EA) 12 MO B034AC 3.2 Integrated Maintenance Plan (IMP) Jenbacher 12 MO B034AD 3.3.2 Meter Reading (Electrical and Water meters) 12 MO
Subtotal
B035 1700000 BSVE
B035AA WHE/MHE/ CESE Services (Operation of) 12 MO B035AB Dispatching Service 12 MO B035AC Non-Government Owned Leased Vehicles 12 MO B035AD Maintenance (Government-Owned) 12 MO
RECURRING WORK PRICE 1ST OPTION YEAR TOTAL
Description Extended Estimated Quantity
Unit of Issue
Unit Price Extended Price
B700 Service Orders 1,000 EA
B701 Septic Tank 5 year inspection
Provide labor and material to perform 5 year inspection of septic tanks.
0 EA
B702 Power line clearing Provide labor and material to perform removal of tree limbs encroaching near Electrical lines.
4 EA
B703-B705 reserved
Subtotal Non-Recurring Work PRICE 1ST
OPTION
B706 High Reach Work The Contractor shall provide labor, material, and equipment to perform high reach functions that include, but are not limited to, installation and removal of seasonal decorations signs fund drive or
180 LH
B707 Generator Overhaul
1ST OPTION YEAR
The Contractor shall provide labor, material, and equipment to perform generator overhaul maintenance on GE Jenbaucher generator located in building 1338.
N/A EA
B708-B710 reserved
Subtotal Non-Recurring Work PRICE 1ST
OPTION
B711 Wrecker Tow Truck Service
Supply Labor and material necessary to perform tow truck services for government vehicles. All tow truck services shall be classified as emergencies.
10 EA
B712 Bus Service Supply labor and material to provide bus drivers with buses for Command programs. Buses shall be free of dirt, graffiti, and litter. Buses shall be operated in accordance with local safety standards.
10 EA
B713 Truck Operation Services
Supply labor and material to provide operators for the operation of truck-tractors and semitrailers truck-
10 EA
B714 Composite Skilled UPL Rate Work - Subject to the Applicable Service Contract Act (SCA)
Provide one composite skilled labor hour of work-in-place performed by substantially and highly trained, certified, and/or licensed craftsmen and technicians, such as carpenters, painters, electricians, plumbers, equipment mechanics, electronics technicians, and
2,500 LH
ATTACHMENT J-0200000-11
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT N40085-17-R-1140
EXHIBIT B
Line Item 0004 Non-Recurring Work Price - 1st Option Period ELINs B700-B720
B715 Composite Unskilled UPL Rate Work - Subject to the Applicable Service Contract Act (SCA) and any Applicable
CBA. MUST BE
NEGOTIATED BY
KO
Provide one composite unskilled labor hour of work-in-place performed by minimally trained or untrained workers, including custodial and grounds maintenance workers, and common laborers per the scope and delivery schedule specified in the order.
2,500 LH
B716 Composite UPL Rate Work - Subject to the applicable Wage Rate Requirement ( Construction).
MUST BE
NEGOTIATED BY
KO
Provide one composite skilled labor hour of work-in-place performed by substantially and highly trained, certified, and/or licensed craftsmen and technicians, such as carpenters, painters, electricians, plumbers, equipment mechanics, electronics technicians, and pest controllers, per the scope and delivery schedule specified in the order.
2,500 LH
B717 Material Costs-
MUST BE
NEGOTIATED BY
KO
Provide all materials and equipment not previously identified under the Recurring Work portion necessary to accomplish UPL Work.
N/A LS
B718-B720 reserved
SUB TOTAL Non-Recurring Work PRICE 1ST
OPTION
TOTAL NON-RECURRING WORK PRICE 1ST
OPTION
Description Quantity Unit of Issue Unit Price Total
Annex 1502000 C001 3.1 Service Orders C001AA 3.1.1 Emergency Service Orders 500 EA 12 MO C001AB 3.1.2 Urgent Service Orders 900 EA 12 MO C001AC 3.1.3 Routine Service Orders 3,600 EA 12 MO
3.2 PREVENTATIVE MAINTENANCE
C002 Spec Item 3.2.1 HVAC Water treatment and 3.2.3 Boiler Water treatment
C002AA Design and Implement HVAC Water treatment PM Program, Spec Item 3.2 Closed (9)and DTW loops (5) total 14
12 MO
C002AB
Design and Implement Boiler Water treatment PM Program, Spec Item 3.2 Closed loops(26)
12 MO
C002AC Glycol (7) 12 MO C002AD Open Loops (2) 12 MO C002AE Geothermal (31) 12 MO
Subtotal C003 Spec Item 3.2.2 DDC C003AA Design and Implement DDC PM Program (3,805 points) 12 MO
Subtotal
C004 Spec Item 3.2.4 Security Systems and Equipment Design and Implement PM Programs for the following
C004AA Fence Line (39,667 LF) 5 times a year 12 MO C004AB Mechanical Gates (13 EA) 12 MO C004AC Vehicle Gates (19 EA) 12 MO C004AD Turnstiles (17 EA) 12 MO C004AE Handicap Gates (13 EA) 12 MO C004AF Light Poles and Bulbs (104 EA) inspect 4 times a year 12 MO C004AG Camera Poles (36 EA) inspect 4 times a year 12 MO C004AH Generators (5 EA) 12 MO C004AJ Popup Barriers (6 Sets of 5) 12 MO
Subtotal
C005 Spec Item 3.2.5 Compressed Air Systems Design and Implement PM Programs for the following
C005AA Air Compressors (69 EA) 12 MO Subtotal
C006 Spec Item 3.2.6 Cathodic Protection Systems Design and Implement PM Programs for the following
C006AA Cathodic Protection Pipe Lines (44 EA) 12 MO C006AB Cathodic Protection Tanks (7 EA) 12 MO
Subtotal
C007 Spec Item 3.2.7 Weight Handling Equipment Design and Implement PM Programs for the following
C007AA Cranes (35 EA) 12 MO C007AB Mobile cranes (2) 12 MO C007AC Boat Lifts (3 EA) 12 MO C007AD Stacker lifts (5 EA) 12 MO C007AE WHE Inspection, Testing, Certifications 3.4.2 12 MO
Subtotal
C008 Spec Item 3.2.8 Lightning Arrestors and Grounding Devices Design and Implement PM Programs for the following
C008AA 1123 testing points 12 MO Subtotal
C009 Spec Item 3.2.9 Jet Refueling System Design and Implement PM Programs for the following
C009AA 5,000 Barrel Tanks (4 EA) 12 MO C009AB 13,500 Barrel Tanks (2 EA) 12 MO
ATTACHMENT J-0200000-11
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT N40085-17-R-1140
EXHIBIT C
Line Item 0005 Recurring Work Price - 2nd Option Period ELINs C001-C034
Description Quantity Unit of Issue Unit Price Total
C009AC Valves (54 EA) 12 MO C009AD Pumps (26 EA) 12 MO C009AE Motor Control Panels (13 EA) 12 MO C009AF Filtration Systems (13 EA) 12 MO
Subtotal
C010 Spec Item 3.2.10 Swimming Pools Design and Implement PM Programs for the following
C010AA Pools (3 EA) 12 MO Subtotal
C011 Spec Item 3.2.11 Arresting Gear Design and Implement PM Programs for the following
C011AA Arresting E-28 Gear (8 EA) 12 MO Subtotal
C012 Spec Item 3.2.12 Auxiliary Generators Design and Implement PM Programs for the following
C012AA 15 KW Generator (1 EA) 12 MO C012AB 25 KW Generator (3 EA) 12 MO C012AC 30 KW Generator (3 EA) 12 MO C012AD 35 KW Generator (2 EA) 12 MO C012AE 40 KW Generator (3 EA) 12 MO C012AF 50 KW Generator (1 EA) 12 MO C012AG 60 KW Generator (7 EA) 12 MO C012AH 65 KW Generator (8 EA) 12 MO C012AJ 80 KW Generator (1 EA) 12 MO C012AK 100 KW Generator (8 EA) 12 MO C012AL 125 KW Generator (2 EA) 12 MO C012AM 135 KW Generator (1 EA) 12 MO C012AN 150 KW Generator (6 EA) 12 MO C012AP 200 KW Generator(10 EA) 12 MO C012AQ 230 KW Generator (3 EA) 12 MO C012AR 250 KW Generator (5 EA) 12 MO C012AS 400 KW Generator (1 EA) 12 MO C012AT 450 KW Generator (2 EA) 12 MO C012AU 1250 KW Generator (1 EA) 12 MO
Subtotal
C013 Spec. Item 3.2.13 Vertical Transportation Equipment Design and Implement PM Programs for the following
C013AA Auto Lifts (24 EA) 12 MO Subtotal Spec.Item 3.3 IMP
C014 Spec Item 3.3.1 HVAC Design and Implement IMP Programs for the following
C014AA Mixing Valve (1 EA) 12 MO C014AB Barometric Damper (1 EA) 12 MO C014AC Fume Hood (1 EA) 12 MO C014AD Gas Packs (3 EA) 12 MO C014AE Heat Exchangers (3 EA) 12 MO C014AF Motorized Louvers (3 EA) 12 MO C014AG Refrigerators (3 EA) 12 MO C014AH Cooling Tower (3 EA) 12 MO C014AJ Air Curtains (4 EA) 12 MO C014AK Condensate tank (8 EA) 12 MO C014AL Fan Coil Unit (188 EA) 12 MO C014AM Air Dryer (16 EA) 12 MO C014AN Freezers (16 EA) 12 MO C014AP Dehumidifiers (16 EA) 12 MO C014AQ Dry Fluid Cooler (10 EA) 12 MO C014AR Expansion Tanks (18 EA) 12 MO C014AS Computer Room Air Conditioner (CRAC) (28 EA) 12 MO C014AT Energy Recovery Units (ERU) (7 EA) 12 MO C014AU Energy Recovery Ventilation (ERV) (17 EA) 12 MO C014AV Ice Machine (27 EA) 12 MO C014AW Air Cooled Chiller (28 EA) 12 MO C014AX Motors (38 EA) 12 MO C014AY Frequency Drives (88 EA) 12 MO
Description Quantity Unit of Issue Unit Price Total
C014AZ Water Heaters (127 EA) 12 MO C014BA Packaged Air Conditioning Unit (234EA) 12 MO C014BB Exhaust Fans (276 EA) 12 MO C014BC Pumps (279 EA) 12 MO C014BD Space Heater (332 EA) 12 MO C014BE Air Handlers (325 EA) 12 MO C014BF Heat Pumps (574 EA) 12 MO C014BG Variable Air Volume (VAV) (844 EA) 12 MO C014BH Water Fountain (2) 12 MO
Subtotal
C015 Spec Item 3.3.2 Boilers and Unfired Pressure Vessels Design and Implement IPM Programs for the following
C015AA Boilers (35 EA) maintenance and Inspection, Testing and Certification 12 MO Subtotal
C016 Spec. Item 3.3.3 Fire Protection
3.3.3.1 Fire Suppression
Design and Implement IMP Programs for the following
C016AA
Wet Sprinkler (192 EA) Maintenance and Inspection , Testing, and Certification 12
MO
C016AB Dry Sprinkler (32) Maintenance and Inspection , Testing, and Certification 12
MO
C016AC Deluge (26) Maintenance and Inspection , Testing, and Certification 12 MO C016AD Foam (8) Maintenance and Inspection , Testing, and Certification 12 MO
C016AE
Air Compressor (9 EA) Maintenance and Inspection , Testing, and Certification 12
MO
C016AF Fire Pump (7 EA) Maintenance and Inspection , Testing, and Certification 12
MO
C016AH 3.3.3.1.1 Fire Extinguishers (8) Inspection 12 MO
3.3.3.2 Fire Alarm System
Design and Implement IMP Programs for the following
C016AJ Fire alarm Maintenance and Inspection , Testing, and Certification (143 EA) 12
MO
Subtotal
C017 Spec. Item 3.3.4 Vertical Transportation Equipment Design and Implement IPM Programs for the following
C017AA Passenger Elevator Hydraulic (7 EA) 12 MO C017AB Limited Use limited application (1 EA) 12 MO C017AC Wheel Chair Lift (1 EA) 12 MO
Subtotal Spec Item 3.4 Inspection Testing, and Certification Program
C018 Spec. Item 3.4.3 Backflow Prevention Devices/Inspection, Testing, Certification
C018AA Back Flow Preventers < 4 inches (128 EA) 12 MO C018AB Back Flow Preventers > 4 inches (42 EA) 12 MO C018AC Vacuum Breaker (53) 12 MO
Subtotal Spec. Item 3.5 Other Recurring Services Program
C019 Spec. Item 3.5.1 Exterior Lighting Systems C019AA Develop and Implement Exterior Lighting System PM Program 12 MO
Subtotal C020 Spec. Item 3.5.2 Grease Traps C020AA Develop and Implement Grease Trap PM Program (5 EA) 12 MO
Subtotal C021 Spec. Item 3.5.3 Airfield Lighting C021AA Develop and Implement Airfield Lighting System PM Program 12 MO
Subtotal C022 Spec. Item 3.5.4 400 Hz converters C022AA Develop and Implement 400 Hz Converter System PM Program (66 EA) 12 MO
Subtotal C023 Spec. Item 3.5.5 Storm Drainage Systems C023AA Develop and Implement Storm Drainage System PM Program 12 MO
Subtotal C024 Spec. Item 3.5.6 Fuel Storage Tanks/Facilities C024AA Develop and Implement Storage Tank/Facilities System PM Program (95) 12 MO
Description Quantity Unit of Issue Unit Price Total
Subtotal C025 Spec. Item 3.5.7 Bachelor Quarters C025AA Develop and implement a Program to support the Bachelor Quarters services
(13 buildings)
12 MO
Subtotal C026 Spec. Item 3.5.8 Aircraft Hanger and Squadron Administration Spaces C026AA Develop and Implement a Program to support Aircraft Hanger Services (5 admin, 9 Hangers, 1 Corrosion Control Facility)
12 MO
C026AB Hanger Doors (35) 12 MO Subtotal
C027 Spec. Item 3.5.9 Off Peak Ice Storage Systems C027AA Develop and Implement Off Peak Ice Storage PM Program (8 EA) 12 MO
Subtotal C028 Spec. Item 3.5.10 Oil/Water Separator
C028AA Develop and Implement Oil/Water Separator System PM Program (30 EA)
12 MO
Subtotal C029 Spec. Item 3.5.11 Solar Panels Hot Water C029AA Develop and Implement Solar Panel System Hot Water PM Program (182EA) 12 MO
Subtotal C030 Spec. Item 3.5.12 Galley Hood Cleaning C030AA Develop and Implement Galley Hood Cleaning PM Program (3) 12 MO
Subtotal C031 Spec. Item 3.5.13 Propane Air Blender C031AA Develop and Implement Propane Air Blender System PM Program 12 MO
Subtotal C032 Spec. Item 3.5.14 UPS Battery Systems C032AA Develop and Implement UPS Battery Systems PM Program 12 MO
Subtotal C033 1503020 Pest Control C033AA COL4 Base Measures (Reduced Levels)
Services for Region facilities/spaces listed in the Frequencies for Scheduled Work provided in J-1503020-08 decrease in services from COL3 Base Measures to COL 4 Base Measures per the Common Output Level Standards listed in J-1503020-06. 0 MO Subtotal
C033AB Spec Item 3 COL3 Base Measures (Starting COL)
C033AB
For Region facilities/spaces listed in the Frequencies for Scheduled Work provided in J-1503020-08, to perform COL3 Base Measures as specified per the Common Output Level Standards listed in J-1503020-06. (477,051 sq.
feet) 12 MO Subtotal
C034 1602000 Electrical C034AA 3.1 Preventative Maintenance Electrical Distribution Systems 12 MO C034AB 3.1.1 Preventative Maintenance Solar Panels Photo Voltaic (1580 EA) 12 MO C034AC 3.2 Integrated Maintenance Plan (IMP) Jenbacher 12 MO C034AD 3.3.2 Meter Reading (Electrical and Water meters) 12 MO
Subtotal
C035 1700000 BSVE
C035AA WHE/MHE/ CESE Services (Operation of) 12 MO C035AB Dispatching Service 12 MO C035AC Non-Government Owned Leased Vehicles 12 MO C035AD Maintenance (Government-Owned) 12 MO
RECURRING WORK PRICE 2ND OPTION YEAR TOTAL
Description Extended Estimated Quantity
Unit of Issue
Unit Price Extended Price
C700 Service Orders 1,000 EA C701 Septic Tank 5 year inspection Provide labor and material to perform 5 year inspection of septic tanks.
0 EA
C702 Power line clearing Provide labor and material to perform removal of tree limbs encroaching near Electrical lines.
4 EA
C703-C705 reserved
Subtotal Non-Recurring Work PRICE 2ND
OPTIONYEAR
C706 High Reach Work The Contractor shall provide labor, material, and equipment to perform high reach functions that include, but are not limited to, installation and removal of seasonal decorations, signs, fund drive or safety banners, roof inspection, maintenance of decorative or ornamental fixtures.
180 LH
C707 Generator Overhaul 2ND OPTION Year
The Contractor shall provide labor, material, and equipment to perform generator overhaul maintenance on GE Jenbaucher generator located in building 1338.
1 EA
C708-C710 reserved
Subtotal Non-Recurring Work PRICE 2ND
OPTIONYEAR
C711 Wrecker Tow Truck Service
Supply Labor and material necessary to perform tow truck services for government vehicles. All tow truck services shall be classified as emergencies.
10 EA
C712 Bus Service Supply labor and material to provide bus drivers with buses for Command programs. Buses shall be free of dirt, graffiti, and litter. Buses shall be operated in accordance with local safety standards.
10 EA
C713 Truck Operation Services
Supply labor and material to provide operators for the operation of truck-tractors and semitrailers, truck-tractors and full trailers, trucks with dolly converters and full trailers and straight trucks; transporting of heavy construction equipment; transporting and setting up the portable stage when needed.
10 EA
C714 Composite Skilled UPL Rate Work - Subject to the Applicable Service Contract Act (SCA) and any Applicable
CBA. MUST BE
NEGOTIATED BY
KO
Provide one composite skilled labor hour of work-in-place performed by substantially and highly trained, certified, and/or licensed craftsmen and technicians, such as carpenters, painters, electricians, plumbers, equipment mechanics, electronics technicians, and pest controllers, per the scope and delivery schedule specified in the task order.
2,500 LH
C715 Composite Unskilled UPL Rate Work - Subject to the Applicable Service Contract Act (SCA) and any Applicable
CBA. MUST BE
NEGOTIATED BY
KO
Provide one composite unskilled labor hour of work-in-place performed by minimally trained or untrained workers, including custodial and grounds maintenance workers, and common laborers per the scope and delivery schedule specified in the order.
2,500 LH
ATTACHMENT J-0200000-11
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT N40085-17-R-1140
EXHIBIT C
Line Item 0006 Non-Recurring Work Price - 2nd Option Period ELINs C700-C720
C716 Composite UPL Rate Work - Subject to the applicable Wage Rate Requirement ( Construction).
MUST BE
NEGOTIATED BY
KO
Provide one composite skilled labor hour of work-in-place performed by substantially and highly trained, certified, and/or licensed craftsmen and technicians, such as carpenters, painters, electricians, plumbers, equipment mechanics, electronics technicians, and pest controllers, per the scope and delivery schedule specified in the order.
2,500 LH
C717 Material Costs-
MUST BE
NEGOTIATED BY
KO
Provide all materials and equipment not previously identified under the Recurring Work portion necessary to accomplish UPL Work.
N/A LS
C718-C720 reserved
SUB TOTAL Non-Recurring Work PRICE 2ND
OPTIONYEAR
TOTAL Non-Recurring Work PRICE 2ND
OPTIONYEAR
Description Quantity Unit of Issue Unit Price Total
Annex 1502000 D001 3.1 Service Orders D001AA 3.1.1 Emergency Service Orders 500 EA 12 MO D001AB 3.1.2 Urgent Service Orders 900 EA 12 MO D001AC 3.1.3 Routine Service Orders 3,600 EA 12 MO
3.2 PREVENTATIVE MAINTENANCE
D002 Spec Item 3.2.1 HVAC Water treatment and 3.2.3 Boiler Water D002AA Design and Implement HVAC Water treatment PM Program, Spec Item 3.2
Closed (9)and DTW loops (5) total 14
12 MO
D002AB
Design and Implement Boiler Water treatment PM Program, Spec Item 3.2 Closed loops(26)
12 MO
D002AC Glycol (7) 12 MO D002AD Open Loops (2) 12 MO D002AE Geothermal (31) 12 MO
Subtotal D003 Spec Item 3.2.2 DDC D003AA Design and Implement DDC PM Program (3,805 points) 12 MO
Subtotal
D004 Spec Item 3.2.4 Security Systems and Equipment Design and Implement PM Programs for the following
D004AA Fence Line (39,667 LF) 5 times a year 12 MO D004AB Mechanical Gates (13 EA) 12 MO D004AC Vehicle Gates (19 EA) 12 MO D004AD Turnstiles (17 EA) 12 MO D004AE Handicap Gates (13 EA) 12 MO D004AF Light Poles and Bulbs (104 EA) inspect 4 times a year 12 MO D004AG Camera Poles (36 EA) inspect 4 times a year 12 MO D004AH Generators (5 EA) 12 MO D004AJ Popup Barriers (6 Sets of 5) 12 MO
Subtotal
D005 Spec Item 3.2.5 Compressed Air Systems Design and Implement PM Programs for the following
D005AA Air Compressors (69 EA) 12 MO Subtotal
D006 Spec Item 3.2.6 Cathodic Protection Systems Design and Implement PM Programs for the following
D006AA Cathodic Protection Pipe Lines (44 EA) 12 MO D006AB Cathodic Protection Tanks (7 EA) 12 MO
Subtotal
D007 Spec Item 3.2.7 Weight Handling Equipment Design and Implement PM Programs for the following
D007AA Cranes (35 EA) 12 MO D007AB Mobile cranes (2) 12 MO D007AC Boat Lifts (3 EA) 12 MO D007AD Stacker lifts (5 EA) 12 MO D007AE WHE Inspection, Testing, Certifications 3.4.2 12 MO
Subtotal
D008 Spec Item 3.2.8 Lightning Arrestors and Grounding Devices Design and Implement PM Programs for the following
D008AA 1123 testing points 12 MO Subtotal
D009 Spec Item 3.2.9 Jet Refueling System Design and Implement PM Programs for the following
D009AA 5,000 Barrel Tanks (4 EA) 12 MO D009AB 13,500 Barrel Tanks (2 EA) 12 MO D009AC Valves (54 EA) 12 MO
ATTACHMENT J-0200000-11
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT N40085-17-R-1140
EXHIBIT D
Line Item 0007 Recurring Work Price - 3rd Option Period ELINs D001-D034
Description Quantity Unit of Issue Unit Price Total
D009AD Pumps (26 EA) 12 MO D009AE Motor Control Panels (13 EA) 12 MO D009AF Filtration Systems (13 EA) 12 MO
Subtotal
D010 Spec Item 3.2.10 Swimming Pools Design and Implement PM Programs for the following
D010AA Pools (3 EA) 12 MO Subtotal
D011 Spec Item 3.2.11 Arresting Gear Design and Implement PM Programs for the following
D011AA Arresting E-28 Gear (8 EA) 12 MO Subtotal
D012 Spec Item 3.2.12 Auxiliary Generators Design and Implement PM Programs for the following
D012AA 15 KW Generator (1 EA) 12 MO D012AB 25 KW Generator (3 EA) 12 MO D012AC 30 KW Generator (3 EA) 12 MO D012AD 35 KW Generator (2 EA) 12 MO D012AE 40 KW Generator (3 EA) 12 MO D012AF 50 KW Generator (1 EA) 12 MO D012AG 60 KW Generator (7 EA) 12 MO D012AH 65 KW Generator (8 EA) 12 MO D012AJ 80 KW Generator (1 EA) 12 MO D012AK 100 KW Generator (8 EA) 12 MO D012AL 125 KW Generator (2 EA) 12 MO D012AM 135 KW Generator (1 EA) 12 MO D012AN 150 KW Generator (6 EA) 12 MO D012AP 200 KW Generator(10 EA) 12 MO D012AQ 230 KW Generator (3 EA) 12 MO D012AR 250 KW Generator (5 EA) 12 MO D012AS 400 KW Generator (1 EA) 12 MO D012AT 450 KW Generator (2 EA) 12 MO D012AU 1250 KW Generator (1 EA) 12 MO
Subtotal
D013 Spec. Item 3.2.13 Vertical Transportation Equipment Design and Implement PM Programs for the following
D013AA Auto Lifts (24 EA) 12 MO Subtotal Spec.Item 3.3 IMP
D014 Spec Item 3.3.1 HVAC Design and Implement IMP Programs for the following
D014AA Mixing Valve (1 EA) 12 MO D014AB Barometric Damper (1 EA) 12 MO D014AC Fume Hood (1 EA) 12 MO D014AD Gas Packs (3 EA) 12 MO D014AE Heat Exchangers (3 EA) 12 MO D014AF Motorized Louvers (3 EA) 12 MO D014AG Refrigerators (3 EA) 12 MO D014AH Cooling Tower (3 EA) 12 MO D014AJ Air Curtains (4 EA) 12 MO D014AK Condensate tank (8 EA) 12 MO D014AL Fan Coil Unit (188 EA) 12 MO D014AM Air Dryer (16 EA) 12 MO D014AN Freezers (16 EA) 12 MO D014AP Dehumidifiers (16 EA) 12 MO D014AQ Dry Fluid Cooler (10 EA) 12 MO D014AR Expansion Tanks (18 EA) 12 MO D014AS Computer Room Air Conditioner (CRAC) (28 EA) 12 MO D014AT Energy Recovery Units (ERU) (7 EA) 12 MO D014AU Energy Recovery Ventilation (ERV) (17 EA) 12 MO D014AV Ice Machine (27 EA) 12 MO D014AW Air Cooled Chiller (28 EA) 12 MO D014AX Motors (38 EA) 12 MO D014AY Frequency Drives (88 EA) 12 MO D014AZ Water Heaters (127 EA) 12 MO
Description Quantity Unit of Issue Unit Price Total
D014BA Packaged Air Conditioning Unit (234EA) 12 MO D014BB Exhaust Fans (276 EA) 12 MO D014BC Pumps (279 EA) 12 MO D014BD Space Heater (332 EA) 12 MO D014BE Air Handlers (325 EA) 12 MO D014BF Heat Pumps (574 EA) 12 MO D014BG Variable Air Volume (VAV) (844 EA) 12 MO D014BH Water Fountain (2) 12 MO
Subtotal
D015 Spec Item 3.3.2 Boilers and Unfired Pressure Vessels Design and Implement IPM Programs for the following
D015AA Boilers (35 EA) maintenance and Inspection, Testing and Certification 12 MO Subtotal
D016 Spec. Item 3.3.3 Fire Protection
3.3.3.1 Fire Suppression Design
and Implement IMP Programs for the following
D016AA
Wet Sprinkler (192 EA) Maintenance and Inspection , Testing, and Certification 12
MO
D016AB Dry Sprinkler (32) Maintenance and Inspection , Testing, and Certification 12
MO
D016AC Deluge (26) Maintenance and Inspection , Testing, and Certification 12 MO D016AD Foam (8) Maintenance and Inspection , Testing, and Certification 12 MO
D016AE
Air Compressor (9 EA) Maintenance and Inspection , Testing, and Certification 12
MO
D016AF Fire Pump (7 EA) Maintenance and Inspection , Testing, and Certification 12
MO
D016AH 3.3.3.1.1 Fire Extinguishers (8) Inspection 12 MO
3.3.3.2 Fire Alarm System
Design and Implement IMP Programs for the following
D016AJ Fire alarm Maintenance and Inspection , Testing, and Certification (143 EA) 12
MO
Subtotal
D017 Spec. Item 3.3.4 Vertical Transportation Equipment Design and Implement IPM Programs for the following
D017AA Passenger Elevator Hydraulic (7 EA) 12 MO D017AB Limited Use limited application (1 EA) 12 MO D017AC Wheel Chair Lift (1 EA) 12 MO
Subtotal Spec Item 3.4 Inspection Testing, and Certification Program
D018 Spec. Item 3.4.3 Backflow Prevention Devices/Inspection, Testing, Certification
D018AA Back Flow Preventers < 4 inches (128 EA) 12 MO D018AB Back Flow Preventers > 4 inches (42 EA) 12 MO D018AC Vacuum Breaker (53) 12 MO
Subtotal Spec. Item 3.5 Other Recurring Services Program
D019 Spec. Item 3.5.1 Exterior Lighting Systems D019AA Develop and Implement Exterior Lighting System PM Program 12 MO
Subtotal D020 Spec. Item 3.5.2 Grease Traps D020AA Develop and Implement Grease Trap PM Program (5 EA) 12 MO
Subtotal D021 Spec. Item 3.5.3 Airfield Lighting D021AA Develop and Implement Airfield Lighting System PM Program 12 MO
Subtotal D022 Spec. Item 3.5.4 400 Hz converters D022AA Develop and Implement 400 Hz Converter System PM Program (66 EA) 12 MO
Subtotal D023 Spec. Item 3.5.5 Storm Drainage Systems D023AA Develop and Implement Storm Drainage System PM Program 12 MO
Subtotal D024 Spec. Item 3.5.6 Fuel Storage Tanks/Facilities D024AA Develop and Implement Storage Tank/Facilities System PM Program (95) 12 MO
D025 Spec. Item 3.5.7 Bachelor Quarters
Description Quantity Unit of Issue Unit Price Total
D025AA Develop and implement a Program to support the Bachelor Quarters services (13 buildings)
12 MO
Subtotal D026 Spec. Item 3.5.8 Aircraft Hanger and Squadron Administration Spaces D026AA Develop and Implement a Program to support Aircraft Hanger Services (5 admin, 9 Hangers, 1 Corrosion Control Facility)
12 MO
D026AB Hanger Doors (35) 12 MO Subtotal
D027 Spec. Item 3.5.9 Off Peak Ice Storage Systems D027AA Develop and Implement Off Peak Ice Storage PM Program (8 EA) 12 MO
Subtotal D028 Spec. Item 3.5.10 Oil/Water Separator
D028AA Develop and Implement Oil/Water Separator System PM Program (30 EA)
12 MO
Subtotal D029 Spec. Item 3.5.11 Solar Panels Hot Water D029AA Develop and Implement Solar Panel System Hot Water PM Program (182EA) 12 MO
Subtotal D030 Spec. Item 3.5.12 Galley Hood Cleaning D030AA Develop and Implement Galley Hood Cleaning PM Program (3) 12 MO
Subtotal D031 Spec. Item 3.5.13 Propane Air Blender D031AA Develop and Implement Propane Air Blender System PM Program 12 MO
Subtotal D032 Spec. Item 3.5.14 UPS Battery Systems D032AA Develop and Implement UPS Battery Systems PM Program 12 MO
Subtotal D033 1503020 Pest Control D033AA COL4 Base Measures (Reduced Levels)
Services for Region facilities/spaces listed in the Frequencies for Scheduled Work provided in J-1503020-08 decrease in services from COL3 Base Measures to COL 4 Base Measures per the Common Output Level Standards listed in J-1503020-06. 0 MO Subtotal
D033AB Spec Item 3 COL3 Base Measures (Starting COL)
D033AB
For Region facilities/spaces listed in the Frequencies for Scheduled Work provided in J-1503020-08, to perform COL3 Base Measures as specified per the Common Output Level Standards listed in J-1503020-06. (477,051 sq.
feet) 12 MO Subtotal
D034 1602000 Electrical D034AA 3.1 Preventative Maintenance Electrical Distribution Systems 12 MO D034AB 3.1.1 Preventative Maintenance Solar Panels Photo Voltaic (1580 EA) 12 MO D034AC 3.2 Integrated Maintenance Plan (IMP) Jenbacher 12 MO D034AD 3.3.2 Meter Reading (Electrical and Water meters) 12 MO
Subtotal
D035 1700000 BSVE
D035AA WHE/MHE/ CESE Services (Operation of) 12 MO D035AB Dispatching Service 12 MO D035AC Non-Government Owned Leased Vehicles 12 MO D035AD Maintenance (Government-Owned) 12 MO
RECURRING WORK PRICE 3RD OPTION YEAR TOTAL
Description Extended Estimated Quantity
Unit of Issue
Unit Price Extended Price
D700 Service Orders 1,000 EA D701 Septic Tank 5 year inspection Provide labor and material to perform 5 year inspection of septic tanks.
0 EA
D702 Power line clearing Provide labor and material to perform removal of tree limbs encroaching near Electrical lines.
4 EA
D703-D705…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.