a_ELIN_HOODSDUCTS.xlsx

XLSX spreadsheet 89 KB Posted

Attached to
IFB Federal contract opportunity
Solicitation number
N4008425B6300
Issued by
Department of the Navy Naval Facilities Engineering Command

About this file

This document is an exhibit containing pricing line items for a federal contract opportunity related to the maintenance, repair, alteration, demolition, and minor construction of building systems including exhaust hoods and ducts, grease traps, fire suppression systems, and kitchen hood washing systems at facilities located at Camp Foster Sasebo, Japan.

The contract contains recurring firm-fixed price items for maintenance and cleaning work as well as non-recurring indefinite delivery/indefinite quantity items for installation, cleaning, and replacement work. Pricing is provided for a base period and four option periods. Key services include maintenance, cleaning, and repair of exhaust hoods and ducts, grease traps, fire suppression systems, and kitchen hood washing systems at various buildings. The contract is being solicited by the Department of the Navy Naval Facilities Engineering Command.

View the file

Other files for this federal contract opportunity

Other files attached to IFB, newest first.
File Type Posted
d_Pre-BidInquiryFom.doc DOC document
f_Provision52.229_11.pdf PDF
c_HANDBOOKFORACCESSPASSANDSECURITY-20230531.pdf PDF
e_eProvision52.204_24.pdf PDF
N408425B6300.pdf PDF
b_AccessRequestForm.xlsx XLSX spreadsheet
g_W_14.pdf PDF
h_PIEESolicitationModuleGuide.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Recurring

ATTACHMENT J-0200000-16
EXHIBIT LINE ITEM NUMBERS
IFB #N4008425B6300
EXHIBIT A - CLIN 0001
Line Item 0001 Recurring Work Price - Base Period
PROVIDE PRICES FOR FACILITY INVESTMENT - RECURRING WORK PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3
ELINs A001 through A004
ELIN /
Sub ELINDescriptionQuantityUnit of IssueUnit Price
(¥)Total Price
(¥)Fund Source
Recurring Work Spec Item 3
A001Exhaust Hoods and Ducts (Spec Item 3.1, 3.2)
3.1, 3.2 (Maintenance)
A001AAEX-1 (Bldg. 155)12MO¥0ST
A001ABEX-2 (Bldg. 500)12MO¥0ST
A001ACEX-3 (Bldg. 1446)12MO¥0ST
A001ADEX-4 (Bldg. 1446)12MO¥0ST
A001AEEX-5 (Bldg. 1446)12MO¥0ST
A001AFEX-6 (Bldg. 1523)12MO¥0ST
A001AGEX-7 (Bldg. 1523)12MO¥0ST
A001AHEX-8 (Bldg. 1523)12MO¥0ST
A001AJEX-9 (Bldg. 1523)12MO¥0ST
A001AKEX-10 (Bldg. 1523)12MO¥0ST
A001ALEX-11 (Bldg. 1649)12MO¥0ST
A001AMEX-12 (Bldg. 1649)12MO¥0ST
A001ANEX-13 (Bldg. 1649)12MO¥0ST
A001APEX-14 (Bldg. 1649)12MO¥0ST
A001AQEX-15 (Bldg. 5140)12MO¥0ST
A001AREX-16 (Bldg. 5141)12MO¥0ST
A001ASEX-17 (Bldg. 7009)12MO¥0ST
Maintenance - Subtotal¥0ST
3.2 (Cleaning)
A001ATEX-1 (Bldg. 155)12MO¥0ST
A001AUEX-2 (Bldg. 500)12MO¥0MWR
A001AVEX-3 (Bldg. 1446)12MO¥0MWR
A001AWEX-4 (Bldg. 1446)12MO¥0MWR
A001AXEX-5 (Bldg. 1446)12MO¥0MWR
A001AYEX-6 (Bldg. 1523)12MO¥0Galley
A001AZEX-7 (Bldg. 1523)12MO¥0Galley
A001BAEX-8 (Bldg. 1523)12MO¥0Galley
A001BBEX-9 (Bldg. 1523)12MO¥0Galley
A001BCEX-10 (Bldg. 1523)12MO¥0Galley
A001BDEX-11 (Bldg. 1649)12MO¥0MWR
A001BEEX-12 (Bldg. 1649)12MO¥0MWR
A001BFEX-13 (Bldg. 1649)12MO¥0MWR
A001BGEX-14 (Bldg. 1649)12MO¥0MWR
A001BHEX-15 (Bldg. 5140)12MO¥0MWR
A001BJEX-16 (Bldg. 5141)12MO¥0ST
A001BKEX-17 (Bldg. 7009)12MO¥0NBU-7
Cleaning - Subtotal¥0
Exhaust Hoods and Ducts - SUBTOTAL¥0
ELIN /
Sub ELINDescriptionQuantityUnit of IssueUnit Price
(¥)Total Price
(¥)Fund Source
A002Grease Traps (Spec Item 3.1, 3.2)
3.1, 3.2 (Maintenance)
A002AACF-1 (Bldg. 500)12MO¥0ST
A002ABCF-2 (Bldg. 1446)12MO¥0ST
A002ACCF-3 (Bldg. 1446)12MO¥0ST
A002ADCF-4 (Bldg. 1523)12MO¥0ST
A002AECF-5 (Bldg. 1523)12MO¥0ST
A002AFCF-6 (Bldg. 1523)12MO¥0ST
A002AGCF-7 (Bldg. 1649)12MO¥0ST
A002AHCF-8 (Bldg. 5140)12MO¥0ST
A002AJCF-9 (Bldg. 7009)12MO¥0ST
A002AKDE-1 (Bldg. 1436)12MO¥0ST
A002ALDE-2 (Bldg. 5127)12MO¥0ST
Maintenance - Subtotal¥0
3.2 (Cleaning)
A002AMCF-1 (Bldg. 500)12MO¥0MWR
A002ANCF-2 (Bldg. 1446)12MO¥0MWR
A002APCF-3 (Bldg. 1446)12MO¥0MWR
A002AQCF-4 (Bldg. 1523)12MO¥0Galley
A002ARCF-5 (Bldg. 1523)12MO¥0Galley
A002ASCF-6 (Bldg. 1523)12MO¥0Galley
A001ATCF-7 (Bldg. 1649)12MO¥0MWR
A001AUCF-8 (Bldg. 5140)12MO¥0MWR
A001AVCF-9 (Bldg. 7009)12MO¥0NBU-7
A001AWDE-1 (Bldg. 1436)12MO¥0DECA-S
A001AXDE-2 (Bldg. 5127)12MO¥0DECA-H
Cleaning - Subtotal¥0
Grease Traps - SUBTOTAL¥0
ELIN /
Sub ELINDescriptionQuantityUnit of IssueUnit Price
(¥)Total Price
(¥)Fund Source
A003Fire Suppression Systems (Spec Item 3.1, 3.3)
A003AAFS-1 (Bldg. 129)12MO¥0NEX
A003ABFS-2 (Bldg. 129)12MO¥0NEX
A003ACFS-3 (Bldg. 129)12MO¥0NEX
A003ADFS-4 (Bldg. 155)12MO¥0ST
A003AEFS-5 (Bldg. 500)12MO¥0MWR
A003AFFS-6 (Bldg. 1446)12MO¥0MWR
A003AGFS-7 (Bldg. 1446)12MO¥0MWR
A003AHFS-8 (Bldg. 1446)12MO¥0MWR
A003AJFS-9 (Bldg. 1446)12MO¥0MWR
A003AKFS-10 (Bldg. 1446)12MO¥0MWR
A003ALFS-11 (Bldg. 1446)12MO¥0MWR
A003AMFS-12 (Bldg. 1523)12MO¥0Galley
A003ANFS-13 (Bldg. 1523)12MO¥0Galley
A003APFS-14 (Bldg. 1523)12MO¥0Galley
A003AQFS-15 (Bldg. 1523)12MO¥0Galley
A003ARFS-16 (Bldg. 1523)12MO¥0Galley
A003ASFS-17 (Bldg. 1649, Chili's)12MO¥0Chili's
A003ATFS-18 (Bldg. 1649, Chili's)12MO¥0Chili's
A003AUFS-19 (Bldg. 1649, Chili's)12MO¥0Chili's
A003AVFS-20 (Bldg. 1649, Chili's)12MO¥0Chili's
A003AWFS-21 (Bldg. 1649)12MO¥0MWR
A003AXFS-22 (Bldg. 1649)12MO¥0MWR
A003AYFS-23 (Bldg. 1649)12MO¥0MWR
A003AZFS-24 (Bldg. 1649)12MO¥0MWR
A003BAFS-25 (Bldg. 1669)12MO¥0DoDEA
A003BBFS-26 (Bldg. 1669)12MO¥0DoDEA
A003BCFS-27 (Bldg. 2001)12MO¥0DoDEA
A003BDFS-28 (Bldg. 5114)12MO¥0DoDEA
A003BEFS-29 (Bldg. 5118)12MO¥0NEX
A003BFFS-30 (Bldg. 5118)12MO¥0NEX
A003BGFS-31 (Bldg. 5140)12MO¥0MWR
A003BHFS-32 (Bldg. 5141)12MO¥0ST
A003BJFS-33 (Bldg. 5158)12MO¥0MWR
A003BKFS-34 (Bldg. 7009)12MO¥0NBU-7
A003BLFS-35 (Bldg. 7009)12MO¥0NBU-7
Fire Suppression Systems - SUBTOTAL¥0
ELIN /
Sub ELINDescriptionQuantityUnit of IssueUnit Price
(¥)Total Price
(¥)Fund Source
A004Kitchen Hood Washing Systems (Spec Items 3.1, 3.2)
A004AAWA-1 (Bldg. 500)0MO¥0ST
A004ABWA-2 (Bldg. 1446)0MO¥0ST
A004ACWA-3 (Bldg. 1446)0MO¥0ST
A004ADWA-4 (Bldg. 1446)0MO¥0ST
A004AEWA-5 (Bldg. 1523)0MO¥0ST
A004AFWA-6 (Bldg. 1523)0MO¥0ST
A004AGWA-7 (Bldg. 1523)0MO¥0ST
A004AHWA-8 (Bldg. 1523)0MO¥0ST
A004AJWA-9 (Bldg. 1523)0MO¥0ST
A004AKWA-10 (Bldg. 1649)0MO¥0ST
A004ALWA-11 (Bldg. 1649)0MO¥0ST
A004AMWA-12 (Bldg. 1649)0MO¥0ST
A004ANWA-13 (Bldg. 5114)0MO¥0ST
Kitchen Hood Washing Systems - SUBTOTAL¥0

TOTAL RECURRING WORK PRICE - BASE PERIOD ¥0

CUI//FEDCON

Source Selection Information - See FAR 2.101 & 3.104 [when filled]

CUI//FEDCON [when filled in] Source Selection Information - See FAR 2.101 and 3.104 [when filled in]

SECTION J

EXHIBIT A

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6'

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Barbwire Fence.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Wood Fence.

PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.

IN ACCORDANCE WITH SECTION C, C.10.1.l

ELIN A001EW through A001FI

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence.

Including Fabric, Posts, Gates, Rails, Tension Wire, Barbwire/Barbed Tape.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Wood Fence. Including Posts and Gates.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Post Cut-off Flush.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Driven Post.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Posts Set in Concrete/Asphalt.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Square Foot to Patch and Refinish Concrete or Asphalt Surface.

Surface Depth to Match Surrounding.

Unit Price Each to Remove and Dispose of or Save and Store (for reuse) Barbwire Single Arm Support.

Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.

Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered

SECTION J

EXHIBIT A

Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

PROVIDE A UNIT PRICE TO PERFORM EXPEDITED SERVICES.

IN ACCORDANCE WITH SECTION C, C.10.2

ELIN A001FJ

Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

SECTION J

EXHIBIT A

PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.

IN ACCORDANCE WITH SECTION C, C.10.3

ELIN A001FK THROUGH A001FP

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Temporary Chain link Fence.

6' Fence Height Driven Posts

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

12' Panel, 6' Height

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

12' Panel, 6' Height, Free-Standing

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

With Barbwire, 7' Fence Height

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

12' Panel, With Barbwire, 7' Height

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

12' Panel, With Barbwire, 7' Height, Free-Standing

Base -Non Recur

ATTACHMENT J-0200000-16
EXHIBIT LINE ITEM NUMBERS
IFB #N4008425B6300
EXHIBIT A - CLIN 0002
Line Item 0002 Non-Recurring Price - Base Period
PROVIDE PRICES FOR FACILITY INVESTMENT - INDEFINITE DELIVERY / INDEFINITE QUANTITY - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4
ELINs A700 through A706
EA = Each LS = Lump Sum
ELINProduct NameDescription ExtendedEstimated QuantityUnit of IssueUnit Price (¥)Extended Price (¥)
A700Installation of Inspection Hatch to Exhaust DuctThe Contractor shall provide and install an inspection hatch to exhaust duct to enable inspection and maintenance for fire suppression detectors and nozzles.

The Contractor shall provide a catalog cut of inspection hatch to be installed. The inspection hatch shall meet the requirements of NFPA 96.

Prior to work, the Contractor shall coordinate with a customer for scheduling the work.

After the work the Contractor shall provide a drawing with location of newly installed inspection hatch.10EA0
A701Grease Trap Cleaning:
0.1 CM - 2.0 CMClean the grease trap, size 0.1 - 2.0 CM, and remove and dispose of grease to ensure grease trap functions properly.

Orders may be issued to clean grease traps that are not on the systems description for recurring work. Location will be provided in the orders.

Grease traps to be served under this item are for cooking oil.10EA0
A702Grease Trap Cleaning:
2.1 CM - 4.0 CMClean the grease trap, size 2.1 - 4.0 CM, and remove and dispose of grease to ensure grease trap functions properly.

Orders may be issued to clean grease traps that are not on the systems description for recurring work. Location will be provided in the orders.

Grease traps to be served under this item are for cooking oil.10EA0
A703Removal of Clogs in the Pipes connected to Grease TrapsThe Contractor shall remove clogs in the pipes connected to the grease traps, by using a vacuum truck. This is in support of NAVFAC PWD shop work.
Work may be required outside Government regular working hours.5EA0
A704Replacement of Wet Chemical Cylinder to the Fire Suppression SystemThe Contractor shall provide and replace a wet chemical cylinder in the cylinder box of the existing fire suppression system and provide all necessary piping and materials to ensure proper installation.10EA0
A705Unit Priced Labor Work - MUST BE NEGOTIATED BY KO.Provide labor to perform all Unit Priced Labor work per the scope and delivery schedule specified in the order.6,000,000LSNegotiated at time of order6,000,000
A706Material and Equipment Costs - MUST BE NEGOTIATED BY KO.Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Contractor's mark-up rate should be included in the proposed unit price. Use with ELIN A705.14,000,000LSNegotiated at time of order14,000,000
TOTAL NON-RECURRING WORK PRICE
BASE YEAR¥20,000,000

CUI//FEDCON [when filled in] Source Selection Information - See FAR 2.101 and 3.104 [when filled in]

CUI//FEDCON [when filled in] Source Selection Information - See FAR 2.101 and 3.104 [when filled in]

1st Option-Recurring

ATTACHMENT J-0200000-16
EXHIBIT LINE ITEM NUMBERS
IFB #N4008425B6300
EXHIBIT A - CLIN 0003
Line Item 0003 Recurring Work Price - First Option Period
PROVIDE PRICES FOR FACILITY INVESTMENT - RECURRING WORK PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3
ELINs B001 through B004
ELIN /
Sub ELINDescriptionQuantityUnit of IssueUnit Price
(¥)Total Price
(¥)Fund Source
Recurring Work Spec Item 3
B001Exhaust Hoods and Ducts (Spec Item 3.1, 3.2)
3.1, 3.2 (Maintenance)
B001AAEX-1 (Bldg. 155)12MO¥0ST
B001ABEX-2 (Bldg. 500)12MO¥0ST
B001ACEX-3 (Bldg. 1446)12MO¥0ST
B001ADEX-4 (Bldg. 1446)12MO¥0ST
B001AEEX-5 (Bldg. 1446)12MO¥0ST
B001AFEX-6 (Bldg. 1523)12MO¥0ST
B001AGEX-7 (Bldg. 1523)12MO¥0ST
B001AHEX-8 (Bldg. 1523)12MO¥0ST
B001AJEX-9 (Bldg. 1523)12MO¥0ST
B001AKEX-10 (Bldg. 1523)12MO¥0ST
B001ALEX-11 (Bldg. 1649)12MO¥0ST
B001AMEX-12 (Bldg. 1649)12MO¥0ST
B001ANEX-13 (Bldg. 1649)12MO¥0ST
B001APEX-14 (Bldg. 1649)12MO¥0ST
B001AQEX-15 (Bldg. 5140)12MO¥0ST
B001AREX-16 (Bldg. 5141)12MO¥0ST
B001ASEX-17 (Bldg. 7009)12MO¥0ST
Maintenance - Subtotal¥0ST
3.2 (Cleaning)
B001ATEX-1 (Bldg. 155)12MO¥0ST
B001AUEX-2 (Bldg. 500)12MO¥0MWR
B001AVEX-3 (Bldg. 1446)12MO¥0MWR
B001AWEX-4 (Bldg. 1446)12MO¥0MWR
B001AXEX-5 (Bldg. 1446)12MO¥0MWR
B001AYEX-6 (Bldg. 1523)12MO¥0Galley
B001AZEX-7 (Bldg. 1523)12MO¥0Galley
B001BAEX-8 (Bldg. 1523)12MO¥0Galley
B001BBEX-9 (Bldg. 1523)12MO¥0Galley
B001BCEX-10 (Bldg. 1523)12MO¥0Galley
B001BDEX-11 (Bldg. 1649)12MO¥0MWR
B001BEEX-12 (Bldg. 1649)12MO¥0MWR
B001BFEX-13 (Bldg. 1649)12MO¥0MWR
B001BGEX-14 (Bldg. 1649)12MO¥0MWR
B001BHEX-15 (Bldg. 5140)12MO¥0MWR
B001BJEX-16 (Bldg. 5141)12MO¥0ST
B001BKEX-17 (Bldg. 7009)12MO¥0NBU-7
Cleaning - Subtotal¥0
Exhaust Hoods and Ducts - SUBTOTAL¥0
ELIN /
Sub ELINDescriptionQuantityUnit of IssueUnit Price
(¥)Total Price
(¥)Fund Source
B002Grease Traps (Spec Item 3.1, 3.2)
3.1, 3.2 (Maintenance)
B002AACF-1 (Bldg. 500)12MO¥0ST
B002ABCF-2 (Bldg. 1446)12MO¥0ST
B002ACCF-3 (Bldg. 1446)12MO¥0ST
B002ADCF-4 (Bldg. 1523)12MO¥0ST
B002AECF-5 (Bldg. 1523)12MO¥0ST
B002AFCF-6 (Bldg. 1523)12MO¥0ST
B002AGCF-7 (Bldg. 1649)12MO¥0ST
B002AHCF-8 (Bldg. 5140)12MO¥0ST
B002AJCF-9 (Bldg. 7009)12MO¥0ST
B002AKDE-1 (Bldg. 1436)12MO¥0ST
B002ALDE-2 (Bldg. 5127)12MO¥0ST
Maintenance - Subtotal¥0
3.2 (Cleaning)
B002AMCF-1 (Bldg. 500)12MO¥0MWR
B002ANCF-2 (Bldg. 1446)12MO¥0MWR
B002APCF-3 (Bldg. 1446)12MO¥0MWR
B002AQCF-4 (Bldg. 1523)12MO¥0Galley
B002ARCF-5 (Bldg. 1523)12MO¥0Galley
B002ASCF-6 (Bldg. 1523)12MO¥0Galley
B001ATCF-7 (Bldg. 1649)12MO¥0MWR
B001AUCF-8 (Bldg. 5140)12MO¥0MWR
B001AVCF-9 (Bldg. 7009)12MO¥0NBU-7
B001AWDE-1 (Bldg. 1436)12MO¥0DECA-S
B001AXDE-2 (Bldg. 5127)12MO¥0DECA-H
Cleaning - Subtotal¥0
Grease Traps - SUBTOTAL¥0
ELIN /
Sub ELINDescriptionQuantityUnit of IssueUnit Price
(¥)Total Price
(¥)Fund Source
B003Fire Suppression Systems (Spec Item 3.1, 3.3)
B003AAFS-1 (Bldg. 129)12MO¥0NEX
B003ABFS-2 (Bldg. 129)12MO¥0NEX
B003ACFS-3 (Bldg. 129)12MO¥0NEX
B003ADFS-4 (Bldg. 155)12MO¥0ST
B003AEFS-5 (Bldg. 500)12MO¥0MWR
B003AFFS-6 (Bldg. 1446)12MO¥0MWR
B003AGFS-7 (Bldg. 1446)12MO¥0MWR
B003AHFS-8 (Bldg. 1446)12MO¥0MWR
B003AJFS-9 (Bldg. 1446)12MO¥0MWR
B003AKFS-10 (Bldg. 1446)12MO¥0MWR
B003ALFS-11 (Bldg. 1446)12MO¥0MWR
B003AMFS-12 (Bldg. 1523)12MO¥0Galley
B003ANFS-13 (Bldg. 1523)12MO¥0Galley
B003APFS-14 (Bldg. 1523)12MO¥0Galley
B003AQFS-15 (Bldg. 1523)12MO¥0Galley
B003ARFS-16 (Bldg. 1523)12MO¥0Galley
B003ASFS-17 (Bldg. 1649, Chili's)12MO¥0MWR/Chili's
B003ATFS-18 (Bldg. 1649, Chili's)12MO¥0MWR/Chili's
B003AUFS-19 (Bldg. 1649, Chili's)12MO¥0MWR/Chili's
B003AVFS-20 (Bldg. 1649, Chili's)12MO¥0MWR/Chili's
B003AWFS-21 (Bldg. 1649)12MO¥0MWR
B003AXFS-22 (Bldg. 1649)12MO¥0MWR
B003AYFS-23 (Bldg. 1649)12MO¥0MWR
B003AZFS-24 (Bldg. 1649)12MO¥0MWR
B003BAFS-25 (Bldg. 1669)12MO¥0MWR
B003BBFS-26 (Bldg. 1669)12MO¥0MWR
B003BCFS-27 (Bldg. 2001)12MO¥0DoDEA
B003BDFS-28 (Bldg. 5114)12MO¥0DoDEA
B003BEFS-29 (Bldg. 5118)12MO¥0NEX
B003BFFS-30 (Bldg. 5118)12MO¥0NEX
B003BGFS-31 (Bldg. 5140)12MO¥0MWR
B003BHFS-32 (Bldg. 5141)12MO¥0ST
B003BJFS-33 (Bldg. 5158)12MO¥0MWR
B003BKFS-34 (Bldg. 7009)12MO¥0NBU-7
B003BLFS-35 (Bldg. 7009)12MO¥0NBU-7
Fire Suppression Systems - SUBTOTAL¥0
ELIN /
Sub ELINDescriptionQuantityUnit of IssueUnit Price
(¥)Total Price
(¥)Fund Source
B004Kitchen Hood Washing Systems (Spec Items 3.1, 3.2)
B004AAWA-1 (Bldg. 500)12MO¥0ST
B004ABWA-2 (Bldg. 1446)12MO¥0ST
B004ACWA-3 (Bldg. 1446)12MO¥0ST
B004ADWA-4 (Bldg. 1446)12MO¥0ST
B004AEWA-5 (Bldg. 1523)12MO¥0ST
B004AFWA-6 (Bldg. 1523)12MO¥0ST
B004AGWA-7 (Bldg. 1523)12MO¥0ST
B004AHWA-8 (Bldg. 1523)12MO¥0ST
B004AJWA-9 (Bldg. 1523)12MO¥0ST
B004AKWA-10 (Bldg. 1649)12MO¥0ST
B004ALWA-11 (Bldg. 1649)12MO¥0ST
B004AMWA-12 (Bldg. 1649)12MO¥0ST
B004ANWA-13 (Bldg. 5114)12MO¥0ST
Kitchen Hood Washing Systems - SUBTOTAL¥0

TOTAL RECURRING WORK PRICE - FIRST OPTION PERIOD ¥0

CUI//FEDCON [when filled in] Source Selection Information - See FAR 2.101 and 3.104 [when filled in]

CUI//FEDCON [when filled in] Source Selection Information - See FAR 2.101 and 3.104 [when filled in]

SECTION J

EXHIBIT A

PROVIDE PRICES TO MAINTAIN GROUNDS - FIRM FIXED PRICE

IN ACCORDANCE WITH SECTION C, Items 3.1, 3.2, 3.3, and 3.4 ELIN A001 through A0015 Line Item 0001 Base Year - Firm Fixed Price ELIN A001 through A0015

SECTION J

EXHIBIT A

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Barbwire Fence.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Wood Fence.

PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.

IN ACCORDANCE WITH SECTION C, C.10.1.l

ELIN A001EW through A001FI

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence.

Including Fabric, Posts, Gates, Rails, Tension Wire, Barbwire/Barbed Tape.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Wood Fence. Including Posts and Gates.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Post Cut-off Flush.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Driven Post.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Posts Set in Concrete/Asphalt.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Square Foot to Patch and Refinish Concrete or Asphalt Surface.

Surface Depth to Match Surrounding.

Unit Price Each to Remove and Dispose of or Save and Store (for reuse) Barbwire Single Arm Support.

Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.

Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered

Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

PROVIDE A UNIT PRICE TO PERFORM EXPEDITED SERVICES.

IN ACCORDANCE WITH SECTION C, C.10.2

ELIN A001FJ

Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

SECTION J

EXHIBIT A

PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.

IN ACCORDANCE WITH SECTION C, C.10.3

ELIN A001FK THROUGH A001FP

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

6' Fence Height

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

12' Panel, 6' Height

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

12' Panel, 6' Height, Free-Standing

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

With Barbwire, 7' Fence Height

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

12' Panel, With Barbwire, 7' Height

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

12' Panel, With Barbwire, 7' Height, Free-Standing

Line Item 0002 Base Year - Indefinite Quantity Work ELIN A0016 through A0030

PROVIDE UNIT PRICES FOR INDEFINITE QUANTITY WORK

IN ACCORDANCE WITH SECTION C, Item 4 ELIN A0016 through A0030

1st Option - Non R

ATTACHMENT J-0200000-16
EXHIBIT LINE ITEM NUMBERS
IFB #N4008425B6300
EXHIBIT A - CLIN 0004
Line Item 0004 Non-Recurring Price - First Option Period
PROVIDE PRICES FOR FACILITY INVESTMENT - INDEFINITE DELIVERY / INDEFINITE QUANTITY - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4
ELINs B700 through B706
EA = Each LS = Lump Sum
ELINProduct NameDescription ExtendedEstimated QuantityUnit of IssueUnit Price (¥)Extended Price (¥)
B700Installation of Inspection Hatch to Exhaust DuctThe Contractor shall provide and install an inspection hatch to exhaust duct to enable inspection and maintenance for fire suppression detectors and nozzles.

The Contractor shall provide a catalog cut of inspection hatch to be installed. The inspection hatch shall meet the requirements of NFPA 96.

Prior to work, the Contractor shall coordinate with a customer for scheduling the work.

After the work the Contractor shall provide a drawing with location of newly installed inspection hatch.10EA0
B701Grease Trap Cleaning:
0.1 CM - 2.0 CMClean the grease trap, size 0.1 - 2.0 CM, and remove and dispose of grease to ensure grease trap functions properly.

Orders may be issued to clean grease traps that are not on the systems description for recurring work. Location will be provided in the orders.

Grease traps to be served under this item are for cooking oil.10EA0
B702Grease Trap Cleaning:
2.1 CM - 4.0 CMClean the grease trap, size 2.1 - 4.0 CM, and remove and dispose of grease to ensure grease trap functions properly.

Orders may be issued to clean grease traps that are not on the systems description for recurring work. Location will be provided in the orders.

Grease traps to be served under this item are for cooking oil.10EA0
B703Removal of Clogs in the Pipes connected to Grease TrapsThe Contractor shall remove clogs in the pipes connected to the grease traps, by using a vacuum truck. This is in support of NAVFAC PWD shop work.
Work may be required outside Government regular working hours.5EA0
B704Replacement of Wet Chemical Cylinder to the Fire Suppression SystemThe Contractor shall provide and replace a wet chemical cylinder in the cylinder box of the existing fire suppression system and provide all necessary piping and materials to ensure proper installation.10EA0
B705Unit Priced Labor Work - MUST BE NEGOTIATED BY KO.Provide labor to perform all Unit Priced Labor work per the scope and delivery schedule specified in the order.6,000,000LSNegotiated at time of order6,000,000
B706Material and Equipment Costs - MUST BE NEGOTIATED BY KO.Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Contractor's mark-up rate should be included in the proposed unit price. Use with ELIN B705.14,000,000LSNegotiated at time of order14,000,000
TOTAL NON-RECURRING WORK PRICE
FIRST OPTION PERIOD¥20,000,000

CUI//FEDCON [when filled in] Source Selection Information - See FAR 2.101 and 3.104 [when filled in]

Source Selection Information - See FAR 2.101 and 3.104 [when filled in]

2nd Option - Recurring

ATTACHMENT J-0200000-16
EXHIBIT LINE ITEM NUMBERS
IFB #N4008425B6300
EXHIBIT A - CLIN 0005
Line Item 0005 Recurring Work Price - Second Option Period
PROVIDE PRICES FOR FACILITY INVESTMENT - RECURRING WORK PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3
ELINs C001 through C004
ELIN /
Sub ELINDescriptionQuantityUnit of IssueUnit Price
(¥)Total Price
(¥)Fund Source
Recurring Work Spec Item 3
C001Exhaust Hoods and Ducts (Spec Item 3.1, 3.2)
3.1, 3.2 (Maintenance)
C001AAEX-1 (Bldg. 155)12MO¥0ST
C001ABEX-2 (Bldg. 500)12MO¥0ST
C001ACEX-3 (Bldg. 1446)12MO¥0ST
C001ADEX-4 (Bldg. 1446)12MO¥0ST
C001AEEX-5 (Bldg. 1446)12MO¥0ST
C001AFEX-6 (Bldg. 1523)12MO¥0ST
C001AGEX-7 (Bldg. 1523)12MO¥0ST
C001AHEX-8 (Bldg. 1523)12MO¥0ST
C001AJEX-9 (Bldg. 1523)12MO¥0ST
C001AKEX-10 (Bldg. 1523)12MO¥0ST
C001ALEX-11 (Bldg. 1649)12MO¥0ST
C001AMEX-12 (Bldg. 1649)12MO¥0ST
C001ANEX-13 (Bldg. 1649)12MO¥0ST
C001APEX-14 (Bldg. 1649)12MO¥0ST
C001AQEX-15 (Bldg. 5140)12MO¥0ST
C001AREX-16 (Bldg. 5141)12MO¥0ST
C001ASEX-17 (Bldg. 7009)12MO¥0ST
Maintenance - Subtotal¥0ST
3.2 (Cleaning)
C001ATEX-1 (Bldg. 155)12MO¥0ST
C001AUEX-2 (Bldg. 500)12MO¥0MWR
C001AVEX-3 (Bldg. 1446)12MO¥0MWR
C001AWEX-4 (Bldg. 1446)12MO¥0MWR
C001AXEX-5 (Bldg. 1446)12MO¥0MWR
C001AYEX-6 (Bldg. 1523)12MO¥0Galley
C001AZEX-7 (Bldg. 1523)12MO¥0Galley
C001BAEX-8 (Bldg. 1523)12MO¥0Galley
C001BBEX-9 (Bldg. 1523)12MO¥0Galley
C001BCEX-10 (Bldg. 1523)12MO¥0Galley
C001BDEX-11 (Bldg. 1649)12MO¥0MWR
C001BEEX-12 (Bldg. 1649)12MO¥0MWR
C001BFEX-13 (Bldg. 1649)12MO¥0MWR
C001BGEX-14 (Bldg. 1649)12MO¥0MWR
C001BHEX-15 (Bldg. 5140)12MO¥0MWR
C001BJEX-16 (Bldg. 5141)12MO¥0ST
C001BKEX-17 (Bldg. 7009)12MO¥0NBU-7
Cleaning - Subtotal¥0
Exhaust Hoods and Ducts - SUBTOTAL¥0
ELIN /
Sub ELINDescriptionQuantityUnit of IssueUnit Price
(¥)Total Price
(¥)Fund Source
C002Grease Traps (Spec Item 3.1, 3.2)
3.1, 3.2 (Maintenance)
C002AACF-1 (Bldg. 500)12MO¥0ST
C002ABCF-2 (Bldg. 1446)12MO¥0ST
C002ACCF-3 (Bldg. 1446)12MO¥0ST
C002ADCF-4 (Bldg. 1523)12MO¥0ST
C002AECF-5 (Bldg. 1523)12MO¥0ST
C002AFCF-6 (Bldg. 1523)12MO¥0ST
C002AGCF-7 (Bldg. 1649)12MO¥0ST
C002AHCF-8 (Bldg. 5140)12MO¥0ST
C002AJCF-9 (Bldg. 7009)12MO¥0ST
C002AKDE-1 (Bldg. 1436)12MO¥0ST
C002ALDE-2 (Bldg. 5127)12MO¥0ST
Maintenance - Subtotal¥0
3.2 (Cleaning)
C002AMCF-1 (Bldg. 500)12MO¥0MWR
C002ANCF-2 (Bldg. 1446)12MO¥0MWR
C002APCF-3 (Bldg. 1446)12MO¥0MWR
C002AQCF-4 (Bldg. 1523)12MO¥0Galley
C002ARCF-5 (Bldg. 1523)12MO¥0Galley
C002ASCF-6 (Bldg. 1523)12MO¥0Galley
C001ATCF-7 (Bldg. 1649)12MO¥0MWR
C001AUCF-8 (Bldg. 5140)12MO¥0MWR
C001AVCF-9 (Bldg. 7009)12MO¥0NBU-7
C001AWDE-1 (Bldg. 1436)12MO¥0DECA-S
C001AXDE-2 (Bldg. 5127)12MO¥0DECA-H
Cleaning - Subtotal¥0
Grease Traps - SUBTOTAL¥0
ELIN /
Sub ELINDescriptionQuantityUnit of IssueUnit Price
(¥)Total Price
(¥)Fund Source
C003Fire Suppression Systems (Spec Item 3.1, 3.3)
C003AAFS-1 (Bldg. 129)12MO¥0NEX
C003ABFS-2 (Bldg. 129)12MO¥0NEX
C003ACFS-3 (Bldg. 129)12MO¥0NEX
C003ADFS-4 (Bldg. 155)12MO¥0ST
C003AEFS-5 (Bldg. 500)12MO¥0MWR
C003AFFS-6 (Bldg. 1446)12MO¥0MWR
C003AGFS-7 (Bldg. 1446)12MO¥0MWR
C003AHFS-8 (Bldg. 1446)12MO¥0MWR
C003AJFS-9 (Bldg. 1446)12MO¥0MWR
C003AKFS-10 (Bldg. 1446)12MO¥0MWR
C003ALFS-11 (Bldg. 1446)12MO¥0MWR
C003AMFS-12 (Bldg. 1523)12MO¥0Galley
C003ANFS-13 (Bldg. 1523)12MO¥0Galley
C003APFS-14 (Bldg. 1523)12MO¥0Galley
C003AQFS-15 (Bldg. 1523)12MO¥0Galley
C003ARFS-16 (Bldg. 1523)12MO¥0Galley
C003ASFS-17 (Bldg. 1649, Chili's)12MO¥0MWR/Chili's
C003ATFS-18 (Bldg. 1649, Chili's)12MO¥0MWR/Chili's
C003AUFS-19 (Bldg. 1649, Chili's)12MO¥0MWR/Chili's
C003AVFS-20 (Bldg. 1649, Chili's)12MO¥0MWR/Chili's
C003AWFS-21 (Bldg. 1649)12MO¥0MWR
C003AXFS-22 (Bldg. 1649)12MO¥0MWR
C003AYFS-23 (Bldg. 1649)12MO¥0MWR
C003AZFS-24 (Bldg. 1649)12MO¥0MWR
C003BAFS-25 (Bldg. 1669)12MO¥0MWR
C003BBFS-26 (Bldg. 1669)12MO¥0MWR
C003BCFS-27 (Bldg. 2001)12MO¥0DoDEA
C003BDFS-28 (Bldg. 5114)12MO¥0DoDEA
C003BEFS-29 (Bldg. 5118)12MO¥0NEX
C003BFFS-30 (Bldg. 5118)12MO¥0NEX
C003BGFS-31 (Bldg. 5140)12MO¥0MWR
C003BHFS-32 (Bldg. 5141)12MO¥0ST
C003BJFS-33 (Bldg. 5158)12MO¥0MWR
C003BKFS-34 (Bldg. 7009)12MO¥0NBU-7
C003BLFS-35 (Bldg. 7009)12MO¥0NBU-7
Fire Suppression Systems - SUBTOTAL¥0
ELIN /
Sub ELINDescriptionQuantityUnit of IssueUnit Price
(¥)Total Price
(¥)Fund Source
C004Kitchen Hood Washing Systems (Spec Items 3.1, 3.2)
C004AAWA-1 (Bldg. 500)12MO¥0ST
C004ABWA-2 (Bldg. 1446)12MO¥0ST
C004ACWA-3 (Bldg. 1446)12MO¥0ST
C004ADWA-4 (Bldg. 1446)12MO¥0ST
C004AEWA-5 (Bldg. 1523)12MO¥0ST
C004AFWA-6 (Bldg. 1523)12MO¥0ST
C004AGWA-7 (Bldg. 1523)12MO¥0ST
C004AHWA-8 (Bldg. 1523)12MO¥0ST
C004AJWA-9 (Bldg. 1523)12MO¥0ST
C004AKWA-10 (Bldg. 1649)12MO¥0ST
C004ALWA-11 (Bldg. 1649)12MO¥0ST
C004AMWA-12 (Bldg. 1649)12MO¥0ST
C004ANWA-13 (Bldg. 5114)12MO¥0ST
Kitchen Hood Washing Systems - SUBTOTAL¥0

TOTAL RECURRING WORK PRICE - SECOND OPTION PERIOD ¥0

Source Selection Information - See FAR 2.101 and 3.104 [when filled in]

Source Selection Information - See FAR 2.101 and 3.104 [when filled in]

2nd Option - Non R

ATTACHMENT J-0200000-16
EXHIBIT LINE ITEM NUMBERS
IFB #N4008425B6300
EXHIBIT A - CLIN 0006
Line Item 0006 Non-Recurring Price - Second Option Period
PROVIDE PRICES FOR FACILITY INVESTMENT - INDEFINITE DELIVERY / INDEFINITE QUANTITY - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4
ELINs C700 through C706
EA = Each LS = Lump Sum
ELINProduct NameDescription ExtendedEstimated QuantityUnit of IssueUnit Price (¥)Extended Price (¥)
C700Installation of Inspection Hatch to Exhaust DuctThe Contractor shall provide and install an inspection hatch to exhaust duct to enable inspection and maintenance for fire suppression detectors and nozzles.

The Contractor shall provide a catalog cut of inspection hatch to be installed. The inspection hatch shall meet the requirements of NFPA 96.

Prior to work, the Contractor shall coordinate with a customer for scheduling the work.

After the work the Contractor shall provide a drawing with location of newly installed inspection hatch.10EA0
C701Grease Trap Cleaning:
0.1 CM - 2.0 CMClean the grease trap, size 0.1 - 2.0 CM, and remove and dispose of grease to ensure grease trap functions properly.

Orders may be issued to clean grease traps that are not on the systems description for recurring work. Location will be provided in the orders.

Grease traps to be served under this item are for cooking oil.10EA0
C702Grease Trap Cleaning:
2.1 CM - 4.0 CMClean the grease trap, size 2.1 - 4.0 CM, and remove and dispose of grease to ensure grease trap functions properly.

Orders may be issued to clean grease traps that are not on the systems description for recurring work. Location will be provided in the orders.

Grease traps to be served under this item are for cooking oil.10EA0
C703Removal of Clogs in the Pipes connected to Grease TrapsThe Contractor shall remove clogs in the pipes connected to the grease traps, by using a vacuum truck. This is in support of NAVFAC PWD shop work.
Work may be required outside Government regular working hours.5EA0
C704Replacement of Wet Chemical Cylinder to the Fire Suppression SystemThe Contractor shall provide and replace a wet chemical cylinder in the cylinder box of the existing fire suppression system and provide all necessary piping and materials to ensure proper installation.10EA0
C705Unit Priced Labor Work - MUST BE NEGOTIATED BY KO.Provide labor to perform all Unit Priced Labor work per the scope and delivery schedule specified in the order.6,000,000LSNegotiated at time of order6,000,000
C706Material and Equipment Costs - MUST BE NEGOTIATED BY KO.Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Contractor's mark-up rate should be included in the proposed unit price. Use with ELIN C705.14,000,000LSNegotiated at time of order14,000,000
TOTAL NON-RECURRING WORK PRICE
SECOND OPTION YEAR¥20,000,000

CUI//FEDCON [when filled in] Source Selection Information - See FAR 2.101 and 3.104 [when filled in]

Source Selection Information - See FAR 2.101 and 3.104 [when filled in]

3rd Option -Recurring

ATTACHMENT J-0200000-16
EXHIBIT LINE ITEM NUMBERS
IFB #N4008425B6300
EXHIBIT A - CLIN 0007
Line Item 0007 Recurring Work Price - Third Option Period
PROVIDE PRICES FOR FACILITY INVESTMENT - RECURRING WORK PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3
ELINs D001 through D004
ELIN /
Sub ELINDescriptionQuantityUnit of IssueUnit Price
(¥)Total Price
(¥)Fund Source
Recurring Work Spec Item 3
D001Exhaust Hoods and Ducts (Spec Item 3.1, 3.2)
3.1, 3.2 (Maintenance)
D001AAEX-1 (Bldg. 155)12MO¥0ST
D001ABEX-2 (Bldg. 500)12MO¥0ST
D001ACEX-3 (Bldg. 1446)12MO¥0ST
D001ADEX-4 (Bldg. 1446)12MO¥0ST
D001AEEX-5 (Bldg. 1446)12MO¥0ST
D001AFEX-6 (Bldg. 1523)12MO¥0ST
D001AGEX-7 (Bldg. 1523)12MO¥0ST
D001AHEX-8 (Bldg. 1523)12MO¥0ST
D001AJEX-9 (Bldg. 1523)12MO¥0ST
D001AKEX-10 (Bldg. 1523)12MO¥0ST
D001ALEX-11 (Bldg. 1649)12MO¥0ST
D001AMEX-12 (Bldg. 1649)12MO¥0ST
D001ANEX-13 (Bldg. 1649)12MO¥0ST
D001APEX-14 (Bldg. 1649)12MO¥0ST
D001AQEX-15 (Bldg. 5140)12MO¥0ST
D001AREX-16 (Bldg. 5141)12MO¥0ST
D001ASEX-17 (Bldg. 7009)12MO¥0ST
Maintenance - Subtotal¥0ST
3.2 (Cleaning)
D001ATEX-1 (Bldg. 155)12MO¥0ST
D001AUEX-2 (Bldg. 500)12MO¥0MWR
D001AVEX-3 (Bldg. 1446)12MO¥0MWR
D001AWEX-4 (Bldg. 1446)12MO¥0MWR
D001AXEX-5 (Bldg. 1446)12MO¥0MWR
D001AYEX-6 (Bldg. 1523)12MO¥0Galley
D001AZEX-7 (Bldg. 1523)12MO¥0Galley
D001BAEX-8 (Bldg. 1523)12MO¥0Galley
D001BBEX-9 (Bldg. 1523)12MO¥0Galley
D001BCEX-10 (Bldg. 1523)12MO¥0Galley
D001BDEX-11 (Bldg. 1649)12MO¥0MWR
D001BEEX-12 (Bldg. 1649)12MO¥0MWR
D001BFEX-13 (Bldg. 1649)12MO¥0MWR
D001BGEX-14 (Bldg. 1649)12MO¥0MWR
D001BHEX-15 (Bldg. 5140)12MO¥0MWR
D001BJEX-16 (Bldg. 5141)12MO¥0ST
D001BKEX-17 (Bldg. 7009)12MO¥0NBU-7
Cleaning - Subtotal¥0
Exhaust Hoods and Ducts - SUBTOTAL¥0
ELIN /
Sub ELINDescriptionQuantityUnit of IssueUnit Price
(¥)Total Price
(¥)Fund Source
D002Grease Traps (Spec Item 3.1, 3.2)
3.1, 3.2 (Maintenance)
D002AACF-1 (Bldg. 500)12MO¥0ST
D002ABCF-2 (Bldg. 1446)12MO¥0ST
D002ACCF-3 (Bldg. 1446)12MO¥0ST
D002ADCF-4 (Bldg. 1523)12MO¥0ST
D002AECF-5 (Bldg. 1523)12MO¥0ST
D002AFCF-6 (Bldg. 1523)12MO¥0ST
D002AGCF-7 (Bldg. 1649)12MO¥0ST
D002AHCF-8 (Bldg. 5140)12MO¥0ST
D002AJCF-9 (Bldg. 7009)12MO¥0ST
D002AKDE-1 (Bldg. 1436)12MO¥0ST
D002ALDE-2 (Bldg. 5127)12MO¥0ST
Maintenance - Subtotal¥0
3.2 (Cleaning)
D002AMCF-1 (Bldg. 500)12MO¥0MWR
D002ANCF-2 (Bldg. 1446)12MO¥0MWR
D002APCF-3 (Bldg. 1446)12MO¥0MWR
D002AQCF-4 (Bldg. 1523)12MO¥0Galley
D002ARCF-5 (Bldg. 1523)12MO¥0Galley
D002ASCF-6 (Bldg. 1523)12MO¥0Galley
D001ATCF-7 (Bldg. 1649)12MO¥0MWR
D001AUCF-8 (Bldg. 5140)12MO¥0MWR
D001AVCF-9 (Bldg. 7009)12MO¥0NBU-7
D001AWDE-1 (Bldg. 1436)12MO¥0DECA-S
D001AXDE-2 (Bldg. 5127)12MO¥0DECA-H
Cleaning - Subtotal¥0
Grease Traps - SUBTOTAL¥0
ELIN /
Sub ELINDescriptionQuantityUnit of IssueUnit Price
(¥)Total Price
(¥)Fund Source
D003Fire Suppression Systems (Spec Item 3.1, 3.3)
D003AAFS-1 (Bldg. 129)12MO¥0NEX
D003ABFS-2 (Bldg. 129)12MO¥0NEX
D003ACFS-3 (Bldg. 129)12MO¥0NEX
D003ADFS-4 (Bldg. 155)12MO¥0ST
D003AEFS-5 (Bldg. 500)12MO¥0MWR
D003AFFS-6 (Bldg. 1446)12MO¥0MWR
D003AGFS-7 (Bldg. 1446)12MO¥0MWR
D003AHFS-8 (Bldg. 1446)12MO¥0MWR
D003AJFS-9 (Bldg. 1446)12MO¥0MWR
D003AKFS-10 (Bldg. 1446)12MO¥0MWR
D003ALFS-11 (Bldg. 1446)12MO¥0MWR
D003AMFS-12 (Bldg. 1523)12MO¥0Galley
D003ANFS-13 (Bldg. 1523)12MO¥0Galley
D003APFS-14 (Bldg. 1523)12MO¥0Galley
D003AQFS-15 (Bldg. 1523)12MO¥0Galley
D003ARFS-16 (Bldg. 1523)12MO¥0Galley
D003ASFS-17 (Bldg. 1649, Chili's)12MO¥0MWR/Chili's
D003ATFS-18 (Bldg. 1649, Chili's)12MO¥0MWR/Chili's
D003AUFS-19 (Bldg. 1649, Chili's)12MO¥0MWR/Chili's
D003AVFS-20 (Bldg. 1649, Chili's)12MO¥0MWR/Chili's
D003AWFS-21 (Bldg. 1649)12MO¥0MWR
D003AXFS-22 (Bldg. 1649)12MO¥0MWR
D003AYFS-23 (Bldg. 1649)12MO¥0MWR
D003AZFS-24 (Bldg. 1649)12MO¥0MWR
D003BAFS-25 (Bldg. 1669)12MO¥0MWR
D003BBFS-26 (Bldg. 1669)12MO¥0MWR
D003BCFS-27 (Bldg. 2001)12MO¥0DoDEA
D003BDFS-28 (Bldg. 5114)12MO¥0DoDEA
D003BEFS-29 (Bldg. 5118)12MO¥0NEX
D003BFFS-30 (Bldg. 5118)12MO¥0NEX
D003BGFS-31 (Bldg. 5140)12MO¥0MWR
D003BHFS-32 (Bldg. 5141)12MO¥0ST
D003BJFS-33 (Bldg. 5158)12MO¥0MWR
D003BKFS-34 (Bldg. 7009)12MO¥0NBU-7
D003BLFS-35 (Bldg. 7009)12MO¥0NBU-7
Fire Suppression Systems - SUBTOTAL¥0
ELIN /
Sub ELINDescriptionQuantityUnit of IssueUnit Price
(¥)Total Price
(¥)Fund Source
D004Kitchen Hood Washing Systems (Spec Items 3.1, 3.2)
D004AAWA-1 (Bldg. 500)12MO¥0ST
D004ABWA-2 (Bldg. 1446)12MO¥0ST
D004ACWA-3 (Bldg. 1446)12MO¥0ST
D004ADWA-4 (Bldg. 1446)12MO¥0ST
D004AEWA-5 (Bldg. 1523)12MO¥0ST
D004AFWA-6 (Bldg. 1523)12MO¥0ST
D004AGWA-7 (Bldg. 1523)12MO¥0ST
D004AHWA-8 (Bldg. 1523)12MO¥0ST
D004AJWA-9 (Bldg. 1523)12MO¥0ST
D004AKWA-10 (Bldg. 1649)12MO¥0ST
D004ALWA-11 (Bldg. 1649)12MO¥0ST
D004AMWA-12 (Bldg. 1649)12MO¥0ST
D004ANWA-13 (Bldg. 5114)12MO¥0ST
Kitchen Hood Washing Systems - SUBTOTAL¥0

TOTAL RECURRING LINE ITEMS - THIRD OPTION PERIOD ¥0

CUI//FEDCON [when filled in] Source Selection Information - See FAR 2.101 and 3.104 [when filled in]

Source Selection Information - See FAR 2.101 and 3.104 [when filled in]

3rd Option - Non R

ATTACHMENT J-0200000-16
EXHIBIT LINE ITEM NUMBERS
IFB #N4008425B6300
EXHIBIT A - CLIN 0008
Line Item 0008 Non-Recurring Price - Third Option Period
PROVIDE PRICES FOR FACILITY INVESTMENT - INDEFINITE DELIVERY / INDEFINITE QUANTITY - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4
ELINs D700 through D706
EA = Each LS = Lump Sum
ELINProduct NameDescription ExtendedEstimated QuantityUnit of IssueUnit Price (¥)Extended Price (¥)
D700Installation of Inspection Hatch to Exhaust DuctThe Contractor shall provide and install an inspection hatch to exhaust duct to enable inspection and maintenance for fire suppression detectors and nozzles.

The Contractor shall provide a catalog cut of inspection hatch to be installed. The inspection hatch shall meet the requirements of NFPA 96.

Prior to work, the Contractor shall coordinate with a customer for scheduling the work.

After the work the Contractor shall provide a drawing with location of newly installed inspection hatch.10EA0
D701Grease Trap Cleaning:
0.1 CM - 2.0 CMClean the grease trap, size 0.1 - 2.0 CM, and remove and dispose of grease to ensure grease trap functions properly.

Orders may be issued to clean grease traps that are not on the systems description for recurring work. Location will be provided in the orders.

Grease traps to be served under this item are for cooking oil.10EA0
D702Grease Trap Cleaning:
2.1 CM - 4.0 CMClean the grease trap, size 2.1 - 4.0 CM, and remove and dispose of grease to ensure grease trap functions properly.

Orders may be issued to clean grease traps that are not on the systems description for recurring work. Location will be provided in the orders.

Grease traps to be served under this item are for cooking oil.10EA0
D703Removal of Clogs in the Pipes connected to Grease TrapsThe Contractor shall remove clogs in the pipes connected to the grease traps, by using a vacuum truck. This is in support of NAVFAC PWD shop work.
Work may be required outside Government regular working hours.5EA0
D704Replacement of Wet Chemical Cylinder to the Fire Suppression SystemThe Contractor shall provide and replace a wet chemical cylinder in the cylinder box of the existing fire suppression system and provide all necessary piping and materials to ensure proper installation.10EA0
D705Unit Priced Labor Work - MUST BE NEGOTIATED BY KO.Provide labor to perform all Unit Priced Labor work per the scope and delivery schedule specified in the order.6,000,000LSNegotiated at time of order6,000,000
D706Material and Equipment Costs - MUST BE NEGOTIATED BY KO.Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Contractor's mark-up rate should be included in the proposed unit price. Use with ELIN D705.14,000,000LSNegotiated at time of order14,000,000
TOTAL NON-RECURRING WORK PRICE
THIRD OPTION PERIOD¥20,000,000

CUI//FEDCON [when filled in] Source Selection Information - See FAR 2.101 and 3.104 [when filled in]

Source Selection Information - See FAR 2.101 and 3.104 [when filled in]

4th Option-Recurring

ATTACHMENT J-0200000-16
EXHIBIT LINE ITEM NUMBERS
IFB #N4008425B6300
EXHIBIT A - CLIN 0009
Line Item 0009 Recurring Work Price - Fourth Option Period
PROVIDE PRICES FOR FACILITY INVESTMENT - RECURRING WORK PRICE - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3
ELINs E001 through E004
ELIN /
Sub ELINDescriptionQuantityUnit of IssueUnit Price
(¥)Total Price
(¥)Fund Source
Recurring Work Spec Item 3
E001Exhaust Hoods and Ducts (Spec Item 3.1, 3.2)
3.1, 3.2 (Maintenance)
E001AAEX-1 (Bldg. 155)12MO¥0ST
E001ABEX-2 (Bldg. 500)12MO¥0ST
E001ACEX-3 (Bldg. 1446)12MO¥0ST
E001ADEX-4 (Bldg. 1446)12MO¥0ST
E001AEEX-5 (Bldg. 1446)12MO¥0ST
E001AFEX-6 (Bldg. 1523)12MO¥0ST
E001AGEX-7 (Bldg. 1523)12MO¥0ST
E001AHEX-8 (Bldg. 1523)12MO¥0ST
E001AJEX-9 (Bldg. 1523)12MO¥0ST
E001AKEX-10 (Bldg. 1523)12MO¥0ST
E001ALEX-11 (Bldg. 1649)12MO¥0ST
E001AMEX-12 (Bldg. 1649)12MO¥0ST
E001ANEX-13 (Bldg. 1649)12MO¥0ST
E001APEX-14 (Bldg. 1649)12MO¥0ST
E001AQEX-15 (Bldg. 5140)12MO¥0ST
E001AREX-16 (Bldg. 5141)12MO¥0ST
E001ASEX-17 (Bldg. 7009)12MO¥0ST
Maintenance - Subtotal¥0ST
3.2 (Cleaning)
E001ATEX-1 (Bldg. 155)12MO¥0ST
E001AUEX-2 (Bldg. 500)12MO¥0MWR
E001AVEX-3 (Bldg. 1446)12MO¥0MWR
E001AWEX-4 (Bldg. 1446)12MO¥0MWR
E001AXEX-5 (Bldg. 1446)12MO¥0MWR
E001AYEX-6 (Bldg. 1523)12MO¥0Galley
E001AZEX-7 (Bldg. 1523)12MO¥0Galley
E001BAEX-8 (Bldg. 1523)12MO¥0Galley
E001BBEX-9 (Bldg. 1523)12MO¥0Galley
E001BCEX-10 (Bldg. 1523)12MO¥0Galley
E001BDEX-11 (Bldg. 1649)12MO¥0MWR
E001BEEX-12 (Bldg. 1649)12MO¥0MWR
E001BFEX-13 (Bldg. 1649)12MO¥0MWR
E001BGEX-14 (Bldg. 1649)12MO¥0MWR
E001BHEX-15 (Bldg. 5140)12MO¥0MWR
E001BJEX-16 (Bldg. 5141)12MO¥0ST
E001BKEX-17 (Bldg. 7009)12MO¥0NBU-7
Cleaning - Subtotal¥0
Exhaust Hoods and Ducts - SUBTOTAL¥0
ELIN /
Sub ELINDescriptionQuantityUnit of IssueUnit Price
(¥)Total Price
(¥)Fund Source
E002Grease Traps (Spec Item 3.1, 3.2)
3.1, 3.2 (Maintenance)
E002AACF-1 (Bldg. 500)12MO¥0ST
E002ABCF-2 (Bldg. 1446)12MO¥0ST
E002ACCF-3 (Bldg. 1446)12MO¥0ST
E002ADCF-4 (Bldg. 1523)12MO¥0ST
E002AECF-5 (Bldg. 1523)12MO¥0ST
E002AFCF-6 (Bldg. 1523)12MO¥0ST
E002AGCF-7 (Bldg. 1649)12MO¥0ST
E002AHCF-8 (Bldg. 5140)12MO¥0ST
E002AJCF-9 (Bldg. 7009)12MO¥0ST
E002AKDE-1 (Bldg. 1436)12MO¥0ST
E002ALDE-2 (Bldg. 5127)12MO¥0ST
Maintenance - Subtotal¥0
3.2 (Cleaning)
E002AMCF-1 (Bldg. 500)12MO¥0MWR
E002ANCF-2 (Bldg. 1446)12MO¥0MWR
E002APCF-3 (Bldg. 1446)12MO¥0MWR
E002AQCF-4 (Bldg. 1523)12MO¥0Galley
E002ARCF-5 (Bldg. 1523)12MO¥0Galley
E002ASCF-6 (Bldg. 1523)12MO¥0Galley
E001ATCF-7 (Bldg. 1649)12MO¥0MWR
E001AUCF-8 (Bldg. 5140)12MO¥0MWR
E001AVCF-9 (Bldg. 7009)12MO¥0NBU-7
E001AWDE-1 (Bldg. 1436)12MO¥0DECA-S
E001AXDE-2 (Bldg. 5127)12MO¥0DECA-H
Cleaning - Subtotal¥0
Grease Traps - SUBTOTAL¥0
ELIN /
Sub ELINDescriptionQuantityUnit of IssueUnit Price
(¥)Total Price
(¥)Fund Source
E003Fire Suppression Systems (Spec Item 3.1, 3.3)
E003AAFS-1 (Bldg. 129)12MO¥0NEX
E003ABFS-2 (Bldg. 129)12MO¥0NEX
E003ACFS-3 (Bldg. 129)12MO¥0NEX
E003ADFS-4 (Bldg. 155)12MO¥0ST
E003AEFS-5 (Bldg. 500)12MO¥0MWR
E003AFFS-6 (Bldg. 1446)12MO¥0MWR
E003AGFS-7 (Bldg. 1446)12MO¥0MWR
E003AHFS-8 (Bldg. 1446)12MO¥0MWR
E003AJFS-9 (Bldg. 1446)12MO¥0MWR
E003AKFS-10 (Bldg. 1446)12MO¥0MWR
E003ALFS-11 (Bldg. 1446)12MO¥0MWR

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .